Specification_Section_06_13_33.pdf

PDF 22 KB Posted

Attached to
Repair Pier 3 at Military Ocean Terminal Concord (MOTCO), California
Solicitation number
W91238-15-R-0002
Issued by

About this file

Revised Specification Section 06 13 33

View the file

Other files

File Type Posted
Bidder_Inquiry_Reopened.pdf PDF
W91238-15-R-0002-0010.pdf PDF
Attachment_04_-_Wage_Determination_Updated_05-08-2015.pdf PDF
Attachment_20_-_Revised_SOW _Specifications _Dated_05-22-2015.pdf PDF
Attachment_21_-_Updated_CLIN_Schedule.pdf PDF
W91238-15-R-0002-0009.pdf PDF
Amendment_0008.pdf PDF
Wage_Determination_1_May_2015.pdf PDF
Amendment_0007.pdf PDF
New_Proposal_due_date_14_May_2015-W91238-15-R-0002_MOTCO_PIER_3.pdf PDF
Davis_Bacon_Wage_Determination_29_April_15.pdf PDF
New_Proposal_Due_Date_7_May_2015_Amend_0006.pdf PDF
New_Proposal_due_date_7_May_2015-W91238-15-R-0002_MOTCO_PIER_3.pdf PDF
Amendment_0005.pdf PDF
Attachment_L _Pier_3_Structural_Repairs_27May03.pdf PDF
Attachment_I _Naval_Magazines_4Sep44.pdf PDF
Attachment_B _USFWS_Biological_Opinion_4Feb15.PDF PDF
Attachment_E _MEC_Support_during_HTRW_01Aug04.pdf PDF
Attachment_F _Routine_Inspection_Report_Apr12.pdf PDF
Attachment_D _DDESB_Approval_ESS_27Sep13.pdf PDF
Amendment_0004.pdf PDF
Wage_Determination_27Mar15.pdf PDF
Attachment_H _Minimum_Separation_Distances_16Sep13.pdf PDF
Attachment_J _MOTCO_Pier_3_Special_Structural_Inspection_Report_16Jun14.pdf PDF
Attachment_K _Naval_Weapons_Station_21Feb97.pdf PDF
EM_385-1-97_12Apr13.pdf PDF
MOTCO_Environmental_Impact_Statement_10Feb15.pdf PDF
Attachment_C _MOTCO_ESS_7Aug13.pdf PDF
Attachment_G _Special_Inspection_Report_Mar13.pdf PDF
Amendment_0003.pdf PDF
Amendment_0002.pdf PDF
Amendment_0001.pdf PDF
Site_Visit_Sign-In_Sheet.pdf PDF
NCIC_CONSENT_FORM.docx DOCX document
MOTCO_FM_190-2_Camera_Pass.docx DOCX document
Drawings_10Sep14.pdf PDF
Specifications_31Dec14.pdf PDF
Scope_of_Work_31Dec14.pdf PDF
DDESB_Technical_Paper_18_20Dec04.pdf PDF
Solicitation_W91238-15-R-0002.pdf PDF
iWatch_Army_What_To_Do_Booklet_4Nov14.pdf PDF
Wage_Determination_19Dec14.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REPAIR PIER 3 - PHASE I SPECIFICATION NO. 1991

MOTCO CONCORD, CALIFORNIA

SECTION TABLE OF CONTENTS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

SECTION 06 13 33

PIER TIMBERWORK AND REPAIR

PART 1 GENERAL

1.1 REFERENCE

1.2 DELIVERY AND STORAGE

1.3 WORK INVOLVED

PART 2 PRODUCTS

2.1 MATERIALS

2.1.1 Lumber and Timbers

2.1.1.1 Solid Sawn

2.1.2 Hardware

2.1.2.1 Zinc-Coating

2.1.2.2 Washer Sizes

PART 3 EXECUTION

3.1 CONSTRUCTION

3.1.1 Framing

3.1.2 Bracing

3.1.3 Fastening

3.1.4 Galvanized Surface

3.1.5 Sealers

-- End of Section Table of Contents --

SECTION 06 13 33 Page 1 Amendment 0004

SECTION 06 13 33

PIER TIMBERWORK AND REPAIR

PART 1 GENERAL

1.1 REFERENCE

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN WOOD PROTECTION ASSOCIATION (AWPA)

AWPA C2 (2003) Lumber, Timber, Bridge Ties and Mine Ties - Preservative Treatment by Pressure Processes

AWPA P5 (2014) Standard for Waterborne Preservatives

ASTM INTERNATIONAL (ASTM)

ASTM A123/A123M (2013) Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products

ASTM A153/A153M (2009) Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware

ASTM A307 (20122014) Standard Specification for Carbon Steel Bolts and Studs, 60 000 PSI Tensile Strength

U.S. GENERAL SERVICES ADMINISTRATION (GSA)

FS RR-W-410 (Rev G) Wire Rope and Strand

1.2 DELIVERY AND STORAGE

Open-stack untreated timber and lumber material on skids at least 12 inches aboveground and at least 5 feet from edge of pavement, in a manner that will prevent warping and allow shedding of water. Close-stack treated timber and lumber material in a manner that will prevent long timbers or preframed material from sagging or becoming crooked. Keep ground under and within 5 feet of such piles free of weeds, rubbish, and combustible materials. Protect materials from weather. Handle treated timber with ropes or chain slings without dropping, breaking outer fibers, bruising, or penetrating surface with tools. Do not use cant dogs, peaveys, hooks, or pike poles. Protect timber and hardware from damage.

1.3 WORK INVOLVED

For any replacement, and re-assembly of timber bracings and any timber connected to piles to be wrapped, the materials and procedures shall be as

SECTION 06 13 33 Page 2 required in this section of the specification.

PART 2 PRODUCTS

2.1 MATERIALS

2.1.1 Lumber and Timbers

2.1.1.1 Solid Sawn

Provide solid sawn lumber and timbers of stress-rated Southern Pine or Douglas Fir-Larch, with a stress rating of 1600 psi minimum, and identified by the grade mark of a recognized association or independent inspection agency using the specific grading requirements of an association recognized as covering the species used. Lumber and timbers shall have a preservative treatment in accordance with AWPA C2 and AWPA P5 using water-borne preservative (material subject to marine borer exposure). Contractor shall be responsible for the quality of the treated product.

2.1.2 Hardware

Bolts with necessary nuts and washers, timber connectors, drift pins, dowels, nails, screws, spikes, and other fastenings. Bolts and nuts shall conform to ASTM A307. Provide cast-iron ogee washers, or plate washers.

Provide bolts with washers under nut and head. Provide timber connectors and other metal fastenings as required.

2.1.2.1 Zinc-Coating

Galvanize all ferous hardware by the hot-dip process in accordance with ASTM A123/A123M or ASTM A153/A153M, as applicable.

2.1.2.2 Washer Sizes

Cast-iron ogee washers shall be a minimum of 2-1/2 inches in diameter for 1 inch diameter bolts, and 2 inches in diameter for 7/8 inch diameter bolts.

Square plate washers shall be a minimum of 3-1/2 inches each side and 1-1/16 inch thick for 1 inch diameter bolts, and 3 inches each side and 15/16 inch thick for 7/8 inch diameter bolts.

PART 3 EXECUTION

3.1 CONSTRUCTION

3.1.1 Framing

Cut and frame lumber and timber so that joints will fit over contact surface. Secure timbers in alignment. Open joints are unacceptable.

Shimming is not allowed. Bore holes for bolts with a bit 1/16 inch larger in diameter than rod or bolt.

3.1.2 Bracing

Provide bracing of sufficient length to provide a minimum distance of 8 inches between outside bolt and end of brace. Bracing and girts shall bear firmly against piles or timber to which secured. Place fillers to avoid bending the bracing more than 1 inch out of line when bracing bolts or other fastenings are drawn up tight. Built-up fillers will not be permitted. Make filler a single piece of the same treated lumber as that

SECTION 06 13 33 Page 3 in the brace, with a width of at least 6 inches and a length of at least 12 inches. Bolt ends of bracing through pile, post, or cap with a bolt of minimum diameter indicated on drawings.

3.1.3 Fastening

Vertical bolts shall have nuts on the lower end. Provide bolts having sufficient additional threading to provide at least 3/8 inch per foot thickness of timber for future retightening.

3.1.4 Galvanized Surface

Repair and recoat zinc coating which has been field or shop cut, burned by welding, abraded, or otherwise damaged to such an extent as to expose the base metal.

3.1.5 Sealers

All holes and penetrations shall be sealed with a petroleum-based or mastic.

-- End of Section --

SECTION 06 13 33 Page 4

06 13 33 - PIER TIMBERWORK AND REPAIR
06 13 33 - PIER TIMBERWORK AND REPAIR
PART 1 GENERAL
1.1 REFERENCE
1.2 DELIVERY AND STORAGE
1.3 WORK INVOLVED
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 Lumber and Timbers
2.1.1.1 Solid Sawn
2.1.2 Hardware
2.1.2.1 Zinc-Coating
2.1.2.2 Washer Sizes
PART 3 EXECUTION
3.1 CONSTRUCTION
3.1.1 Framing
3.1.2 Bracing
3.1.3 Fastening
3.1.4 Galvanized Surface
3.1.5 Sealers