Amendment No. 0003.pdf
PDF 80 KB Posted
- Attached to
- Environmental Support for Small Hazardous and Toxic Waste Removal Actions and Investigations
- Solicitation number
- W91238-12-R-0009
About this file
Amendment No. 0003
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
ENVIRONMENTAL SUPPORT FOR HAZARDOUS AND TOXIC WASTE REMOVAL ACTIONS, INVESTIGATIONS, AND REMEDIATION, WITHIN
THE USACE SOUTH PACIFIC DIVISION BOUNDARIES:
AMENDMENT NO. 0003 REPLACES PAGE 23 IN ITS ENTIRETY. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91238-12-R-0009
X 9B. DATED (SEE ITEM 11)
13-Dec-2011
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
05-Jan-2012
CODE
USACE SACRAMENTO DISTRICT
ATTN: CONTRACTING DIVISION
1325 J ST
SACRAMENTO CA 95814-2922
W91238 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W91238-12-R-0009
AMENDMENT NO. 0003
GROUNDWATER MONITORING/EXTRACTION/INJECTION WELLS: The requirements will be described in detail in each individual Task Order. A geologist or equivalent professional under the supervision of a California licensed Professional Geologist, with a least 3 years experience in hazardous waste projects, soil and rock logging, and monitoring well installation, shall be onsite. A California licensed Professional Geologist shall be responsible for all geophysical and bore hole logging, drilling, well installation, developing and testing activities. The driller shall be state licensed. Geophysical log interpretation shall be done by a California licensed Professional Geophysicist. The log analyst shall be able to demonstrate competence through background, training, and experience when so called upon. The Contractor shall have a minimum of 3 years of monitor well installation experience.
3.7 TRANSFORMER REMOVAL and DISPOSAL: The Contractor shall remove and dispose of transformers containing PCB's in accordance with local, state and federal regulations. Specific requirements related to transformer removal and disposal will be described in detail in each individual Task Order.
3.8 ASBESTOS ABATEMENT: Asbestos abatement requirements will be described in detail in each individual Task Order. The Contractor shall comply with all Federal, state and local regulations with regards to testing, abatement, work practices, disposal, and clearance.
3.9 LEAD-BASED PAINT ABATEMENT: Lead-based paint requirements will be described in detail in each individual Task Order. The Contractor shall comply with all Federal, state, and local regulations with regards to testing, work practices, disposal, and clearance.
3.10 TEMPORARY FACILITIES. PERMANENT INSTALLATIONS AND SITE RESTORATION: Contractor shall have the capability to construct temporary facilities as required to support site work. Contractor may also be required to construct permanent installations, for example, replacement below or above ground storage tanks. Site restoration construction will generally be required as well.
3.11 OTHER INCIDENTAL SERVICES IN DIRECT SUPPORT OF THE PROJECT
ACTIVITIES:
3.11.1 Environmental Audits: Some task orders will require the Contractor to perform Environmental Audits, including Preliminary Assessments and Environmental Assessments, in accordance with the following guidance:
a) ASTM E 1527·93 Standard Practice For Environmental Site Assessments: Phase I Environmental Site Assessment Process
b) ASTM E 1528-93 Standard Practice For Environmental Site Assessments: Transaction Screen Process
Specific requirements related to performance of environmental audits will be described in detail in each individual Task Order. In general, this service shall be performed in conjunction with one or more of the field service/construction activities described elsewhere in this specification.
3.11.2 Surveys and Mapping: The Contractor shall provide survey and mapping services when needed to support removal action activities. Surveyors shall be licensed in the state that the work is being performed.
File details come from the government source that posted it. Updated .