Solicitation Amendment 0003

View the file

Other files

File Type Posted
A.07.24_W9123718R0004_-_0002_FBO.pdf PDF
A.07.24_W9123718R0004_-_0002_FBO.pdf PDF
A.07.23_W9123718R0004_-_0001.pdf PDF
A.07.23_W9123718R0004.pdf PDF
A.01.30_Forms_and_Drawings.pdf PDF
A.01.30_PPQ.pdf PDF
A.02.02_Synopsis-signed.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The solicitation is hereby amended for clarification purposes only regarding the Price Breakout Schedule. The following verbiage has been added "Pricing is to be based on the assumption that the majority of w ork being completed, will be w ithin the Great Lakes and Ohio River Division (LRD). Work outside the boundaries of LRD, for Districts and Divisions w ithin the conintental United States, w ill be negotiated on a task order basis as required."

All other terms and conditions remain unchanged.

The due date for submission of proposals remains unchaged at 9 November 2018 by 11:00 am Eastern.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 17

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 30-Oct-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9123718R0004

X 9B. DATED (SEE ITEM 11)

18-Sep-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

30-Oct-2018

CODE

USACE, CONTRACTING DIVISION

ALLISON LEWIS, 502 8TH STREET

HUNTINGTON WV 25701

W91237 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9123718R0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 18-Oct-2018 11:00 AM to 09-Nov-2018 11:00 AM.

SECTION B - SUPPLIES OR SERVICES AND PRICES

The following have been added by full text:

PRICE BREAKOUT SCHEDULE_REV02

NATIONAL INLAND FLOATING PLANT AND LAND DRILLING SERVICES

PRICE BREAKOUT SCHEDULE (REVISION 02)

NOTE: The quantities listed in the price breakout schedule are approximate and are provided as information only to assist in the preparation of proposals. The quantities are not guaranteed and the actual quantities provided under this contract shall not be justification for modification to the contract for additional payment above the amount negotiated on individual Task Orders.

NOTE: Pricing is to be based on the assumption that the majority of work to be completed, will be within the Great Lakes and Ohio River Division (LRD). Work outside the boundaries of LRD, for Districts and Divisions within the continental United States, will be negotiated on a task order basis as required.

In reference to FAR Clause 52.217-5, Evaluation of Options, the Government will evaluate offers for award purposes by adding the total price for all option periods to the total price for the base period. A target of 2 contracts may be awarded with a shared capacity amount not-to-exceed $20M. It should be noted given the significant contingencies in the estimated quantities, if awarded a contract for this requirement, the offeror's proposed overall total price (base and all option periods) will not be reflective of the contract value for this procurement.

In accordance to FAR Clause 52.217-8, Option to Extend Services, the rates to be used during the continued performance of any services will be the rates in effect at the time of the extension and will be evaluated at the time of contract award.

BASE PERIOD

Item DESCRIPTION UNIT EST

QTY

U/P Estimated Price

0001 Overburden Drilling without Sampling LF 250 Drive Sampling without HS Augers:

0002 0-60 Feet LF 125 0003 60-120 Feet LF 50 0004 120-400 Feet LF 20

Drive Sampling with HS Augers:

0005 0-60 Feet LF 125 0006 60-120 Feet LF 50 0007 120-400 Feet LF 25

General Sampling 0008 Undisturbed Sampling 3" EA 10 0009 Undisturbed Sampling 5" EA 15

0010 Drilling in Rock and Concrete without Sampling

LF

0011 Drilling in reinforced concrete without

0012 Coring in Rock and Concrete, 2.125" or Conventional Cores

0013 Coring in rock and concrete, NQ Wireline

0014 Coring in reinforced concrete, 2.125" or NQ Wireline

0015 Coring in rock and concrete, Vertical 4" LF 300 0016 Coring in rock and concrete, 4" Nominal PQ

0017 Coring in reinforced concrete, 4" or PQ

0018 Coring in rock and concrete, 6" cores LF 75 0019 Coring in reinforced concrete, 6" cores LF 25 0020 Sonic Drilling, in Soil, 4" Nominal, 0-200 Feet LF 50 0021 Sonic Drilling, in Soil, 4" Nominal, 200-400

Feet

0022 Sonic Drilling, in Soil, 8" Nominal, 0-200 Feet LF 50 0023 Sonic Drilling, in Soil, 8" Nominal, 200-400

0024 Sonic Drilling, in Rock, 4" Nominal, 0-200

TBN

0025 Sonic Drilling, in Rock, 4" Nominal, 200-400

0026 Sonic Drilling, in Rock, 8" Nominal, 0-200

0027 Sonic Drilling, in Rock, 8" Nominal, 200-400

Instrumentation 0028 Piezometer Installation - Regular EA 8 0029 Piezometer Installation - Flush Mount EA 8 0030 Piezometer Surface Protection Rehab EA 4 0031 Inclinometer Installation EA 4 0032 Surface Displacement Monument EA 4

Other 0033 Directed Installation of Casing LF 10 0034 Cribbing Construction HR 100 0035 Flagger HR 100 0036 Movement of Equipment MI 1000 0037 Mob/Demob of Drill Rig (Land) EA 10 0038 Mob/Demob of Drill Rig (Sonic) EA 10 0039 Mob & Demob of ATV Rig EA 10 0040 Surveying EA 10 0041 Geophysical Logging Mobilization EA 20 0042 Geophysical Logging Video LF 2000 0043 Geophysical Logging Acoustic LF 2000

0044 Geophysical Logging Acoustic and Video LF 2000 Floating Plant

0045 Overburden Drilling without Sampling LF 50 Drive Sampling without HS Augers:

0046 0-60 feet LF 125 0047 60-120 feet LF 50 0048 120-400 feet LF 25

Drive Sampling with HS Augers:

0049 0-60 feet LF 125 0050 60-120 feet LF 50 0051 120-400 feet LF 25

General Sampling 0052 Drilling in rock and concrete without sampling

0053 Drilling in reinforced concrete without sampling

0054 Coring in rock and concrete, 2.125" conventional cores

0055 Coring in rock and concrete, NQ Wireline LF 500 0056 Coring in reinforced concrete, 2.125" or NQ

0057 Coring in rock and concrete, Vertical 4" LF 500 0058 Coring in rock and concrete, 4" Nominal PQ

0059 Coring in reinforced concrete, 4" or PQ

0060 Coring in rock and concrete, 6" cores LF 500 0061 Coring in reinforced concrete, 6" cores LF 500 0062 Sonic Drilling, in Soil, 4" Nominal, 0-200 Feet

To Be Negotiated

0063 Sonic Drilling, in Soil, 4" Nominal, 200-400

0064 Sonic Drilling, in Soil, 8" Nominal, 0-200 Feet To Be Negotiated 0065 Sonic Drilling, in Soil, 8" Nominal, 200-400

0066 Sonic Drilling, in Rock, 4" Nominal, 0-200

0067 Sonic Drilling, in Rock, 4" Nominal, 200-400

0068 Sonic Drilling, in Rock, 8" Nominal, 0-200

0069 Sonic Drilling, in Rock, 8" Nominal, 200-400

Other 0070 Movement of Equipment MI 825 0071 Surveying EA 10 0072 Mobilization and Demobilization of Helper

Boat

EA

0073 Mob/Demob of Floating Plant EA 5

0074 Floating Plant DA 100 0075 Helper Boat 1 DA 100 0076 Helper Boat 2 DA 0 0077 Geophysical Logging Mobilization EA 20 0078 Geophysical Logging Video LF 1000 0079 Geophysical Logging Acoustic LF 1000 0080 Geophysical Logging Acoustic and Video LF 1000

Combined Other 0081 Security Clearance & Training EA 50 0082 Inspection Registered Professional SH 500 0083 Inspection non-Registered Professional TBN 0 0084 Other Direct costs (to be negotiated) To Be Negotiated 0085 gINT Logs EA 200 0086 Mileage To Be Negotiated 0087 Energy Calibration of Hammers EA 3 0088 Hydraulic Pressure Test Abbreviated EA 350 0089 Hydraulic Pressure Test Standard EA 500

TOTAL BASE PERIOD:

OPTION PERIOD ONE

Item DESCRIPTION UNIT EST

QTY

U/P Estimated Price

1001 Overburden Drilling without Sampling LF 250

Drive Sampling without HS Augers:

1002 0-60 Feet LF 125 1003 60-120 Feet LF 50 1004 120-400 Feet LF 20

Drive Sampling with HS Augers:

1005 0-60 Feet LF 125 1006 60-120 Feet LF 50 1007 120-400 Feet LF 25

General Sampling 1008 Undisturbed Sampling 3" EA 10 1009 Undisturbed Sampling 5" EA 15 1010 Drilling in Rock and Concrete without

1011 Drilling in reinforced concrete without

1012 Coring in Rock and Concrete, 2.125" or

1013 Coring in rock and concrete, NQ Wireline

1014 Coring in reinforced concrete, 2.125" or NQ

1015 Coring in rock and concrete, Vertical 4" LF 300 1016 Coring in rock and concrete, 4" Nominal PQ

1017 Coring in reinforced concrete, 4" or PQ

1018 Coring in rock and concrete, 6" cores LF 75 1019 Coring in reinforced concrete, 6" cores LF 25 1020 Sonic Drilling, in Soil, 4" Nominal, 0-200 Feet LF 50 1021 Sonic Drilling, in Soil, 4" Nominal, 200-400

1022 Sonic Drilling, in Soil, 8" Nominal, 0-200 Feet LF 50 1023 Sonic Drilling, in Soil, 8" Nominal, 200-400

1024 Sonic Drilling, in Rock, 4" Nominal, 0-200

1025 Sonic Drilling, in Rock, 4" Nominal, 200-400

1026 Sonic Drilling, in Rock, 8" Nominal, 0-200

1027 Sonic Drilling, in Rock, 8" Nominal, 200-400

1028 Piezometer Installation - Regular EA 8 1029 Piezometer Installation - Flush Mount EA 8 1030 Piezometer Surface Protection Rehab EA 4 1031 Inclinometer Installation EA 4 1032 Surface Displacement Monument EA 4

1033 Directed Installation of Casing LF 10 1034 Cribbing Construction HR 100 1035 Flagger HR 100 1036 Movement of Equipment MI 1000 1037 Mob/Demob of Drill Rig (Land) EA 10 1038 Mob/Demob of Drill Rig (Sonic) EA 10 1039 Mob & Demob of ATV Rig EA 10 1040 Surveying EA 10 1041 Geophysical Logging Mobilization EA 20 1042 Geophysical Logging Video LF 2000 1043 Geophysical Logging Acoustic LF 2000 1044 Geophysical Logging Acoustic and Video LF 2000

Floating Plant 1045 Overburden Drilling without Sampling LF 50

Drive Sampling without HS Augers:

1046 0-60 feet LF 125 1047 60-120 feet LF 50 1048 120-400 feet LF 25

Drive Sampling with HS Augers:

1049 0-60 feet LF 125 1050 60-120 feet LF 50 1051 120-400 feet LF 25

General Sampling 1052 Drilling in rock and concrete without sampling

1053 Drilling in reinforced concrete without

1054 Coring in rock and concrete, 2.125"

1055 Coring in rock and concrete, NQ Wireline LF 500 1056 Coring in reinforced concrete, 2.125" or NQ

1057 Coring in rock and concrete, Vertical 4" LF 500 1058 Coring in rock and concrete, 4" Nominal PQ

1059 Coring in reinforced concrete, 4" or PQ

1060 Coring in rock and concrete, 6" cores LF 500 1061 Coring in reinforced concrete, 6" cores LF 500 1062 Sonic Drilling, in Soil, 4" Nominal, 0-200 Feet To Be Negotiated 1063 Sonic Drilling, in Soil, 4" Nominal, 200-400

1064 Sonic Drilling, in Soil, 8" Nominal, 0-200 Feet To Be Negotiated 1065 Sonic Drilling, in Soil, 8" Nominal, 200-400

1066 Sonic Drilling, in Rock, 4" Nominal, 0-200

1067 Sonic Drilling, in Rock, 4" Nominal, 200-400

1068 Sonic Drilling, in Rock, 8" Nominal, 0-200

1069 Sonic Drilling, in Rock, 8" Nominal, 200-400

1070 Movement of Equipment MI 825 1071 Surveying EA 10 1072 Mobilization and Demobilization of Helper

1073 Mob/Demob of Floating Plant EA 5 1074 Floating Plant DA 100 1075 Helper Boat 1 DA 100 1076 Helper Boat 2 DA 0 1077 Geophysical Logging Mobilization EA 20 1078 Geophysical Logging Video LF 1000 1079 Geophysical Logging Acoustic LF 1000 1080 Geophysical Logging Acoustic and Video LF 1000

Combined Other 1081 Security Clearance & Training EA 50 1082 Inspection Registered Professional SH 500 1083 Inspection non-Registered Professional TBN 0 1084 Other Direct costs (to be negotiated) To Be Negotiated 1085 gINT Logs EA 200 1086 Mileage To Be Negotiated 1087 Energy Calibration of Hammers EA 3 1088 Hydraulic Pressure Test Abbreviated EA 350 1089 Hydraulic Pressure Test Standard EA 500

TOTAL OPTION PERIOD ONE:

OPTION PERIOD TWO

QTY

U/P Estimated Price

2001 Overburden Drilling without Sampling LF 250 Drive Sampling without HS Augers:

2002 0-60 Feet LF 125 2003 60-120 Feet LF 50 2004 120-400 Feet LF 20

Drive Sampling with HS Augers:

2005 0-60 Feet LF 125

2006 60-120 Feet LF 50 2007 120-400 Feet LF 25

General Sampling 2008 Undisturbed Sampling 3" EA 10 2009 Undisturbed Sampling 5" EA 15 2010 Drilling in Rock and Concrete without

2011 Drilling in reinforced concrete without

2012 Coring in Rock and Concrete, 2.125" or

2013 Coring in rock and concrete, NQ Wireline LF 300 2014 Coring in reinforced concrete, 2.125" or NQ

2015 Coring in rock and concrete, Vertical 4" LF 300 2016 Coring in rock and concrete, 4" Nominal PQ

2017 Coring in reinforced concrete, 4" or PQ

2018 Coring in rock and concrete, 6" cores LF 75 2019 Coring in reinforced concrete, 6" cores LF 25 2020 Sonic Drilling, in Soil, 4" Nominal, 0-200 Feet LF 50 2021 Sonic Drilling, in Soil, 4" Nominal, 200-400

2022 Sonic Drilling, in Soil, 8" Nominal, 0-200 Feet LF 50 2023 Sonic Drilling, in Soil, 8" Nominal, 200-400

2024 Sonic Drilling, in Rock, 4" Nominal, 0-200

2025 Sonic Drilling, in Rock, 4" Nominal, 200-400

2026 Sonic Drilling, in Rock, 8" Nominal, 0-200

2027 Sonic Drilling, in Rock, 8" Nominal, 200-400

2028 Piezometer Installation - Regular EA 8 2029 Piezometer Installation - Flush Mount EA 8 2030 Piezometer Surface Protection Rehab EA 4 2031 Inclinometer Installation EA 4 2032 Surface Displacement Monument EA 4

Other 2033 Directed Installation of Casing LF 10 2034 Cribbing Construction HR 100 2035 Flagger HR 100 2036 Movement of Equipment MI 1000 2037 Mob/Demob of Drill Rig (Land) EA 10 2038 Mob/Demob of Drill Rig (Sonic) EA 10 2039 Mob & Demob of ATV Rig EA 10

2040 Surveying EA 10

2041 Geophysical Logging Mobilization EA 20

2042 Geophysical Logging Video LF 2000 2043 Geophysical Logging Acoustic LF 2000 2044 Geophysical Logging Acoustic and Video LF 2000

Floating Plant 2045 Overburden Drilling without Sampling LF 50

Drive Sampling without HS Augers:

2046 0-60 feet LF 125 2047 60-120 feet LF 50 2048 120-400 feet LF 25

Drive Sampling with HS Augers:

2049 0-60 feet LF 125 2050 60-120 feet LF 50 2051 120-400 feet LF 25

General Sampling 2052 Drilling in rock and concrete without sampling

2053 Drilling in reinforced concrete without

2054 Coring in rock and concrete, 2.125"

2055 Coring in rock and concrete, NQ Wireline LF 500 2056 Coring in reinforced concrete, 2.125" or NQ

2057 Coring in rock and concrete, Vertical 4"

2058 Coring in rock and concrete, 4" Nominal PQ

2059 Coring in reinforced concrete, 4" or PQ

2060 Coring in rock and concrete, 6" cores LF 500 2061 Coring in reinforced concrete, 6" cores LF 500 2062 Sonic Drilling, in Soil, 4" Nominal, 0-200 Feet To Be Negotiated 2063 Sonic Drilling, in Soil, 4" Nominal, 200-400

2064 Sonic Drilling, in Soil, 8" Nominal, 0-200 Feet To Be Negotiated 2065 Sonic Drilling, in Soil, 8" Nominal, 200-400

2066 Sonic Drilling, in Rock, 4" Nominal, 0-200

2067 Sonic Drilling, in Rock, 4" Nominal, 200-400

2068 Sonic Drilling, in Rock, 8" Nominal, 0-200

2069 Sonic Drilling, in Rock, 8" Nominal, 200-400

2070 Movement of Equipment MI 825 2071 Surveying EA 10 2072 Mobilization and Demobilization of Helper

Boat

EA 2

2073 Mob/Demob of Floating Plant EA 5 2074 Floating Plant DA 100 2075 Helper Boat 1 DA 100

2076 Helper Boat 2 DA 50

2077 Geophysical Logging Mobilization EA 20 2078 Geophysical Logging Video LF 1000 2079 Geophysical Logging Acoustic LF 1000 2080 Geophysical Logging Acoustic and Video LF 1000

Combined Other 2081 Security Clearance & Training EA 50 2082 Inspection Registered Professional SH 500 2083 Inspection non-Registered Professional TBN 0 2084 Other Direct costs (to be negotiated) To Be Negotiated

2085 gINT Logs EA 200 2086 Mileage To Be Negotiated 2087 Energy Calibration of Hammers EA 3 2088 Hydraulic Pressure Test Abbreviated EA 350 2089 Hydraulic Pressure Test Standard EA 500

TOTAL OPTION PERIOD TWO:

OPTION PERIOD THREE

QTY

U/P Estimated Price

3001 Overburden Drilling without Sampling

3002 0-60 Feet LF 125 3003 60-120 Feet LF 50 3004 120-400 Feet LF 20

Drive Sampling with HS Augers:

3005 0-60 Feet LF 125 3006 60-120 Feet LF 50 3007 120-400 Feet LF 25

General Sampling

3008 Undisturbed Sampling 3" EA 10 3009 Undisturbed Sampling 5" EA 15 3010 Drilling in Rock and Concrete without

3011 Drilling in reinforced concrete without

3012 Coring in Rock and Concrete, 2.125" or

3013 Coring in rock and concrete, NQ Wireline LF 300 3014 Coring in reinforced concrete, 2.125" or NQ

3015 Coring in rock and concrete, Vertical 4" LF 300 3016 Coring in rock and concrete, 4" Nominal PQ

3017 Coring in reinforced concrete, 4" or PQ

3018 Coring in rock and concrete, 6" cores LF 75 3019 Coring in reinforced concrete, 6" cores LF 25 3020 Sonic Drilling, in Soil, 4" Nominal, 0-200 Feet LF 50 3021 Sonic Drilling, in Soil, 4" Nominal, 200-400

3022 Sonic Drilling, in Soil, 8" Nominal, 0-200 Feet LF 50 3023 Sonic Drilling, in Soil, 8" Nominal, 200-400

3024 Sonic Drilling, in Rock, 4" Nominal, 0-200

3025 Sonic Drilling, in Rock, 4" Nominal, 200-400

3026 Sonic Drilling, in Rock, 8" Nominal, 0-200

3027 Sonic Drilling, in Rock, 8" Nominal, 200-400

3028 Piezometer Installation - Regular EA 8 3029 Piezometer Installation - Flush Mount EA 8 3030 Piezometer Surface Protection Rehab EA 4 3031 Inclinometer Installation EA 4 3032 Surface Displacement Monument EA 4

Other 3033 Directed Installation of Casing LF 10 3034 Cribbing Construction HR 100 3035 Flagger HR 100 3036 Movement of Equipment MI 1000 3037 Mob/Demob of Drill Rig (Land) EA 10 3038 Mob/Demob of Drill Rig (Sonic) EA 10 3039 Mob & Demob of ATV Rig EA 10 3040 Surveying EA 10 3041 Geophysical Logging Mobilization EA 20 3042 Geophysical Logging Video LF 2000

3043 Geophysical Logging Acoustic LF 2000 3044 Geophysical Logging Acoustic and Video LF 2000

Floating Plant 3045 Overburden Drilling without Sampling LF 50

Drive Sampling without HS Augers:

3046 0-60 feet LF 125 3047 60-120 feet LF 50 3048 120-400 feet LF 25

Drive Sampling with HS Augers:

3049 0-60 feet LF 125 3050 60-120 feet LF 50

3051 120-400 feet LF 25 General Sampling

3052 Drilling in rock and concrete without sampling

3053 Drilling in reinforced concrete without

3054 Coring in rock and concrete, 2.125"

3055 Coring in rock and concrete, NQ Wireline LF 500 3056 Coring in reinforced concrete, 2.125" or NQ

3057 Coring in rock and concrete, Vertical 4" LF 500 3058 Coring in rock and concrete, 4" Nominal PQ

3059 Coring in reinforced concrete, 4" or PQ

3060 Coring in rock and concrete, 6" cores LF 500 3061 Coring in reinforced concrete, 6" cores LF 500 3062 Sonic Drilling, in Soil, 4" Nominal, 0-200 Feet To Be Negotiated 3063 Sonic Drilling, in Soil, 4" Nominal, 200-400

3064 Sonic Drilling, in Soil, 8" Nominal, 0-200 Feet To Be Negotiated 3065 Sonic Drilling, in Soil, 8" Nominal, 200-400

3066 Sonic Drilling, in Rock, 4" Nominal, 0-200

3067 Sonic Drilling, in Rock, 4" Nominal, 200-400

3068 Sonic Drilling, in Rock, 8" Nominal, 0-200

3069 Sonic Drilling, in Rock, 8" Nominal, 200-400

3070 Movement of Equipment MI 825 3071 Surveying EA 10 3072 Mobilization and Demobilization of Helper

3073 Mob/Demob of Floating Plant EA 5

3074 Floating Plant DA 100 3075 Helper Boat 1 DA 100 3076 Helper Boat 2 DA 0 3077 Geophysical Logging Mobilization EA 20 3078 Geophysical Logging Video LF 1000 3079 Geophysical Logging Acoustic LF 1000 3080 Geophysical Logging Acoustic and Video LF 1000

Combined Other 3081 Security Clearance & Training EA 50 3082 Inspection Registered Professional SH 500 3083 Inspection non-Registered Professional TBN 0 3084 Other Direct costs (to be negotiated) To Be Negotiated 3085 gINT Logs EA 200 3086 Mileage To Be Negotiated 3087 Energy Calibration of Hammers EA 3 3088 Hydraulic Pressure Test Abbreviated EA 350 3089 Hydraulic Pressure Test Standard EA 500

TOTAL OPTION PERIOD THREE:

OPTION PERIOD FOUR

QTY

U/P Estimated Price

4001 Overburden Drilling without Sampling LF 250 Drive Sampling without HS Augers:

4002 0-60 Feet LF 125 4003 60-120 Feet LF 50 4004 120-400 Feet LF 20

Drive Sampling with HS Augers:

4005 0-60 Feet LF 125 4006 60-120 Feet LF 50 4007 120-400 Feet LF 25

General Sampling 4008 Undisturbed Sampling 3" EA 10 4009 Undisturbed Sampling 5" EA 15 4010 Drilling in Rock and Concrete without

4011 Drilling in reinforced concrete without

4012 Coring in Rock and Concrete, 2.125" or

4013 Coring in rock and concrete, NQ Wireline LF 300 4014 Coring in reinforced concrete, 2.125" or NQ

4015 Coring in rock and concrete, Vertical 4" LF 300 4016 Coring in rock and concrete, 4" Nominal PQ

4017 Coring in reinforced concrete, 4" or PQ

4018 Coring in rock and concrete, 6" cores LF 75 4019 Coring in reinforced concrete, 6" cores LF 25 4020 Sonic Drilling, in Soil, 4" Nominal, 0-200 Feet LF 50 4021 Sonic Drilling, in Soil, 4" Nominal, 200-400

4022 Sonic Drilling, in Soil, 8" Nominal, 0-200 Feet LF 50 4023 Sonic Drilling, in Soil, 8" Nominal, 200-400

4024 Sonic Drilling, in Rock, 4" Nominal, 0-200

4025 Sonic Drilling, in Rock, 4" Nominal, 200-400

4026 Sonic Drilling, in Rock, 8" Nominal, 0-200

4027 Sonic Drilling, in Rock, 8" Nominal, 200-400

4028 Piezometer Installation - Regular EA 8 4029 Piezometer Installation - Flush Mount EA 8 4030 Piezometer Surface Protection Rehab EA 4 4031 Inclinometer Installation EA 4 4032 Surface Displacement Monument EA 4

Other 4033 Directed Installation of Casing LF 10 4034 Cribbing Construction HR 100 4035 Flagger HR 100 4036 Movement of Equipment MI 1000 4037 Mob/Demob of Drill Rig (Land) EA 10 4038 Mob/Demob of Drill Rig (Sonic) EA 10 4039 Mob & Demob of ATV Rig EA 10 4040 Surveying EA 10 4041 Geophysical Logging Mobilization EA 20 4042 Geophysical Logging Video LF 2000 4043 Geophysical Logging Acoustic LF 2000 4044 Geophysical Logging Acoustic and Video LF 2000

Floating Plant 4045 Overburden Drilling without Sampling LF 50

4046 0-60 feet LF 125

4047 60-120 feet LF 50 4048 120-400 feet LF 25

Drive Sampling with HS Augers:

4049 0-60 feet LF 125 4050 60-120 feet LF 50 4051 120-400 feet LF 25

General Sampling

4052 Drilling in rock and concrete without sampling

4053 Drilling in reinforced concrete without

4054 Coring in rock and concrete, 2.125"

4055 Coring in rock and concrete, NQ Wireline LF 500 4056 Coring in reinforced concrete, 2.125" or NQ

4057 Coring in rock and concrete, Vertical 4" LF 500 4058 Coring in rock and concrete, 4" Nominal PQ

4059 Coring in reinforced concrete, 4" or PQ

4060 Coring in rock and concrete, 6" cores LF 500 4061 Coring in reinforced concrete, 6" cores LF 500

4062 Sonic Drilling, in Soil, 4" Nominal, 0-200 Feet

4063 Sonic Drilling, in Soil, 4" Nominal, 200-400

4064 Sonic Drilling, in Soil, 8" Nominal, 0-200 Feet To Be Negotiated 4065 Sonic Drilling, in Soil, 8" Nominal, 200-400

4066 Sonic Drilling, in Rock, 4" Nominal, 0-200

4067 Sonic Drilling, in Rock, 4" Nominal, 200-400

4068 Sonic Drilling, in Rock, 8" Nominal, 0-200

4069 Sonic Drilling, in Rock, 8" Nominal, 200-400

Movement of Equipment

MI

4071 Surveying

4072 Mobilization and Demobilization of Helper

4073 Mob/Demob of Floating Plant EA 5 4074 Floating Plant DA 100 4075 Helper Boat 1 DA 100 4076 Helper Boat 2 DA 0 4077 Geophysical Logging Mobilization EA 20 4078 Geophysical Logging Video LF 1000 4079 Geophysical Logging Acoustic LF 1000 4080 Geophysical Logging Acoustic and Video

Combined Other

4081 Security Clearance & Training EA 50 4082 Inspection Registered Professional SH 500 4083 Inspection non-Registered Professional TBN 0 4084 Other Direct costs (to be negotiated) To Be Negotiated 4085 gINT Logs EA 200 4086 Mileage To Be Negotiated 4087 Energy Calibration of Hammers EA 3 4088 Hydraulic Pressure Test Abbreviated EA 350 4089 Hydraulic Pressure Test Standard

TOTAL OPTION PERIOD FOUR

GRAND TOTAL: BASE and ALL OPTION PERIODS _______________

Legend: TBN = To Be Negotiated DA = Day HR = Hour LF = Linear Feet MI = Miles EA = Each SH = Shift

(End of Summary of Changes)