2019_0802_Hamilton_City_Phase_2B_Presolicitation_Notice.pdf
PDF 117 KB Posted
- Solicitation number
- W9123819B0009
About this file
Hamilton City Phase 2B Pre-Solicitation Notice
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2019_0919_19B0009_AMD_04.pdf | ||
| 2019_0917_19B0009_AMD_03.pdf | ||
| 2190_Pricing_Schedule-AMD-02.docx | DOCX document | |
| 6-04-2253-AMD-02.pdf | ||
| 2190_Pricing_Schedule-AMD-02.pdf | ||
| 2019_0916_19B0009_AMD_02.pdf | ||
| 2190-AMD-02.pdf | ||
| 2019_0906_19B0009_Ham_City_Ph2B_Site_Visit_Attendance_Roster.pdf | ||
| 2019_0829_19B0009_AMD_01.pdf | ||
| Exhibit_A_Pricing_Schedule.docx | DOCX document | |
| Attachment_03_Wage_Determination.pdf | ||
| 2019_0823_19B0009_Ham_City_Ph2B.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Hamilton City Phase 2B Levee Improvement Construction Project
The Government anticipates issuing an Invitation for Bids (IFB) with the intent of awarding one
Firm-Fixed Price construction contract for the Hamilton City Phase 2B Levee Improvement
Construction Project to the lowest-priced responsible bidder whose bid conforms (i.e., is responsive) to the solicitation requirements.
Hamilton City Phase 2B Project Description:
The Hamilton City Flood Damage Reduction and Ecosystem Restoration Project is located in the areas surrounding Hamilton City, CA along the Sacramento River. The project objectives are to provide Hamilton City with a 1 in 75 year level of flood protection and reconnecting roughly 900 acres of floodplain to the Sacramento River by replacing the existing J levee with a new setback levee. The reconnected floodplain will be restored with native vegetation to provide riparian and other types of habitat. The Phase 2B portion of the project will focus on constructing the final third of the new levee which is approximately two miles in length. The previous two phases, Phase 1 were completed in 2017 and 2018, respectively. Phase 2B will be the connecting segment between Phase 2A at the north and Phase 1 at the south. (See Map Below)
In accordance with the DFAR 236.204(i), the magnitude disclosure of this construction project is between $10M and $25M.
The applicable FSC Code: Y1LC, Construction of Tunnels and Subsurface Structures and North
American Industry Classification System Code (NAICS): 237990 Other Heavy and Civil
Engineering Construction. The small business size standard is $36.5 million.
The solicitation (IFB) is estimated to be issued on or about 15 August 2019 with bids due approximately 30 calendar days later.
This acquisition will proceed as HUBZone Small Business Set-Aside.
The site visit date, time and location will be identified in the solicitation.
BE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED OR REVISED AT
ANY TIME DURING THE PRE-SOLICITATION, SOLICITATION, SELECTION,
EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS.
Prospective bidders should stay posted to this notice for updates.