A.01.30_Forms_and_Drawings.pdf
PDF 3 MB Posted
- Solicitation number
- W91237-18-R-0004
About this file
Appendices - Forms & Drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A.07.24_W9123718R0004_-_0003.pdf | ||
| A.07.24_W9123718R0004_-_0002_FBO.pdf | ||
| A.07.24_W9123718R0004_-_0002_FBO.pdf | ||
| A.07.23_W9123718R0004_-_0001.pdf | ||
| A.07.23_W9123718R0004.pdf | ||
| A.01.30_PPQ.pdf | ||
| A.02.02_Synopsis-signed.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CELRH-2093
Y N Y N
Start Finish Y N
FT
Bearing: Distance:
Y N Y N Personnel on site : (names)
Delays in Work:
Hours:
Linear Feet CASING:
Installed by:
Driving___ Drilling___
FT
Energy Rating if Automatic:
Concrete Confined? Linear Feet
Description of Barrel, Manufacturer, Model, Size
Description of Bit, Manufacturer, Serial Number
PRESSURE TESTS Number: Zones Tested: Single/Double Packer:
PIEZOMETER INSTALLATION Tip Depth Top Zone Depth Bottom of Zone Depth
BACKFILL: check after 24 hours for success
Y N Y N Y N
Dozer Time:
Hours:
Signature of Field Inspector:
Hole Location Photo?
Bentonite Balls Bags of Bentonite Bags of Cement
Remarks: Any item requiring Clarification, names of visitors, special instructions from Corps Personnel:
Other Billable Work Items:
Buckets Backfill successful:
Locator Bar Installed?
Standpipe
SOIL SAMPLING
Flushmount
Difficulties:
CORING:
Size:_______ Size: ______ Size: ______
Coring Difficulties: Depths, Remarks, Include Zone of Rod Chatter, Water Loss, Rod Drops, Core Loss, etc.:
Depth Casing First Required:
Depth Groundwater First Encountered:
Depth Water Introduced to Hole:
Size and type of Hammer Used:
Number pushed:
SPT without Hollow Stem Augers:
3" Drive Sampling w/Hollow Stem Augers:
Other: ___________________________ Problems with Heaving - Depths, Solutions, etc.
3" Drive Sampling w/o Hollow Stem Augers:
Directed Installation of Casing:
Undisturbed Sampling:
Size and Type:
Summary of work performed today: (type of drilling, depths, etc.)
Cause:
FIELD SUPERVISOR'S DAILY REPORT
FILL OUT THE FOLLOWING FOR EACH HOLE FOR WHICH DRILLING PROGRESS HAS BEEN MADE EACH DAY
Drilling without sampling:
SPT with Hollow Stem Augers:
Driller Field Supervisor Helper Inspector Qlty Assur. Inspect.
Weather: (must include temp)
Drill Rig: Manufacturer model-company designation
First Last personnel?
Project: Location: Boring Number:
Bearing and Batter:
Boring Moved:
Elevation Change Bearing/Distance from original location
Boring Completed Today?
Shift
Date:
Drillling Contractor: Utilities Checked:
Rights of Entry Checked:
Safety: Hard Hat, Safety Glasses, Steel-toed shoes, and appropriate level of protective equipment worn by all on-site
H1ECXSBS
Text Box Figure 1
Huntington District Engineering and
Construction Division Geotechnical
Engineering Branch
SUBSURFACE EXPLORATION
INSPECTOR'S SHIFT REPORT OF OPERATION
Plant and Materials Used
Inclinometers Installed:
From To ShiftRight of Entry
Obtained?
Y N N/A
Project:
Inspection Contractor Contract Number Task Order Number
Drilling Contractor Contract Number Task Order Number
Date
Report Number
Inspector's Signature
Boring Number
Drill w/o Sampling
With Hol.
Stem w/o Hol.
Stem 2-in ch Crossing
Construct R oc k
C on cr et e
C on fin ed
C on fin ed
Coring
Pressure Test
Surface Protect.
Rehab Install St an di ng
Fl us h
Piezometer
R oc k
C on cr et e
C on fin ed
Size in. Size in. Size in.
lf lf lf
3-in ch
Directed install.
Casing
Standard Penetration
Undist Sampling lf lf lf lf lf ea ea ea hrslf lf ea lf lf ea ealf lf lf lf lf lf hrs
Total:
lf lf lf ea ea ealf lf lf lflf lf
Pumps: (Manufacturer and model) Other: (Manufacturer and model)
Core Barrel and Bits: (Manufacturer, Model, and size)HoursDrill Rigs: (Manufacturer and model) Drive Hammers: (Size, type, and energy rating) ea ea ealf lf lf lf lf hrs
Drilling Progress: (Include progress of work, cause and extent of delays, excessive core loss, drill chatter, broken cores, movement of hole location and reasons, etc.)
Remarks: (Include verbal instructions given to contractors, names of visitors, driller, and inspectors, weather conditions, and safety violations.)
Mobilization and Demobilization: Surface Displacement Monument:
Confined Drilling, Drain Cleanout:
Pump Tests:
Flagman:Cribbing:
Backhoe: hrs hrs hrs ea ea ea lfhrs
Work Perfomed Today: (Indicate location and description of work performed, depths, and tests performed.)
Other Quantities
Number of Employees Supervisory Dillers Laborers Operators Inspectors Government
Dozer: (Manufacturer and model)
Quantities hrs
H1ECXSBS
Figure 2
CLASSIFICATION CLASSIFICATION
TYPE: TYPE:
ENG FORM BAG ENG FORM BAG
1-Oct-65 JAR 1-Oct-65 JAR
CLASSIFICATION CLASSIFICATION
TYPE: TYPE:
ENG FORM BAG ENG FORM BAG
1-Oct-65 JAR 1-Oct-65 JAR
FR
O
M
PROJECT LOCATION
SAMPLE NO.
HOLE NO.
ELEVATION
DISTURBED UNDISTURBED
FROM: TO:DEPTH
FR
O
M
PROJECT LOCATION
HOLE NO.
DEPTH FROM: TO:
ELEVATION
SAMPLE NO.
DISTURBED UNDISTURBED
REMARKS
DATE INSPECTOR
OF
FR
O
M
PROJECT
SAMPLE NO.
OF
REMARKS
DATE INSPECTOR
DATE INSPECTOR
LOCATION
HOLE NO.
DEPTH FROM: TO:
ELEVATION
DISTURBED UNDISTURBED
REMARKS
DATE INSPECTOR
OF
OF
FR
O
M
PROJECT LOCATION
HOLE NO.
DEPTH FROM: TO:
ELEVATION
SAMPLE NO.
DISTURBED UNDISTURBED
REMARKS
H1ECXSBS
Figure 3
JAR NUMBER
HOLE NO.
JAR NUMBER
HOLE NO.
THRU
FR
O
M
PROJECT LOCATION
THRU
FR
O
M
PROJECT LOCATION
BOX OF
----CUT LINE------STANDARD BOX LABELS----------CUT LINE----
BOX OF
H1ECXSBS
Figure 4
SUBSURFACE EXPLORATION SUMMARY SHEET
Page __ of __
Line Priority Boring # Top Bottom Rock Drill D.S. DS DS UD UD Soils Total Casing Depth Piez. VW Press Batter Direction Acoustic Video Remarks # Elev Elev Elev w/o Samp w/HS 2" 3" Sampling NQ PQ 6" Conc. Coring Total Piez. Tests Imaging Imaging
FT. Ft. ! ! ! Ea. Size Ft. Ft. Ft. Ft. Ft. Ft. ! Ft. Ea. Ea. # Degrees Bearing Y or N Y or N
1 C-13-149 1365 1255 1365 0 0 0 N/A
2 0 0 0 0 N/A
3 0 0 0 0 N/A
4 0 0 0 0 N/A
5 0 0 0 0 N/A
6 0 0 0 0 N/A
7 0 0 0 0 N/A
8 0 0 0 0 N/A
9 0 0 0 0 N/A
10 0 0 0 0 N/A
11 0 0 0 0 N/A
12 0 0 0 0 N/A
13 0 0 0 0 N/A
14 0 0 0 0 N/A
15 0 0 0 0 N/A
16 0 0 0 0 N/A
17 0 0 0 0 N/A
18 0 0 0 0 N/A
19 0 0 0 0 N/A
20 0 0 0 0 N/A
21 0 0 0 0 N/A
22 0 0 0 0 N/A
23 0 0 0 0 N/A
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 Approved By:Prepared By: Checked By:Mob/Demob ea :Inspection Shifts
Spec ial
In str ucti ons:
Summation:
Total Estimated Hours:
See written scope of work.
PROJECT: DESCRIPTION:
Coring Type
H1ECXSBS
Figure 5
TOP OF GROUND
BRASS MARKER(GOV FURNISHED)
FINISHED AND SLOPED TO DRAIN
CONCRETE SURFACE SHALL BE STEEL TROW EL
5.0’
6"
CONCRETE
#4 RESTEEL BAR
MARKER.
AND SUPPLIES EXCEPT BRASS
FOR FURNISHING ALL MATERIALS
CONTRACTOR IS RESPONSIBLE
MONUMENT - FIGURE 17A
SURFACE DISPLACEMENT
NOT TO SCALE
PIPE
PVC SCHEDULE 40
BLACK STEEL OR
TOP O
F G
ROUND
BRASS MARKER(GOV FURNISHED)
FINISHED AND SLOPED TO DRAIN
CONCRETE SURFACE SHALL BE STEEL TROW EL
5.0’
6"
CONCRETE
#4 RESTEEL BAR
MARKER.
AND SUPPLIES EXCEPT BRASS
FOR FURNISHING ALL MATERIALS
CONTRACTOR IS RESPONSIBLE
MONUMENT - FIGURE 17B
SURFACE DISPLACEMENT
CUT
FILL
NOT TO SCALE
PIPE
PVC SCHEDULE 40
BLACK STEEL OR
(Ds-D) 0.1 (Ds-Do)
Obtain readings until:
Preferably until:
READING
NUMBER
TIME OF
READING
ELAPSED
TIME Da Ds D Ds-D AMOUNT OF
WATER USED
(Ds-D) (Ds-Do)
UNIFIED SOIL CLASSIFICATION:
0.37
SHEET: OF
GROUND SURFACE
ELEVATION (GS):
TOP OF RISER EL:
D1
D2 Ds
Do
Da
H2
H1 H0
Tip Elevation:
Ambient Piezometer Level
(Ds-D) (Ds-Do)
PROJECT: PIEZOMETER NO.
OBSERVERS: DATE AND TIME:
GROUND SURFACE ELEVATION (GS): TOP OF RISER ELEVATION (TOR):
BOTTOM OF PIEZOMETER ELEVATION: DEPTH FROM TOP OF RISER (Da):
AMBIENT PIEZOMETER LEVEL (Ds):
LOCATION DISCRIPTION: (MAIN DAM, DIKE, UPSTREAM SLOPE, ETC.)
PIEZOMETER TIME LAG TEST
H1ECXSBS
Figure 18a
PIEZOMETER TIME LAG TEST (CONTINUED)
FIGURE 29
SHEET: OF
TIME OF
READING
ELAPSED
TIME Da Ds D Ds-D (Ds-D) AMOUNT OF
WATER USED
PIEZOMETER TIME LAG TEST
(Ds-Do)
PROJECT: PIEZOMETER NO.
REMARKS:
READING
NUMBER
H1ECXSBS
Figure 18b
FIGURE 19
DRILLER:
RIG TYPE:
DIAMETER OF BORING:
BACKFILL QUANTITIES:
BACKFILL LOG REPORT
PROJECT:
BORING NUMBER:
DATE BACKFILLED:
BACKFILLED BY:
INSPECTOR:
2. LOCATION
3. DRILLING AGENCY
4. HOLE NO.
5. NAME OF DRILLER
6. DIRECTION OF HOLE
7. THICKNESS OF OVERBURDEN
8. DEPTH DRILLED INTO ROCK
9. TOTAL DEPTH OF HOLE
DIVISION
1. PROJECT
INSTALLATION
10. SIZE AND TYPE OF BIT
12. MANUFACTURER'S DESIGNATION OF DRILL
13. TOTAL NO. OF OVER-
BURDEN SAMPLES TAKEN
14. TOTAL NUMBER CORE BOXES
15. ELEVATION GROUND W ATER
16. DATE HOLE
17. ELEVATION TOP OF HOLE
18. TOTAL CORE RECOVERY FOR BORING
STARTED COMPLETED
DISTURBED UNDISTURBED
SHEET
OF SHEETS
VERTICAL INCLINED DEG. FROM VERT.
ELEVATION DEPTH CLASSIFICATION OF MATERIALS
dcba
(Description)
(TBM or MSL)
(Coordinates or Station)
(As shown on drawing title and file number)
11. DATUM FOR ELEVATION SHOW N
DRILLING LOG
LRH FORM 1836 PROJECT HOLE NO.
Feet
Feet
Feet
19. NAME OF INSPECTOR
BOX
LRD
LOSS
RQD/
FT.
ELEV.
P.S.I.
PRESS
C.F.M.
FLOW
BOX OR
SAMPLE
NO.
ffe
H1ECXSBS
Figure 20a
INSTALLATION SHEET
ELEVATION DEPTH LEGEND CLASSIFICATION OF MATERIALS
dcba
(Description)
Hole No.
LRH FORM PROJECT HOLE NO.1836-A
OF SHEETS
ELEVATION TOP OF HOLE
DRILLING LOG (Cont Sheet)
PROJECT
% CORE
RECOV-
ERY
BOX OR
SAMPLE
NO.
fe
FT.
ELEV.
P.S.I.
PRESS
C.F.M.
FLOW
H1ECXSBS
Figure 20b
TOP
DEPTH
BOTTOM
DEPTH START END INTERVAL
START OF
TEST
END OF
TEST
ORH FORM 2142 Dec 68
SUBSURFACE EXPLORATION PRESSURE TEST DATA
PROJECT: BORING NO.: INSPECTOR: DATE:
FIELD TEST DATA
PUMP CAPACITY: METER TYPE: METER SERIAL NUMBER:
BORING SIZE: TOP OF HOLE ELEVATION: TOP OF ROCK ELEVATION: STATIC WATER LEVEL:
TEST SECTION
GAGE
READING
TIME OF TEST METER READING TOTAL
WATER
GAL/
CU.FT. C.F.M.
H1ECXSBS
Figure 21
H1ECXSBS
Figure 22
| Field Supervisor's Daily Report |
| Inspector's Daily Report.pdf |
| Standard Jar Label |
| Standard Sample Box Label.pdf |
| Drilling summary sheet sample.pdf |
| Piezometer/Uplift Cell Installation Report |
| Piezometer Lag Time Test |
| NX core box detail figure 6 |
| 4" core box detail figure 7 |
| 6" core box detail figure 8 |
| Piezometer Assembly figure 9 |
| Single Piezometer Installation Detail Rock Fill figure 10 |
| Single Piezometer Installation Foundations through Embankment Figure 11 |
| Double Piezometer Installation Detail Impervious Fill on Rock Figure 12 |
| Single Peizometer Installation Detail Impervious Fill Figure 13 |
| Piezometer Cover Detail Standard Installation Figure 14 |
| Peizometer Cover Detail Standard Installation Square Riser Figure 15 |
| Flush Mount Piezometer Detail Figure 16 |
| Backfill Log Report Figure 19 |
| Piezo Lag time Sheet 1.pdf |
| Piezometer Time Lag Test page 1 |
| Pressure Test Sheet.pdf |
| Pressure Test Sheet |
| FIGURE 17A FORMS AND DRAWINGS.pdf |
| Geotechnical figures and forms 2011 |
| References |
| Design Model, PW_WORKDIR:dms32369 |
| G-BSAD_4.dgn |
| FIGURE 17B FORMS AND DRAWINGS.pdf |
| Geotechnical figures and forms 2011 |
| References |
| Design Model, PW_WORKDIR:dms32369 |
| G-BSAD_4.dgn |
| piezo lag time test master.pdf |
| Piezometer Time Lag Test page 1 |
| Piezometer Time Lag Test (Cont) |
| Piezo Lag time Sheet 1.pdf |
| Piezometer Time Lag Test page 1 |
| Drill Rig Inspection Form.pdf |
| Daily Drill Rig Inspection Form |
| 1836 log sheet page 1.pdf |
| Core logs master |
| 1836 log sheet subsequent pages.pdf |
| Core logs master |
File details come from the government source that posted it.