Spec. No. 2190
Pricing Schedule
(Phase 2B)
Hamilton City Flood Damage Reduction and Ecosystem Restoration Project
Phase 2B Glenn County, California
Base Contract (Sta. 0+00 to Sta. 129+61 and Sta. 195+50 to Sta. 216+00)
CLIN Description Estimated Quantity
Unit of Measure Unit Price Total Price
0001 Mobilization and Demobilization 1 JOB $ $
0002 Clearing and Grubbing* 21 AC $ $
Temporary Storm Water Pollution
Control
1 JOB $ $
J Levee Aggregate Surface Course
Removal*
2,320 CY $ $
0005 J Levee Stripping* 10,900 CY $ $
J Levee Degrade Unsuitable Material
Disposal*
25,000 CY $ $
0007 J Levee Degrade* 99,600 CY $ $
0008 Demolition and Removal 1 JOB $ $
Phase 2A Waterside Maintenance Road
Surface Course*
2,320 CY $ $
0010 Phase 2A Drainage Ditch Excavation* 2,500 CY $ $
0011 Topsoil Stripping* 6,450 CY $ $
0012 Observation Trench Excavation* 12,700 CY $ $
0013 Embankment Fill* 43,500 CY $ $
0014 Random Fill* 2,400 CY $ $
0015 Well Abandonment 1 EA $ $
0016 Grass Seeding and Erosion Control* 21 AC $ $
0017 Aggregate Surface Course* 3,602 TN
5,000 TN $ $
0018 Deer Fence* 2,950 LF $ $
0019 Post and Cable Fence* 1,150 LF $ $
Quantity
Unit of Measure Unit Price Total Price
0020 Stone Protection* 12,200 TN $ $
0021 Pipe Gates 2 EA $ $
0022 Double Swing Gates* 1 EA $ $
0023 Tree Removal 1 JOB $ $
TOTAL ESTIMATED PRICE $
NOTE: AC is acre, CY is cubic yard, EA is each, TN is ton, SY is square yard, and LF is linear foot.
*Indicates quantity is estimated and subject to Federal Acquisition Regulation clause 52.211-18 Variation in Estimated Quantity.
Option 1 (Sta. 129+61 to 195+50)
Quantity
Unit of Measure Unit Price Total Price
1001 Clearing and Grubbing* 23 AC $ $
Temporary Storm Water Pollution
Control
1 JOB $ $
1003 Demolition and Removal 1 JOB $ $
1004 J Levee Degrade* 28,500 CY $ $
1005 Topsoil Stripping* 10,100 CY $ $
1006 Observation Trench Excavation* 26,400 CY $ $
1007 Drainage Ditch Excavation* 2,600 CY $ $
1008 Pipe Trench Excavation* 5,900 CY $ $
1009 Embankment Fill* 112,400 CY $ $
1010 Random Fill* 4,400 CY $ $
1011 30” Steel Pipe* 2,550
LF $ $
1012 30” Flap Gate 1 EA $ $
Concrete Riser, Inlet, and Outlet
Structures
1 JOB $ $
1014 48” RCP Culvert 160 LF $ $
1015 48” Sluice Gate 1 EA $ $
1016 48” Flap Gate 1 EA $ $
1017 Aggregate Surface Course* 6,500 TN $ $
Quantity
Unit of Measure Unit Price Total Price
1018 Grass Seeding and Erosion Control* 23 AC $ $
1019 Deer Fence* 6,950 LF $ $
1020 Double Swing Gates* 4 EA $ $
1021 Stone Protection* 150 TN $ $
1022 Irrigation Systems Removal 1 JOB $ $
1023 Tree Removal 1 JOB $ $
1024 Existing Pump Structure Relocation 1 JOB $ $
1025 J Levee Stripping* 3,000 CY $ $
1026 J Levee Degrade Unsuitable Material
Disposal*
4,000 CY $ $
Option 2 (J Levee Alignment Sta. 98+75 to 106+60)
Estimated Quantity
Unit of Measure Unit Price Total Price
2001 Stone Protection* 23,500 TN $ $
Option 3 (Surplus J Levee Degrade Material Stockpiling)
Estimated Quantity
Unit of Measure Unit Price Total Price
3001 Clearing and Grubbing* 4.5 AC $ $
Temporary Storm Water Pollution
Control
1 JOB $ $
3003 Topsoil Stripping* 7,400 CY $ $
Surplus J Levee Degrade Material
Stockpiling*
54,000 CY $ $
3005 Grass Seeding and Erosion Control* 5 AC $ $
NOTE: AC is acre, CY is cubic yard, EA is each, TN is ton, SY is square yard, and LF is linear foot.
*Indicates quantity is estimated and subject to Federal Acquisition Regulation clause 52.211-18 Variation in Estimated Quantity.