AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

A. Revise FAR 52.217-7 to identify w hen the Government intends to exercise Options 2001 and 3001; and B. Revise Section 00 73 00 Supplementary Conditions to identify the respective periods of performance for Options 2001 and 3001.

C. See Summary of Changes.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 17-Sep-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9123819B0009

X 9B. DATED (SEE ITEM 11)

23-Aug-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

17-Sep-2019

CODE

USACE SACRAMENTO DISTRICT

ATTN: CONTRACTING DIVISION

1325 J STREET

SACRAMENTO CA 95814-2922

W91238 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9123819B0009

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 70 00 - CONDITIONS OF THE CONTRACT

The following have been added by full text:

52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989)

The Government may require the delivery of the numbered line item, identified in the Schedule as an option item

(See Section 00 10 00, Contract Line Item Number (CLIN) 1001, 2001 and 3001), in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor by

CLIN 1001 (i.e., Option 1) 1 June 2020

CLIN 2001 (i.e., Option 2) 15 December 2019; and

CLIN 3001 (i.e., Option 3) 1 June 2020.

Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.

(End of clause)

SECTION 00 72 00 - GENERAL CONDITIONS

CLIN 2001

The CLIN extended description has changed from:

Contractor must provide everything necessary to complete Hamilton City Phase 2B Option 2001 in accordance with the plans, specifications, terms and conditions. Option 2001 encompasses the work supporting the J Levee

Alignment from STA. 98+75 to 106+60).

To:

Contractor must provide everything necessary to complete Hamilton City Phase 2B Option 2001 in accordance with the plans, specifications, terms and conditions. Option 2001 encompasses the work supporting the J Levee

Alignment from STA. 98+75 to 106+60). If this option is exercised, an NTP will be issued to begin the period of performance for this option. See FAR 52.217-5 and FAR 52.217-7.

CLIN 3001

The CLIN extended description has changed from:

Contractor must provide everything necessary to complete Hamilton City Phase 2B Option 3001 in accordance with the plans, specifications, terms and conditions. Option 3001 consists of surplus J Levee Degrade Material

W9123819B0009

Stockpiling.

To:

Contractor must provide everything necessary to complete Hamilton City Phase 2B Option 3001 in accordance with the plans, specifications, terms and conditions. Option 3001 consists of surplus J Levee Degrade Material

Stockpiling. If this option is exercised, an NTP will be issued to begin the period of performance for this option. See

FAR 52.217-5 and FAR 52.217-7.

SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS

The following Delivery Schedule for CLIN 2001 has been added:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

350 dys. AOE 1 VALLEY RESIDENT OFFICE

2021 JEFFERSON BLVD

WEST SACRAMENTO CA 95691

FOB: Destination

L2M0250

The following Delivery Schedule for CLIN 3001 has been added:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

150 dys. AOE 1 VALLEY RESIDENT OFFICE

2021 JEFFERSON BLVD

WEST SACRAMENTO CA 95691

FOB: Destination

L2M0250

(End of Summary of Changes)