Hamilton City Phase 2B Levee Improvement Construction Project
Solicitation number
W9123819B0009
Issued by

About this file

Hamilton City Phase 2B Pre-Solicitation Notice

View the file

Other files

File Type Posted
2019_0919_19B0009_AMD_04.pdf PDF
2019_0917_19B0009_AMD_03.pdf PDF
2190_Pricing_Schedule-AMD-02.docx DOCX document
6-04-2253-AMD-02.pdf PDF
2190_Pricing_Schedule-AMD-02.pdf PDF
2019_0916_19B0009_AMD_02.pdf PDF
2190-AMD-02.pdf PDF
2019_0906_19B0009_Ham_City_Ph2B_Site_Visit_Attendance_Roster.pdf PDF
2019_0829_19B0009_AMD_01.pdf PDF
Exhibit_A_Pricing_Schedule.docx DOCX document
Attachment_03_Wage_Determination.pdf PDF
2019_0823_19B0009_Ham_City_Ph2B.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hamilton City Phase 2B Levee Improvement Construction Project

The Government anticipates issuing an Invitation for Bids (IFB) with the intent of awarding one

Firm-Fixed Price construction contract for the Hamilton City Phase 2B Levee Improvement

Construction Project to the lowest-priced responsible bidder whose bid conforms (i.e., is responsive) to the solicitation requirements.

Hamilton City Phase 2B Project Description:

The Hamilton City Flood Damage Reduction and Ecosystem Restoration Project is located in the areas surrounding Hamilton City, CA along the Sacramento River. The project objectives are to provide Hamilton City with a 1 in 75 year level of flood protection and reconnecting roughly 900 acres of floodplain to the Sacramento River by replacing the existing J levee with a new setback levee. The reconnected floodplain will be restored with native vegetation to provide riparian and other types of habitat. The Phase 2B portion of the project will focus on constructing the final third of the new levee which is approximately two miles in length. The previous two phases, Phase 1 were completed in 2017 and 2018, respectively. Phase 2B will be the connecting segment between Phase 2A at the north and Phase 1 at the south. (See Map Below)

In accordance with the DFAR 236.204(i), the magnitude disclosure of this construction project is between $10M and $25M.

The applicable FSC Code: Y1LC, Construction of Tunnels and Subsurface Structures and North

American Industry Classification System Code (NAICS): 237990 Other Heavy and Civil

Engineering Construction. The small business size standard is $36.5 million.

The solicitation (IFB) is estimated to be issued on or about 15 August 2019 with bids due approximately 30 calendar days later.

This acquisition will proceed as HUBZone Small Business Set-Aside.

The site visit date, time and location will be identified in the solicitation.

BE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED OR REVISED AT

ANY TIME DURING THE PRE-SOLICITATION, SOLICITATION, SELECTION,

EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS.

Prospective bidders should stay posted to this notice for updates.