About this file

Solicitaion W91238-12-R-0023

View the file

Other files

File Type Posted
12-R-0023 Amendment 05.pdf PDF
Amendment 0004.pdf PDF
RFP Q A Set 5.pdf PDF
RFP Q A Set 4.pdf PDF
W91238-12-R-0023 0003.pdf PDF
RFP Q A Set 3.pdf PDF
W91238-12-R-0023 0002.pdf PDF
RFP QA Set 2.pdf PDF
W91238-12-R-0023 Amendment 0001.pdf PDF
W91238-12-R-0023 Q A 1.pdf PDF
Section J - Attach 1a Equiv Fed Wage Rates.xls XLS spreadsheet
Section J - Attach 5.xlsx XLSX spreadsheet
Attachment 1.pdf PDF
Attachment 4.pdf PDF
Section J - Attach 6.xls XLS spreadsheet
Section J - Attach 7 dd1547.pdf PDF
Section J - Attach 1 Wage Rates.docx DOCX document
Attachment 2.pdf PDF
Attachment 3.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 02:00 PM local time 28 Jun 2012

X

A X B X C

D

EX

X G F 75 - 91

92 - 116 X H 117 - 127 caren.a.jackson@usace.army.mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

1 127

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

W91238 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 5 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and

1325 J. St., Sacramento, CA conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

CAREN A JACKSON 916-557-7716

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

2 - 7

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

8 - 50 J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 53 - 54 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 55 - 56 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

57 - 73

PART II - CONTRACT CLAUSES

USACE SACRAMENTO DISTRICT

ATTN: CONTRACTING DIVISION

1325 J STREET

SACRAMENTO CA 95814-2922

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

15 May 2012

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

W91238-12-R-0023

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0001 40,000,000 Lot Base Period ERS MATOC FFP

FFP

Base Period Indefinite Delivery / Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) with shared capacity of $40 million for Environmental Remediation Services in support of U.S. Army Corps of Engineers, South Pacific Division. Base Period is three years from date of contract award FOB: Destination

MAX

NET AMT

UNIT UNIT PRICE MAX AMOUNT

0002 UNDEFINED Lot Base Period ERS MATOC CPFF

CPFF

Base Period Indefinite Delivery / Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) with shared capacity of $10 million for Environmental Remediation Services in support of U.S. Army Corps of Engineers, South Pacific Division. Base Period is three years from date of contract award

MAX COST

FIXED FEE

TOTAL MAX COST + FEE

UNIT UNIT PRICE MAX AMOUNT

0003 UNDEFINED Lot OPTION Option Period, ERS MATOC FFP

FFP

Option Period Indefinite Delivery / Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) with shared capacity amount remaining from Base Period for Environmental Remediation Services in support of U.S. Army Corps of Engineers, South Pacific Division. Option Period is for two years.

MAX

NET AMT

UNIT UNIT PRICE MAX AMOUNT

0004 UNDEFINED Lot OPTION Option Period, ERS MATOC CPFF

CPFF

Option Period Indefinite Delivery / Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) with shared capacity amount remaining from Base Period for Environmental Remediation Services in support of U.S. Army Corps of Engineers, South Pacific Division. Option Period is for two years.

MAX COST

FIXED FEE

TOTAL MAX COST + FEE

SECTION B

Section B – Supplies or Services & Prices / Costs

1. Contract Definition

This Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) is a part of the U.S. Army Corps of Engineers, Northwestern, Southwestern and South Pacific Divisions’ Multiple Environmental Government Acquisition (MEGA) Strategy.

This will be an Indefinite Delivery/Indefinite Quantity (IDIQ), Multiple Award Task Order Contract

(MATOC) for Environmental Remediation Services under NAICS Code 562910, in support of the U.S. Army Corps of Engineers (USACE), for use within South Pacific Division (SPD) boundaries. The total shared contract capacity of $50 million will be divided between SPD Districts of Sacramento, Los Angeles, and Albuquerque. Firm fixed-price (FFP) and cost reimbursement (including cost plus fixed-fee (CPFF), cost plus award fee (CPAF, and cost plus incentive fee (CPIF) task orders may be written against the IDIQ contracts.

The intent is to award up to five (5) contracts under this solicitation; however, if the Contracting Officer determines during the source selection process that fewer or more than five (5) contracts should be awarded, based upon the selection criteria, the Contracting Officer has the discretion of adjusting that number, or awarding none at all.

Please ensure this NAICS code 562910 is incorporated in your current CCR registration at www.ccr.gov.

Failure to have this NAICS code current in CCR may result in not being considered for the award.

2. Eligibility

The contract is unrestricted. See FAR 52.219-9 Small Business Subcontracting Plan.

3. Total Amount of Contract

The total amount of the MATOC with shared capacity among all contractors awarded contracts under this solicitation shall not exceed $50 million. There is no limit of the number of task orders that may be executed against this contract. The cumulative total of all task orders issued under the MATOC shall not exceed the total contract capacity amount of $50 million.

4. Guaranteed Contract Amount

Each contract awarded under this solicitation shall have a guaranteed base period minimum amount of $2,500.00. The guaranteed minimum will be met with the obligation of a task order meeting or exceeding the guaranteed amount, or will be funded on the basic contract.

5. Performance Period

Contracts will have a basic performance period of three (3) years plus a two (2) year option period or until the $50 million contract limit is reached, whichever comes first. Total length of the contract, including the option period, will not exceed five (5) years from date of contract award.

6. Pricing

Firm-fixed price task orders will be for services performed at prices expressly provided for therein and based on Section B. Profit will be negotiated for each individual task order. The amount to be paid to the contractor for each firm-fixed price task order shall be based on the hourly rate for labor disciplines listed in Table 1 and markups for the other direct costs in paragraph 6.1. All hourly rates shall include Overhead, General/Administrative, Labor Burden Fringes, and shall be exclusive of profit. The labor rates provided by the offeror, and determined fair and reasonable by the government, will be binding on the basic contract and will be the maximum rates at the task order level. If a discipline is not listed in Table 1 and is required for a specific task order, that labor rate will be negotiated with the offeror before award of that task order. These rates will be the maximum rates that can be proposed at the task order level; however, rates lower than the maximum contract rates may be offered at the task order level.

Cost reimbursable type task orders will be for allowable incurred costs for best effort on the part of the contractor. For all cost reimbursement type task orders, the contractor will use DCAA/DCMA approved forward pricing rates or Certified Public Accountant (CPA) established cost pools in accordance with FAR Part 31 for Year 1 for Overhead, G&A, and other indirect costs. Profit will be negotiated on individual cost reimbursable task orders issued. Offerors must have an accounting system that is deemed adequate by the Defense Contract Audit Agency (DCAA) / Defense Contract Management Agency (DCMA) to be eligible for contract award under this solicitation.

Offerors that do not have an approved accounting system may otherwise receive award of a MATOC. However, they will not be eligible to propose on cost reimbursable task orders. Finally, the contractor will provide a capped for Overhead, G&A and other indirect cost for Years 1, 2 and 3, which will be incorporated into their Contract Management Procedure as shown below. The contractor will submit a new Federal/State audit to establish new Forward Pricing Rates and New Caps for Years 4 and 5. The contractor shall have the ability to support cost reimbursable task orders (i.e., DCAA-approved accounting system and adequate purchasing system). The government reserves the right to request a DCAA Audit prior to contract award. Additionally, each cost reimbursable task order issued will be subject to DCAA Audit. Prices will be based on Section B of the solicitation, which is to be completed by all offerors.

Years 1, 2, and 3 Capped Rates. The contractor shall provide the following information.

Home Office Overhead Total overhead components (fringes, benefits, overhead, and G&A) will be capped at

_____% of [ ] total cost or [ ] direct labor costs. (Check appropriate box).

A ceiling for G&A for Other Direct Costs (ODCs) is______%. This includes all other markups other than

Facilities Capital Cost of Money (FCCM).

Field Office Overhead (if applicable).

Total overhead components (fringes, benefits, overhead, and G&A) will be capped at _____% of [ ] total cost or [ ] direct labor costs. (Check appropriate box).

A ceiling for G&A for ODCs is______%. This includes all other markups other than FCCOM.

Offerors are instructed to provide one overhead rate for evaluation purposes and provide a breakout to state what is included in that rate if necessary. All rates (direct and indirect) provided in Section B must be traceable to the rates in the proposed sample task. Any proposal that does not provide rates as instructed or provide traceability to the sample task will not be considered / evaluated for award

Offerors are cautioned against submitting an unbalanced offer. The government will analyze offers to determine whether they are unbalanced with respect to prices or separately priced line items. Offers that are determined to be materially unbalanced may be rejected. An offer is mathematically unbalanced if it is based on prices which are significantly less than the cost for some contract line items and significantly overstated in relation to cost for others. In addition, an offer is materially unbalanced if it is mathematically unbalanced and there is a reasonable doubt that the offer would result in the lowest overall cost to the government, even though it is the lowest evaluated offer.

Applicable Department of Labor Wage Rates (FAR 52.222-41) and Statement of Equivalent Rates for Federal

Hires (FAR 52.222-42) will be included at the individual task orders level when the site and location for the work is known.

The offeror shall only provide the Overhead and G&A rates for the prime, even if the labor disciplines will be performed by the prime or a subcontractor, depending on the task order. The subcontractor would be subject to honoring the labor rates stated for the subject labor discipline.

NOTE: If during the Contract Period of Performance, the Contractor’s original subcontracted personnel are no longer available to the Prime, the Prime shall find a subcontractor that has at a minimum, the same qualifications as the previous subcontracted personnel. The Prime shall be responsible for negotiating the labor rates for those personnel that have been provided in this RFP. Those rates provided are the maximum that will be paid by the Government for any replacement personnel.

Escalation of Labor Rates. Due to current economic uncertainties, it is recognized that labor rates may need to be adjusted on a 12-month basis; therefore, offerors will be afforded an opportunity to propose annual escalation percentages which will be used for evaluation of basic contract price and may be subject to renegotiation prior to the start of each 12-month cycle. The Contracting Officer will compare the contractor’s proposed rates to the most recent “core” Consumer Price Index and other accepted price indices, with the goal of negotiating a fair escalation percentage.

6.1 Overhead Rates / Markups (included in the Hourly Labor Rates Shown in Table 1 below):

Base Year 1

Base Year 2

Base Year 3

Option Year 1

Option Year 2

Total Labor Overhead Rate* _________%

G&A Rate* _________% Annual Escalation ________% ________% ________% ________%

*Must be substantiated by DCAA at a later time

6.2 The following items shall be paid at negotiated cost, plus markups identified below:

6.2.1 Specialized equipment and / or material ________%

6.2.2 Rental Equipment ________%

6.2.3 In-house copying/reproduction/copying ________%

Service

6.2.4 Other Direct Costs including, but not ________%

limited to, shipping, mailing, computer usage, and miscellaneous supplies items

6.2.5 Subcontracting Effort ________%

6.3 Direct Labor Rates

Offerors are required to provide Direct Labor Rates for the disciplines identified in Section J Attachment 5. Direct Labor Rates provided in Attachment 5 must be traceable to the direct labor rates provided in the sample task. Any proposal that does not provide rates as instructed or provide traceability to the sample task will not be considered / evaluated for award.

Please refer to Section L for complete instructions.

Offerors are to submit their labor rates for each of the ordering periods at the time of proposal submission.

For each labor discipline, please annotate whether the discipline provided is Prime or Subcontractor.

7. Department of Labor Wage Rates

For the purposes of the sample project, Department of Labor Wage Determination 2005-2049, Rev 14, dated June 13, 2011 and Statement of Equivalent Rates for Federal Hires for 2011 are attached in Section J of this solicitation.

For individual task orders written against the contract, the appropriate Department of Labor Wage Determination and Statement of Equivalent Rates for Federal Hires will be provided.

Department of Labor Wage Rates will be provided and used by the Government when the individual requests for Tasks Orders are issued.

8. Travel

Per Diem (lodging and MI & E expenses) shall be paid at the current Government rates in accordance with the Joint Federal Travel Regulation (JFTR) per person per calendar day spent in travel status. No per diem will be paid for travel less than the number of hours per day stated in the current JFTR. Per diem rate information may be obtained at https://secureapp2.hqda.pentagon.mil/perdiem/.

Actual cost of transportation by public conveyance (plane, limited to coach class) shall be paid. Privately owned vehicles shall be paid at the current Government mileage rate in accordance with the JFTR.

Section C - Descriptions and Specifications

SECTION C

1. Scope.

1.1. Scope. This Environmental Remediation Services (ERS) contract will support work assigned to the U.S.

Army Corps of Engineers (USACE), including but not limited to, Department of Defense Environmental Restoration Program (DERP); Formerly Used Defense Sites (FUDS); DoD Environmental Compliance Program, Environmental Support for Others (ESFO)Program; support to the Environmental Protection Agency (EPA) including Superfund and Brownfield Programs; Formerly Utilized Sites Remedial Action Program (FUSRAP);

environmental cleanup for various military and Interagency and International Support (IIS) customers;

environmental stewardship, and other environmental related regulatory programs.

1.2. Task orders under this contract will be in support of existing and future USACE customers within South

Pacific Division (SPD) Boundaries. Task orders will be issued as firm-fixed price (FFP) or cost-reimbursable (CR) to include Cost Plus Fixed-Fee (CPFF), Cost Plus Incentive Fee (CPIF) and Cost Plus Award Fee (CPAF) based on the requirements of the Performance Work Statement (PWS) at various known or suspected Hazardous, Toxic, and Radioactive Waste (HTRW) sites. Services may include, but are not limited to, the control of environmental contamination from pollutants, toxic substances, radioactive materials, and hazardous materials.

1.3. The majority of the task orders that will be issued under this ERS contract will be to provide services related to requirements of the Resource Conservation and Recovery Act (RCRA), the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), the National Oil and Hazardous Substances Pollution Contingency Plan (NCP), the Clean Water Act, the Clean Air Act, and other related Federal Programs in addition to State/Local specific regulations/requirements dealing with hazardous waste management/disposal, radioactive waste/mixed waste management/disposal, and with Underground Storage Tanks (USTs), and other fuels related issues. Remedial actions may address both regulated and non-regulated toxic substances. Incidental construction will also be included in the ERS contracts however, construction activities must be incidental to the ERS work.

Services that may be required in an ERS task order include, but are not limited to: preparation of work plans;

studies with associated reports; multiple phases of field investigations; preliminary assessments (PA); site inspections (SI) and remedial site inspections; remedial investigations (RI); feasibility studies (FS); Engineering Evaluation Cost Analysis (EECA); monitoring well installation and sampling; short and long term monitoring/long term operations (LTM/LTO) or Long Term Response Action (LTRA); data management; data interpretation;

engineering evaluation and corrective actions; optimization studies; ground-water modeling; geophysical surveys;

remediation cost estimates; management of non-hazardous and hazardous investigative derived waste (IDW);

environmental and human health risk assessments; risk based remediation; air emission issues including vapor intrusion; surface water discharge, applying for environmental permits, remedial design; well abandonment;

meetings; public meeting participation; preparation of presentation material both written and visual; hydrological, sediment and soil studies; project reports; engineering support and/or design; value engineering studies; operations and maintenance (O&M) for HTRW sites; energy evaluations for remediation systems; remedial action plans;

remedial actions; removal action plans; removal actions; construction support; site closeout/decision documents;

abandoned mines program support; and, future project programming and scheduling support.

1.4. Remedial action activities could include, but are not limited to the following: air sparging; soil vapor extraction; bioremediation including explosive media; asbestos and lead-based paint remediation; radon abatement;

landfill capping and collection systems; building remediation and demolition; sediment remediation; air discharge systems; ground-water extraction and injection systems; air stripping; carbon absorption; ground-water treatment systems; incineration of soils; low-temperature thermal desorption; mixed water disposal; solidification of contaminated matter; soil washing; detection, recovery, and disposal of MEC (incidental to ERS work), or any in-situ or on-site treatment methods. Remedial actions may address both regulated and non-regulated toxic substances.

Incidental construction will also be included in the ERS contracts; however, construction activities must be incidental to the ERS work. Incidental military munitions response activities will also be included in the ERS contracts; however, military munitions response activities (i.e., avoidance, minor construction support, etc.) must be incidental to the ERS work.

1.5. Deleted.

1.6. Project specific task orders will be issued under the basic contract and any exercised option period thereto. The USACE Contracting Officer or Contracting Officer’s Representative will provide the Contractor with any site-specific information in the USACE possession upon issuance of each task order. Information provided by USACE on any site will be dependent on the current status of the site.

1.7. Performance-Based Task Orders. Performance-based service contracts (PBC): (1) describe the requirements in terms of results required rather than methods of performing the work; (2) use measurable performance standards (e.g., terms of quality, timeliness, quantity); (3) specify procedures for reductions in fee and/or price for deficient services; and (4) include performance incentives/disincentives where appropriate.

Performance-based contract methods are intended to ensure that required performance quality levels are achieved and that the Government’s total payment is commensurate with the quantity and quality of services received.

Performance-based task orders, with a tailored task order specific Quality Assurance Surveillance Plan (QASP) will be issued IAW FAR 37.102 against the awarded contracts unless the required approval is received in accordance with AFARS 5137.170-2.

FAR 2.101 defines Performance Work Statements (PWS) as “a statement of work for performance-based acquisitions that describes the required results in clear, specific and objective terms with measurable outcomes” and Statements of Objectives (SOO) as a “Government-prepared document incorporated into the solicitation that states the overall performance objectives. It is used in solicitations when the Government intends to provide the maximum flexibility to each offeror to propose an innovative approach.” PBCs tend to require more engineering support than traditional prescriptive contracts. This is because PBCs specify what the final goal of a project is, but not how it is to be accomplished. Basically, the PWS and SOO describe the end result the contractor is required to achieve on a specific project but do not tell them how to complete it, thus allowing for maximum flexibility for offerors to propose innovative approaches. PWSs emphasize performance that can be contractually defined so that the results of the contractor's effort can be measured in terms of technical and quality achievement, schedule progress, or cost performance. Under a PWS, milestone payments occur only when the results meet or exceed the stated objectives. Simply meeting the Milestone/ Objective, (i.e., submittal of a document for review) is not the same as completion of the Milestone/Objective, (i.e., approval and acceptance of the document by the regulators).

Only upon the completion, approval, and acceptance will the Government pay for that Milestone/Objective. For a performance-based task order, the contractor will be required to use its expertise and develop the methods to achieve the required end result. The requirement for QASPs for service contracts is set forth in FAR Subpart 37.6 and FAR 46.103.

A PWS for a Task Order will to every extent possible:

Define desired results/outcomes.

Define what level of performance is expected (and ensure it is meaningful and fair) and use performance standards and QASP.

Provide all information known about the site(s) or where it can be located and accessed by the

Contractor.

Define incentives and disincentives.

Define the measurement terms using clear and concise language avoiding vague or broad statements.

1.8. The description of work stated herein provides a general understanding of the Contractor functions to be performed; individual task orders will contain the specific performance based requirements. Technical requirements described herein in no way limit the activities that may be required under the terms of this contract.

1.9. The Contractor shall be responsible for acquiring the latest version of applicable regulatory or agency guidance, including but not limited to, the referenced documents cited in this Section C of this Solicitation and/or subsequent task orders issued after award of the Contract, unless otherwise specified.

2. General.

2.1. The Contractor, operating as an independent Contractor and not as an agent of the Government, shall provide all labor, materials, facilities, and equipment to perform all work identified in each individual task order.

The Contractor may be required to perform work under multiple task orders at different sites simultaneously. The Contractor shall be cognizant of all appropriate laws, regulations, and guidance. The Contractor shall ensure that all work activities performed by his personnel, subcontractors and suppliers are executed as required by these laws and regulations. Any incident of noncompliance noted by the Contractor shall immediately be brought to the attention of the Contracting Officer (CO) and/or the Contracting Officer's Representative (COR) by written notice. Nothing in this contract shall relieve the Contractor of the responsibility to comply with these laws and regulations. Any conflicts between laws/regulations and contract/task order requirements shall be brought to the attention of the CO and/or COR.

2.2. Permits. The Contractor shall obtain permits and licenses necessary to conduct the work required by this

Contract including, but not necessarily limited to, environmental permits, building permits, discharge, Nuclear Regulatory Commission (NRC) or state license for radiation activities, and Department of Transportation (DOT) permits for transport of HTRW on public highways. Rights of entry on and off Government property may be required.

2.3. Data Ownership and Data Rights. All reports and data whatsoever, including all electronic data and software, generated under this contract will be determined by negotiation IAW the DFARS. When submitting proposals, offerors shall identify IAW DFARS 252.227-7017 to the extent known, all technical data or software that will be delivered with restrictions on its use, release, or disclosure.

3. Contract Performance Requirements.

3.1. Work Plans. For each task order the Contractor is required to submit an HTRW Work Plan (WP) as appropriate. The WP basically describes the Contractor’s activities as outlined in the task order. The WP shall contain (when relevant) but not be limited to, the following:

Description of available data and contaminant characterization Statement of the work to be accomplished including a statement of Data Quality Objective(s) Discussion on implementation of the project including the method of operation, type of equipment, personnel required, and other special considerations A schedule that presents the requirements to complete any required field work and key project milestones Permits, licenses, certificates, identification number, labeling and marking of containers, location of the disposal facility (investigative derived waste (IDW) decision tree), CERCLA status of disposal facility, and other requirements for radioactive waste (see EM1110-35-1, Chapter 8), if necessary

Coordination with USACE for characterization and disposal of DOD-owned radioactive materials or waste in accordance with EM 1110-35-1, Chapter 8

Key personnel to be used on the project along with their roles and responsibilities Site-specific assumptions and clarifications Site control measures Logs, reports, and record keeping to be utilized

3.2. Investigation and Field Studies (Both on-site and off-site work). The Contractor shall perform all planning, fieldwork, analysis and preparation of any reports as specified in the task order (s). The investigative services to be provided generally consist of, but are not limited to, performing investigations to determine the contaminant(s) source(s), geology, and ground-water conditions, contaminant concentration, contaminant migration, and geotechnical characteristics as well as any other related tasks. The data collection requirements shall be established in the task orders and be usable for preparation of a remedial design and/or implementation of the response action(s), evaluation, and response including final disposal. Investigation may or may not be performed in conjunction with the response action, depending on the final task order. Work may include risk assessments, fate and transport, ground-water modeling, or other techniques to determine the potential risks to human health and the environment. The Contractor shall prepare associated reports as described in each individual task order. The Contractor shall have the capability and experience to provide a wide range of investigative and response services required for remediation/responses at HTRW sites, including, but not limited to:

Site characterization and evaluation Identification of action levels for regulated hazardous wastes or substances resulting from review of Federal, state and local laws, regulation, guidance, or developed through risk assessments. This shall also include coordination with appropriate regulatory agencies Public Health Evaluations and National Environmental Policy Act (NEPA) documentation as required for proposed site remediation techniques and alternatives Survey and Mapping, GIS, remote sensing Boring for soil sampling, testing (field and/or laboratory) or other chemical or geotechnical analysis (either on- or off-site) Drilling, installation and development of ground-water monitoring wells, production wells, extraction and injection wells, piezometers or other instrumentation Conducting surface or down hole geophysical surveys Conducting hydro geological field testing and performing analyses and data interpretation Sampling and sample handling techniques for chemical and geotechnical characteristics including data management and data interpretation Short and Long Term Monitoring Evaluation of available response actions, and recommendations of the most environmentally sound and cost-effective alternatives Multi-Agency Radiation Site Survey and Investigation Manual (MARSSIM) for radioactive materials sites Preparing and submitting plans (e.g. closure plans, waste analysis plans, Spill Prevention, Control and Countermeasure (SPCC) plans, Underground Storage Tank (UST) Site Assessment plans, Contingency Plans, etc.)

Expert Testimony Participation in community education, public involvement, or public affairs activities Chemical analysis (both on- and off-site) of all media for a wide variety of organic and inorganic parameters including, but not limited to:

Non-hazardous, hazardous, mixed and radioactive wastes Other chemical, physical, and composite testing Characterization and screening for waste-bulking compatibility Transportation and disposal of hazardous substances and radioactive materials Conventional water and waste water quality parameters Reviewing work products for technical adequacy Potentially Responsible Party (PRP) Activities Recordkeeping Training and documentation required by Federal, state, and local laws and regulations

3.3. Analytical Testing. The Government requires the contractor to be compliant with the Uniform Federal Policy Quality Assurance Project Plan (UFP QAPP) format for all work plans prepared under this contract. The Government requires the contractor to use the most recent version of the Department of Defense Quality Systems Manual for Environmental Laboratories (DOD QSM) for all definitive environmental data. The DoD QSM is available at www.denix.osd.mil under announcements. The laboratory to be used shall be accredited by the DoD Environmental Laboratory Accreditation Program (ELAP) or by project-specific audit. All proposals shall identify the prime laboratory and secondary laboratory(ies) to be used for this type of contract work. The recommendation for acceptability of the laboratory will be at the discretion of the USACE Project Chemist. If the laboratory fails to meet the project specific requirements at any time, the USACE Project Chemist may request use of the laboratory be discontinued and analytical services be procured from a laboratory which can meet the project specific requirements.

Data shall be provided as Staged Electronic Data Deliverables (SEDD) minimum stage 2A. The proposed laboratories shall follow, at a minimum, DoD QSM Version 4.2 project library; along with the ADR.NET software for data verification of batch QC parameters. Sponsorship for ADR.NET software tools is available to Contractors.

The Contractor must perform manual verification/validation of any analytical steps that are not automated within ADR.NET. This includes, but is not limited to data verification and validation of each method’s specific initial calibration, calibration verification and instrument performance parameters as specified in the EPA methodology and DoD QSM. To complete the data assessment, data verification results that show exceedances, will require further evaluation through data validation procedures. Data will be validated according to decision logic and data qualifiers outlined in the most recent version of the EPA National Functional Guidelines or other project-specific guidance. Support for specific programs may also mandate the submission of chemical and/or sampling data in electronic formats for archival / retrieval within an agency-specific database systems. For instance, Air Force Projects will require an ERPIMS database format submission, US Army requires ERIS database format submission, and FUDS requires a SEDD data submission. ERPMIS is the Air Force system for validation and management of data from environmental projects at all Air Force bases. This data contains analytical chemistry samples, tests, and results as well as hydrogeological information, site/location descriptions, and monitoring well characteristics. Task orders for Air Force bases will require data to be generated for entry into the ERPIMS data base.

3.4. Engineering Support and Remedial Design. The Contractor may be required to provide a wide variety of engineering services to support remediation/response actions. The extent of the engineering services will be described in detail in each individual task order and may include but are not limited to structural, mechanical, electrical, architectural, geotechnical, geological, civil, environmental, cost engineering, constructability reviews, and other engineering support. The successful Contractor shall perform all necessary planning, fieldwork, and prepare all engineering documents identified in the task order. Engineering documents shall be representative of industry or Government standards for drawings and specifications or by performance specifications. All Engineering documents produced by the Contractor shall be stamped by a licensed Professional Engineer and shall be submitted to the USACE Project Manager for approval. Engineering documents may include, but not be limited to:

Design Analysis, containing the criteria, design assumptions calculations and other pertinent data Performance specifications or completely edited Government furnished guide specifications Computer Aided Design (CAD) generated drawings must be compatible with USACE software. The National CAD Standards can be found at the National Institute of Building Sciences website:

http://www.buildingsmartalliance.org/index.php/ncs. These Standards will be used by the Construction Contractor at time of as-built preparation.

The Contractor schedules shall be compatible with Primavera or with Microsoft Project Manager.

Cost estimating software should utilize an industry approved software package capable of providing sufficient information to adequately and accurately capture the projected project costs.

Title Two Services to include checking shop drawings, materials, fixtures, equipment, samples, plant materials in accordance with the specifications and drawings.

Record drawings, modifications or as-built drawings Constructability reviews Other engineering and technical support may include technical expertise or expert testimony during regulations negotiations Securing permits as requested Liaison and interface with regulatory agencies Resolution of problems during response actions

3.5. Response Actions, Removals, and Operations and Maintenance. Response actions may or may not be performed in conjunction with investigation and engineering support depending on the individual task order. The requirements related to response actions will be described in detail in individual task orders. The successful Contractor shall perform all necessary planning, fieldwork, and implementation of the response actions requirements identified. The Contractor selected for this work shall have the capability and experience to perform a wide range of investigations, response actions, and removals for HTRW sites including, but not limited to:

On-Site source control and containment using a variety of technologies On-Site treatment using a variety of technologies Preparation of Manifest for Customer Signature Transportation to and/or storage, treatment, and/or disposal of waste in an off-site facility Survey, removal, transportation and disposal of asbestos-containing materials Installation of all support facilities Preparation of all applicable Operation and Maintenance (O&M) Manuals and associated training of facility personnel for equipment installed Short and Long Term Operation and Maintenance of facilities constructed under this Contract for the period specified (inclusive of facilities constructed through other contracts or under other task orders issued under this contract) Problem solving during response with unexpected conditions or execution problems at the site

3.6. Planning Documentation Deliverables (Sampling and Analysis Plan (SAP), Field Sampling Plan (FSP) and QAPP or similar planning documentation). The Quality Assurance Project Plan (QAPP) is required to be included in the RCRA Facility Investigation (RFI) Work Plan for RCRA investigations. The SAP is mandated by the CERCLA, 40 CFR Part 300 Subpart E-Hazardous Substance Response. The CERCLA required SAP has two major subsections, the field-sampling plan (FSP), which deals with field activities, and the QAPP, which covers the generation of analytical data. In addition, the UFP-QAPP (EPA-505-B-900A, current version) template has recently been adopted for use by several governmental agencies within the Intergovernmental Data Quality Task Force (IDQTF). Also refer to USACE EM 200-1-3, Requirements for the Preparation of SAP for detailed requirements of the selected project planning documents. Regardless of the planning documents title, in order to obtain data of sufficient quality to satisfy data quality objectives for legally defensible data, the EPA, and/or state regulators require the preparation of appropriate planning documents for all environmental measurements that will be used for environmental regulatory compliance. The Contractor is responsible for preparing the appropriate planning document (referred herein as FSP/QAPP) that complies with the EPA or other lead regulatory agency regulations, USACE guidance, the Department of Defense Quality Systems Manual (DOD QSM) and EPA QA/R-5. All procedures and activities required for the acquisition of data shall be presented in the FSP/QAPP for approval by the USACE technical team, state and EPA authorities, as necessary, prior to the initiation of any fieldwork. In limited circumstances, USACE may grant conditional approval to the FSP/QAPP to permit some work to begin while non-critical deficiencies are being resolved. But for this exception, it is the responsibility of the Contractor performing the work to assure that no environmental data are acquired before the document is approved and received by project personnel.

The FSP/QAPP describes how environmental data collection operations are planned, carried out, and assessed.

Accordingly, the purpose of the FSP/QAPP is to document in detail all aspects of the project’s field and laboratory activities, including quality assurance (QA) and quality control (QC) activities executed to evaluate them. The FSP/QAPP must provide information in sufficient detail regarding sample design, sample types, sample locations, interpretation scenarios, any field contingencies, sampling methodologies, and other sample handling techniques to collect data that meets the project objectives. Specifics on detection and reporting limits of analytics used to support decisions, analytical methods, sample collection methods, field decision logic, data handling, and application to the Conceptual Site Model (CSM), QC practices, data submittals, and CSM updating activities must also be addressed. Data management strategies must be established within the FSP/QAPP, and appropriately handled during fieldwork to ensure that all data generated is made available to any stakeholders, decision-makers and personnel involved in the work or near real-time decision-making. The FSP/QPP also describes the organization and QA objectives for field sampling and laboratory efforts, and any evaluation and interpretation of the data before its use. The FSP/QAPP serves as a mechanism to formalize the results of planning activities, and allows review and approval of all activities conducted as outlined within those planning documents amongst all project stakeholders.

The final decision to modify or revise the FSP/QAPP shall be initiated by USACE with input from any of the project stakeholders. If it is determined that conditions exist such that the technical or data quality objectives of the project cannot be obtained with the original FSP/QAPP, a decision will be made to update the FSP/QAPP. The originator (or designee) shall modify the document and then shall submit the revised version to the same approval authorities that approved the original FSP/QAPP. As with the original FSP/QAPP implementation and approval process, no revisions shall be implemented until project personnel have received the approved FSP/QAPP revisions.

As part of either the UFP QAPP or FSP/SAP, a Material Handling Plan (MHP) or Investigation Derived Waste (IDW) Plan shall be submitted. This plan consists of procedures outlining the safe handling of contaminated material, drummed material, and contaminated liquids in addition to procedures for off-site transportation and disposal of materials. Manifesting, DOT shipping papers, and chain-of-custody procedures should also be included.

The plan may also cover importation of clean fill materials for large, grading projects. If the project involves radioactive waste, Low-level radioactive waste, or mixed (co-mingled) waste, the contractor shall follow the requirements in EM 1110-35-1, as well as all federal, state, and local regulations.

3.7. Compliance with Federal, State and USACE Regulations. USACE has a varied customer base with unique environmental approaches and requirements. Most USACE environmental work falls under EPA environmental regulations covered by CERCLA or RCRA, or other state-level program. As such, each project’s lead regulatory agency must be identified, and any unique requirements accommodated. In general, all programs mandate the preparation of planning documents to assure the fieldwork and chemical data quality are supportive of the intended use of the data and final decisions being made.

3.8. Reviews. All deliverables will be reviewed by various levels of USACE, customers, local, State and

Federal regulatory agencies, and other project stakeholders, as appropriate. The Contractor will respond to all comments on deliverables.

4. Key Personnel.

The Contractor selected for this Contract shall have the experienced personnel to perform, or provide, a wide range of services required for Environmental Services and any responses to releases at HTRW sites. The Contractor or Contractor and Subcontractor Team jointly must have HTRW qualifications. The offeror must identify the key personnel to be assigned to the Contract by name, position, and firm (if other than prime contractor, show address (city/state) where the firm is located) in the organization chart. Resumes shall be presented with appropriate dates and responses to required qualifications as noted in the position description. The resumes will be evaluated to determine whether the individuals meet the desired qualifications and experience necessary to perform their roles and responsibilities under this Contract.

Exclusive of the project management functions (Program Manager, Senior Contracts Manager, Project Manager, and Contractor Quality Control Supervisor), the Contractor may utilize subcontractors, or consultants identified in the accepted proposal or subsequently approved by the USACE Contracting Officer to perform any of the functions required within the specific task order. Additional Project Managers can be from teaming relationships.

NOTE: The Contracting Officer shall approve all Replacement Key Personnel. Resumes of these individuals shall be required as part of task order proposals or whenever a change in personnel is to occur, in order to verify the replacement meets the qualifications of the solicitation. Other disciplines not listed may be required to perform specific task orders. These disciplines will be required to have comparable qualifications in their field of expertise and the resumes of these individuals may be required as part of task order proposals.

4.1. Program Manger. The Contractor shall designate one (1) individual as the Program Manager that serves as a single point of contact for coordination of program issues with USACE. The Program Manager shall be responsible for the overall management of the contract including cost, schedule and technical quality. The Program Manger shall be competent, experienced and knowledgeable in the full range of HTRW activities from investigations, to studies, designs, remediation, short-term operations and maintenance, and with the specific activities identified in this contract. The Program Manager shall take immediate corrective action when performance is not acceptable to USACE. The Program Manager shall oversee the development and implementation of record keeping, administrative and quality control programs. The Program Manager will provide an annual report to the USACE MEGA Program Manager that shall include details on subcontracting executed under awarded delivery orders.

The individual proposed as the Program Manager should have a college degree in engineering, construction management, geology, chemistry, or related field.

The individual proposed as the Program Manager should have five (5) years experience in Program

Management for other contracts/programs with a minimum of three (3) years working experience in ERS.

The individual proposed as the Program Manager should document professional registration, in their respective field, where applicable or available.

The Program Manager must be an employee of the Prime.

4.2. Project Manager(s). For each task order, the Contractor shall designate a Project Manager (PM). The

Program Manager may act as the Project Manager, with approval of USACE, if execution is sufficiently limited.

The Offeror shall identify the PM before issuance of the task order and the PM qualifications, experience and performance history shall be satisfactory to the Contracting Officer or COR. The Project Manager shall be the single point of contact for the task order, and shall be responsible for the management and execution of the task order in accordance with the approved performance work statement, approved work plans, and all federal, state, and local laws and regulations. The Project Manager shall ensure coordination between the Safety and Health Manager (SHM) and the Site Safety and Health Officer (SSHO) to ensure that all site activities are performed in a safe manner. The Contractor shall also maintain close communication and coordination with USACE for the duration of the project, including weekly and/or monthly progress and detailed cost reporting.

Individuals proposed as Project Managers shall have a college degree in engineering, construction management, geology, chemistry, or related field.

Individuals proposed as Project Managers should have five (5) years experience in Project Management for other contracts/programs with a minimum of three (3) years working experience at HTRW sites.

Individuals proposed as Project Managers should report professional registration, in their respective field, where…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .