Hamilton City FDR & ER Project, Phase 2B 2190
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 00 00
GENERAL REQUIREMENTS
PART 1 GENERAL
1.1 PAYMENT
1.2 DEFINITIONS
1.2.1 J Levee
1.2.2 Line of Protection
1.2.3 Designated Flood Season
1.3 REFERENCES
1.4 VETERANS EMPLOYMENT EMPHASIS FOR U.S. ARMY CORPS OF ENGINEERS
CONTRACTS
1.5 SUBMITTALS
1.6 GENERAL SAFETY REQUIREMENTS
1.6.1 General
1.6.2 The Prime Contractor's Superintendent
1.6.3 Violations
1.7 SECURITY
1.8 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER
1.8.1 Monthly Anticipated Adverse Weather Delays
1.8.2 Operations During the Designated Flood Season
1.9 EQUIPMENT DATA FORM
1.10 HOURS OF OPERATION
1.11 BID ITEM OVERRUN
1.12 WARRANTY OF CONSTRUCTION
1.13 NON CONTRACT WORK
1.14 IRVINE FINCH RIVER ACCESS
1.15 DAMAGE TO ROADS
1.15.1 Documentation Regarding Potential Damage to Access Routes
1.15.1.1 Preconstruction Access Road Survey
1.15.1.2 Post-Construction Access Road Survey
1.16 SPECIAL SURVEY PROCEDURES
1.16.1 Survey Services
1.16.2 Survey Supervision and Scheduling
1.16.3 Personnel Plan
1.16.4 Special Survey Conditions - Preconstruction Survey Cross
Sections
1.16.5 Post Construction Surveys
1.17 SPECIAL CONSTRUCTION CONDITIONS
1.17.1 Access to the Project Area
1.17.2 In-Water Work Window
1.17.3 Points of Contact for River Discharge Data
1.17.4 River Gaging Stations
1.17.5 J Levee Degrade Sequencing
1.17.5.1 Degrade North of Highway 32
1.17.5.2 Hamilton City Flood Protection
1.17.6 Groundwater
1.17.7 Project Security and Public Safety
SECTION 01 00 00 Page 1 AMD-02
1.17.8 Cooperation With Others
1.17.8.1 Agricultural Spraying
1.17.8.2 Other Government Contractors
1.18 MEETINGS
1.18.1 Preconstruction Meetings
1.18.2 Weekly Coordination Meetings
1.18.3 Contractor Quality Control Coordination Meeting
1.18.4 Preconstruction Safety Conference
1.19 WATER
1.20 UTILITIES
1.20.1 Pacific Gas and Electric (PG&E)
1.20.1.1 10" Natural Gas Transmission Pipeline
1.20.1.2 Electrical Poles and Lines
1.20.2 Existing Pump Facility
1.21 DESIGNATED BORROW SITES
1.21.1 GCID Canal Borrow Site Sequencing
1.22 COMMERCIAL BORROW SITE
1.23 COMMERCIAL DISPOSAL SITE
1.24 HAUL ROUTE PLAN
PART 2 PRODUCTS
2.1 GOVERNMENT FURNISHED MATERIALS
PART 3 EXECUTION
3.1 AFTER AWARD DOCUMENTS
3.1.1 Hard Copies of Plans
ATTACHMENTS:
CESPK FORM 450
50-04-6260HC-PH2b Clearing Plans.pdf
-- End of Section Table of Contents --
SECTION 01 00 00 Page 2 AMD-02
SECTION 01 00 00
GENERAL REQUIREMENTS
PART 1 GENERAL
1.1 PAYMENT
No separate payment will be made for the work covered under this Section and all costs in connection therewith will be considered a subsidiary obligation.
1.2 DEFINITIONS
1.2.1 J Levee
The J levee is the existing levee which currently provides flood protection from the Sacramento River to Hamilton City. The J Levee extends from J Levee Alignment station 0+00 to approximate J Levee Alignment station 213+75 where it ties into the Hamilton City Project's Phase 1 levee, previously constructed in 2017.
1.2.2 Line of Protection
The Line of Protection is defined as the existing flood control levee which provides flood protection from the Sacramento River to Hamilton City. The existing Line of Protection includes the J Levee as defined above and the Phase 1 levee constructed in 2017.
1.2.3 Designated Flood Season
The California Designated Flood Season extends from November 1 to April 15.
1.3 REFERENCES
The publications listed below form a part of this Section to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
EM 1110-1-1005 (2007) Control and Topographic Surveying
ER 415-1-15 (1989) Construction Time Extensions for Weather
U.S. ARMY CORPS OF ENGINEERS, SACRAMENTO DISTRICT (CESPK)
CESPK FORM 450 (1992) Contractor Equipment Data Sheet
DM 4-805-10 (1991) Survey Manual
SECTION 01 00 00 Page 3 AMD-02
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910 Occupational Safety and Health Standards
29 CFR 1926 Safety and Health Regulations for Construction
1.4 VETERANS EMPLOYMENT EMPHASIS FOR U.S. ARMY CORPS OF ENGINEERS CONTRACTS
In addition to complying with the requirements outlined in FAR Part 22.13, FAR Provision 52.222-38, FAR Clause 52.222-35, FAR Clause 52.222-37, DFARS
222.13 and Department of Labor regulations, U.S. Army Corps of Engineers (USACE) contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract. While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE contractors are encouraged to seek out highly qualified veterans to perform services under this contract. The following resources are available to assist USACE contractors in their outreach efforts:
Federal Veteran employment information at http://www.fedshirevets.gov/index.aspx
Department of Labor Veterans Employment Assistance http://www.dol.gov/vets/
Department of Veterans Affairs-VOW to Hire Heroes Act http://benefits.va.gov/vow/
Army Wounded Warrior Program -http://wtc.army.mil/modules/employers/index.html
U.S. Chamber of Commerce Foundation-Hiring Our Heroes http://www.hiringourheroes.org/
Employer Guide to Hire Veterans https://www.dol.gov/sites/dolgov/files/VETS/legacy/files/Employer-Guide-to-Hire-Vete
1.5 SUBMITTALS
Government approval is required for all submittals with a "G" designation;
submittals not having a designation are for information only. The following must be submitted in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Preconstruction Quantity Survey Plan; G
Personnel Plan
Preconstruction Survey Cross Sections
Preconstruction Access/Haul Road Survey
Disposal Site Plan; G
Haul Route Plan; G
Borrow Source Plan; G
SECTION 01 00 00 Page 4 AMD-02
Hard Copies of Plans
Equipment List
Flood Season Work Plan; G, DO
SD-11 Closeout Submittals
Post-Construction Access/Haul Road Survey
Haul Road Repairs; G
1.6 GENERAL SAFETY REQUIREMENTS
1.6.1 General
For information regarding specific Safety Requirements see Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS. Refer to EM 385-1-1, Contract Clauses, and the Occupational Safety and Health Act (OSHA) Standards for Construction 29 CFR 1926; General Industry Standards 29 CFR 1910; and the National Fire Protection Association Codes are applicable to this contract. In case of conflict the most stringent requirement of the standards is applicable.
1.6.2 The Prime Contractor's Superintendent
The Prime Contractor's superintendent must take an active role in enforcing the safety requirements by participation in safety conferences, hazard analysis (see below), tool box meetings, walk-through inspections, correction of violations, etc., and including that of the subcontractor's work.
1.6.3 Violations
If recurring violations and/or gross violation indicate that the safety performance is unsatisfactory, corrective action must be taken as directed, and at the discretion of the Contracting Officer the retention or some part thereof will be withheld from the progress payment until corrective action has been completed.
1.7 SECURITY
The project location may be particularly subject to vandalism. Materials left on-site are done so at the Contractors' risk, and if lost, at the Contractor's expense. Provide security for all the work. Particularly, construct and maintain the signs, including but not limited to, those necessary for Public Safety and Traffic Control, as specified in GENERAL PROVISIONS. Replace those signs damaged or destroyed due to vandalism at no additional expense to the Government.
1.8 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER
This provision specifies the procedure for the determination of time extensions for unusually severe weather. In order for the Contracting Officer to award a time extension under this clause, the following conditions must be satisfied:
a. The weather experienced at the project site during the contract period
SECTION 01 00 00 Page 5 AMD-02 must be found to be unusually severe, that is, more severe than the adverse weather anticipated for the project location during any given month.
b. The unusually severe weather must actually cause a delay to the completion of the project. The delay must be beyond the control and without the fault or negligence of the Contractor.
1.8.1 Monthly Anticipated Adverse Weather Delays
The following schedule of monthly anticipated adverse weather delays is based on National Oceanic and Atmospheric Administration (NOAA) or similar data for the project location and will constitute the base line for monthly weather time evaluations. The Contractor's progress schedule must reflect these anticipated adverse weather delays in all weather dependent activities.
MONTHLY ANTICIPATED ADVERSE WEATHER DELAY
WORK DAYS BASED ON (5) DAY WORK WEEK
STATE CALIFORNIA INSTALLATION/NOAA MARYSVILLE STATION
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
7 6 5 4 1 0 0 0 1 2 5 7
Upon execution of the Notice to Proceed (NTP) and continuing throughout the contract, the Contractor will record on the daily CQC report, the occurrence of adverse weather and resultant impact to normally scheduled work. Actual adverse weather delay days must prevent work on critical activities for 50 percent or more of the Contractor's scheduled work day.
Refer to ER 415-1-15.
Flow conditions in the Sacramento River will not be considered as adverse or unusually severe weather and no time extension to the contract will be granted to the Contractor for this circumstance.
1.8.2 Operations During the Designated Flood Season
Operations on the riverside of the Line of Protection during the Designated Flood Season are prohibited unless explicit approval has been granted by the Contracting Officer. If during the designated flood season the need to perform work on the riverside of the Line of Protection is anticipated, submit to the Government for approval a Flood Season Work Plan which details the type of work to be performed, the need for the work, and the proposed schedule to complete the work detailed in the plan.
1.9 EQUIPMENT DATA FORM
Furnish CESPK FORM 450 for all necessary equipment to perform work requiring adjustment of contract price and must submit these forms with the modification proposals. A sample form is at the end of this Section.
1.10 HOURS OF OPERATION
Construction activities on weekdays Monday through Friday, including equipment warm-up, will be limited to daylight hours but not earlier than
SECTION 01 00 00 Page 6 AMD-02
7:00 A.M. and not later than 7:00 P.M. Construction activities on Saturdays, including equipment warm-up, will be limited to daylight hours, but not earlier than 8:00 A.M. and not later than 6:00 P.M. The Government must be given 48 hours notice prior to working on any Saturday.
Construction activities on Sunday are limited to daylight hours for scheduled maintenance only, but not earlier than 9:00 AM and not later than 6:00 PM. Construction activities are not permitted on Federal holidays. A list of Federal holidays for any given year can be found at:
https://www.opm.gov/policy-data-oversight/snow-dismissal-procedures/federal-holidays Submit requests for work hour variations a minimum 10 working days prior to the desired change to Contracting Officer and their representative for approval. Work hours are the discretion of the local jurisdiction therefore additional limits on hours operations may be imposed during this construction event. The Contractor will be notified a minimum of 10 working days prior to such changes.
1.11 BID ITEM OVERRUN
Throughout the contract (at a minimum, every five calendar days), monitor placement or installation of unit price items (if any) with respect to the original estimated quantities shown in the contract. If placement or installation indicates a possible overrun with respect to the original estimated quantities shown in the contract, immediately provide written notification to the Contracting Officer with revised total estimated quantities.
1.12 WARRANTY OF CONSTRUCTION
a. Performance Bond.
(1) It is understood that the Contractor's Performance Bond will remain effective throughout the life of all warranties and warranty extensions.
(2) In the event the Contractor or his designated representative fails to commence and diligently pursue any work required under the Warranty of Construction Section of the Technical Provisions within a reasonable time after receipt of written notification pursuant to the requirements thereof, the Contracting Officer has a right to demand that said work be performed under the Performance Bond by making written notice on the surety. If the surety fails or refuses to perform the obligation it assumed under the Performance Bond, the Contracting Officer must have the work performed by others, and after completion of the work, make demand for reimbursement of any or all expenses incurred by the Government while performing the work, including, but not limited to administrative expenses.
(3) Warranty repair work which arises to threaten the health or safety of personnel, the physical safety of property or equipment, or which impairs operations, habitability of living spaces, etc., will be handled by the Contractor on an immediate basis as directed verbally by the Contracting Officer or his authorized representative. Written verification will follow verbal instructions. Failure of the Contractor to respond as verbally directed will be cause for the Contracting Officer or his authorized representative to have the warranty repair work performed by others and to proceed against the Contractor as
SECTION 01 00 00 Page 7 AMD-02 outlined in the paragraph b. above.
b. Pre-Warranty Conference. Prior to contract completion and at a time designated by the Contracting Officer or his authorized representative, meet with the Contracting Officer to develop a mutual understanding with respect to the requirements of Section 00 73 00 SUPPLEMENTARY CONDITIONS, Paragraph, WARRANTY OF CONSTRUCTION, of this specification. Communication procedures for Contractor notification of warranty defects, priorities with respect to the type of defect, reasonable time required for Contractor response, and other details deemed necessary by the Contracting Officer or his authorized representative for the execution of the construction warranty will be established/reviewed at this meeting.
In connection with these requirements and at the time of the Contractor's quality control completion inspection, the Contractor will furnish the name, telephone number and address of a licensed and bonded company which is authorized to initiate and pursue warranty work action on behalf of the Contractor. This single point of contact will be located within the local service area of the warranted construction, will be continuously available, and will be responsive to Government inquiry on warranty work action and status. This requirement does not relieve the Contractor of any of his responsibilities in connection with Section 00 73 00 SUPPLEMENTARY CONDITIONS, Paragraph, WARRANTY OF
CONSTRUCTION.
c. Equipment Warranty Identification Tags. Provide warranty identification tags on all equipment installed under this contract.
d. Contractor's Response to Warranty Service Requirements. The following warranty service requirements are applicable to this contract.
Following notification by the Contracting Officer or the Contracting Officer's Representative, respond to a warranty service requirement identified by the Contracting Officer's Representative in accordance with the "Warranty Service Priority List" of this program. This list prioritizes warranty work into the categories:
First Priority 1A. Perform on site inspection to evaluate situation, determine course of action, initiate work within 24 hours and work continuously to completion or relief.
Second Priority 1B. Perform on site inspection to evaluate situation, determine course of action, initiate work within 48 hours and work continuously to completion of relief.
Third Priority. All other work to be initiated within 5 work days and work continuously to completion or relief.
The "Warranty Service Priority List" must be compiled by the Contractor and approved by the Contracting Officer.
Should parts be required to complete the work and the parts are not immediately available provide the Contracting Officer's Representative with firm written proposals for emergency alternatives and temporary repairs for Government participation within 12 hours after arrival at the job site, and provide emergency relief until the required parts are available on site for the Contractor to perform permanent warranty repair. Include a firm date and time that the required parts must be available on site to complete the permanent warranty repair. The
SECTION 01 00 00 Page 8 AMD-02
Contracting Officer's Representative will evaluate the proposed alternatives and negotiate the alternative considered to be in the best interest of the Government to reduce the impact of the emergency condition. Alternatives considered by the Contracting Officer's Representative will include the alternative for the Contractor to "Do Nothing" while waiting until the required parts are available to perform permanent warranty repair. Negotiating a proposal which will require Government participation and the expenditure of Government funds must constitute a separate procurement action by the using service.
1.13 NON CONTRACT WORK
Do not perform any work or erect any structure for third parties, landowners or otherwise, within the limits of the rights-of-way without prior approval of the Contracting Officer.
1.14 IRVINE FINCH RIVER ACCESS
All vehicles and equipment operated within the paved areas of the Irvine Finch River Access facility must have rubber tires or tracks. Non-rubber tires or tracks are not permitted within the Irvine Finch River Access.
1.15 DAMAGE TO ROADS
Preserve and protect all existing private or project access or right-of-way roads. At the completion of work and prior to the Contractor leaving the project, he must restore to pre-project conditions all such roads and provide documentation of Haul Road Repairs. Repairs must include replacement of base rock and/or surface treatment as required. Refer also to paragraph PROTECTION OF TRAFFIC in Section 01 50 00 TEMPORARY
CONSTRUCTION FACILITIES AND CONTROLS.
1.15.1 Documentation Regarding Potential Damage to Access Routes
1.15.1.1 Preconstruction Access Road Survey
Complete and submit a Preconstruction Access/Haul Road Survey including digital video and digital photographs of all public, private, and project access or right-of-way roads. Submit two copies of the survey, the digital video, and the digital photographs before the start of construction operations. Video must be digital format.
1.15.1.2 Post-Construction Access Road Survey
After completion of construction of the project, submit a Post-Construction Access/Haul Road Survey including digital video and digital photographs of the same area where Preconstruction digital video and digital photographs were taken. Submit two copies of the survey, the digital video, and digital photographs.
1.16 SPECIAL SURVEY PROCEDURES
1.16.1 Survey Services
Perform all survey services in accordance with EM 1110-1-1005. This publication can be downloaded from: EM_1110-1-1005.pdf
SECTION 01 00 00 Page 9 AMD-02
1.16.2 Survey Supervision and Scheduling
Submit a Preconstruction Quantity Survey Plan of the proposed preconstruction quantity survey. All survey services must be performed by or under the direct supervision of a person licensed to practice surveying in the State of California. Prior to commencement of survey work, submit in writing the name and license number of the person who will perform the required surveys. Keep field notes in accordance with DM 4-805-10. The accuracy of the survey must be third order or better.
1.16.3 Personnel Plan
Plan stating the specific personnel names, license numbers, and specific tasks of those who will be performing the Preconstruction Survey Cross Sections, plus the procedures to be followed in conducting the Preconstruction Survey Cross Sections.
1.16.4 Special Survey Conditions - Preconstruction Survey Cross Sections
Survey cross sections along the entire length of the construction site, including all borrow areas planned to be used, and submit Preconstruction Survey Cross Sections before construction begins. Use these Preconstruction Survey Cross Sections to reflect existing ground before any construction activities begin and when measuring pay quantities for clearing and grubbing, topsoil stripping, excavation, fill, and grass seeding and erosion control. Use the Preconstruction Survey Cross Sections for measurement of work specified in Section 31 00 00 EARTHWORK. Survey cross sections perpendicular to the Construction Reference Line. Survey the cross sections within 2 feet of the locations specified herein. Take the Preconstruction Survey Cross Sections at 50 foot intervals along the Construction Reference Lines shown on the drawings. Perform a profile survey of the top of the levee. Use this survey to show the elevations of the top of the levee shown on the plan and profile sheets.
Cross sections along the Construction Reference Line must extend from 25 feet landward of the landside levee toe, across the Construction Reference Line, and continue out to a point at least 25 feet waterward of the waterside toe of the levee.
Elevations must be taken at inflection points but at not more than 10 feet intervals. Horizontal and vertical accuracy must be to the nearest 0.1 foot. Horizontal locations must not deviate from the alignment of the cross section line by more than 1 foot. All cross sections must be plotted as viewed in the downstream direction. The survey data must be provided to the Contracting Officer on IBM-formatted CD ROM disks containing survey control and cross section points defined in the form of north and east coordinates and their elevations (i.e. X, Y and Z). Horizontal control must be referenced to the California Zone II, North American Datum (NAD) of 1983. Vertical control must be the National Geodetic Vertical Datum (NGVD) of 1929. Survey data must be provided in english units in either Microstation V8i 3D design file format (*.DGN), or AutoCAD 2013 or newer format (*.DWG). All data collected as part of the survey and all data used in the generation of digital terrain model surfaces (including, but not limited to point files and landxml files) for comparison to post construction surveys and generation of quantities must be included in the submittal.
Provide 2 CD/DVD of the electronic survey data files (including, but not limited to, CADD files, point data, etc.), and 2 sets of the cross section
SECTION 01 00 00 Page 10 AMD-02 data, plotted as viewed in the downstream direction, with a 20 horizontal X 10 vertical grid, on a standard ANSI D size drawing sheet, at a scale of 1:10, horizontal and vertical. Preparing any needed layout drawings.
Black line prints from PDF files are acceptable.
If the results of the Preconstruction Survey Cross Sections show significant (15 percent or more) erosion than on the contract drawings, meet with the Contracting Officer to resolve the differences and use the Preconstruction Survey Cross Sections results to adjust designs as necessary.
1.16.5 Post Construction Surveys
Each post construction survey must be of the same scope as its corresponding preconstruction survey. Survey cross sections must be taken at the same interval and locations and must cover the same extents as the preconstruction survey cross sections. All data collected as part of each survey, used to generate quantities, and generated in the preparation of the submittal must be provided to the government.
1.17 SPECIAL CONSTRUCTION CONDITIONS
1.17.1 Access to the Project Area
Due to ongoing activities within several of the properties within the project area, such as agricultural activities including orchard harvests, access to the project site will be limited until certain dates. All work required within the different Clearing Areas, as delineated in the attached "50-04-6260HC-PH2b Clearing Plans.pdf", must not begin sooner than the dates given in the below table.
Clearing Areas Base Contract or Option Item Accessible Not Sooner Than:
1 Base Notice to Proceed
2 Base 15 November
3 Base 15 November
4 Option Option Execution
5 Option Option Execution
6 Option Option Execution
7 Base Notice to Proceed
1.17.2 In-Water Work Window
Any and all work required to be performed within the water of the Sacramento River, such as stone protection placement, must be performed during the In-Water Work Window between July 1 and November 1. The In-Water Work Window also requires all work begin not sooner than one (1) hour after sunrise and end not later than one (1) hour before sunset of each day.
SECTION 01 00 00 Page 11 AMD-02
1.17.3 Points of Contact for River Discharge Data
The site is subjected to regulated discharges on the Sacramento River.
Contact the following individual with the U.S. Bureau of Reclamation to obtain flow forecasting information for planning construction activities.
The forecasts are updated monthly toward the middle of the month and provide monthly average values. Daily flows are subject to variability in response to changing water demands.
Central Valley Operations Office Ms. Elizabeth Kiteck 916-979-2684
1.17.4 River Gaging Stations
Water surface elevation data is available for the stream gages operated by the Department of Water Resources. Obtain data from the California Department of Water Resources, California Data Exchange Center (CDEC) web site http://cdec.water.ca.gov. River forecasts available on the CDEC Website address is http://cdec.water.ca.gov/rivforecasts.html
The Government does not guarantee the reliability or accuracy of the hydrographs and will assume no responsibility for any deductions, conclusions, or interpretations that may be made from them. Undertake any such studies that are deemed necessary to assess the reliability and accuracy of the information presented in the hydrographs.
1.17.5 J Levee Degrade Sequencing
1.17.5.1 Degrade North of Highway 32
Degrade of the existing J Levee north of highway 32 must not begin until after the two windows in the existing setback levee north of highway 32 (between stations 69+75 and 71+88.86, and between stations 112+29.5 and 114+50) have been filled closed in accordance with this Contract's requirements.
1.17.5.2 Hamilton City Flood Protection
The Contract must be executed in a manner which ensures that not later than 15 October the Line of Protection to Hamilton City impacted by this project has been restored to a minimum of the preconstruction condition.
1.17.6 Groundwater
Groundwater at the site is expected to be near the same level as the Sacramento River water surface except when there is a rapid rise or decrease in the river, where the groundwater level will eventually follow by some unknown period of time.
1.17.7 Project Security and Public Safety
Require all visitors to abide by all construction site safety requirements. Notify the Contracting Officer 48 hours before the commencement of any physical activities on the site. Site security and the protection of equipment and materials is the responsibility of the Contractor for the duration of the contract.
SECTION 01 00 00 Page 12 AMD-02
1.17.8 Cooperation With Others
Provide a weekly update of planned construction activities and traffic operations for distribution by the Government to local agricultural stakeholders and landowners within and adjacent to the project site.
Annual harvest operations from late summer through the end of October are expected to produce significant agricultural equipment and truck traffic immediately adjacent to the project site including along designated haul/access routes. Stay within the designated haul/access routes as shown on the drawings. The designated haul/access routes are not project exclusive and the construction operation must not interfere with others.
Also see paragraph UTILITIES of this section for additional information on coordination with utility companies.
1.17.8.1 Agricultural Spraying
The agricultural land surrounding the project is subject to spraying of different chemicals by multiple application methods (i.e. land based or aerial spraying) throughout the year. Coordinate with the Agricultural Spray contact provided below for agricultural spray schedules, locations, and buffer zones of applied spray. Plan and adjust work activities according to the spray schedules and recommended spray buffer zones.
Agricultural Spray Contact:
Cliff Kitayama 26 Kingsburry Ct Chico, CA 95926 cykit49@gmail.com Office:(530) 894-1360 Mobile:(530) 720-0035
1.17.8.2 Other Government Contractors
Other Government Contractors will be working in the vicinity of the project site and will require access to the land on the waterside of the setback levee. These other Contractors will be performing orchard removal and regular spraying for weed control purposes in the areas waterward of the Limits of Work shown in the Drawings. Coordinate with these other Government Contractors and gauranteee their access through the project site to their features of work.
1.18 MEETINGS
There may be other meetings required by this contract or unforeseen circumstances not indicated below.
1.18.1 Preconstruction Meetings
Arrange a preconstruction meeting as specified in Contract Clause 52.236-26 Preconstruction Conference.
1.18.2 Weekly Coordination Meetings
Schedule, prepare and distribute agenda and administer the weekly coordination meeting throughout of the project. The purpose of these meetings is to review the actual progress and planned activities for the upcoming two weeks. The weekly progress meeting will address the status of
SECTION 01 00 00 Page 13 AMD-02 the SWPPP, Environmental concerns, RFI's and Submittals. The meeting is to be facilitated by the Contractor's CQCM, and attended by the superintendent, SSHO, USACE Engineering and construction field personnel, and any partners or sponsors who would like to attend. Meeting attendes will be coordinated with the Contracting Officer's Representative.
1.18.3 Contractor Quality Control Coordination Meeting
See Section 01 45 00 QUALITY CONTROL regarding the obligation to set up the Quality Control Coordination Meeting.
1.18.4 Preconstruction Safety Conference
See Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS Paragraph titled Site Safety and Health Officer (SSHO) regarding the obligation to set up the Preconstruction Safety Conference and hold safety meetings.
1.19 WATER
Water and associated equipment required for dust control must be supplied by water trucks.
1.20 UTILITIES
Immediately notify the Contracting Officer in writing of any unidentified utilities encountered that may interfere with construction operations, within the construction limits. Identify the location of discovered utilities that were not shown on the plans and not visible as of the date of this contract. Notify the Contracting Officer at least 30 days in advance of the date on which work will be started which requires the removal or relocation of such unidentified utilities or private improvements. Care must be taken to preserve and protect any such improvements from injury or damage during construction operations.
Construction operations which cause damages to personal property, utilities, public lands or interference of services must be fully reimbursed by the Contractor. Should such damage be found to have been caused without the Contractor's fault or negligence an equitable adjustment in the amount due under the contract will be made under the applicable
CONTRACT CLAUSES.
1.20.1 Pacific Gas and Electric (PG&E)
1.20.1.1 10" Natural Gas Transmission Pipeline
The existing 10" natural gas transmission pipeline which crosses the levee alignment at approximate station 70+80 and approximate station 113+55 will be removed and relocated by PG&E landward of the levee alignment in late Summer and Fall 2019. A segment of the existing pipeline and its utility vault structure will still remain within the J Levee at approximate J levee station 90+25. This remaining pipeline segment and its utility vault must be protected in place as indicated in the Drawings.
Prior to commencing any work in the vicinity of the PG&E 10" natural gas transmission pipeline, provide to both the Government and PG&E an equipment list detailing data on all equipment planned to be operated in the vicinity of the pipeline. Depending on the equipment planned for use, more stringent coverage requirements than those given on the Drawings may be imposed by PG&E over their pipeline. Compliance with more stringent requirements, should they be necessary, is mandatory.
SECTION 01 00 00 Page 14 AMD-02
1.20.1.2 Electrical Poles and Lines
Electrical poles exist within the project area and those which lie within the project footprint are scheduled to be relocated outside the levee footprint prior to 1 April 2020. It is possible this relocation effort may extend beyond 1 April 2020. If the relocations are not compelted prior to 1 April, plan to accommodate the relocation, removal, or raising of known electrical utilities by Pacific Gas & Electric (PG&E) concurrently with levee construction.
1.20.2 Existing Pump Facility
The existing pump facility located at approximate Ditch Excavation Alignment station 0+50 will have its two pumps and motors removed by others prior to April 1st, 2020. The remaining pump structure and sump well must be removed and relocated as indicated on the drawings.
1.21 DESIGNATED BORROW SITES
Embankment fill and random fill, as defined in Section 31 00 00 EARTHWORK, must be acquired from excavations required under this contract, including the existing J levee to be degraded, and supplemented from the designated Borrow Areas A, B, C, D, and E shown on the drawings as necessary.
1.21.1 GCID Canal Borrow Site Sequencing
The GCID Canal Borrow Areas must be used in alphabetical order starting at Borrow Area A. Borrow Area A must be depleted to the maximum extent possible prior to procedeing to the next borrow cell. This process of fully depleteing a given borrow cell prior to proceding to the next must be followed for all GCID Canal borrow cells.
1.22 COMMERCIAL BORROW SITE
In the case that the designated borrow sites shown on the Drawings do not provide adequate amounts of borrow for completion of the project, locate a reliable commercial borrow site, and secure Import Fill, as defined in Section 31 00 00 EARTHWORK, as needed for the project. Comply with requirements defined in the plans, specifications, and contract documents in the selection and use of the commercial borrow site and materials.
Comply with all applicable local, state, and federal regulations in the selection and use of the borrow site and activities associated with removal of borrow material.
Prior to beginning construction work submit a Borrow Source Plan to the Contracting Officer. Include the location of borrow site(s), as well as copies of borrow site current and valid NEPA/CEQA documentation, applicable Federal, State and Local permits. Provide certification to the Contracting Officer that the borrow material is free from contaminants and is suitable for use on the project. Prepare and submit the Borrow Source Plan at no additional cost to the Government.
1.23 COMMERCIAL DISPOSAL SITE
Locate a reliable commercial disposal site, and secure a disposal site as needed for the project. The disposal site must be in compliance with the requirements defined in the plans, specifications, and contract documents.
Disposal site and disposal activities must be in compliance with all
SECTION 01 00 00 Page 15 AMD-02 applicable local, state, and federal regulations.
Prior to beginning construction work submit a Disposal Site Plan to the Contracting Officer. Include the location of disposal site(s), as well as copies of disposal site current and valid NEPA/CEQA documentation, applicable Federal, State and Local permits. Prepare and submit the Disposal Site Plan at no additional cost to the Government.
1.24 HAUL ROUTE PLAN
Submit a Haul Route Plan prior to beginning work. This plan must include offices, material storage areas and structures and the access routes to these areas. Indicate haul routes from the sites to major highways. Show all required traffic signs, special limits, warning devices, lighting and other such safety devices required by EM 385-1-1, OSHA, local cities and CALTRANS (on state roads), and any required permits for use of public roads from local and state agencies. Provide alternate routes in the plan for when interferences block designated haul routes. Revise and resubmit the plan if the haul routes being used are not as shown on the plan.
Require all visitors to abide by all construction site safety requirements. Notify the Corps Contracting Officer 48 hours before the commencement of any physical activities on the site. Work for sections such as Demolition, Grading, Tree Removal and other sections with excavations must be coordinated with this plan.
PART 2 PRODUCTS
2.1 GOVERNMENT FURNISHED MATERIALS
The Government will provide an optical disc at the preconstruction conference that contains the materials specifed in Section 01 78 00
CLOSEOUT SUBMITTALS
PART 3 EXECUTION
3.1 AFTER AWARD DOCUMENTS
3.1.1 Hard Copies of Plans
Provide the conformed hard copy sets reproduced from the PDF Contract documents provided by the Contracting Officer at the time of award. Hard copy drawings must be two (2) sets of ANSI D (22" x 34") and five (5) sets of half size (11" x 17") 3-hole punched and bound with metal posts. The five (5) sets of specifications must be standard letter (8 1/2" x 11") 3-hole punched and bound with metal posts. Submit these documents within 5 work days of receipt of the AWARDdocuments from the Government.
-- End of Section --
SECTION 01 00 00 Page 16 AMD-02
CONTRACTOR EQUIPMENT DATA SHEET
(Data to be furnished by Contractor for all equipment to be used on modifications as required under the Special Provisions of the Contract.)
DATE
CONTRACTOR CONTRACT NUMBER
1. EQUIPMENT DESCRIPTION
2. MODEL AND SERIES
3. YEAR PURCHASED
4. PURCHASE PRICE AT YEAR PURCHASED
5. LIST PRICE, YEAR OF MANUFACTURE
6. YEAR MANUFACTURED
7. EQUIPMENT HORSEPOWER
8. CARRIER HORSEPOWER
9. FUEL TYPE
10. SHIPPING WEIGHT
11. TIRE SIZE: FRONT - ______________________ DRIVE - _______________________ TRAILING - _______________________
REMARKS:
CESPK FORM 450 1 SEP 92 (Edition of Apr 84 will be used) FormFlow 2.2, ver 1
AutoCAD SHX Text D-107
AutoCAD SHX Text D-108
AutoCAD SHX Text G-103
AutoCAD SHX Text D-105
AutoCAD SHX Text D-106
AutoCAD SHX Text D-109
AutoCAD SHX Text D-110
AutoCAD SHX Text G-102
AutoCAD SHX Text D-104
AutoCAD SHX Text D-103
AutoCAD SHX Text D-102
AutoCAD SHX Text D-101
AutoCAD SHX Text Dwg scale:
AutoCAD SHX Text Plot date:
AutoCAD SHX Text File name:
AutoCAD SHX Text Design file no:
AutoCAD SHX Text Drawing Code:
AutoCAD SHX Text
SACRAMENTO, CALIFORNIA
AutoCAD SHX Text
CORPS OF ENGINEERS
AutoCAD SHX Text
DEPARTMENT OF THE ARMY
AutoCAD SHX Text Submitted by:
AutoCAD SHX Text Reviewed by:
AutoCAD SHX Text Designed by:
AutoCAD SHX Text Dwn by:
AutoCAD SHX Text Date:
AutoCAD SHX Text Spec No.:
AutoCAD SHX Text number:
AutoCAD SHX Text reference
AutoCAD SHX Text Sheet
AutoCAD SHX Text Rev.
AutoCAD SHX Text Symbol
AutoCAD SHX Text Description
AutoCAD SHX Text Sacramento District
AutoCAD SHX Text US Army Corps
AutoCAD SHX Text of Engineers
AutoCAD SHX Text
SACRAMENTO DISTRICT
AutoCAD SHX Text
IN-HOUSE DESIGN
AutoCAD SHX Text
1325 'J' STREET
AutoCAD SHX Text
SACRAMENTO, CA 95814-2922
AutoCAD SHX Text A
AutoCAD SHX Text Border Revised 06/20/02, COESHTD2.DWG
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Date
AutoCAD SHX Text Approved
AutoCAD SHX Text
GLENN COUNTY
AutoCAD SHX Text
CALIFORNIA
AutoCAD SHX Text
HAMILTON CITY COMBINED ECOSYSTEM RESTORATION
AutoCAD SHX Text
AND FLOOD RISK MANAGEMENT PROJECT
AutoCAD SHX Text
PHASE 2B VEGETATION CLEARING
AutoCAD SHX Text
JRLEE
AutoCAD SHX Text
JRLEE
AutoCAD SHX Text /s/ Rick Torbik, Section Chief
AutoCAD SHX Text Chief, Civil Engineering Design Section B
AutoCAD SHX Text 50-04-6260
AutoCAD SHX Text
AutoCAD SHX Text
AS_NOTED
AutoCAD SHX Text 08-16-2019
AutoCAD SHX Text
EXHIBIT A
AutoCAD SHX Text
SHEET LAYOUT AND PROJECT AREA
AutoCAD SHX Text G-101
AutoCAD SHX Text N
AutoCAD SHX Text 0'
AutoCAD SHX Text 600'
AutoCAD SHX Text 1200'
AutoCAD SHX Text 2400'
AutoCAD SHX Text
GCID CANAL
AutoCAD SHX Text
HWY 32
AutoCAD SHX Text
COUNTY RD. 23
AutoCAD SHX Text
HWY 45
AutoCAD SHX Text
SACRAMENTO RIVER
HAMILTON CITY
D-103
AutoCAD SHX Text D-102
AutoCAD SHX Text D-101
AutoCAD SHX Text Dwg scale:
AutoCAD SHX Text Plot date:
AutoCAD SHX Text File name:
AutoCAD SHX Text Design file no:
AutoCAD SHX Text Drawing Code:
AutoCAD SHX Text
SACRAMENTO, CALIFORNIA
AutoCAD SHX Text
CORPS OF ENGINEERS
AutoCAD SHX Text
DEPARTMENT OF THE ARMY
AutoCAD SHX Text Submitted by:
AutoCAD SHX Text Reviewed by:
AutoCAD SHX Text Designed by:
AutoCAD SHX Text Dwn by:
AutoCAD SHX Text Date:
AutoCAD SHX Text Spec No.:
AutoCAD SHX Text number:
AutoCAD SHX Text reference
AutoCAD SHX Text Sheet
AutoCAD SHX Text Rev.
AutoCAD SHX Text Symbol
AutoCAD SHX Text Description
AutoCAD SHX Text Sacramento District
AutoCAD SHX Text US Army Corps
AutoCAD SHX Text of Engineers
AutoCAD SHX Text
SACRAMENTO DISTRICT
AutoCAD SHX Text
IN-HOUSE DESIGN
AutoCAD SHX Text
1325 'J' STREET
AutoCAD SHX Text
SACRAMENTO, CA 95814-2922
AutoCAD SHX Text A
AutoCAD SHX Text Border Revised 06/20/02, COESHTD2.DWG
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Date
AutoCAD SHX Text Approved
AutoCAD SHX Text
GLENN COUNTY
AutoCAD SHX Text
CALIFORNIA
AutoCAD SHX Text
HAMILTON CITY COMBINED ECOSYSTEM RESTORATION
AutoCAD SHX Text
AND FLOOD RISK MANAGEMENT PROJECT
AutoCAD SHX Text
PHASE 2B VEGETATION CLEARING
AutoCAD SHX Text
JRLEE
AutoCAD SHX Text
JRLEE
AutoCAD SHX Text /s/ Rick Torbik, Section Chief
AutoCAD SHX Text Chief, Civil Engineering Design Section B
AutoCAD SHX Text 50-04-6260
AutoCAD SHX Text
AutoCAD SHX Text
AS_NOTED
AutoCAD SHX Text 08-16-2019
AutoCAD SHX Text
EXHIBIT A
AutoCAD SHX Text
ELDERBERRY TRANSPLANT REMOVAL OVERVIEW
AutoCAD SHX Text G-102
AutoCAD SHX Text N
AutoCAD SHX Text 0'
AutoCAD SHX Text 200'
AutoCAD SHX Text 400'
AutoCAD SHX Text 800'
AutoCAD SHX Text
HAMILTON CITY
AutoCAD SHX Text NOTES: 1. DURING CLEARING, PROTECT IN PLACE ANY EXISTING ELDERBERRY DURING CLEARING, PROTECT IN PLACE ANY EXISTING ELDERBERRY SHRUBS WITH STEMS OVER 1 INCH IN DIAMETER AS MEASURED AT THE BASE OF THE PLANT.
AutoCAD SHX Text
PROJECT LEVEE, REFER TO SHEET G-101 FOR PHASING AND CONSTRUCTION STATUS
AutoCAD SHX Text
%%ULEGEND
GCID CANAL ROAD
D-107
AutoCAD SHX Text D-108
AutoCAD SHX Text D-105
AutoCAD SHX Text D-106
AutoCAD SHX Text D-109
AutoCAD SHX Text D-110
AutoCAD SHX Text D-104
AutoCAD SHX Text Dwg scale:
AutoCAD SHX Text Plot date:
AutoCAD SHX Text File name:
AutoCAD SHX Text Design file no:
AutoCAD SHX Text Drawing Code:
AutoCAD SHX Text
SACRAMENTO, CALIFORNIA
AutoCAD SHX Text
CORPS OF ENGINEERS
AutoCAD SHX Text
DEPARTMENT OF THE ARMY
AutoCAD SHX Text Submitted by:
AutoCAD SHX Text Reviewed by:
AutoCAD SHX Text Designed by:
AutoCAD SHX Text Dwn by:
AutoCAD SHX Text Date:
AutoCAD SHX Text Spec No.:
AutoCAD SHX Text number:
AutoCAD SHX Text reference
AutoCAD SHX Text Sheet
AutoCAD SHX Text Rev.
AutoCAD SHX Text Symbol
AutoCAD SHX Text Description
AutoCAD SHX Text Sacramento District
AutoCAD SHX Text US Army Corps
AutoCAD SHX Text of Engineers
AutoCAD SHX Text
SACRAMENTO DISTRICT
AutoCAD SHX Text
IN-HOUSE DESIGN
AutoCAD SHX Text
1325 'J' STREET
AutoCAD SHX Text
SACRAMENTO, CA 95814-2922
AutoCAD SHX Text A
AutoCAD SHX Text Border Revised 06/20/02, COESHTD2.DWG
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Date
AutoCAD SHX Text Approved
AutoCAD SHX Text
GLENN COUNTY
AutoCAD SHX Text
CALIFORNIA
AutoCAD SHX Text
HAMILTON CITY COMBINED ECOSYSTEM RESTORATION
AutoCAD SHX Text
AND FLOOD RISK MANAGEMENT PROJECT
AutoCAD SHX Text
PHASE 2B VEGETATION CLEARING
AutoCAD SHX Text
JRLEE
AutoCAD SHX Text
JRLEE
AutoCAD SHX Text /s/ Rick Torbik, Section Chief
AutoCAD SHX Text Chief, Civil Engineering Design Section B
AutoCAD SHX Text 50-04-6260
AutoCAD SHX Text
AutoCAD SHX Text
AS_NOTED
AutoCAD SHX Text 08-16-2019
AutoCAD SHX Text
EXHIBIT A
AutoCAD SHX Text
ELDERBERRY TRANSPLANT REMOVAL OVERVIEW
AutoCAD SHX Text G-102
AutoCAD SHX Text N
AutoCAD SHX Text 0'
AutoCAD SHX Text 200'
AutoCAD SHX Text 400'
AutoCAD SHX Text 800'
AutoCAD SHX Text
HAMILTON CITY
AutoCAD SHX Text
HWY 32
AutoCAD SHX Text
PROJECT LEVEE, REFER TO SHEET G-101 FOR PHASING AND CONSTRUCTION STATUS
AutoCAD SHX Text
%%ULEGEND
AutoCAD SHX Text
HWY 45
AutoCAD SHX Text
1ST STREET
SACRAMENTO AVE.
T-357
AutoCAD SHX Text T-355
AutoCAD SHX Text T-358
AutoCAD SHX Text T-356
AutoCAD SHX Text T-366
AutoCAD SHX Text T-365
AutoCAD SHX Text T-364
AutoCAD SHX Text T-362
AutoCAD SHX Text T-360
AutoCAD SHX Text T-359
AutoCAD SHX Text T-361
AutoCAD SHX Text T-363
AutoCAD SHX Text Dwg scale:
AutoCAD SHX Text Plot date:
AutoCAD SHX Text File name:
AutoCAD SHX Text Design file no:
AutoCAD SHX Text Drawing Code:
AutoCAD SHX Text
SACRAMENTO, CALIFORNIA
AutoCAD SHX Text
CORPS OF ENGINEERS
AutoCAD SHX Text
DEPARTMENT OF THE ARMY
AutoCAD SHX Text Submitted by:
AutoCAD SHX Text Reviewed by:
AutoCAD SHX Text Designed by:
AutoCAD SHX Text Dwn by:
AutoCAD SHX Text Date:
AutoCAD SHX Text Spec No.:
AutoCAD SHX Text number:
AutoCAD SHX Text reference
AutoCAD SHX Text Sheet
AutoCAD SHX Text Rev.
AutoCAD SHX Text Symbol
AutoCAD SHX Text Description
AutoCAD SHX Text Sacramento District
AutoCAD SHX Text US Army Corps
AutoCAD SHX Text of Engineers
AutoCAD SHX Text
SACRAMENTO DISTRICT
AutoCAD SHX Text
IN-HOUSE DESIGN
AutoCAD SHX Text
1325 'J' STREET
AutoCAD SHX Text
SACRAMENTO, CA 95814-2922
AutoCAD SHX Text A
AutoCAD SHX Text Border Revised 06/20/02, COESHTD2.DWG
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Date
AutoCAD SHX Text Approved
AutoCAD SHX Text
GLENN COUNTY
AutoCAD SHX Text
CALIFORNIA
AutoCAD SHX Text
HAMILTON CITY COMBINED ECOSYSTEM RESTORATION
AutoCAD SHX Text
AND FLOOD RISK MANAGEMENT PROJECT
AutoCAD SHX Text
PHASE 2B VEGETATION CLEARING
AutoCAD SHX Text
JRLEE
AutoCAD SHX Text
JRLEE
AutoCAD SHX Text /s/ Rick Torbik, Section Chief
AutoCAD SHX Text Chief, Civil Engineering Design Section B
AutoCAD SHX Text 50-04-6260
AutoCAD SHX Text
AutoCAD SHX Text
AS_NOTED
AutoCAD SHX Text 08-16-2019
AutoCAD SHX Text
EXHIBIT A
AutoCAD SHX Text
DEMOLITION PLAN
AutoCAD SHX Text D-101
AutoCAD SHX Text N
AutoCAD SHX Text 0'
AutoCAD SHX Text 50'
AutoCAD SHX Text 100'
AutoCAD SHX Text 200'
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
PROJECT LEVEE,
AutoCAD SHX Text
CLEARING AREA 1
AutoCAD SHX Text
CLEARING AREA 2
AutoCAD SHX Text
CLEARING AREA 3
AutoCAD SHX Text
CLEARING AREA 5
AutoCAD SHX Text
CLEARING AREA 6
AutoCAD SHX Text
CLEARING AREA 7
AutoCAD SHX Text
CLEARING AREA 4
AutoCAD SHX Text
TREE/SHRUB LOCATION
AutoCAD SHX Text
DENSE VEGETATION
NOTES: 1. THE CLEARING AREAS SHOWN ON THESE PLANS THE CLEARING AREAS SHOWN ON THESE PLANS CORRESPOND TO THE TEMPORARY WORK AREAS SHOWN ON THE LEVEE CONSTRUCTION PLANS. CLEARING OF THE ENTIRE TEMPORARY WORK AREAS ARE NOT REQUIRED. REFER TO THE CLEARING SPECIFICATIONS FOR THE CLEARING REQUIREMENTS.
T-322
AutoCAD SHX Text T-325
AutoCAD SHX Text T-324
AutoCAD SHX Text T-327
AutoCAD SHX Text T-328
AutoCAD SHX Text T-330
AutoCAD SHX Text T-331
AutoCAD SHX Text T-326
AutoCAD SHX Text T-332
AutoCAD SHX Text T-334
AutoCAD SHX Text T-335
AutoCAD SHX Text T-336
AutoCAD SHX Text T-337
AutoCAD SHX Text T-338
AutoCAD SHX Text T-339
AutoCAD SHX Text T-340
AutoCAD SHX Text T-341
AutoCAD SHX Text T-343
AutoCAD SHX Text T-342
AutoCAD SHX Text T-345
AutoCAD SHX Text T-347
AutoCAD SHX Text T-344
AutoCAD SHX Text T-348
AutoCAD SHX Text T-346
AutoCAD SHX Text T-349
AutoCAD SHX Text T-351
AutoCAD SHX Text T-352
AutoCAD SHX Text T-329
AutoCAD SHX Text T-333
AutoCAD SHX Text T-350
AutoCAD SHX Text T-353
AutoCAD SHX Text T-354
AutoCAD SHX Text T-349A
AutoCAD SHX Text T-339A
AutoCAD SHX Text T-337C
AutoCAD SHX Text T-337B
AutoCAD SHX Text T-337A
AutoCAD SHX Text Dwg scale:
AutoCAD SHX Text Plot date:
AutoCAD SHX Text File name:
AutoCAD SHX Text Design file no:
AutoCAD SHX Text Drawing Code:
AutoCAD SHX Text
SACRAMENTO, CALIFORNIA
AutoCAD SHX Text
CORPS OF ENGINEERS
AutoCAD SHX Text
DEPARTMENT OF THE ARMY
AutoCAD SHX Text Submitted by:
AutoCAD SHX Text Reviewed by:
AutoCAD SHX Text Designed by:
AutoCAD SHX Text Dwn by:
AutoCAD SHX Text Date:
AutoCAD SHX Text Spec No.:
AutoCAD SHX Text number:
AutoCAD SHX Text reference
AutoCAD SHX Text Sheet
AutoCAD SHX Text Rev.
AutoCAD SHX Text Symbol
AutoCAD SHX Text Description
AutoCAD SHX Text Sacramento District
AutoCAD SHX Text US Army Corps
AutoCAD SHX Text of Engineers
AutoCAD SHX Text
SACRAMENTO DISTRICT
AutoCAD SHX Text
IN-HOUSE DESIGN
AutoCAD SHX Text
1325 'J' STREET
AutoCAD SHX Text
SACRAMENTO, CA 95814-2922
AutoCAD SHX Text A
AutoCAD SHX Text Border Revised 06/20/02, COESHTD2.DWG
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Date
AutoCAD SHX Text Approved
AutoCAD SHX Text
GLENN COUNTY
AutoCAD SHX Text
CALIFORNIA
AutoCAD SHX Text
HAMILTON CITY COMBINED ECOSYSTEM RESTORATION
AutoCAD SHX Text
AND FLOOD RISK MANAGEMENT PROJECT
AutoCAD SHX Text
PHASE 2B VEGETATION CLEARING
AutoCAD SHX Text
JRLEE
AutoCAD SHX Text
JRLEE
AutoCAD SHX Text /s/ Rick Torbik, Section Chief
AutoCAD SHX Text Chief, Civil Engineering Design Section B
AutoCAD SHX Text 50-04-6260
AutoCAD SHX Text
AutoCAD SHX Text
AS_NOTED
AutoCAD SHX Text 08-16-2019
AutoCAD SHX Text
EXHIBIT A
AutoCAD SHX Text
DEMOLITION PLAN
AutoCAD SHX Text D-102
AutoCAD SHX Text N
AutoCAD SHX Text 0'
AutoCAD SHX Text 50'
AutoCAD SHX Text 100'
AutoCAD SHX Text 200'
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
PROJECT LEVEE,
AutoCAD SHX Text
CLEARING AREA 1
AutoCAD SHX Text
CLEARING AREA 2
AutoCAD SHX Text
CLEARING AREA 3
AutoCAD SHX Text
CLEARING AREA 5
AutoCAD SHX Text
CLEARING AREA 6
AutoCAD SHX Text
CLEARING AREA 7
AutoCAD SHX Text
CLEARING AREA 4
AutoCAD SHX Text
TREE/SHRUB LOCATION
DENSE VEGETATION
T-283
AutoCAD SHX Text T-286
AutoCAD SHX Text T-287
This is the start of the file's text. The full file is on GovTribe.