About this file

Solicitation Amendment 0004

View the file

Other files

File Type Posted
12-R-0023 Amendment 05.pdf PDF
RFP Q A Set 5.pdf PDF
RFP Q A Set 4.pdf PDF
W91238-12-R-0023 0003.pdf PDF
RFP Q A Set 3.pdf PDF
W91238-12-R-0023 0002.pdf PDF
RFP QA Set 2.pdf PDF
W91238-12-R-0023 Amendment 0001.pdf PDF
W91238-12-R-0023 Q A 1.pdf PDF
Section J - Attach 1a Equiv Fed Wage Rates.xls XLS spreadsheet
Section J - Attach 5.xlsx XLSX spreadsheet
Attachment 1.pdf PDF
Attachment 4.pdf PDF
Section J - Attach 6.xls XLS spreadsheet
Section J - Attach 7 dd1547.pdf PDF
Section J - Attach 1 Wage Rates.docx DOCX document
Attachment 2.pdf PDF
Attachment 3.pdf PDF
W91238-12-R-0023.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this Amendment is to

1. Provide a consolidated version of Section L that incorporates all Amendment 0001 and Amdndment 0003 changes.

2. Provide a consolidated version of Section M containing Amendment 0001 changes.

3. Provide additional clarif ication to Section L, Paragraph 2.8.2, Pages Counted.

4. Change the font restrictions specified in Section L, Paragraph 2.8.3, Page Size to permit the use of Airal (not Arial Narrow ) and Times New Roman font.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 34

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 13-Jun-2012

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91238-12-R-0023

X 9B. DATED (SEE ITEM 11)

15-May-2012

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

11-Jun-2012

CODE

USACE SACRAMENTO DISTRICT

ATTN: CONTRACTING DIVISION

1325 J STREET

SACRAMENTO CA 95814-2922

W91238 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W91238-12-R-0023

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been added by full text:

SECTION L REVISION

1.0 General Information: This solicitation is identified as part of the Multiple Environmental Government Acquisition (MEGA) Strategy/Plan, a combined acquisition effort between the U.S. Army Corps of Engineers (USACE), Northwestern Division (NWD), Southwestern Division (SWD), and South Pacific Division (SPD).

1.1. The U.S. Army Corps of Engineers (USACE), Sacramento District, intends to conduct this acquisition by use of Competitive Source Selection Procedures in accordance with the provisions set forth in the Request for Proposal (RFP) and FAR Part 15 and DoD Source Selection Procedures, dated 04 March 2011. The Government intends to award five (5) Indefinite Delivery/Indefinite Quantity contracts as part of a Multiple Award Task Order Contract (MATOC) pool for Environmental Remediation Services for the U.S. Army Corps of Engineers, for use within SPD boundaries. , to the offerors submitting proposals determined to be most advantageous to the Government; price, and other factors considered. Task orders awarded under this MATOC may be firm fixed price or cost-reimbursement (CPFF, CPIF, or CPAF). The intent is to award five (5) contracts; however, if the Contracting Officer determines during the source selection process that fewer or more than that number of contracts should be awarded, the Contracting Officer has the discretion of adjusting that number (higher or lower), or awarding none at all. In any case, the Government may not award any contract if the resulting contract would not represent a "best value" to the Government using trade-off selection procedures as required by the Federal Acquisition Regulations (FAR) and Defense Federal Acquisition Regulations (DFARS). It is strongly suggested that the provisions stated in the proposal information be fully studied prior to assembly of the proposal.

1.2. There are no drawings associated with this Request for Proposal. Copies of the solicitation are available by INTERNET ACCESS ONLY. All solicitation documents will be posted to the Army Single Face to Industry (ASFI) website (https://acquisition.army.mil) and made available for viewing in Federal Business Opportunities (http://www.fbo.gov). An Interested Vendors List is available in FedBizOpps.

All amendments will be posted to ASFI and made available for viewing in FedBizOpps. It shall be the offeror’s responsibility to check the website for any amendments.

In accordance with FAR 4.8 (Government Contract Files), the Government will retain one copy of all unsuccessful proposals. Unless the offeror requests otherwise, the Government will destroy extra copies of such unsuccessful proposals.

1.3. To assure timely and equitable evaluation of proposals, offerors must follow the instructions contained herein.

Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors. The offeror shall submit in the proposal all requested information specified in this section of the Request for Proposal (RFP) solicitation at or before the exact time specified. There will be no public opening of the proposals received as a result of this solicitation.

1.4. The Contracting Officer has determined there is a high probability of adequate price competition in this acquisition. Upon examination of the initial offers, the Contracting Officer will review this determination and if, in the Contracting Officer's opinion, adequate price competition exists, no additional cost information will be requested and certification under FAR 15.406-2 will not be required. However, if at any time during this competition, the Contracting Officer determines that adequate price competition no longer exists; offerors may be required to submit information to the extent necessary for the Contracting Officer to determine the reasonableness and affordability of the price.

1.5. Exceptions / Assumptions (if required) – Identification and explanation of any exceptions or deviations. Any assumptions used in the proposal preparation must be fully explained. Offerors must clearly identify any exceptions to the solicitation terms and conditions and provide complete accompanying rationale. Exceptions taken to terms and conditions of the RFP, to any of its formal attachments, or to other parts of the solicitation shall be identified.

Each exception shall be specifically related to each paragraph and/or specific part of the solicitation to which the exception is taken. Provide rationale in support of the exception and fully explain its impact, if any, on the performance, schedule, cost and specific requirements of the solicitation. This information shall be provided in the format and content of Table 1 listed below. Exceptions taken by the offeror to terms and conditions to the RFP, to any of its formal attachments, or to other parts of the solicitation will be evaluated by the Government. If determined to be non-compliant the offeror’s proposal may be removed from further consideration for award.

Table 1 - Solicitation Exceptions Solicitation Document

Paragraph / Page

Requirements / Portion

Rationale

SOW ,

Attachment, etc.

Applicable Page Identify the Requirement

Justification

1.6. North American Industry Classification System (NAICS) code and Small Business Size Standard. The NAICS code for this acquisition is 562910. However, the small business size standard for a concern which submits an offer in its own name, but which proposes to furnish an item which it did not itself manufacture is 500 employees.

1.7. The Contracting Division Point of Contact (POC) listed below is the sole point of contact for this acquisition.

Address any questions (including technical questions) or concerns you may have to the Contracting Division POC.

This may be done via e-mail or in writing. Written requests for clarification may be sent to the Contracting Division POC at the following address:

Mailing Address:

U.S. Army Corps of Engineers, Sacramento District ATTN: Contracting Division (Caren A. Jackson) 1325 J Street Room 878 Sacramento, CA 95814-2922 Phone: (916) 557-7716 Fax: (916) 557-5264 E-mail: caren.a.jackson@usace.army.mil

*NOTE: All questions and/or comments should reach the above-referenced Contracting Division POC no later than ten (10) working days prior to the date set for receiving proposals in order that they may be given consideration or actions taken prior to receipt of offers. Questions and answers will be posted on ASFI and be made available for viewing through FedBizOpps.

1.8. If an offeror believes that the requirements in these instructions contain an error, omission, or are otherwise unsound, the offeror shall immediately notify the Contracting Division in writing (email is the preferred method) with supporting rationale. The offeror is reminded that the Government reserves the right to award this effort based on the initial proposal, as received, without discussions.

1.9. Other Information Required: Provide the name, title and telephone number of the company/division point of contact regarding decisions made with respect to your proposal and who can obligate your company contractually.

Also, identify those individuals authorized to negotiate with the government.

2.0. Specific Instructions: Organization/Distribution/Number of Copies/Page Limits

2.1. This Request for Proposal (RFP) does not commit the Government to any costs incurred in the preparation and submission of a proposal or for any other costs incurred by any firm submitting a proposal in response to this solicitation. Note specifically that the offeror will not be participating in a sealed bid procurement process under this acquisition method. Issuance of this Request for Proposal does not constitute an award commitment on the part of the Government.

2.2. The Government reserves the right to discuss aspects of proposals with offerors in the competitive range, if one is determined to be necessary, upon completion of the evaluation, and to award a contract to other than the offeror submitting the lowest priced offer. Offerors are advised that the Government may make award without discussions, clarifications, or any contact concerning the proposals received. Therefore, proposals should be submitted initially on the most favorable terms from a price and technical standpoint. Do not assume that offerors will be contacted or afforded an opportunity to clarify, discuss or revise their proposals.

2.3. Proposals must set forth full, accurate, and complete information as required by this RFP, (including attachments), if applicable. The penalty for making false statements is prescribed in 18 U.S.C. 1001.

2.4. Each offeror shall submit a proposal that consists of two (2) Volumes:

Volume I – Technical Proposal and Past Performance Information Volume II – Cost Information and Representations, Certifications, and Other Statements of Offerors

2.4.1 Binding and Labeling: Volumes I and II may not be submitted together within the same binding (separate volume submissions are required). Each volume shall include, as a minimum, the following:

(a) Volume number on proposal cover.

(b) The prime, consortium, or joint venture’s name, address, telephone number, and e-mail address shall appear in the lower left corner of the proposal cover, title page and table of contents of any document/volume to be evaluated.

(c) Signature of the official that can bind the firm shall appear on the title page.

(d) Proposal volume cover format is at the offeror’s discretion so long as the information required by this paragraph and subsequent paragraphs are met.

(e) Table of contents and a cross-reference to the solicitation paragraphs. Offerors shall include a cross reference table showing where RFP requirements can be found in their proposal.

(f) List of tables/figures/acronyms.

(g) Volume number, factor and date submitted shall appear in the bottom right corner of each page (along with the revision number for the amended page, if necessary).

2.5. Proposals shall be submitted in six (6) hard copies; one marked "Original" and five (5) marked "Copy". In addition, an electronic copy (i.e. CD) of your proposal including all attachments shall be submitted. Submit one CD for Volume I and one CD for Volume II. Cost information in Volume II shall be submitted in an excel format utilizing the pricing schedules in the format provided.

The contents of each proposal volume are described in the Paragraph 3.0 (Volume Content) of this provision.

*NOTE: In accordance with FAR Subpart 4.8, "Government Contract Files," the government will retain one copy of all unsuccessful proposals. The government will destroy extra copies of such unsuccessful proposals.

2.6. Proposals shall be received No Later Than 1400 hours (2:00 p.m.) Pacific Time on 28 JUNE 2012. Mail six (6) hard copies (one (1) original and five (5) copies) and one electronic copy (one CD per volume) in excel and pdf format which includes all attachments of each volume to the following:

U.S. Army Corps of Engineers, Sacramento District ATTN: Contracting Division (Caren Jackson) 1325 J. Street Sacramento, CA 95814-2922

The Packaging that contains the Proposal shall be marked:

Proposal for SolicitationW91238-12-R-0023, DO NOT OPEN.

Be sure to apply all appropriate markings including those prescribed in accordance with FAR 52.215-1(e), "Restriction on Disclosure and Use of Data."

Offers shall be submitted at the location stated and by the time and date as specified in Section A, Page 1.

Due to heightened security at Government installations, those offerors who have their proposals hand-carried* shall contact Caren A. Jackson, Contract Specialist at (916) 557-7716 prior to delivering to the U.S. Army Corps of Engineers, Sacramento District, 1325 J. Street, Sacramento, CA 95814-2922.

On the date specified and for thirty (30) minutes prior to the specified time, a Contracting representative will be in the lobby to receive proposals. Containers (i.e. envelopes, packages, boxes) will be screened for security purposes.

Hand-carried means the individual must be able to carry on their person. If due to size or volume, packages or boxes need to be wheeled in on a cart or dolly, you will be required to go to the dock area located on the northeast side of the facility. After inspection and screening, you will be allowed in the building after presenting valid photo identification. At the time specified in Section A, page 1, local time, it will be announced that receipt of proposals is closed. Official time will be established by time/stamp clock designated by the contract specialist.

2.7. Return Address Requirements.

Offeror(s) must ensure that ALL mail sent to the Sacramento District, U.S. Army Corps of Engineers, either pre-contract or post-contract award, has a return mailing address on the outside of the envelope, package, box, etc.

ANY MAIL addressed to the U.S. Army Corps of Engineers, including but not limited to bids, modifications to bids, proposals, revised proposals, bid guarantees, bonds, correspondence, etc., will be REJECTED by the U. S.

Army Corps of Engineers mail room facility located at 1325 J. Street, Sacramento, CA 95814-2922 if it does not contain a return mailing address. THERE WILL BE NO EXCEPTIONS.

*This instruction shall also apply to those proposals delivered through a delivery or parcel service.

NOTE: No parking on the street in front of the facility entrances will be allowed. Passenger vehicles will need to locate parking meters or parking garages before delivering proposals. Delivery trucks must go to the dock. The vehicle will be inspected and packages screened at the dock. After inspection and screening, the delivery person will be allowed into the building.

2.8. Page Format Restrictions and Limitations:

2.8.1. Page Limitations: Page limitations shall include typewritten text pages, charts, graphs, figures, diagrams, schematics, etc., aside from those items specifically stated as exempt from the page count. Outlines and other similar information documents shall be included as numbered pages - no exceptions. The number of pages per factor shown in Table 2 below may be varied by the offeror to suit its needs for certain identified factors, however, the total number of pages for the proposal submitted may not exceed fifty (50) pages for Volume I. Compliance with page count limits shall be verified via the hardcopy. If exceeded, the excess pages will not be read or considered in the evaluation of the proposal. Page limitations shall also be placed on responses to Evaluation Notices (ENs) if issued. The specified page limits for EN responses will be identified in the letters forwarded to the offeror(s) if necessary.

2.8.2. Pages Counted: Each page shall be counted except the following: cover pages, executive summary, table of contents, title page, list of tables/figures/acronyms, glossaries, separator tabs, dividers, blank pages, Past Performance Questionnaires/Performance Recognition Documents, Small Business Participation Plans, Small Business Subcontracting Plans, the signed certification sheet required under Volume I, Factor III, Subfactor 2 and Volume II in its entirety. Double sided pages are considered as two pages. NOTE: Proposals that exceed fifty (50) pages will have only those pages that are within the page count limits evaluated. All information appearing thereafter will not be evaluated.

2.8.3. Page Size: Unless otherwise stated, a “page” is defined as being one side of an 8.5” x 11” sheet of paper.

Pages shall be typewritten except for the reproduced sections of the solicitation document and the font size shall be Times New Roman or Arial (not Arial Narrow), no less than 10 point. All text shall be legible and easily read.

Margins on all four edges of each sheet will be at least one-half (0.5) inch. Proprietary statements, security markings, and page numbers can fall within the defined margin area. Pages shall be numbered sequentially by volume. These page format restrictions shall apply to responses to EN or IFN responses (if required), as well as to the initial proposal. The font size for resumes required under Volume I, Factor 1, Subfactor 2 shall be Times New Roman or Arial (not Arial Narrow), no less than 9 point. Failure to adhere to these font size restrictions may result in an offerors proposal being removed from further consideration for award.

2.8.4. Indexing: Each volume shall contain a more detailed table of contents to delineate the subparagraphs within that volume. Tab indexing shall be used to identify factors.

2.8.5. Foldouts: Legible tables, charts, graphs and figures shall be used wherever practical to depict organizations, systems and layout, implementation schedules, plans, etc. These displays shall be uncomplicated, legible and shall not exceed 11” x 17” in size. Foldout pages shall fold entirely within the volume. Each printed side of a foldout will count as two pages with the exception of the requirement to present Past Experience on 11” x 17” sheets which shall count as a single page. For tables, charts, graphs and figures, the font shall the same as stated in paragraph

2.8.3. All information (except documentation identification, solicitation number, and page numbers) shall be contained within an image area of 10” x 16”.

2.8.6. Format: The offeror shall submit one (1) original hardcopy, five (5) additional hardcopies, and one (1) electronic (i.e. CD) copy per volume in pdf format (spreadsheets in excel format) of their proposal in the format shown below.

Table 2 - Proposal Format

Proposal Document

Executive Summary

Volume I, Factor I: Technical Requirements

Subfactor 1: Summary of Previous Experience– Environmental Remediation Services

Subfactor 2: Resumes of Key Management Personnel for this Contract

Subfactor 3: Organizational Structure for this Contract

Volume I, Factor II: Performance Risk/Past Performance

Subfactor 1: Past Performance Relevancy with Points of Contact

Subfactor 2: Contractor Performance Information

Volume I, Factor III: Corporate Technical Plans, Practices, and Procedures

Subfactor 1: Quality Assurance / Quality Control Program and Corporate Business Practices

Subfactor 2: Safety and Health Plan

Volume I, Factor IV: Small Business Participation Plan

Volume II – Cost Information and Representations, Certifications, and Other Statements of Offerors

Volume II, Factor I, Cost/Price

Subfactor 1: Section B – Supplies or Services & Prices/Costs (Section J, Attachment 5)

Subfactor 2: Proposal for Sample Project

Volume II, Non-Evaluation Submissions

Tab 1: SF 33 - Solicitation, Offer, and Award (Section A)

Tab 2: Representations, Certifications and Other Statements of Offerors (Section K)

Tab 3: Audit Information

3.0 Volume I Contents - Technical Proposal and Past Performance Information:

3.1 Executive Summary. Volume I of the proposal shall include an Executive Summary which should include an introduction of the proposal team. The Executive Summary shall not exceed two (2) pages in length and will be excluded from the fifty (50) page limitation.

Proposals submitted in response to this solicitation shall consist of the contents required in the sub-paragraphs described below:

3.2. Volume I, Factor I – Technical Requirements

3.2.1. Volume I, Factor I, Subfactor 1 – Summary of Previous Experience – Environmental Remediation Services

Provide at least five (5) and not more than ten (10) examples of projects which demonstrates the offeror's and its team members' experience in performance of the work similar to that described in Section C of this solicitation.

A project is defined as: Work performed pursuant to one specific task order of an indefinite delivery/indefinite quantity (IDIQ) type contract at one site or multiple sites at a single installation or facility or work performed pursuant to a site-specific contract for one site or multiple sites within a single installation or facility. An ID/IQ type contract or the performance of work pursuant to multiple task orders of an ID/IQ type contract does not represent a "project" within this definition. If the offeror provides a specific task order as its "project," it shall provide the base contract number and the task order number for reference purposes. If the offeror provides a site-specific contract as its "project," it shall provide the contract number for reference purposes. The projects must be recent (within the past five years) and a project that is at least 75% complete.

Presentation of Previous Experience: The proposal shall include no less than five, but no more than 10 environmental remediation services projects that have been executed by the offeror and its team members as either a prime contractor or a subcontractor. The projects selected should show diversity in the types of work accomplished by the firm, experience with a variety of contracting award options (such as, firm fixed price, cost reimbursement, performance based, etc.), teaming arrangements, key personnel and their roles on the project, regulatory information, in addition to basic cost information. For the specific purpose of presentation of previous experience, an 11”x17” sheet of paper shall be used per project. For this factor of the proposal, an 11”x17” sheet of paper will be considered as one page. The majority of the sheet should utilize a 10-12 point font; footnotes may use a smaller font.

The following information should be included as a minimum in the presentation of previous experience:

Box A: Project #: Name of project and location (City and State, or military installation name and State, if appropriate)

Box B: This box shall include a general narrative overview of the site including project description and use of innovation, value engineering and major accomplishments.

Box C: List of key personnel and their role on this project; resumes for these individuals shall be included in the proposal. The offeror should indicate which of the key personnel are currently employed by the firm or if they are employed by a subcontractor or teaming member.

Box D: Project performance issues. This could include cost/schedule, health and safety issues, regulatory/stakeholder issues and other performance issues.

Box E: Contract Information/Contract Schedule shall include the outlined information:

Contract Information / Contract Schedule Program

Accomplishments Contract/Task order number: Was the project terminated early or were cure/show-cause letters issued? Yes or No

Contract Role: (Prime or Subcontractor)

Percentage of the entire project the Offeror performed as the Prime or Subcontractor.

Contract Type: (ex. FFP,, CPFF,CPAF, CPIF, etc) Percentage of work billed to date by offeror:

Date of Award Initial Contract Amount: Original Completion Date:

Date of Completion /Final Contract Amount: Actual Completion Date:

Amount added by modification:

Percentage of total project billed to date:

(modifications)

Explanation of any cost growth: Explanation of any late finish or time extensions:

Insurance to cap costs or indemnify: Multiple interim schedule milestones? Y or N

* Bullets

Client Contact Client Contracting Officer Offeror Point of Contact

Box F: Regulatory Involvement. In order to evaluate the offeror’s ability create and maintain a cooperative working environment with State and/or US Environmental Protection Agency (USEPA) regulators , the offeror should provide information, which demonstrates experience with submitting accurate and timely reporting/regulatory submittals in accordance with regulatory requirements. Box F shall include, at the minimum:

a. Regulators Name, organization, and contact information

b. Regulatory program (CERCLA, RCRA, UST program or other regulatory driver)

The offeror may include discussion of effective resolution of regulatory issues, expediting regulatory closure, or other information demonstrating ability to work constructively with the regulatory community.

Box G: Section M Criteria: This should address items from Section M. The offeror should present projects which demonstrate its experience in project management and execution of Environmental Remediation Services, site investigations/characterizations, studies, evaluations, designs, chemical testing, operation and maintenance, sampling, remediation of contaminated sites, and other related experience. The offeror may include both federal and commercial work. The offeror must indicate whether it was prime contractor or subcontractor on each project. If the offeror was the prime contractor, the offeror shall also describe its primary role/duties in execution of the work (i.e. the major components of the project which were completed by the prime’s staff and major components which were subcontracted). The offeror shall also provide information on the project as to the size, complexity, and distinctive and/or unique features of the project. The offeror should provide specific information to demonstrate that it has relevant experience to all of the activities for this project.

The offeror shall demonstrate ability to employ innovative technology successfully. EPA defines innovative technology as a technology that has been field-tested and applied to a hazardous waste problem at a site but lacks a long history of full-scale use. Information about its cost and how well it works may be insufficient to support prediction of its performance under a wide variety of operating conditions. An emerging technology is an innovative technology that is currently undergoing bench-scale testing in which a small version of the technology is tested in a laboratory. An established technology is a technology for which cost and performance information is readily available. Only after a technology has been used at many different sites and the results have been fully documented is that technology considered to be established.

3.2.2. Volume I, Factor I, Subfactor 2 – Resumes of Key Management Personnel for this Contract.

The offeror shall provide the resumes of the key personnel which it expects will execute the work that may be awarded under this contract. Specifically, the offeror shall provide a resume for the key individuals listed below in paragraphs 3.2.2.1 through 3.2.2.11. The resumes should clearly display proposed job title, current employer, education, special qualifications and experience record showing title, specific duties, responsibilities and assignments within at least the last five years. Indicate experience and responsibilities of those key personnel on firm fixed price, performance based and/or cost reimbursement contracts. The purpose of this submittal is to identify the level of expertise available for this contract. The resumes should include appropriate cross reference to the Previous Experience projects. A recommended resume template is included in Section J, Attachment #4.

Arrange resumes in proposal in the order listed in this solicitation. Font size for resumes shall be no less than Times New Roman 9 point font.

After contract award, the Contracting Officer shall approve replacement of any key management personnel after verifying that they meet or exceed the requirements of the solicitation. If further key personnel are required to perform any work under this contract, the offeror will be required to submit their resumes for approval by the Contracting Officer.

3.2.2.1 Program Manager - The offeror shall designate one (1) individual as the Program Manager that serves as a single point of contact for coordination of program issues with USACE. The Program Manager shall be responsible for the overall management of the contract including cost, schedule and technical quality. The Program Manger shall be competent, experienced and knowledgeable in the full range of HTRW activities from investigations, to studies, designs, remediation, short-term operations and maintenance, and with the specific activities identified in this contract. The Program Manager shall take immediate corrective action when performance is not acceptable to USACE. The Program Manager shall oversee the development and implementation of record keeping, administrative and quality control programs.

The individual proposed as the Program Manager should have a college degree in engineering, construction management, geology, chemistry, or related field.

The individual proposed as the Program Manager should have five (5) years experience in Program

Management for other contracts/programs with a minimum of three (3) years working experience in ERS.

The individual proposed as the Program Manager should document professional registration, in their respective field, where applicable or available.

Must be an employee of the Prime.

3.2.2.2 Project Manager(s). The offeror should provide a minimum of three (3) resumes and a maximum of five

(5) for individuals who are trained and experienced as a Project Manager (PM). For each task order, the offeror shall designate a Project Manager (PM). The Program Manager may act as the Project Manager, with approval of USACE, if execution is sufficiently limited. The Offeror shall identify the PM before issuance of the task order and the PM qualifications, experience and performance history shall be satisfactory to the Contracting Officer. The Project Manager shall be the single point of contact for the task order, and shall be responsible for the management and execution of the task order in accordance with the approved performance work statement, approved work plans, and all federal, state, and local laws and regulations. The Project Manager shall ensure coordination between the Safety and Health Manager (SHM) and the Site Safety and Health Officer (SSHO) to ensure that all site activities are performed in a safe manner.

Individuals proposed as Project Managers shall have a college degree in engineering, construction management, geology, chemistry, or related field.

Individuals proposed as Project Managers should have five (5) years experience in Project Management for other contracts/programs with a minimum of three (3) years working experience at HTRW sites.

Individuals proposed as Project Managers should report professional registration, in their respective field, where applicable or available.

As a minimum, two (2) project managers shall be employees of the Prime.

3.2.2.3 Contractor Quality Control Supervisor - The Offeror shall provide a minimum of one (1) resume and a maximum of three (3) for individuals who are trained within its organization to be responsible for overall management of Contractor Quality Control (CQC) and have the authority to act in all CQC matters. The QCS should have appropriate education and experience in the specialized area identified in the task order, ( e.g., chemistry, geology, or hydrogeology). The QCS is responsible to ensure compliance with the requirements identified in the Performance Work Statement and the Contractor Quality Control Plan. These persons shall be stationed at the project site whenever work is in progress. The need for an on-site QCS will be defined in the Performance Work Statement for the project specific task order.

The individual proposed as the CQCS should have a minimum of three (3) years working experience in quality control in the chemical/hazardous waste remediation.

The individual proposed as the CQCS shall have demonstrable expertise in on-site laboratory techniques.

The individual proposed as the CQCS shall have formal education or training in field sampling related to

HTRW.

The individual proposed as the CQCS shall have experience with QA/QC for remedial investigations, design and actions.

3.2.2.4 Safety and Health Professionals. In accordance with the USACE Safety and Health Requirements Manual (EM385-1-1, current version dated 15 September 2008), the offeror shall provide the following personnel for hazardous waste operations:

3.2.2.4.1 Safety and Health Manger (SHM) is required at cleanup operations. The SHM, dependent upon the contaminant-related hazards on the project, shall be a Certified Industrial Hygienist (CIH), Certified Safety Professional (CSP) or Certified Health Physicist (CHP). If the project involves radioactive material, then the contractor shall have a CHP assigned to the project, accessible to the field crew; but not necessarily required to be on-site. The SHM shall demonstrate the authority to shut down the site work if/when Health and Safety becomes an issue. The SHM shall enlist the support of safety and occupational health professionals with appropriate education and experience when working on sites with multiple (chemical, safety, ionizing radiation) hazards. The SHM shall be responsible for the following actions:

a) Developing, maintaining, and overseeing implementation of the Site Safety Health Plan (SSHP);

b) Visiting the project, as needed to audit the effectiveness of the SSHP;

c) Remaining available for project emergencies;

d) Developing modifications to the SSHP as needed;

e) Evaluating occupational exposure monitoring/air sampling data, dosimeters, and adjusting SSHP requirements as necessary;

f) Serving as a QC staff member;

g) Approving the SSHP by signature.

The SHM should have a minimum of three (3) years of experience managing safety and occupational health at hazardous waste site cleanup operations.

3.2.2.4.2 Site Safety and Health Officer (SSHO). The SSHO is required at cleanup operations. The SSHO shall demonstrate the authority to shut down the site work if/when Health and Safety becomes an issue. The SSHO shall have the authority and is responsible for the following actions:

a) Being present anytime cleanup operations are being performed to implement the SSHP;

b) Inspecting site activities to identify safety and occupational health deficiencies and correct them;

c) Coordinating changes/modifications to the SSHP with the SHM, site superintendent, and contracting officer;

d) Conducting project specific training.

The SSHO should have a minimum of one (1) year of experience implementing safety and occupational health procedures at cleanup operations.

The SSHO shall have training and experience to conduct exposure monitoring/air sampling and select/adjust protective equipment use.

3.2.2.5 Senior Contracts Manager - The offeror shall designate one individual to perform the function of Senior Contracts Manager who will ensure that all acquisition and contract management related to this contract (including subcontracts, purchases, rental agreements, subcontract modifications, tracking procurements, maintaining inventory property lists, etc.) are performed in accordance with all terms of this contract. Also where applicable, the Contractor will be responsible for compliance with federal, state, and local laws and regulations related to contract management and acquisition.

The Senior Contracts Manager shall have a college degree including or supplemented by at least 24 semester hours in accounting, economics, business law, procurement, or management related studies.

Alternatively, the Senior Contracts Manager may have completed an examination equivalent to a Certified Professional Contracts Manager through the National Contracts Management Association.

The Senior Contracts Manager should have four (4) years of contract and acquisition management experience in a position of increasing complexity and responsibility including but not limited to, subcontracts, socioeconomic programs, field purchases, rental agreements and modifications.

The Senior Contracts Manager shall demonstrate training in acquisition, contract administration, cost and price analysis related to federal acquisition and firm-fixed price and cost reimbursement contracting experience.

Must be employee of the prime.

3.2.2.6 Geologist - The offeror shall provide a minimum of one (1) and a maximum of three (3) resumes for individuals who are trained and experienced as a geologist to ensure activities, to include plan development, field activities, report writing, designs, etc. are of the quality to meet project objectives. The geologist shall have experience in surface and subsurface soil, ground-water, surface water, sediment, etc. sampling techniques, as well as aspects of obtaining all types of samples through various drilling and sampling techniques, along with appropriate documentation procedures.

Individuals proposed as geologists shall have a college degree in geology or geological engineering from an accredited 4-year program.

Individuals proposed as geologists should document professional registration, in their respective field, where applicable or available.

Individuals proposed as geologists should have a minimum of three (3) years specialized experience in working in ERS.

As a minimum, one (1) geologist must be employed by the Prime.

3.2.2.7 Program Chemist. The offeror shall utilize a Program Chemist who shall ensure that all chemistry related goals of the program are attained. The Program Chemist shall be available for consultation with the Contractor's personnel and Government personnel. The Program Chemist should have general knowledge of remedial process chemistry, fate and transport of organics and inorganics, knowledge of chemical quality control, experience with validation software (ADR.NET or equivalent) and staged electronic data deliverables. The Program Chemist shall be experienced in the sampling and analysis of toxic/hazardous chemicals and radiological contamination in environmental matrices. The Program Chemist will be required to have advanced expertise (senior level) in chemical data quality management of environmental analytical data and demonstrate an understanding and application of the UFP QAPP.

The chemist must demonstrate knowledge ad understanding of the DoD QSM and its application during validation to ensure defensible data are delivered meeting project specific requirements. Knowledge and understanding of data base systems, including ERPIMS, ERIS, EQuIS, etc. is also beneficial. Qualifications of the Program Chemist shall include:

A college degree in chemical, environmental, biological or physical sciences or engineering, with at least 30 semester hours in chemistryfrom an accredited 4-year program is required for the Program Chemist.

A minimum of three (3) years of specialized experience in HTRW/MMRP related work is required.

3.2.2.8 Risk Assessor/Toxicologist. As part of the project organization, the Offeror shall appoint a Risk Assessor.

The project Risk Assessor must have professional knowledge of and applied practical experience in toxicological principles, concepts, regulations, and established methodologies sufficient to perform the full range of duties in hazardous and toxic waste human health and ecological risk assessments; knowledge of related physical and natural sciences, such as toxicology, chemistry, physics, geology, geophysics, biology, mathematics and statistics;

knowledge of standard practices in soil, air, water, and sediment quality and chemical testing procedures; knowledge of site investigative techniques for HTW investigation; knowledge of the TPP and DQO process; knowledge of applicable Federal and State regulations and guidance related to HTW investigations, human health and ecological risk assessments.

The individual proposed as the Risk Assessor shall have a four-year college degree in toxicology, biochemistry, chemistry, environmental science/engineering, or related field from an accredited institution.

The individual proposed as the Risk Assessor should have a minimum of five (5) years of professional experience related to HTW investigations, risk assessments, and remedial actions.

3.2.2.9 Geophysicist. The project geophysicist will be responsible for design, implementation, and management of all geophysical investigations required for the work effort. This individual shall be the project geophysicist-of-record. This position will serve as the primary point-of-contact for technical coordination of project geophysical requirements. The project geophysicist should have experience in selecting the appropriate geophysical platform, sensor and navigational technologies, geophysical data collection and geophysics quality control programs, as well as the preparation of geophysical investigation plans and reports.

The individual proposed as the geophysicist shall have a college degree in geophysics, geology, geological engineering, or a closely related field.

The individual proposed as the geophysicist should document professional registration, in their respective field, where applicable or available.

The individual proposed as the geophysicist should have a minimum of five (5) years of directly related geophysical experience.

3.2.2.9 Civil Engineer. The Project Civil Engineer is responsible for assuring that all civil and geotechnical engineering support goals specified in the Task Order are attained.

The individual proposed as the Project Civil Engineer shall have a college degree in civil engineering (soil mechanics, materials or related specialty), geological engineering, or related field from an Accreditation Board for Engineering and Technology (ABET) accredited college or university.

The individual proposed as the Project Civil Engineer should have demonstrable education and experience in geotechnical engineering.

The individual proposed as the Project Civil Engineer should have five (5) years experience related to investigation, design, and construction of geotechnical features with a minimum of 3 years experience being related to remedial investigations, feasibility studies, and design and construction of geotechnical features in HTRW sites.

3.2.2.10 Deleted.

3.2.2.11 Regulatory Specialist. The Regulatory Specialist is responsible for assuring regulatory compliance is achieved for all environmental related activities in the task order. The project Regulatory Specialist must have professional knowledge of, thorough understanding of and applied practical experience of environmental regulations with respect to, but not limited to, the Resource Conservation and Recovery Act (RCRA), the Hazardous Materials Conservation Act, the Comprehensive Environmental Response Compensation & Liability Act (CERCLA), the Superfund Amendments and Reauthorization Act, the Toxic Substances Control Act, the Clean Air Act, the Clean Water Act, and implementing federal, state and local regulations and their application to the projects.

The individual proposed as the Regulatory Specialist shall have a college degree in physical, natural, or environmental sciences/ engineering from an accredited 4-year program.

The individual proposed as the Regulatory Specialist shall document professional registration in their respective field of expertise (e.g. Certified Hazardous Materials Manager (CHMM); Registered Environmental Manager (REM), etc.)

The individual proposed as the Regulatory Specialist should have a minimum of five (5) years of professional experience related to ERS

The individual proposed as the Regulatory Specialist should have a minimum of three (3) years specialized experience in the accumulation, manifesting and shipment of wastes.

The Regulatory Specialist shall demonstrate the completion of the following training and will be required to maintain/refresh training during the life of the contract in accordance with the regulations:

Training and current certification under 49 CFR 172, Subpart H. If a DOT security plan is required, the contractor shall be in full compliance with DOT regulation, 49 CFR, Subchapter C, Subpart I.

Initial classroom instruction or on-the-job training that teaches hazardous waste management procedures (40 CFR 262) and contingency plan implementation (40 CFR 265.16). An annual review of this training is required. The substantive requirements of the initial training under these standards are met by the initial training under OSHA 29 CFR 1910.120. The annual review requirements are met by the OSHA 8 hour refresher 29 CFR 1910.120.

Recurrent training to meet requirements of 49 CFR 172.704(c)(2) as required by various Federal regulations (e.g. Department of Transportation 49 CFR 172.700, Subpart H, etc.)

3.2.3. Volume I, Factor I, Subfactor 3 – Organizational Structure for this Contract

3.2.3.1. The organizational structure of the offeror's proposed team (all subcontractors shall be included in this organizational structure), for this project shall be outlined through a narrative and a diagrammed organizational chart. Key sub-organizations such as chemistry, geology, safety, project management, engineering, construction, etc., shall be shown and briefly described. The relationship of these capabilities to the offeror shall be described; i.e.

owned, subcontracted effort, joint venture, member of consortium, etc. The corporate/organizational narrative should include a brief list of the projects, which have been executed under this organizational structure and the length of time the sub-organization(s) not owned by the offeror has been a part of the organizational structure (or the team). It is important that the offeror clearly define the organizational roles/responsibilities and the contractual/legal responsibilities of the team or joint venture units and briefly describe how the project(s) will be accomplished under the proposed organizational structure. The offeror may utilize a table format to outline roles and responsibilities of key personnel including lines of communication.

3.2.3.2. Small businesses are encouraged to form teaming arrangements, joint ventures, or consortiums involving two or more small businesses. For consolidated acquisitions, the size standard is applied to the individual person or concerns, not to the combined assets of the joint venture. Note: This type of strategy allows members of the Small Business Community to leverage their capabilities to participate at the prime level without invalidating their status as small businesses. If appropriate, the proposal may identify how Past Experience, Projects 1 through 10 were executed using the proposed organizational structure.

3.3. Volume I, Factor II – Performance Risk/Past Performance

3.3.1. Volume I, Factor II, Subfactor 1 – Past Performance Relevancy with Points of Contact

The offeror shall provide past performance information for each project listed in the offeror's experience in response to…