Spec. No. 2190

Pricing Schedule (Phase 2B)

Hamilton City Flood Damage Reduction and Ecosystem Restoration Project Phase 2B Glenn County, California

Base Contract (Sta. 0+00 to Sta. 129+61 and Sta. 195+50 to Sta. 216+00)

CLIN
Description
Estimated Quantity
Unit of Measure
Unit Price
Total Price
0001
Mobilization and Demobilization
1
JOB
$
$
0002
Clearing and Grubbing*
21
AC
$
$
0003
Temporary Storm Water Pollution Control
1
JOB
$
$
0004
J Levee Aggregate Surface Course Removal*
2,320
CY
$
$
0005
J Levee Stripping*
10,900
CY
$
$
0006
J Levee Degrade Unsuitable Material Disposal*
25,000
CY
$
$
0007
J Levee Degrade*
99,600
CY
$
$
0008
Demolition and Removal
1
JOB
$
$
0009
Phase 2A Waterside Maintenance Road Surface Course*
2,320
CY
$
$
0010
Phase 2A Drainage Ditch Excavation*
2,500
CY
$
$
0011
Topsoil Stripping*
6,450
CY
$
$
0012
Observation Trench Excavation*
12,700
CY
$
$
0013
Embankment Fill*
43,500
CY
$
$
0014
Random Fill*
2,400
CY
$
$
0015
Well Abandonment
1
EA
$
$
0016
Grass Seeding and Erosion Control*
21
AC
$
$
0017
Aggregate Surface Course*
3,602
TN
5,000
TN
$
$
0018
Deer Fence*
2,950
LF
$
$
0019
Post and Cable Fence*
1,150
LF
$
$
0020
Stone Protection*
12,200
TN
$
$
0021
Pipe Gates
2
EA
$
$
0022
Double Swing Gates*
1
EA
$
$
0023
Tree Removal
1
JOB
$
$
TOTAL ESTIMATED PRICE
$

NOTE: AC is acre, CY is cubic yard, EA is each, TN is ton, SY is square yard, and LF is linear foot.

*Indicates quantity is estimated and subject to Federal Acquisition Regulation clause 52.211-18 Variation in Estimated Quantity.

Option 1 (Sta. 129+61 to 195+50)

CLIN
Description
Estimated Quantity
Unit of Measure
Unit Price
Total Price
1001
Clearing and Grubbing*
23
AC
$
$
1002
Temporary Storm Water Pollution Control
1
JOB
$
$
1003
Demolition and Removal
1
JOB
$
$
1004
J Levee Degrade*
28,500
CY
$
$
1005
Topsoil Stripping*
10,100
CY
$
$
1006
Observation Trench Excavation*
26,400
CY
$
$
1007
Drainage Ditch Excavation*
2,600
CY
$
$
1008
Pipe Trench Excavation*
5,900
CY
$
$
1009
Embankment Fill*
112,400
CY
$
$
1010
Random Fill*
4,400
CY
$
$
1011
30” Steel Pipe*
2,550
LF
$
$
1012
30” Flap Gate
1
EA
$
$
1013
Concrete Riser, Inlet, and Outlet Structures
1
JOB
$
$
1014
48” RCP Culvert
160
LF
$
$
1015
48” Sluice Gate
1
EA
$
$
1016
48” Flap Gate
1
EA
$
$
1017
Aggregate Surface Course*
6,500
TN
$
$
1018
Grass Seeding and Erosion Control*
23
AC
$
$
1019
Deer Fence*
6,950
LF
$
$
1020
Double Swing Gates*
4
EA
$
$
1021
Stone Protection*
150
TN
$
$
1022
Irrigation Systems Removal
1
JOB
$
$
1023
Tree Removal
1
JOB
$
$
1024
Existing Pump Structure Relocation
1
JOB
$
$
TOTAL ESTIMATED PRICE
$

NOTE: AC is acre, CY is cubic yard, EA is each, TN is ton, SY is square yard, and LF is linear foot.

*Indicates quantity is estimated and subject to Federal Acquisition Regulation clause 52.211-18 Variation in Estimated Quantity.