W62N6M00000081

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Hill/Dugw ay/SLC DB Mechanicail Upgrade

The purpose of this amendment is to revise the IDIQ contract intent as a SATOC.

The proposal due date remains unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 16

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 01-Jul-2010

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91238-10-R-0053

X 9B. DATED (SEE ITEM 11)

22-Jun-2010

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

01-Jul-2010

CODE

USACE SACRAMENTO DISTRICT

ATTN: CONTRACTING DIVISION

1325 J STREET-ROOM 878

SACRAMENTO CA 95814-2922

W91238 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W91238-10-R-0053

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The required performance has changed from Multiple Award Indefinite Delivery/Indefinite Quantity (IDIQ) contracts supporting the Corps of Engineers South Pacific Division mission for use primarily for areas around and including Hill/Dugway/SLC, UT. The work includes mechanical efforts (including new work, additions, alterations, maintenance and repairs). The aggregate not-to-exceed amount for each IDIQ contract is $15 million or three years (whichever comes first). There are no option periods. The North American Industry Classification System (NAICS) Code is 238220. This project is being procured as a 100% Small Business Set Aside to Single Award Indefinite Delivery/Indefinite Quantity (IDIQ) contracts supporting the Corps of Engineers South Pacific Division mission for use primarily for areas around and including Hill/Dugway/SLC, UT. The work includes mechanical efforts (including new work, additions, alterations, maintenance and repairs). The aggregate not-to-exceed amount for each IDIQ contract is $15 million or three years (whichever comes first). There are no option periods. The North American Industry Classification System (NAICS) Code is 238220. This project is being procured as a 100% Small Business Set Aside.

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

The following have been modified:

SECTION 0110 BASIC

SECTION 00110

PROPOSAL BASIS OF AWARD,

GENERAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS,

PHASE I INSTRUCTIONS AND EVALUATIONS,

AND CONTRACT AWARD

1. OVERVIEW.

a. This is a "Best Value" construction solicitation primarily for mechanical (including new work, additions, alterations, maintenance and repairs) efforts supporting the Corps of Engineers South Pacific Division mission primarily for areas around and including Hill AFB/Dugway Proving Grounds/Salt Lake City, Utah. The Contracting Officer will award a firm fixed-price Single Award Indefinite Delivery Indefinite Quantity (IDIQ) contract to that responsible Offeror whom the Source Selection Authority determined conforms to the solicitation, is fair and reasonable, and offers the best overall value to the Government, considering all non-price factors described herein, and price. The first Task Order utilized in the pricing proposal and task order technical approach will be awarded to this “Best Value” contractor.

b. This is a two-phase design-build selection process acquisition requiring two separate proposal submittals, a phase-one (non-price technical volume) proposal and a phase-two (price and technical volumes) proposal. Phase-one will consist of an evaluation of only non-price factors which include Experience and Capability, and Past Performance of the offeror. Then no more than five (5) of the most highly qualified offerors in phase-one will be offered the opportunity to submit a proposal under phase-two. The names of these contractors selected to advance to Phase-Two will be posted on the Federal Business Opportunity website, www.fbo.gov. Phase-two will consist of an evaluation of price and non-price factors which include Technical Approach.

c. The Government does not intend to conduct discussions during phase-one, nor request revised phase-one proposal. The Government reserves the right to conduct phase-one discussions, if it deems such to be in its best interest. The Government may communicate with an offeror to afford it the opportunity to respond to adverse past performance evaluations obtained from references on which it has not previously had an opportunity to comment, if that information makes a difference in the Government’s decision whether or not to include the offeror in the shortlist for phase-two.

2. BASIS OF AWARD.

2.1. ELIGIBILITY FOR CONTRACT AWARD

In accordance with the requirements of Part 9 of the Federal Acquisition Regulation (FAR), no contract shall be entered into unless the Contracting Officer ensures that all requirements of law, executive orders, regulations, and all other applicable procedures, including clearances and approvals, have been met. This includes the FAR requirement that no award shall be made unless the Contracting Officer makes an affirmative determination of responsibility. To be determined responsible, a prospective contractor must meet the general standards in FAR Part 9 and any special standards set forth in the solicitation.

2.2. SOURCE SELECTION USING THE TRADE-OFF PROCESS

The Government will select the offer that represents the best value to the Government by using the trade-off process described in FAR Part 15. This process permits tradeoffs between price and technical (“non-cost”) factors and allows the Government to accept other than the lowest priced offer. The award decision will be based on a comparative analysis and an integrated assessment of proposals against all source selection criteria in the solicitation.

2.3. RELATIVE IMPORTANCE OF PRICE TO THE TECHNICAL EVALUATION FACTORS

All evaluation factors other than cost or price, when combined, are significantly more important than cost or price.

The Government is concerned with striking the most advantageous balance between technical merit (“quality”) and cost to the Government (i.e., the price). The degree of importance of price could become greater depending upon the equality of the technical proposals. If competing technical proposals are determined to be essentially equal, price could become the controlling factor.

2.4. EVALUATION OF THE PRICE PROPOSAL

a. Price or cost to the Government will be evaluated and considered but will not be scored or combined with other aspects of the proposal evaluation. The price proposal used for evaluation will consist of the proposed basic IDIQ CLIN 0001 G&A rate and the proposed Task Order price. The proposed price will be analyzed for reasonableness.

It may also be analyzed to determine whether it is realistic for the work to be performed; reflects a clear understanding of the requirements; and is consistent with the offeror’s Technical Proposal. Additionally, all offers will be analyzed for unbalanced pricing.

b. Information required to be submitted in the Price Proposal volume in addition to the executed SF 1442 with acknowledgement of amendments and the completed pricing schedule will be used to determine the offeror’s eligibility for contract award in accordance with paragraph 2.1 above (for example, the offeror’s representations and certifications; the bid guarantee; and the offeror’s pre-award survey information. The Government may enter into exchanges with offerors about such information without it constituting discussions, subject to applicable FAR limitations, including FAR 15.306, Exchanges with offerors after receipt of proposals; FAR 28.101-4, and Noncompliance with bid guarantee requirements.

2.5. THE TECHNICAL EVALUATION FACTORS:

a. The Government will evaluate each offeror’s technical proposal based on how well the proposal addresses each of the evaluation factors, listed below and further described in the submission requirements in Sections 00110 and 00120, and on how well the offeror has performed on related projects through the evaluation of the past performance information provided from references or obtained from other sources. Each of the evaluation factors will be evaluated by the Government and an adjectival rating and risk rating will be determined by consensus of the Government evaluation board.

b. The evaluation factors correlate directly to the main organizational tabs identified in the proposal submission instructions in the submission requirements in Sections 00110 and 00120. However, any information contained in the technical proposal can nonetheless be considered by the Government in its evaluation under any factor.

Phase-One Proposal. (Section 00110) Factor 1: Experience and Capability Factor 2: Past Performance

Phase-Two Proposal. (Section 00120) Factor 3: Technical Approach

2.6. RELATIVE WEIGHTING OF THE TECHNICAL EVALUATION FACTORS

The Technical Evaluation Factors are listed below in descending order of importance, as follows:

Factor 1 – Experience and Capability is the most heavily weighted factor.

Factor 2 – Past Performance is weighted less than Factor 1, and Factor 3 – Technical Approach is the least heavily weighted factor it is weighted significantly less than any other evaluation factor.

2.7. GENERAL TECHNICAL EVALUATION CRITERIA

a. The offeror’s conformance with the specified format and submission requirements will be considered during the technical evaluation. Failure to comply with the formatting and/or submission requirements may be seen as indicative of the type of problems that could be expected during contract performance. Lack of conformance could therefore result in a higher risk assessment, in addition to any other impacts on the evaluation. Material omission(s) may cause the technical proposal to be rejected as unacceptable. However, in accordance with FAR 52.215-1, the Government may waive informalities and minor irregularities in proposals. For example, a failure by a proposed design contractor to submit a properly executed letter of commitment may be considered as increasing risk, but will not be considered a proposal deficiency.

b. Technical proposals which do not provide the specified information in the specified location in accordance with the submission instructions may be downgraded. The Government is under no obligation to search for information that is not in the specified location.

c. Proposals which are generic, vague, or lacking in detail may be downgraded. The proposal submission instructions are written to give prospective contractors, where feasible, an indication of the level of detail desired by the Government. The offeror’s failure to include information that the Government has indicated should be included may result in the proposal being downgraded and/or being found deficient if inadequate detail is provided.

d. Any prescribed page and formatting limitations will be strictly adhered to and enforced by the Government. The Government will not evaluate any excess information resulting from the offeror’s failure to comply with the submission instructions. Examples: If an offeror were to submit three pages in response to an item with a two page limitation, the information on the first two pages would be evaluated but the information on the third page would not be evaluated. If an offeror were to submit a fold-out sheet (e.g. 11”x17”) in response to a one-page limitation where fold-out sheets were not authorized, only the information that could reasonably have been submitted on one 8-1/2 x 11 inch sheet would be evaluated. If an offeror were to submit three 8-1/2 x 11 inch pages in response to a one not-to-exceed 11 x 17 inch page limitation, only the information that could reasonably have been submitted on one 11 x 17 inch sheet would be evaluated. If an offeror submitted alternates that were not requested, the information will not be evaluated.

e. The degree of risk to the Government inherent in the offeror’s technical proposal will be a consideration under every evaluation factor.

f. A “deficiency” is a material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level. “Weakness” means a flaw in a proposal that increases the risk of unsuccessful contract performance. A “significant weakness” is a proposal flaw that appreciably increases the risk of unsuccessful contract performance.

The Government cannot accept an offer with a deficiency in its technical proposal. The term “acceptable” is therefore used in this context to describe a technical proposal that does not contain a deficiency and thus could be accepted by the Government, notwithstanding any weaknesses or significant weaknesses in the proposal.

g. The Government cannot make award based on a deficient offer. Therefore, a rating of “Unacceptable” under any factor will render the offer ineligible for award, unless the Government elects to enter into discussions with that offeror and all deficiencies are remedied in a revised proposal or as stated in paragraph 2.7.a. above.

h. Failure of a proposed design contractor to furnish authorization for the Government to discuss its past performance with the offeror will not be considered a proposal deficiency. However, the Government will not be able to disclose to the offeror any details pertaining to their performance problems.

i. Past Performance Adjectival ratings and Performance Risk - Performance risks are those risks associated with an offeror's likelihood of success in performing the solicitation's requirements as indicated by that offeror's record of current or past performance.

Excellent Essentially no doubt exists that the offeror will successfully perform the required effort based on their performance record.

Risk Level: Very Low

Good Little doubt exists that the offeror will successfully perform the required effort based on their performance record. Risk Level: Low

Adequate Some doubt exists that the offeror will successfully perform the required effort based on their performance record. Risk Level: Moderate

Marginal Significant doubt exists that the offeror will successfully perform the required effort based on their performance record. Risk Level: High

Poor It is extremely doubtful that the offeror will successfully perform the required effort based on their performance record. Risk Level: Very High

Unknown The offeror has no relevant past performance upon which to base a meaningful performance risk prediction. By law, contractors with no relevant past performance history cannot be evaluated favorably or unfavorably. Risk Level: Unknown

j. Adjectival ratings and proposal risk for other than past performance.

ADJECTIVE

DEFINITION AND CRITERIA

Excellent

The proposal has exceptional merit and reflects an excellent approach which will clearly result in the superior attainment of all requirements and objectives. This clearly achievable approach includes numerous advantageous characteristics of substance, and essentially no disadvantages, which can be expected to result in outstanding performance.

The risk of unsuccessful performance is very low as the proposal provides solutions which are unquestionably feasible and practical. These solutions are further considered very low risk in that they are exceptionally clear and precise, fully supported, and demonstrate a clear understanding of the requirements. Risk Level: Very Low

Good

The proposal demonstrates a sound approach which is expected to meet all requirements and objectives. This sound approach includes advantageous characteristics of substance, and few relatively minor disadvantages, which collectively can be expected to result in satisfactory performance. The risk of unsuccessful performance is low as the proposal contains solutions which are considered feasible and practical. These solutions are further considered to reflect low risk in that they are clear and precise, supported, and demonstrate an understanding of the requirements. Risk Level: Low

Acceptable

The proposal demonstrates an approach which is capable of meeting all requirements and objectives. The approach includes both advantageous and disadvantageous characteristics of substance, where the advantages are not outweighed by the disadvantages.

Collectively, the advantages and disadvantages are likely to result in acceptable performance. The risk of unsuccessful performance is moderate, as the proposal solutions are generally feasible and practical. These solutions are further considered to reflect moderate risk in that they are somewhat clear and precise, partially supported, and demonstrate a general understanding of the requirements. Risk Level: Moderate

Marginal

The proposal demonstrates an approach which may not be capable of meeting all requirements and objectives. The approach has disadvantages of substance and advantages, which if they exist, are outweighed by the disadvantages. Collectively, the advantages and disadvantages are not likely to result in satisfactory performance. The risk of unsuccessful performance is high as the proposal contains solutions which may not be feasible and practical. These solutions are further considered to reflect high risk in that they lack clarity and precision, are generally unsupported, and do not demonstrate a complete understanding of the requirements. Risk Level: High

Susceptible to Being Made Acceptable

The proposal demonstrates an approach which, as initially proposed, cannot be rated Marginal because of error(s), omission(s) or deficiency(ies) which are capable of being corrected without a major rewrite or revision of the proposal. These solutions are further considered to reflect high to very high risk in that they lack clarity and precision, are generally unsupported, and do not demonstrate a complete understanding of the requirements. Risk Level: High to Very High

NOTE: A Susceptible rating cannot be a final rating. The final rating will either increase to a rating of Marginal or better or decrease to Unacceptable

Unacceptable

The proposal demonstrates an approach which, based on a very high risk, will very likely not be capable of meeting all requirements and objectives. This approach has numerous disadvantages of substance, and advantages which, if they exist, are far outweighed by disadvantages. Collectively, the advantages and disadvantages will not result in satisfactory performance. The risk of unsuccessful performance is very high as the proposal contains solutions which are not feasible and practical. The solutions are further considered to reflect very high risk in that they lack any clarity or precision, are unsupported, and do not demonstrate an understanding of the requirement.

Risk Level: Very High

3 GENERAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS FOR A TWO-PHASE DESIGN-

BUILD PROPOSAL.

3.1 GENERAL INSTRUCTIONS.

3.1.1 Media, Page Size, Margins, Fonts, and Page Limitations.

Submit only the hard-copy paper documents and electronic files specifically authorized elsewhere in this section.

Facsimile bids/offers, modifications thereto, or cancellations of bids/offers will not be accepted. Do not submit excess information, to include audio-visual materials, electronic media, etc. Do not include links to information on websites in lieu of incorporating the information physically into the proposal. Except where another size is specifically authorized for a specific submission, use only 8 1/2” x 11” paper. Use at least 1 inch margins, which may include headers and footers. Do not justify the right margin. Ensure that all text and graphics are clearly legible. Do not use a font size smaller than 10, unusual font styles such as script, or condensed fonts. For submissions with page limitations, the pages will be counted as follows: One side of the paper is one page;

information on both the back and front of one sheet of paper will be counted as two pages. Where authorized, a foldout sheet will count as one page. Pages furnished for organizational purposes only, such as a “Table of Contents” or divider tabs, are excluded from page limitations.

3.1.2 Proposal Binding.

The preferred method for assembling proposals is a method that enables the rapid insertion or deletion of pages such as three ring binders. Ensure recommended capacity is not exceeded and that pages turn freely. Do not use spring clamps, spiral binding systems, or heat binding systems.

3.1.3 Conditioning of Offer.

Do not include exceptions to the terms and conditions of the solicitation in either the technical or price proposal volumes. Inclusion of any standard company terms and conditions that conflict with the terms and conditions of the solicitation may result in a determination that the offer is unacceptable and thus ineligible for award. Resolve questions about the terms and conditions or technical requirements of the solicitation prior to submission of the offer; see “Inquiries”, located in Section 00010, for points of contact. Notwithstanding the above, the offeror must clearly describe in the proposal cover sheet submitted with the price volume any exceptions, within the offer, to the contractual and/or technical terms and conditions of the solicitation.

3.1.4 Restrictions on Offeror-Provided Information.

“Confidential” projects cannot be submitted to demonstrate capability unless all of the information required for evaluation as specified herein can nonetheless be provided to the Government as part of the offeror’s technical proposal. Offerors that include in their proposals information that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, must clearly mark the information in accordance with FAR 52.215-1, “Instructions to Offeror – Competitive Acquisition”, paragraph (e), “Restriction on disclosure and use of data”. Files shall not contain classified data.

3.2 REQUIREMENT FOR SEPARATE PRICE AND TECHNICAL PROPOSAL VOLUMES.

The proposal shall be submitted as summarized below and as required by the specifications.

a. Phase-One Proposal.

(1) Factor 1: Experience and Capability

(2) Factor 2: Past Performance

b. Phase-Two Proposal.

(1) Volume I – Cost/Price Volume

(a) Proposal Cover Sheet

(b) Standard Form 1442, Acknowledgement of Amendments, Joint Venture Agreement

(c) Pricing Schedule

(d) Work Breakdown Structure

(e) Representation, Certifications, and Other Statements of Offerors

(f) Bid Guarantee

(g) Pre-Award Survey Information

(2) Volume II – Technical Volume Factor 3: Technical Approach

Each offeror must submit a phase-one proposal consisting of only a “technical” volume and each selected phase-two offeror must submit a phase-two proposal consisting of both a “price” volume and a “technical” volume. The price volume includes the signed offer and the offeror’s proposed prices, as well as other “pro forma” requirements. The technical volume includes all required information relating to the “non-price” evaluation factors, which may include both technical and management evaluation criteria. The two volumes must be submitted as separate, physically distinct volumes. Both volumes must be received at the location shown in Block 8 of Standard Form 1442, not later than the date and time specified in Block 13 of Standard Form 1442. The information in the two volumes is evaluated separately and independently. Therefore, all information intended by the offeror to be evaluated as part of the price volume must be submitted as part of the price volume. All information intended by the offeror to be evaluated as part of the technical volume must be submitted as part of the technical volume. Do not merely cross-reference similar material between the technical and price volumes. Information in the price volume will not be considered in the technical evaluation, and vice versa.

3.2.1 Marking of Proposal Volumes.

Mark each volume as either the “Price Proposal” or the “Technical Proposal”. Additionally, mark the outside front cover of each volume with the project title and location, solicitation number, name and address of the offeror, and volume copy number. (Markings which identify the offeror are not desired on either the back cover or on the spline/binding.)

3.2.2 Tabbing of Proposal Volumes.

Offers are to be formatted and tabbed in accordance with the instructions that follow for each proposal volume.

3.2.3 Table of Contents.

Include a table of contents for each proposal volume.

The following have been deleted:

52.216-27 Single or Multiple Awards OCT 1995

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

The following have been modified:

SPECIAL CONTRACT REQUIRMENTS

SECTION 00800

SPECIAL CONTRACT REQUIREMENTS (SCRs)

52.231-5000 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE (EFARS

CLAUSE DATED MAR 1995)

(a) This statement shall become operative only for negotiated contracts where cost or pricing data is requested, and for modifications to sealed bid or negotiated contracts where cost or pricing data is requested. This clause does not apply to terminations. See 52.249-5000, Basis for Settlement of Proposals, and FAR Part 49.

(b) Allowable cost for CONSTRUCTION and marine plant and equipment in sound workable condition owned or controlled and furnished by a contractor or subcontractor at any tier shall be based on actual cost data for each piece of equipment or groups of similar serial and series for which the Government can determine both ownership and operating costs from the contractor's accounting records. When both ownership and operating costs cannot be determined for any piece of equipment or groups of similar serial or series equipment from the contractor's accounting records, costs for that equipment shall be based upon the applicable provisions of EP 1110-1-8, CONSTRUCTION Equipment Ownership and Operating Expense Schedule, Region VII. Working conditions shall be considered to be average for determining equipment rates using the schedule unless specified otherwise by the contracting officer.

For equipment not included in the schedule, rates for comparable pieces of equipment may be used or a rate may be developed using the formula provided in the schedule. For forward pricing, the schedule in effect at the time of negotiations shall apply. For retroactive pricing, the schedule in effect at the time the work was performed shall apply.

(c) Equipment rental costs are allowable, subject to the provisions of FAR 31.105(d)(ii) and FAR 31.205-36. Rates for equipment rented from an organization under common control, lease-purchase arrangements, and sale-leaseback arrangements, will be determined using the schedule, except that actual rates will be used for equipment leased from an organization under common control that has an established practice of leasing the same or similar equipment to unaffiliated lessees.

(d) When actual equipment costs are proposed and the total amount of the pricing action exceeds the small purchase threshold, the contracting officer shall request the contractor to submit either certified cost or pricing data, or partial/limited data, as appropriate. The data shall be submitted on Standard Form 1411, Contract Pricing Proposal Cover Sheet.

NOTE 1: EP 1110-1-8 is available on the Internet at the following location:

http://www.usace.army.mil/inet/usace-docs/eng-pamphlets NOTE 2: Standard Form 1411 is no longer a current form. The Contracting Officer may require submission of cost or pricing data in the format indicated in Table 15-2 of FAR 15.408, specify an alternative format, or permit submission in the contractor’s format. Information other than cost or pricing data may be submitted in the contractor’s own format unless the use of a specific format is prescribed elsewhere in this contract.

52.249-5000 BASIS FOR SETTLEMENT OF PROPOSALS (EFARS CLAUSE DATED DEC

1995)

Actual costs will be used to determine equipment costs for a settlement proposal submitted on the total cost basis under FAR 49.206-2(b). In evaluating a termination settlement proposal using the total cost basis, the following principles will be applied to determine allowable equipment costs:

(1) Actual costs for each piece of equipment or groups of similar serial or series equipment need not be available in the Contractor's accounting records to determine total actual equipment costs.

(2) If equipment costs have been allocated to a contract using predetermined rates, those charges will be adjusted to actual costs.

(3) Recorded job costs adjusted for unallowable expenses will be used to determine equipment operating expenses.

(4) Ownership costs (depreciation) will be determined using the Contractor's depreciation schedule (subject to the provisions of FAR 31.205- 11).

(5) License, taxes, storage and insurance costs are normally recovered as an indirect expense and unless the Contractor charges these costs directly to contracts, they will be recovered through the indirect expense rate.

SECURITY REQUIREMENTS FOR UNCLASSIFIED CONTRACTS:

a. All Contractor employees (U.S. citizens and Non- U.S. citizens) working under this contract (to include grants, cooperative agreements and task orders) who require access to Automated Information Systems (AIS), (stand alone computers, network computers/systems, e-mail) shall, at a minimum, be designated into an ADP-III position (non-sensitive) in accordance with DoD 5220-22-R, Industrial Security Regulation. The investigative requirements for an ADP-III position are a favorable National Agency Check (NAC), SF-85P, Public Trust Position.

b. The contractor shall have each applicable employee complete a SF-85P and submit to the Sacramento District Security Officer within three (3) working days after award of any contract or task order, and shall be submitted prior to the individual being permitted access to an AIS. Contractors that have a commercial or government entity (CAGE) Code and Facility Security Clearance through the Defense Security Service shall process the NACs and forward visit requests/results of NAC to the Sacramento District Security Officer. For those contractors that do not have a CAGE Code or Facility Security Clearance, the Sacramento District Security Office will process the investigation in coordination with the Contractor and contract employees.

c. In accordance with Engineering Regulation, ER 380-1-18, Section 4, foreign nationals who work on Corps of Engineers’ contracts or task orders shall be approved by the HQUSACE Foreign Disclosure Officer or higher before beginning work on the contract/task order. This regulation includes subcontractor employees. (NOTE: exceptions to the above requirement include foreign nationals who perform janitorial and/or ground maintenance services.)

The contractor shall submit to the Sacramento District Contract Office, the names of all foreign nationals proposed for performance under this contract/task order, along with documentation to verify that he/she was legally admitted into the United States and has authority to work and/or go to school in the US. Such documentation may include a US passport, Certificate of US citizenship (INS Form N-560 or N-561), Certificate of Naturalization (INS Form N-550 or N-570), foreign passport with I-551 stamp or attached INS Form I-94 indicating employment authorization, Alien Registration Receipt Card with photograph (INS Form I-151 or I-551), Temporary Resident Card (INS Form I-688), Employment Authorization Card (INS Form I-688A), Reentry Permit (INS Form I-327), Refugee Travel Document (INS Form I-571), Employment Authorization Document issued by the INS which contains a photograph (INS Form I-688B).

d. The address and telephone number for the Sacramento District Security Officer is as follows:

U.S. Army Engineer District, Sacramento Attn: Security Officer (CESPK-DE-S) 1325 J Street Sacramento, CA 95814-2922 Tel: (916) 557-6920

e. All transmittals of documentation and other information pertaining to this requirement must be marked with the applicable contract, grant, agreement, and/or task order number and the name of the contracting officer.

Additionally, the contracting officer must be notified in writing whenever a SF 85P has been submitted to the Security Officer for processing.

EMPLOYEE IDENTIFICATION AND FINGERPRINTS:

If employee identification is required for security or other reasons, the Contractor shall be responsible for furnishing to each employee and for requiring each employee engaged on the work to display such identification as may be approved and directed by the Contracting Officer. All prescribed identification shall immediately be delivered to the Contracting Officer, for cancellation upon the release of any employee. When required by the Contracting Officer, the Contractor shall obtain and submit fingerprints of all persons employed or to be employed on the project.

SCHEDULES, PLANS, AND SUBMITTALS REQUIRED BY THE TECHNICAL SPECIFICATIONS:

The Contractor will be required to provide the schedule, plans, and submittals required by the Technical Specifications on a Task Order basis, unless otherwise directed by the Contracting Officer.

NON-PRE-PRICED LINE ITEMS:

Work within the general scope of the contract and the task order but not pre-priced may be negotiated with the Contractor and included in the task order, which will then be issued on a bilateral basis. When it is anticipated that the need for the line item will be recurring, the contract may be modified to include that unit priced line item.

NOTICE TO PROCEED:

Proof of insurance must be provided within 10 calendar days of contract award. Performance and payment bonds must be provided within 10 calendar days of the contractor's receipt of the task order. A Notice to Proceed for each Task Order will not be issued until the Government is in receipt of proof of insurance and acceptable performance and payment bonds.

BONDING REQUIREMENTS:

Performance and payment bonds will be provided on a task-order basis. Full bonding is required for each task order, even those not exceeding $100,000.

ALTERNATE STRUCTURED APPROACH TO WEIGHTED GUIDELINE METHOD FOR CONSTRUCTION

CONTRACTS:

The following alternate structured approach shall be used for all fixed-price construction contract actions.

Factor Rate Weight Value

Degree of risk 20 Relative difficulty of work 15 Size of job 15 Period of performance 15 Contractor's investment 5 Assistance by Government 5 Subcontracting 25

Total 100%

Based on the circumstances of the procurement action, each of the above factors shall be weighted from .03 to .12 as indicated below. “Value” shall be obtained by multiplying the rate by the weight. The Value column when totaled indicates the fair and reasonable profit percentage under the circumstances of the particular procurement. The profit percentage should be multiplied by the total contract costs, including general and administrative costs.

(1) Degree of risk. Where the work involves no risk or the degree of risk is very small, the weighting should be .03; as the degree of risk increases, the weighting should be increased up to a maximum of .12. Lump sum items shall generally have a higher weight than unit price items; other things to consider include the nature of the work and where it is to be performed. Consider the portion of the work to be done by subcontractors, amount and type of labor included in costs, whether the negotiation is before or after performance of the work, etc. Modifications settled before the fact have much greater risk than those settled after the fact. A weight of .03 is appropriate for after the fact equitable adjustments and/or settlements.

(2) Relative Difficulty of Work: If the work is difficult and complex, the weight should be .12 and should be proportionately reduced to .03 on the simplest of jobs. This factor is tied in to some extent with the degree of risk. Some other things to consider are the nature of the work, by whom it is to be done (i.e., subcontractors, consultants), what is the time schedule.

(3) Size of Job. Work of $100,000 or less shall be weighted at .12.

Work estimated between $100,000 and $5,000,000 shall be proportionately weighted from .12 to .05. Work from $5,000,000 to $10,000,000 shall be weighted at .04. Work in excess of $10,000,000 shall be weighted at .03. It should be noted that control of fixed expenses generally improves with increased job magnitude.

(4) Period of Performance. Work not to exceed one month is to be proportionately weighted at .03. Durations between one month and 24 months are to be proportionately weighted between .03 and .12. Work in excess of 24 months is to be weighted at .12.

(5) Contractor's Investment. To be weighted from .03 to .12 on the basis of below average, average and above average. Things to consider include amount of subcontracting, Government-furnished property or data such as surveys, soil tests, method of making progress payments, and any mobilization payment items.

(6) Assistance by Government. To be weighted from .12 to .03 on the basis of average to above average. Consider use of Government-owned property, equipment and facilities, and expediting assistance.

(7) Subcontracting. To be weighted inversely proportional to the amount of subcontracting. Where 80% or more of the work is to be subcontracted use .03. The weighting should be increased proportionately to .12 where all the work is performed by the contractor's own forces.

INDEFINITE-DELIVERY CONTRACTS:

(a) This contract is an indefinite-delivery, indefinite-quantity (IDIQ) contract. All work shall be performed through issuance of task orders. The

Contractor shall perform no work under this contract unless a written task order, signed by the Contracting Officer, has been issued by the Government.

The Contractor shall complete all work described in the scope of work for each task order within the performance period of each task order. A Corps of Engineers, Sacramento District, Contracting Officer is the only person authorized to issue task orders against this contract. Task Orders may be issued via FACSIMILE, with hard copy of the task order to follow. The effective date of the task order, if FACSIMILE is used, is the date the Government receives verbal or written confirmation of receipt from the Contractor.

(b) Fixed price “lump sum” task orders will be negotiated based on the projected level of effort required to complete the work. After acceptance of the fixed price lump sum task order by the Contractor, the task order price will not be adjusted solely to reflect the actual quantities utilized by the contractor in performance of the work. The contract price will only be adjusted to reflect changes in scope or conditions governed by other clauses (differing site conditions, etc.).

(c) The contract period has a guaranteed minimum amount of $2,000,00.

The guaranteed minimum amount is all that the Government obligates on the contract. All other funds are obligated on individual task orders.

(d) In the event of any inconsistency between the contract and any task order, the terms and conditions of the contract shall control.

SUBCONTRACTING WITH SMALL, SMALL DISADVANTAGED AND WOMEN-OWNED SMALL

BUSINESSES:

Contractors are cautioned that failure of any Contractor to comply in good faith with the contract clauses pertaining to (1) Utilization of Small Business Concerns or (2) Small, Small Disadvantaged and Women-Owned Small Business Subcontracting Plans, when applicable, will be a material breach of contract. In order to assist contractors in developing a source list of small, small disadvantaged and/or women-owned small business concerns you are encouraged to contact your minority contractor associates, the local Minority Business Development Agency and the appropriate General Business Service Centers in your Standard Metropolitan Statistical Area. Contractors may obtain addresses of these sources from:

Write: US Army Engineer District, Sacramento ATTN: Deputy for Small Business 1325 J Street, 9th Floor Sacramento, California 95814-2922

Or Contact: Ms. Michelle Stratton Deputy for Small Business

Telephone: (916) 557-7641

HAZARDOUS MATERIALS DELIVERED UNDER THIS CONTRACT:

(a) If any hazardous materials will be delivered under this contract (see Section 00600, FAR 52.223-3, and DFARS 252.223-7001), the Material Safety Data Sheets (MSDS) for locally purchased, nonstandard stock hazardous material will be submitted to the Corps of Engineers Contracting Officer or Contracting Officer's Representative. For all other materials, the MSDS will also be submitted to U.S. Army Environmental Hygiene Agency, ATTN: HSE-OI, Aberdeen Proving Grounds MD 21010.

(b) Hazardous material is defined in Federal Standard No. 313, sold by the General Services Administration Specifications Unit (3FBP-W), 7th & D Streets, SW, Washington DC 20407.

INVOICES:

The Government shall pay the Contractor upon submission of proper invoices for supplies delivered and accepted or services rendered and accepted for the portion of work actually performed under this contract. Refer to Section 00700 Clause 252.232-7003 “Electronic Submission of Payment Requests and Receiving Reports” for registration and procedures. An additional copy of invoices will be submitted to the address in Block 26, SF-1442, which will be completed at time of award. Invoices shall be submitted on ENG Form 93 which will be provided to the Contractor by the Government.

AS-BUILT DRAWINGS (PROGRESS PAYMENT):

One-half of one percent of construction award money shall be withheld until the final as-built drawings and CADD files are accepted by the Government.

CONTRACTOR-PROVIDED UTILITIES:

All utilities used in the performance of the work shall be furnished and paid for by the Contractor. The Contractor, at the Contractor's expense, and in a workmanlike manner satisfactory to the Contracting Officer, shall install and maintain all necessary temporary connections and distribution lines and the Contractor shall remove the same prior to final acceptance of the construction.

SALVAGE AND SCRAP GOVERNMENT PROPERTY:

(a) "Government property" means all property owned by or leased to the Government or acquired by the Government under the terms of the contract. It includes both Government-furnished property and contractor-acquired property.

(b) "Salvage" means Government property in possession of a contractor, including subcontractors, that, because of its worn, damaged, deteriorated, or incomplete condition or specialized nature, has no reasonable prospect of sale or use as serviceable property without major repairs, but has some value in excess of its scrap value.

(c) "Scrap" means Government personal property that has no value except for its basic material content.

(d) In accordance with FAR 45.505-8 the Contractor shall maintain records of all scrap and salvage generated from this contract. The Contractor's records shall contain the following information:

(1) Contract Number

(2) Description of salvageable items or classification (material content) of scrap

(3) Quantity on hand

(e) The Contractor shall provide final accounting and disposition recommendations of all Government property not consumed in performing this contract or delivered to the Government including salvage and scrap. The Government will review the Contractor's records and shall cause correction if the Government disagrees with the classification of items as salvage or scrap. The Contractor shall dispose of the items as directed by the Contracting Officer. Items designated as scrap (agreed to by the Contracting Officer) shall be retained by the Contractor; its disposition shall be the responsibility of the Contractor. See Specification Section 01 00 00, paragraph entitled "Scrap Material". Items designated as salvageable items (agreed to by the Contracting Officer) shall be turned over to the Government.

(End of Summary of Changes)