2019_0802_Reach_B_Presolicitation_Notice.pdf
PDF 112 KB Posted
- Attached to
- Reach B Levee Improvement Construction Project Federal contract opportunity
- Solicitation number
- W9123819B0020
About this file
Reach B Pre-solicitation Notice
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Natomas Basin Reach B Levee Improvement Construction Project
The Government anticipates issuing an Invitation for Bids (IFB) with the intent of awarding one
Firm-Fixed Price construction contract for the Natomas Basin Reach B Levee Improvement
Construction Project to the lowest-priced responsible bidder whose bid conforms (i.e., is responsive) to the solicitation requirements.
Reach B Project Description:
Reach B begins just south of the intersection of Garden Highway and Power Line Road
(Approximate STA 650+50) and extends downstream to just south of Farm Road (Approximate
STA 772+50). See area map below.
Levee improvements for Reach B include:
A landside adjacent levee will be constructed to match existing top of levee (TOL) elevations in the first year of construction.
Settlement is expected to occur during the initial construction period with additional settlement over the following year.
o Settlement that occurs after the first year of construction shall be reconciled during the second year of construction and repair of settlement of asphalt (i.e., paving) along the landside edge Garden Highway will also be completed during this time.
Seepage berms will also be constructed along Reach B.
Pumping Plant (PP) 3 will undergo extensive modifications o Four new pumps will be installed along with the associated electrical improvements. Each new pump will have its own separate outfall pipe.
o A new outfall for each of the four pipes will include a headwall, flap gates, siphon breaker, positive closure vault and piping.
o The sump will be improved to include reinforced concrete baffle walls to separate each pump station.
o Construction in this area will also include relief wells and lining of the existing canal in proximity to PP3.
Construction of the new outfall pipes will require raising the Garden Highway from STA 675+17.44 to 678+50. Construction activities will involve temporary, partial and full shutdowns of Garden Highway.
In accordance with the DFAR 236.204, the magnitude disclosure of this construction project is between $25M and $100M.
The applicable FSC Code: Y1LC, Construction of Tunnels and Subsurface Structures and North
American Industry Classification System Code (NAICS): 237990 Other Heavy and Civil
Engineering Construction. The small business size standard is $36.5 million.
The solicitation (IFB) is estimated to be issued on or about 15 August 2019 with bids due approximately 30 calendar days later.
This acquisition will proceed as an unrestricted, full and open competition.
The site visit date, time and location will be identified in the solicitation.
BE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED OR REVISED AT
ANY TIME DURING THE PRE-SOLICITATION, SOLICITATION, SELECTION,
EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS.
Prospective bidders should stay posted to this notice for updates.
File details come from the government source that posted it.