Amendment_0003.pdf

PDF 29 KB Posted

Attached to
Repair Pier 3 at Military Ocean Terminal Concord (MOTCO), California
Solicitation number
W91238-15-R-0002
Issued by

View the file

Other files

File Type Posted
Bidder_Inquiry_Reopened.pdf PDF
W91238-15-R-0002-0010.pdf PDF
Attachment_04_-_Wage_Determination_Updated_05-08-2015.pdf PDF
Attachment_20_-_Revised_SOW _Specifications _Dated_05-22-2015.pdf PDF
Attachment_21_-_Updated_CLIN_Schedule.pdf PDF
W91238-15-R-0002-0009.pdf PDF
Amendment_0008.pdf PDF
Wage_Determination_1_May_2015.pdf PDF
Amendment_0007.pdf PDF
New_Proposal_due_date_14_May_2015-W91238-15-R-0002_MOTCO_PIER_3.pdf PDF
Davis_Bacon_Wage_Determination_29_April_15.pdf PDF
New_Proposal_Due_Date_7_May_2015_Amend_0006.pdf PDF
New_Proposal_due_date_7_May_2015-W91238-15-R-0002_MOTCO_PIER_3.pdf PDF
Amendment_0005.pdf PDF
Specification_Section_06_13_33.pdf PDF
Attachment_L _Pier_3_Structural_Repairs_27May03.pdf PDF
Attachment_I _Naval_Magazines_4Sep44.pdf PDF
Attachment_B _USFWS_Biological_Opinion_4Feb15.PDF PDF
Attachment_E _MEC_Support_during_HTRW_01Aug04.pdf PDF
Attachment_F _Routine_Inspection_Report_Apr12.pdf PDF
Attachment_D _DDESB_Approval_ESS_27Sep13.pdf PDF
Amendment_0004.pdf PDF
Wage_Determination_27Mar15.pdf PDF
Attachment_H _Minimum_Separation_Distances_16Sep13.pdf PDF
Attachment_J _MOTCO_Pier_3_Special_Structural_Inspection_Report_16Jun14.pdf PDF
Attachment_K _Naval_Weapons_Station_21Feb97.pdf PDF
EM_385-1-97_12Apr13.pdf PDF
MOTCO_Environmental_Impact_Statement_10Feb15.pdf PDF
Attachment_C _MOTCO_ESS_7Aug13.pdf PDF
Attachment_G _Special_Inspection_Report_Mar13.pdf PDF
Amendment_0002.pdf PDF
Amendment_0001.pdf PDF
Site_Visit_Sign-In_Sheet.pdf PDF
NCIC_CONSENT_FORM.docx DOCX document
MOTCO_FM_190-2_Camera_Pass.docx DOCX document
Drawings_10Sep14.pdf PDF
Specifications_31Dec14.pdf PDF
Scope_of_Work_31Dec14.pdf PDF
DDESB_Technical_Paper_18_20Dec04.pdf PDF
Solicitation_W91238-15-R-0002.pdf PDF
iWatch_Army_What_To_Do_Booklet_4Nov14.pdf PDF
Wage_Determination_19Dec14.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04 EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Repair Pier 3 at Military Ocean Terminal Concord (MOTCO), California.

The purpose of this amendment is to extend the proposal due date to April 9, 2015 at 2:00pm local time.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA 15C. DATE SIGNED 15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer) (Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91238-15-R-0002

X 9B. DATED (SEE ITEM 11)

31-Dec-2014

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

6-Mar-2015

CODE

US ARMY CORPS OF ENGINEERS, SACRAMENTO

CONTRACTING DIVISION

1325 J STREET

SACRAMENTO CA 95814-2922

W91238 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODE CODE

EMAIL: TEL:

W91238-15-R-0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 11-Mar-2015 02:00 PM to 9-Apr-2015 02:00 PM.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .