Attachment_D _DDESB_Approval_ESS_27Sep13.pdf

PDF 486 KB Posted

Attached to
Repair Pier 3 at Military Ocean Terminal Concord (MOTCO), California
Solicitation number
W91238-15-R-0002
Issued by

About this file

Attachment D DDESB Approval ESS

View the file

Other files

File Type Posted
Bidder_Inquiry_Reopened.pdf PDF
W91238-15-R-0002-0010.pdf PDF
Attachment_04_-_Wage_Determination_Updated_05-08-2015.pdf PDF
Attachment_20_-_Revised_SOW _Specifications _Dated_05-22-2015.pdf PDF
Attachment_21_-_Updated_CLIN_Schedule.pdf PDF
W91238-15-R-0002-0009.pdf PDF
Amendment_0008.pdf PDF
Wage_Determination_1_May_2015.pdf PDF
Amendment_0007.pdf PDF
New_Proposal_due_date_14_May_2015-W91238-15-R-0002_MOTCO_PIER_3.pdf PDF
Davis_Bacon_Wage_Determination_29_April_15.pdf PDF
New_Proposal_Due_Date_7_May_2015_Amend_0006.pdf PDF
New_Proposal_due_date_7_May_2015-W91238-15-R-0002_MOTCO_PIER_3.pdf PDF
Amendment_0005.pdf PDF
Specification_Section_06_13_33.pdf PDF
Attachment_L _Pier_3_Structural_Repairs_27May03.pdf PDF
Attachment_I _Naval_Magazines_4Sep44.pdf PDF
Attachment_B _USFWS_Biological_Opinion_4Feb15.PDF PDF
Attachment_E _MEC_Support_during_HTRW_01Aug04.pdf PDF
Attachment_F _Routine_Inspection_Report_Apr12.pdf PDF
Amendment_0004.pdf PDF
Wage_Determination_27Mar15.pdf PDF
Attachment_H _Minimum_Separation_Distances_16Sep13.pdf PDF
Attachment_J _MOTCO_Pier_3_Special_Structural_Inspection_Report_16Jun14.pdf PDF
Attachment_K _Naval_Weapons_Station_21Feb97.pdf PDF
EM_385-1-97_12Apr13.pdf PDF
MOTCO_Environmental_Impact_Statement_10Feb15.pdf PDF
Attachment_C _MOTCO_ESS_7Aug13.pdf PDF
Attachment_G _Special_Inspection_Report_Mar13.pdf PDF
Amendment_0003.pdf PDF
Amendment_0002.pdf PDF
Amendment_0001.pdf PDF
Site_Visit_Sign-In_Sheet.pdf PDF
NCIC_CONSENT_FORM.docx DOCX document
MOTCO_FM_190-2_Camera_Pass.docx DOCX document
Drawings_10Sep14.pdf PDF
Specifications_31Dec14.pdf PDF
Scope_of_Work_31Dec14.pdf PDF
DDESB_Technical_Paper_18_20Dec04.pdf PDF
Solicitation_W91238-15-R-0002.pdf PDF
iWatch_Army_What_To_Do_Booklet_4Nov14.pdf PDF
Wage_Determination_19Dec14.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE ARMY

US ARMY DEFENSE AMMUNITION

CENTER

1 C TREE ROAD MCALESTER OK 74501-9053

REPLY TO

ATTENTION OF

JMAC-EST 27 September 2013

MEMORANDUM FOR US Army Corps of Engineers, Environmental and Munitions Center of Expertise, (CEHNC-EMM/Mr. Zange/Mr. Becker), P.O. Box 1600, Huntsville, AL 35807-4301.

SUBJECT: DDESB Approval, Explosives Safety Submission, Removal Action/Construction Support, Port Chicago Terrestrial Explosion Area and Port Chicago Water Explosion Area, Military Ocean Terminal Concord (MOTCO) Concord, CA.

1. References:

a. Memorandum, CEHNC-EMM, dated 7 August 2013, subject: Explosives Safety Submission (ESS) for Military Ocean Terminal Concord (MOTCO) Port Chicago Terrestrial Explosion Area MRS and Port Chicago Water Explosion Area MRS, Concord, CA, August 2013.

b. DoD 6055.09-M, Ammunition and Explosives Safety Standards, 29 Feb 08, administratively reissued August 4, 2010.

c. DA SAIE-ESOH Memorandum date 16 September 2013, subject: Munitions Response Actions-Minimum Separation Distance (Relative to Impulse Water Pressure) from Underwater Detonations. (Encl).

d. Memorandum, DDESB-PE, dated 24 September 2013, subject: DDESB Approval of

Explosives Safety Submission, Removal Action/Construction Support of Port Chicago Terrestrial Explosion Area and Port Chicago Water Explosion Area, Military Ocean Terminal Concord, Concord, CA. (Encl).

2. The subject Explosives Site Plan, Remedial Investigation/Feasibility Study, transmitted by reference 1.a, has been reviewed in accordance with reference 1.b. Reference 1.d provide Army level approval for intrusive underwater explosive operation for Port Chicago Terrestrial Explosion Area and Port Chicago Water Explosion Area, located at Military Ocean Terminal Concord, Concord, CA. Reference 1.c provides Department of Defense Explosives Safety Board (DDESB) approval. This approval will be made part of the administrative record for the site.

3. If any changes occur during or after completion of this effort that could increase explosive risk or hazards to site workers or the public due to the presence of military munitions at the site, an amendment to this ESP must be submitted for review and approval.

4. The POC is Jorge L. Villafane, JMAC-EST, DSN 956-8966, commercial (918) 420-8966, email jorge.l.villafane.civ@mail.mil.

mailto:jorge.l.villafane.civ@mail.mil mailto:jorge.l.villafane.civ@mail.mil

JMAC-EST

SUBJECT: DDESB Approval, Explosives Safety Submission, Removal Action/Construction Support, Port Chicago Terrestrial Explosion Area and Prot Chicago Water Explosion Area, Military Ocean Terminal Concord (MOTCO) Concord, CA.

Jimmy L. Langley Ph.D., CSHM Toxic Chemical Agent Team Leader Explosives Safety Knowledge, MEC

And Chemical Division

CF (w/encl):

Office of the Director of Army Safety (DACS-SF/Mr. Patton), 223 23rd Street, Crystal Plaza 5, Suite 980, Arlington, VA 22202

Office of the Deputy Assistant Secretary of the Army for Environment, Safety, and Occupational Health, Special Assistant for Munitions, (DASA-DESOH/Mr. King), 110 Army Pentagon, Washington, DC 20310-0110

U.S. Army Corps of Engineers (CESO/Ms. Roberts), 20 Massachusetts Avenue, NW, Washington, DC 20314-1000

2013-09-27T11:24:46-0500
LANGLEY.JIMMY.L.1230696388

File details come from the government source that posted it. Updated .