Solicitation Amendment 02 - U.S. Army Corps of Engineers Dam Safety Modification Mandatory Center of Expertise National Inland Floating Plant and Land Drilling Services
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A.07.24_W9123718R0004_-_0003.pdf | ||
| A.07.24_W9123718R0004_-_0002_FBO.pdf | ||
| A.07.23_W9123718R0004_-_0001.pdf | ||
| A.07.23_W9123718R0004.pdf | ||
| A.01.30_Forms_and_Drawings.pdf | ||
| A.01.30_PPQ.pdf | ||
| A.02.02_Synopsis-signed.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 11:00 AM local t ime 18 Oct 2018
X
A X B X C
D
EX
X G F 99 - 105
106 - 115 X H 116 - 124
Allison.Lewis@usace.army .mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
1 124
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
W91237 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
Room 419 conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
ALLISON LEWIS (304)399-5046
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 33
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT
PACKAGING AND MARKING
34 - 74 J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
76 X K REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 77 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 78 - 83 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIO NS AND INSTRUCTIO NS
PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS
84 - 98
PART II - CO NTRACT CLAUSES
USACE, CONTRACTING BRANCH
ALLISON LEWIS, 502 8TH STREET
HUNTINGTON WV 25701
304-399-5046
304-399-5281FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
18 Sep 2018
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
W9123718R0004
Section B - Supplies or Services and Prices
PRICE BREAKOUT SCHEDULE
NATIONAL INLAND FLOATING PLANT AND LAND DRILLING SERVICES
NOTE: The quantities listed in the price breakout schedule are approximate and are provided as information only to assist in the preparation of proposals. The quantities are not guaranteed and the actual quantities provided under this contract shall not be justification for modification to the contract for additional payment above the amount negotiated on individual Task Orders.
In reference to FAR Clause 52.217-5, Evaluation of Options, the Government will evaluate offers for award purposes by adding the total price for all option periods to the total price for the base period. A target of 2 contracts may be awarded with a shared capacity amount not-to-exceed $20M. It should be noted given the significant contingencies in the estimated quantities, if awarded a contract for this requirement, the offeror's proposed overall total price (base and all option periods) will not be reflective of the contract value for this procurement.
In accordance to FAR Clause 52.217-8, Option to Extend Services, the rates to be used during the continued performance of any services will be the rates in effect at the time of the extension and will be evaluated at the time of contract award.
BASE PERIOD
Item DESCRIPTION UNIT EST
QTY
U/P Estimated Price
0001 Overburden Drilling without Sampling LF 250 Drive Sampling without HS Augers:
0002 0-60 Feet LF 125 0003 60-120 Feet LF 50 0004 120-400 Feet LF 20
Drive Sampling with HS Augers:
0005 0-60 Feet LF 125 0006 60-120 Feet LF 50 0007 120-400 Feet LF 25
General Sampling 0008 Undisturbed Sampling 3" EA 10 0009 Undisturbed Sampling 5" EA 15 0010 Drilling in Rock and Concrete without
Sampling
LF
0011 Drilling in reinforced concrete without
0012 Coring in Rock and Concrete, 2.125" or Conventional Cores
0013 Coring in rock and concrete, NQ Wireline
0014 Coring in reinforced concrete, 2.125" or NQ Wireline
0015 Coring in rock and concrete, Vertical 4" LF 300 0016 Coring in rock and concrete, 4" Nominal PQ
0017 Coring in reinforced concrete, 4" or PQ
0018 Coring in rock and concrete, 6" cores LF 75
0019 Coring in reinforced concrete, 6" cores LF 25 0020 Sonic Drilling, in Soil, 4" Nominal, 0-200 Feet LF 50 0021 Sonic Drilling, in Soil, 4" Nominal, 200-400
Feet
0022 Sonic Drilling, in Soil, 8" Nominal, 0-200 Feet LF 50 0023 Sonic Drilling, in Soil, 8" Nominal, 200-400
0024 Sonic Drilling, in Rock, 4" Nominal, 0-200
TBN
0025 Sonic Drilling, in Rock, 4" Nominal, 200-400
0026 Sonic Drilling, in Rock, 8" Nominal, 0-200
0027 Sonic Drilling, in Rock, 8" Nominal, 200-400
Instrumentation 0028 Piezometer Installation - Regular EA 8 0029 Piezometer Installation - Flush Mount EA 8 0030 Piezometer Surface Protection Rehab EA 4 0031 Inclinometer Installation EA 4 0032 Surface Displacement Monument EA 4
Other 0033 Directed Installation of Casing LF 10 0034 Cribbing Construction HR 100 0035 Flagger HR 100 0036 Movement of Equipment MI 1000 0037 Mob/Demob of Drill Rig (Land) EA 10 0038 Mob/Demob of Drill Rig (Sonic) EA 10 0039 Mob & Demob of ATV Rig EA 10 0040 Surveying EA 10 0041 Geophysical Logging Mobilization EA 20 0042 Geophysical Logging Video LF 2000 0043 Geophysical Logging Acoustic LF 2000 0044 Geophysical Logging Acoustic and Video LF 2000
Floating Plant 0045 Overburden Drilling without Sampling LF 50
Drive Sampling without HS Augers:
0046 0-60 feet LF 125 0047 60-120 feet LF 50 0048 120-400 feet LF 25
Drive Sampling with HS Augers:
0049 0-60 feet LF 125 0050 60-120 feet LF 50 0051 120-400 feet LF 25
General Sampling 0052 Drilling in rock and concrete without sampling
0053 Drilling in reinforced concrete without sampling
0054 Coring in rock and concrete, 2.125" conventional cores
0055 Coring in rock and concrete, NQ Wireline LF 500 0056 Coring in reinforced concrete, 2.125" or NQ
0057 Coring in rock and concrete, Vertical 4" LF 500 0058 Coring in rock and concrete, 4" Nominal PQ
0059 Coring in reinforced concrete, 4" or PQ
0060 Coring in rock and concrete, 6" cores LF 500 0061 Coring in reinforced concrete, 6" cores LF 500 0062 Sonic Drilling, in Soil, 4" Nominal, 0-200 Feet
To Be Negotiated
0063 Sonic Drilling, in Soil, 4" Nominal, 200-400
0064 Sonic Drilling, in Soil, 8" Nominal, 0-200 Feet To Be Negotiated 0065 Sonic Drilling, in Soil, 8" Nominal, 200-400
0066 Sonic Drilling, in Rock, 4" Nominal, 0-200
0067 Sonic Drilling, in Rock, 4" Nominal, 200-400
0068 Sonic Drilling, in Rock, 8" Nominal, 0-200
0069 Sonic Drilling, in Rock, 8" Nominal, 200-400
Other 0070 Movement of Equipment MI 825 0071 Surveying EA 10 0072 Mobilization and Demobilization of Helper
Boat
EA
0073 Mob/Demob of Floating Plant EA 5 0074 Floating Plant DA 100 0075 Helper Boat 1 DA 100 0076 Helper Boat 2 DA 0 0077 Geophysical Logging Mobilization EA 20 0078 Geophysical Logging Video LF 1000 0079 Geophysical Logging Acoustic LF 1000 0080 Geophysical Logging Acoustic and Video LF 1000
Combined Other 0081 Security Clearance & Training EA 50 0082 Inspection Registered Professional SH 500 0083 Inspection non-Registered Professional TBN 0 0084 Other Direct costs (to be negotiated) To Be Negotiated 0085 gINT Logs EA 200 0086 Mileage To Be Negotiated 0087 Energy Calibration of Hammers EA 3 0088 Hydraulic Pressure Test Abbreviated EA 350
0089 Hydraulic Pressure Test Standard EA 500
TOTAL BASE PERIOD:
OPTION PERIOD ONE
QTY
U/P Estimated Price
1001 Overburden Drilling without Sampling LF 250 Drive Sampling without HS Augers:
1002 0-60 Feet LF 125 1003 60-120 Feet LF 50 1004 120-400 Feet LF 20
Drive Sampling with HS Augers:
1005 0-60 Feet LF 125 1006 60-120 Feet LF 50 1007 120-400 Feet LF 25
General Sampling 1008 Undisturbed Sampling 3" EA 10 1009 Undisturbed Sampling 5" EA 15 1010 Drilling in Rock and Concrete without
1011 Drilling in reinforced concrete without
1012 Coring in Rock and Concrete, 2.125" or
1013 Coring in rock and concrete, NQ Wireline
1014 Coring in reinforced concrete, 2.125" or NQ
1015 Coring in rock and concrete, Vertical 4" LF 300 1016 Coring in rock and concrete, 4" Nominal PQ
1017 Coring in reinforced concrete, 4" or PQ
1018 Coring in rock and concrete, 6" cores LF 75 1019 Coring in reinforced concrete, 6" cores LF 25 1020 Sonic Drilling, in Soil, 4" Nominal, 0-200 Feet LF 50 1021 Sonic Drilling, in Soil, 4" Nominal, 200-400
1022 Sonic Drilling, in Soil, 8" Nominal, 0-200 Feet LF 50 1023 Sonic Drilling, in Soil, 8" Nominal, 200-400
1024 Sonic Drilling, in Rock, 4" Nominal, 0-200
1025 Sonic Drilling, in Rock, 4" Nominal, 200-400
1026 Sonic Drilling, in Rock, 8" Nominal, 0-200
1027 Sonic Drilling, in Rock, 8" Nominal, 200-400
1028 Piezometer Installation - Regular EA 8 1029 Piezometer Installation - Flush Mount EA 8 1030 Piezometer Surface Protection Rehab EA 4 1031 Inclinometer Installation EA 4 1032 Surface Displacement Monument EA 4
Other 1033 Directed Installation of Casing LF 10 1034 Cribbing Construction HR 100 1035 Flagger HR 100 1036 Movement of Equipment MI 1000 1037 Mob/Demob of Drill Rig (Land) EA 10 1038 Mob/Demob of Drill Rig (Sonic) EA 10 1039 Mob & Demob of ATV Rig EA 10 1040 Surveying EA 10 1041 Geophysical Logging Mobilization EA 20 1042 Geophysical Logging Video LF 2000 1043 Geophysical Logging Acoustic LF 2000 1044 Geophysical Logging Acoustic and Video LF 2000
Floating Plant 1045 Overburden Drilling without Sampling LF 50
Drive Sampling without HS Augers:
1046 0-60 feet LF 125 1047 60-120 feet LF 50 1048 120-400 feet LF 25
Drive Sampling with HS Augers:
1049 0-60 feet LF 125 1050 60-120 feet LF 50 1051 120-400 feet LF 25
General Sampling 1052 Drilling in rock and concrete without sampling
1053 Drilling in reinforced concrete without
1054 Coring in rock and concrete, 2.125"
1055 Coring in rock and concrete, NQ Wireline LF 500 1056 Coring in reinforced concrete, 2.125" or NQ
1057 Coring in rock and concrete, Vertical 4" LF 500 1058 Coring in rock and concrete, 4" Nominal PQ
1059 Coring in reinforced concrete, 4" or PQ
1060 Coring in rock and concrete, 6" cores LF 500 1061 Coring in reinforced concrete, 6" cores LF 500 1062 Sonic Drilling, in Soil, 4" Nominal, 0-200 Feet To Be Negotiated
1063 Sonic Drilling, in Soil, 4" Nominal, 200-400
1064 Sonic Drilling, in Soil, 8" Nominal, 0-200 Feet To Be Negotiated 1065 Sonic Drilling, in Soil, 8" Nominal, 200-400
1066 Sonic Drilling, in Rock, 4" Nominal, 0-200
1067 Sonic Drilling, in Rock, 4" Nominal, 200-400
1068 Sonic Drilling, in Rock, 8" Nominal, 0-200
1069 Sonic Drilling, in Rock, 8" Nominal, 200-400
1070 Movement of Equipment MI 825 1071 Surveying EA 10 1072 Mobilization and Demobilization of Helper
1073 Mob/Demob of Floating Plant EA 5 1074 Floating Plant DA 100 1075 Helper Boat 1 DA 100 1076 Helper Boat 2 DA 0 1077 Geophysical Logging Mobilization EA 20 1078 Geophysical Logging Video LF 1000 1079 Geophysical Logging Acoustic LF 1000 1080 Geophysical Logging Acoustic and Video LF 1000
Combined Other 1081 Security Clearance & Training EA 50 1082 Inspection Registered Professional SH 500 1083 Inspection non-Registered Professional TBN 0 1084 Other Direct costs (to be negotiated) To Be Negotiated 1085 gINT Logs EA 200 1086 Mileage To Be Negotiated 1087 Energy Calibration of Hammers EA 3 1088 Hydraulic Pressure Test Abbreviated EA 350 1089 Hydraulic Pressure Test Standard EA 500
TOTAL OPTION PERIOD ONE:
OPTION PERIOD TWO
QTY
U/P Estimated Price
2001 Overburden Drilling without Sampling LF 250 Drive Sampling without HS Augers:
2002 0-60 Feet LF 125 2003 60-120 Feet LF 50 2004 120-400 Feet LF 20
Drive Sampling with HS Augers:
2005 0-60 Feet LF 125 2006 60-120 Feet LF 50 2007 120-400 Feet LF 25
General Sampling 2008 Undisturbed Sampling 3" EA 10 2009 Undisturbed Sampling 5" EA 15 2010 Drilling in Rock and Concrete without
2011 Drilling in reinforced concrete without
2012 Coring in Rock and Concrete, 2.125" or
2013 Coring in rock and concrete, NQ Wireline LF 300 2014 Coring in reinforced concrete, 2.125" or NQ
2015 Coring in rock and concrete, Vertical 4" LF 300 2016 Coring in rock and concrete, 4" Nominal PQ
2017 Coring in reinforced concrete, 4" or PQ
2018 Coring in rock and concrete, 6" cores LF 75 2019 Coring in reinforced concrete, 6" cores LF 25 2020 Sonic Drilling, in Soil, 4" Nominal, 0-200 Feet LF 50 2021 Sonic Drilling, in Soil, 4" Nominal, 200-400
2022 Sonic Drilling, in Soil, 8" Nominal, 0-200 Feet LF 50 2023 Sonic Drilling, in Soil, 8" Nominal, 200-400
2024 Sonic Drilling, in Rock, 4" Nominal, 0-200
2025 Sonic Drilling, in Rock, 4" Nominal, 200-400
2026 Sonic Drilling, in Rock, 8" Nominal, 0-200
2027 Sonic Drilling, in Rock, 8" Nominal, 200-400
2028 Piezometer Installation - Regular EA 8 2029 Piezometer Installation - Flush Mount EA 8 2030 Piezometer Surface Protection Rehab EA 4 2031 Inclinometer Installation EA 4 2032 Surface Displacement Monument EA 4
Other 2033 Directed Installation of Casing LF 10 2034 Cribbing Construction HR 100 2035 Flagger HR 100 2036 Movement of Equipment MI 1000 2037 Mob/Demob of Drill Rig (Land) EA 10
2038 Mob/Demob of Drill Rig (Sonic) EA 10 2039 Mob & Demob of ATV Rig EA 10 2040 Surveying EA 10 2041 Geophysical Logging Mobilization EA 20
2042 Geophysical Logging Video LF 2000 2043 Geophysical Logging Acoustic LF 2000 2044 Geophysical Logging Acoustic and Video LF 2000
Floating Plant 2045 Overburden Drilling without Sampling LF 50
Drive Sampling without HS Augers:
2046 0-60 feet LF 125 2047 60-120 feet LF 50 2048 120-400 feet LF 25
Drive Sampling with HS Augers:
2049 0-60 feet LF 125 2050 60-120 feet LF 50 2051 120-400 feet LF 25
General Sampling 2052 Drilling in rock and concrete without sampling
2053 Drilling in reinforced concrete without
2054 Coring in rock and concrete, 2.125"
2055 Coring in rock and concrete, NQ Wireline LF 500 2056 Coring in reinforced concrete, 2.125" or NQ
2057 Coring in rock and concrete, Vertical 4"
2058 Coring in rock and concrete, 4" Nominal PQ
2059 Coring in reinforced concrete, 4" or PQ
2060 Coring in rock and concrete, 6" cores LF 500 2061 Coring in reinforced concrete, 6" cores LF 500 2062 Sonic Drilling, in Soil, 4" Nominal, 0-200 Feet To Be Negotiated 2063 Sonic Drilling, in Soil, 4" Nominal, 200-400
2064 Sonic Drilling, in Soil, 8" Nominal, 0-200 Feet To Be Negotiated 2065 Sonic Drilling, in Soil, 8" Nominal, 200-400
2066 Sonic Drilling, in Rock, 4" Nominal, 0-200
2067 Sonic Drilling, in Rock, 4" Nominal, 200-400
2068 Sonic Drilling, in Rock, 8" Nominal, 0-200
2069 Sonic Drilling, in Rock, 8" Nominal, 200-400
2070 Movement of Equipment MI 825 2071 Surveying EA 10 2072 Mobilization and Demobilization of Helper
Boat
EA 2
2073 Mob/Demob of Floating Plant EA 5 2074 Floating Plant DA 100 2075 Helper Boat 1 DA 100 2076 Helper Boat 2 DA 50
2077 Geophysical Logging Mobilization EA 20 2078 Geophysical Logging Video LF 1000 2079 Geophysical Logging Acoustic LF 1000 2080 Geophysical Logging Acoustic and Video LF 1000
Combined Other 2081 Security Clearance & Training EA 50 2082 Inspection Registered Professional SH 500 2083 Inspection non-Registered Professional TBN 0 2084 Other Direct costs (to be negotiated) To Be Negotiated
2085 gINT Logs EA 200 2086 Mileage To Be Negotiated 2087 Energy Calibration of Hammers EA 3 2088 Hydraulic Pressure Test Abbreviated EA 350 2089 Hydraulic Pressure Test Standard EA 500
TOTAL OPTION PERIOD TWO:
OPTION PERIOD THREE
QTY
U/P Estimated Price
3001 Overburden Drilling without Sampling
Drive Sampling without HS Augers:
3002 0-60 Feet LF 125 3003 60-120 Feet LF 50 3004 120-400 Feet LF 20
Drive Sampling with HS Augers:
3005 0-60 Feet LF 125 3006 60-120 Feet LF 50 3007 120-400 Feet LF 25
General Sampling 3008 Undisturbed Sampling 3" EA 10 3009 Undisturbed Sampling 5" EA 15 3010 Drilling in Rock and Concrete without
3011 Drilling in reinforced concrete without
3012 Coring in Rock and Concrete, 2.125" or
3013 Coring in rock and concrete, NQ Wireline LF 300 3014 Coring in reinforced concrete, 2.125" or NQ
3015 Coring in rock and concrete, Vertical 4" LF 300 3016 Coring in rock and concrete, 4" Nominal PQ
3017 Coring in reinforced concrete, 4" or PQ
3018 Coring in rock and concrete, 6" cores LF 75 3019 Coring in reinforced concrete, 6" cores LF 25 3020 Sonic Drilling, in Soil, 4" Nominal, 0-200 Feet LF 50 3021 Sonic Drilling, in Soil, 4" Nominal, 200-400
3022 Sonic Drilling, in Soil, 8" Nominal, 0-200 Feet LF 50 3023 Sonic Drilling, in Soil, 8" Nominal, 200-400
3024 Sonic Drilling, in Rock, 4" Nominal, 0-200
3025 Sonic Drilling, in Rock, 4" Nominal, 200-400
3026 Sonic Drilling, in Rock, 8" Nominal, 0-200
3027 Sonic Drilling, in Rock, 8" Nominal, 200-400
3028 Piezometer Installation - Regular EA 8 3029 Piezometer Installation - Flush Mount EA 8 3030 Piezometer Surface Protection Rehab EA 4 3031 Inclinometer Installation EA 4 3032 Surface Displacement Monument EA 4
Other 3033 Directed Installation of Casing LF 10 3034 Cribbing Construction HR 100 3035 Flagger HR 100 3036 Movement of Equipment MI 1000 3037 Mob/Demob of Drill Rig (Land) EA 10 3038 Mob/Demob of Drill Rig (Sonic) EA 10 3039 Mob & Demob of ATV Rig EA 10 3040 Surveying EA 10 3041 Geophysical Logging Mobilization EA 20 3042 Geophysical Logging Video LF 2000 3043 Geophysical Logging Acoustic LF 2000 3044 Geophysical Logging Acoustic and Video LF 2000
Floating Plant 3045 Overburden Drilling without Sampling LF 50
3046 0-60 feet LF 125 3047 60-120 feet LF 50 3048 120-400 feet LF 25
Drive Sampling with HS Augers:
3049 0-60 feet LF 125 3050 60-120 feet LF 50 3051 120-400 feet LF 25
General Sampling 3052 Drilling in rock and concrete without sampling
3053 Drilling in reinforced concrete without
3054 Coring in rock and concrete, 2.125"
3055 Coring in rock and concrete, NQ Wireline LF 500 3056 Coring in reinforced concrete, 2.125" or NQ
3057 Coring in rock and concrete, Vertical 4" LF 500 3058 Coring in rock and concrete, 4" Nominal PQ
3059 Coring in reinforced concrete, 4" or PQ
3060 Coring in rock and concrete, 6" cores LF 500 3061 Coring in reinforced concrete, 6" cores LF 500 3062 Sonic Drilling, in Soil, 4" Nominal, 0-200 Feet To Be Negotiated 3063 Sonic Drilling, in Soil, 4" Nominal, 200-400
3064 Sonic Drilling, in Soil, 8" Nominal, 0-200 Feet To Be Negotiated 3065 Sonic Drilling, in Soil, 8" Nominal, 200-400
3066 Sonic Drilling, in Rock, 4" Nominal, 0-200
3067 Sonic Drilling, in Rock, 4" Nominal, 200-400
3068 Sonic Drilling, in Rock, 8" Nominal, 0-200
3069 Sonic Drilling, in Rock, 8" Nominal, 200-400
3070 Movement of Equipment MI 825 3071 Surveying EA 10 3072 Mobilization and Demobilization of Helper
3073 Mob/Demob of Floating Plant EA 5 3074 Floating Plant DA 100 3075 Helper Boat 1 DA 100 3076 Helper Boat 2 DA 0 3077 Geophysical Logging Mobilization EA 20
3078 Geophysical Logging Video LF 1000 3079 Geophysical Logging Acoustic LF 1000 3080 Geophysical Logging Acoustic and Video LF 1000
Combined Other 3081 Security Clearance & Training EA 50 3082 Inspection Registered Professional SH 500 3083 Inspection non-Registered Professional TBN 0 3084 Other Direct costs (to be negotiated) To Be Negotiated 3085 gINT Logs EA 200 3086 Mileage To Be Negotiated 3087 Energy Calibration of Hammers EA 3 3088 Hydraulic Pressure Test Abbreviated EA 350 3089 Hydraulic Pressure Test Standard EA 500
TOTAL OPTION PERIOD THREE:
OPTION PERIOD FOUR
QTY
U/P Estimated Price
4001 Overburden Drilling without Sampling LF 250 Drive Sampling without HS Augers:
4002 0-60 Feet LF 125 4003 60-120 Feet LF 50 4004 120-400 Feet LF 20
Drive Sampling with HS Augers:
4005 0-60 Feet LF 125 4006 60-120 Feet LF 50 4007 120-400 Feet LF 25
General Sampling 4008 Undisturbed Sampling 3" EA 10 4009 Undisturbed Sampling 5" EA 15 4010 Drilling in Rock and Concrete without
4011 Drilling in reinforced concrete without
4012 Coring in Rock and Concrete, 2.125" or
4013 Coring in rock and concrete, NQ Wireline LF 300 4014 Coring in reinforced concrete, 2.125" or NQ
4015 Coring in rock and concrete, Vertical 4" LF 300 4016 Coring in rock and concrete, 4" Nominal PQ
4017 Coring in reinforced concrete, 4" or PQ
4018 Coring in rock and concrete, 6" cores LF 75
4019 Coring in reinforced concrete, 6" cores LF 25 4020 Sonic Drilling, in Soil, 4" Nominal, 0-200 Feet LF 50 4021 Sonic Drilling, in Soil, 4" Nominal, 200-400
4022 Sonic Drilling, in Soil, 8" Nominal, 0-200 Feet LF 50 4023 Sonic Drilling, in Soil, 8" Nominal, 200-400
4024 Sonic Drilling, in Rock, 4" Nominal, 0-200
4025 Sonic Drilling, in Rock, 4" Nominal, 200-400
4026 Sonic Drilling, in Rock, 8" Nominal, 0-200
4027 Sonic Drilling, in Rock, 8" Nominal, 200-400
4028 Piezometer Installation - Regular EA 8 4029 Piezometer Installation - Flush Mount EA 8 4030 Piezometer Surface Protection Rehab EA 4 4031 Inclinometer Installation EA 4 4032 Surface Displacement Monument EA 4
Other 4033 Directed Installation of Casing LF 10 4034 Cribbing Construction HR 100 4035 Flagger HR 100 4036 Movement of Equipment MI 1000 4037 Mob/Demob of Drill Rig (Land) EA 10 4038 Mob/Demob of Drill Rig (Sonic) EA 10 4039 Mob & Demob of ATV Rig EA 10 4040 Surveying EA 10 4041 Geophysical Logging Mobilization EA 20 4042 Geophysical Logging Video LF 2000 4043 Geophysical Logging Acoustic LF 2000 4044 Geophysical Logging Acoustic and Video LF 2000
Floating Plant 4045 Overburden Drilling without Sampling LF 50
Drive Sampling without HS Augers:
4046 0-60 feet LF 125 4047 60-120 feet LF 50 4048 120-400 feet LF 25
Drive Sampling with HS Augers:
4049 0-60 feet LF 125 4050 60-120 feet LF 50 4051 120-400 feet LF 25
General Sampling
4052 Drilling in rock and concrete without sampling
4053 Drilling in reinforced concrete without
4054 Coring in rock and concrete, 2.125"
4055 Coring in rock and concrete, NQ Wireline LF 500 4056 Coring in reinforced concrete, 2.125" or NQ
4057 Coring in rock and concrete, Vertical 4" LF 500 4058 Coring in rock and concrete, 4" Nominal PQ
4059 Coring in reinforced concrete, 4" or PQ
4060 Coring in rock and concrete, 6" cores LF 500 4061 Coring in reinforced concrete, 6" cores LF 500 4062 Sonic Drilling, in Soil, 4" Nominal, 0-200 Feet
4063 Sonic Drilling, in Soil, 4" Nominal, 200-400
4064 Sonic Drilling, in Soil, 8" Nominal, 0-200 Feet To Be Negotiated 4065 Sonic Drilling, in Soil, 8" Nominal, 200-400
4066 Sonic Drilling, in Rock, 4" Nominal, 0-200
4067 Sonic Drilling, in Rock, 4" Nominal, 200-400
4068 Sonic Drilling, in Rock, 8" Nominal, 0-200
4069 Sonic Drilling, in Rock, 8" Nominal, 200-400
Movement of Equipment
MI
4071 Surveying
4072 Mobilization and Demobilization of Helper
4073 Mob/Demob of Floating Plant EA 5 4074 Floating Plant DA 100 4075 Helper Boat 1 DA 100 4076 Helper Boat 2 DA 0 4077 Geophysical Logging Mobilization EA 20 4078 Geophysical Logging Video LF 1000 4079 Geophysical Logging Acoustic LF 1000 4080 Geophysical Logging Acoustic and Video
Combined Other
4081 Security Clearance & Training EA 50 4082 Inspection Registered Professional SH 500 4083 Inspection non-Registered Professional TBN 0 4084 Other Direct costs (to be negotiated) To Be Negotiated 4085 gINT Logs EA 200 4086 Mileage To Be Negotiated 4087 Energy Calibration of Hammers EA 3 4088 Hydraulic Pressure Test Abbreviated EA 350 4089 Hydraulic Pressure Test Standard
TOTAL OPTION PERIOD FOUR
GRAND TOTAL: BASE and ALL OPTION PERIODS _______________
Legend: TBN = To Be Negotiated DA = Day HR = Hour LF = Linear Feet MI = Miles EA = Each SH = Shift
PRICE BREAKOUT SCHEDULE_REV01
NATIONAL INLAND FLOATING PLANT AND LAND DRILLING SERVICES
REVISED PRICE BREAKOUT SCHEDULE
NOTE: The quantities listed in the price breakout schedule are approximate and are provided as information only to assist in the preparation of proposals. The quantities are not guaranteed and the actual quantities provided under this contract shall not be justification for modification to the contract for additional payment above the amount negotiated on individual Task Orders.
In reference to FAR Clause 52.217-5, Evaluation of Options, the Government will evaluate offers for award purposes by adding the total price for all option periods to the total price for the base period. A target of 2 contracts may be awarded with a shared capacity amount not-to-exceed $20M. It should be noted given the significant contingencies in the estimated quantities, if awarded a contract for this requirement, the offeror's proposed overall total price (base period and all option periods) will not be reflective of the contract value for this procurement.
In accordance with FAR Clause 52.217-8, Option to Extend Services, the rates to be used during the continued performance of any services will be the rates in effect at the time of the extension and will be evaluated at the time of contract award.
BASE PERIOD
QTY
U/P Estimated Price
0001 Overburden Drilling without Sampling LF 250 Drive Sampling without HS Augers:
0002 0-60 Feet LF 125 0003 60-120 Feet LF 50 0004 120-400 Feet LF 20
0005 0-60 Feet LF 125
0006 60-120 Feet LF 50 0007 120-400 Feet LF 25
General Sampling 0008 Undisturbed Sampling 3" EA 10 0009 Undisturbed Sampling 5" EA 15 0010 Drilling in Rock and Concrete without
0011 Drilling in reinforced concrete without
0012 Coring in Rock and Concrete, 2.125" or
0013 Coring in rock and concrete, NQ Wireline
0014 Coring in reinforced concrete, 2.125" or NQ
0015 Coring in rock and concrete, Vertical 4" LF 300 0016 Coring in rock and concrete, 4" Nominal PQ
0017 Coring in reinforced concrete, 4" or PQ
0018 Coring in rock and concrete, 6" cores LF 75 0019 Coring in reinforced concrete, 6" cores LF 25 0020 Sonic Drilling, in Soil, 4" Nominal, 0-200 Feet LF 50 0021 Sonic Drilling, in Soil, 4" Nominal, 200-400
0022 Sonic Drilling, in Soil, 8" Nominal, 0-200 Feet LF 50 0023 Sonic Drilling, in Soil, 8" Nominal, 200-400
0024 Sonic Drilling, in Rock, 4" Nominal, 0-200
0025 Sonic Drilling, in Rock, 4" Nominal, 200-400
0026 Sonic Drilling, in Rock, 8" Nominal, 0-200
0027 Sonic Drilling, in Rock, 8" Nominal, 200-400
0028 Piezometer Installation - Regular EA 8 0029 Piezometer Installation - Flush Mount EA 8 0030 Piezometer Surface Protection Rehab EA 4 0031 Inclinometer Installation EA 4 0032 Surface Displacement Monument EA 4
Other 0033 Directed Installation of Casing LF 10 0034 Cribbing Construction HR 100 0035 Flagger HR 100 0036 Movement of Equipment MI 1000 0037 Mob/Demob of Drill Rig (Land) EA 10 0038 Mob/Demob of Drill Rig (Sonic) EA 10
0039 Mob & Demob of ATV Rig EA 10 0040 Surveying EA 10 0041 Geophysical Logging Mobilization EA 20 0042 Geophysical Logging Video LF 2000 0043 Geophysical Logging Acoustic LF 2000 0044 Geophysical Logging Acoustic and Video LF 2000
Floating Plant 0045 Overburden Drilling without Sampling LF 50
Drive Sampling without HS Augers:
0046 0-60 feet LF 125 0047 60-120 feet LF 50 0048 120-400 feet LF 25
Drive Sampling with HS Augers:
0049 0-60 feet LF 125 0050 60-120 feet LF 50 0051 120-400 feet LF 25
General Sampling 0052 Drilling in rock and concrete without sampling
0053 Drilling in reinforced concrete without
0054 Coring in rock and concrete, 2.125"
0055 Coring in rock and concrete, NQ Wireline LF 500 0056 Coring in reinforced concrete, 2.125" or NQ
0057 Coring in rock and concrete, Vertical 4" LF 500 0058 Coring in rock and concrete, 4" Nominal PQ
0059 Coring in reinforced concrete, 4" or PQ
0060 Coring in rock and concrete, 6" cores LF 500 0061 Coring in reinforced concrete, 6" cores LF 500 0062 Sonic Drilling, in Soil, 4" Nominal, 0-200 Feet
0063 Sonic Drilling, in Soil, 4" Nominal, 200-400
0064 Sonic Drilling, in Soil, 8" Nominal, 0-200 Feet To Be Negotiated 0065 Sonic Drilling, in Soil, 8" Nominal, 200-400
0066 Sonic Drilling, in Rock, 4" Nominal, 0-200
0067 Sonic Drilling, in Rock, 4" Nominal, 200-400
0068 Sonic Drilling, in Rock, 8" Nominal, 0-200
0069 Sonic Drilling, in Rock, 8" Nominal, 200-400
0070 Movement of Equipment MI 825 0071 Surveying EA 10 0072 Mobilization and Demobilization of Helper
0073 Mob/Demob of Floating Plant EA 5 0074 Floating Plant DA 100 0075 Helper Boat 1 DA 100 0076 Helper Boat 2 DA 0 0077 Geophysical Logging Mobilization EA 20 0078 Geophysical Logging Video LF 1000 0079 Geophysical Logging Acoustic LF 1000 0080 Geophysical Logging Acoustic and Video LF 1000
Combined Other 0081 Security Clearance & Training EA 50 0082 Inspection Registered Professional SH 500 0083 Inspection non-Registered Professional TBN 0 0084 Other Direct costs (to be negotiated) To Be Negotiated 0085 gINT Logs EA 200 0086 Mileage To Be Negotiated 0087 Energy Calibration of Hammers EA 3 0088 Hydraulic Pressure Test Abbreviated EA 350 0089 Hydraulic Pressure Test Standard EA 500
TOTAL BASE PERIOD:
OPTION PERIOD ONE
QTY
U/P Estimated Price
1001 Overburden Drilling without Sampling LF 250 Drive Sampling without HS Augers:
1002 0-60 Feet LF 125 1003 60-120 Feet LF 50 1004 120-400 Feet LF 20
Drive Sampling with HS Augers:
1005 0-60 Feet LF 125 1006 60-120 Feet LF 50 1007 120-400 Feet LF 25
General Sampling 1008 Undisturbed Sampling 3" EA 10 1009 Undisturbed Sampling 5" EA 15 1010 Drilling in Rock and Concrete without
1011 Drilling in reinforced concrete without
1012 Coring in Rock and Concrete, 2.125" or
1013 Coring in rock and concrete, NQ Wireline
1014 Coring in reinforced concrete, 2.125" or NQ
1015 Coring in rock and concrete, Vertical 4" LF 300 1016 Coring in rock and concrete, 4" Nominal PQ
1017 Coring in reinforced concrete, 4" or PQ
1018 Coring in rock and concrete, 6" cores LF 75 1019 Coring in reinforced concrete, 6" cores LF 25 1020 Sonic Drilling, in Soil, 4" Nominal, 0-200 Feet LF 50 1021 Sonic Drilling, in Soil, 4" Nominal, 200-400
1022 Sonic Drilling, in Soil, 8" Nominal, 0-200 Feet LF 50 1023 Sonic Drilling, in Soil, 8" Nominal, 200-400
1024 Sonic Drilling, in Rock, 4" Nominal, 0-200
1025 Sonic Drilling, in Rock, 4" Nominal, 200-400
1026 Sonic Drilling, in Rock, 8" Nominal, 0-200
1027 Sonic Drilling, in Rock, 8" Nominal, 200-400
1028 Piezometer Installation - Regular EA 8 1029 Piezometer Installation - Flush Mount EA 8 1030 Piezometer Surface Protection Rehab EA 4 1031 Inclinometer Installation EA 4 1032 Surface Displacement Monument EA 4
Other 1033 Directed Installation of Casing LF 10 1034 Cribbing Construction HR 100 1035 Flagger HR 100 1036 Movement of Equipment MI 1000 1037 Mob/Demob of Drill Rig (Land) EA 10 1038 Mob/Demob of Drill Rig (Sonic) EA 10 1039 Mob & Demob of ATV Rig EA 10 1040 Surveying EA 10 1041 Geophysical Logging Mobilization EA 20 1042 Geophysical Logging Video LF 2000 1043 Geophysical Logging Acoustic LF 2000 1044 Geophysical Logging Acoustic and Video LF 2000
Floating Plant 1045 Overburden Drilling without Sampling LF 50
Drive Sampling without HS Augers:
1046 0-60 feet LF 125 1047 60-120 feet LF 50 1048 120-400 feet LF 25
1049 0-60 feet LF 125 1050 60-120 feet LF 50 1051 120-400 feet LF 25
General Sampling 1052 Drilling in rock and concrete without sampling
1053 Drilling in reinforced concrete without
1054 Coring in rock and concrete, 2.125"
1055 Coring in rock and concrete, NQ Wireline LF 500 1056 Coring in reinforced concrete, 2.125" or NQ
1057 Coring in rock and concrete, Vertical 4" LF 500 1058 Coring in rock and concrete, 4" Nominal PQ
1059 Coring in reinforced concrete, 4" or PQ
1060 Coring in rock and concrete, 6" cores LF 500 1061 Coring in reinforced concrete, 6" cores LF 500 1062 Sonic Drilling, in Soil, 4" Nominal, 0-200 Feet To Be Negotiated 1063 Sonic Drilling, in Soil, 4" Nominal, 200-400
1064 Sonic Drilling, in Soil, 8" Nominal, 0-200 Feet To Be Negotiated 1065 Sonic Drilling, in Soil, 8" Nominal, 200-400
1066 Sonic Drilling, in Rock, 4" Nominal, 0-200
1067 Sonic Drilling, in Rock, 4" Nominal, 200-400
1068 Sonic Drilling, in Rock, 8" Nominal, 0-200
1069 Sonic Drilling, in Rock, 8" Nominal, 200-400
1070 Movement of Equipment MI 825 1071 Surveying EA 10 1072 Mobilization and Demobilization of Helper
1073 Mob/Demob of Floating Plant EA 5 1074 Floating Plant DA 100 1075 Helper Boat 1 DA 100 1076 Helper Boat 2 DA 0 1077 Geophysical Logging Mobilization EA 20 1078 Geophysical Logging Video LF 1000 1079 Geophysical Logging Acoustic LF 1000 1080 Geophysical Logging Acoustic and Video LF 1000
1081 Security Clearance & Training EA 50
1082 Inspection Registered Professional SH 500 1083 Inspection non-Registered Professional TBN 0 1084 Other Direct costs (to be negotiated) To Be Negotiated 1085 gINT Logs EA 200 1086 Mileage To Be Negotiated 1087 Energy Calibration of Hammers EA 3 1088 Hydraulic Pressure Test Abbreviated EA 350 1089 Hydraulic Pressure Test Standard EA 500
TOTAL OPTION PERIOD ONE:
OPTION PERIOD TWO
QTY
U/P Estimated Price
2001 Overburden Drilling without Sampling LF 250 Drive Sampling without HS Augers:
2002 0-60 Feet LF 125 2003 60-120 Feet LF 50 2004 120-400 Feet LF 20
Drive Sampling with HS Augers:
2005 0-60 Feet LF 125 2006 60-120 Feet LF 50 2007 120-400 Feet LF 25
General Sampling 2008 Undisturbed Sampling 3" EA 10 2009 Undisturbed Sampling 5" EA 15 2010 Drilling in Rock and Concrete without
2011 Drilling in reinforced concrete without
2012 Coring in Rock and Concrete, 2.125" or
2013 Coring in rock and concrete, NQ Wireline LF 300 2014 Coring in reinforced concrete, 2.125" or NQ
2015 Coring in rock and concrete, Vertical 4" LF 300 2016 Coring in rock and concrete, 4" Nominal PQ
2017 Coring in reinforced concrete, 4" or PQ
2018 Coring in rock and concrete, 6" cores LF 75 2019 Coring in reinforced concrete, 6" cores LF 25 2020 Sonic Drilling, in Soil, 4" Nominal, 0-200 Feet LF 50 2021 Sonic Drilling, in Soil, 4" Nominal, 200-400
2022 Sonic Drilling, in Soil, 8" Nominal, 0-200 Feet LF 50
2023 Sonic Drilling, in Soil, 8" Nominal, 200-400
2024 Sonic Drilling, in Rock, 4" Nominal, 0-200
2025 Sonic Drilling, in Rock, 4" Nominal, 200-400
2026 Sonic Drilling, in Rock, 8" Nominal, 0-200
2027 Sonic Drilling, in Rock, 8" Nominal, 200-400
2028 Piezometer Installation - Regular EA 8 2029 Piezometer Installation - Flush Mount EA 8 2030 Piezometer Surface Protection Rehab EA 4 2031 Inclinometer Installation EA 4 2032 Surface Displacement Monument EA 4
Other 2033 Directed Installation of Casing LF 10 2034 Cribbing Construction HR 100 2035 Flagger HR 100 2036 Movement of Equipment MI 1000 2037 Mob/Demob of Drill Rig (Land) EA 10 2038 Mob/Demob of Drill Rig (Sonic) EA 10 2039 Mob & Demob of ATV Rig EA 10 2040 Surveying EA 10 2041 Geophysical Logging Mobilization EA 20
2042 Geophysical Logging Video LF 2000 2043 Geophysical Logging Acoustic LF 2000 2044 Geophysical Logging Acoustic and Video LF 2000
Floating Plant 2045 Overburden Drilling without Sampling LF 50
Drive Sampling without HS Augers:
2046 0-60 feet LF 125 2047 60-120 feet LF 50 2048 120-400 feet LF 25
Drive Sampling with HS Augers:
2049 0-60 feet LF 125 2050 60-120 feet LF 50 2051 120-400 feet LF 25
General Sampling 2052 Drilling in rock and concrete without sampling
2053 Drilling in reinforced concrete without
2054 Coring in rock and concrete, 2.125"
2055 Coring in rock and concrete, NQ Wireline LF 500
2056 Coring in reinforced concrete, 2.125" or NQ
2057 Coring in rock and concrete, Vertical 4"
2058 Coring in rock and concrete, 4" Nominal PQ
2059 Coring in reinforced concrete, 4" or PQ
2060 Coring in rock and concrete, 6" cores LF 500 2061 Coring in reinforced concrete, 6" cores LF 500 2062 Sonic Drilling, in Soil, 4" Nominal, 0-200 Feet To Be Negotiated 2063 Sonic Drilling, in Soil, 4" Nominal, 200-400
2064 Sonic Drilling, in Soil, 8" Nominal, 0-200 Feet To Be Negotiated 2065 Sonic Drilling, in Soil, 8" Nominal, 200-400
2066 Sonic Drilling, in Rock, 4" Nominal, 0-200
2067 Sonic Drilling, in Rock, 4" Nominal, 200-400
2068 Sonic Drilling, in Rock, 8" Nominal, 0-200
2069 Sonic Drilling, in Rock, 8" Nominal, 200-400
2070 Movement of Equipment MI 825 2071 Surveying EA 10 2072 Mobilization and Demobilization of Helper
Boat
EA 2
2073 Mob/Demob of Floating Plant EA 5 2074 Floating Plant DA 100 2075 Helper Boat 1 DA 100 2076 Helper Boat 2 DA 50
2077 Geophysical Logging Mobilization EA 20 2078 Geophysical Logging Video LF 1000 2079 Geophysical Logging Acoustic LF 1000 2080 Geophysical Logging Acoustic and Video LF 1000
Combined Other 2081 Security Clearance & Training EA 50 2082 Inspection Registered Professional SH 500 2083 Inspection non-Registered Professional TBN 0 2084 Other Direct costs (to be negotiated) To Be Negotiated
2085 gINT Logs EA 200 2086 Mileage To Be Negotiated 2087 Energy Calibration of Hammers EA 3 2088 Hydraulic Pressure Test Abbreviated EA 350 2089 Hydraulic Pressure Test Standard EA 500
TOTAL OPTION PERIOD TWO:
OPTION PERIOD THREE
QTY
U/P Estimated Price
3001 Overburden Drilling without Sampling
3002 0-60 Feet LF 125 3003 60-120 Feet LF 50 3004 120-400 Feet LF 20
Drive Sampling with HS Augers:
3005 0-60 Feet LF 125 3006 60-120 Feet LF 50 3007 120-400 Feet LF 25
General Sampling 3008 Undisturbed Sampling 3" EA 10 3009 Undisturbed Sampling 5" EA 15 3010 Drilling in Rock and Concrete without
3011 Drilling in reinforced concrete without
3012 Coring in Rock and Concrete, 2.125" or
3013 Coring in rock and concrete, NQ Wireline LF 300 3014 Coring in reinforced concrete, 2.125" or NQ
3015 Coring in rock and concrete, Vertical 4" LF 300 3016 Coring in rock and concrete, 4" Nominal PQ
3017 Coring in reinforced concrete, 4" or PQ
3018 Coring in rock and concrete, 6" cores LF 75 3019 Coring in reinforced concrete, 6" cores LF 25 3020 Sonic Drilling, in Soil, 4" Nominal, 0-200 Feet LF 50 3021 Sonic Drilling, in Soil, 4" Nominal, 200-400
3022 Sonic Drilling, in Soil, 8" Nominal, 0-200 Feet LF 50 3023 Sonic Drilling, in Soil, 8" Nominal, 200-400
3024 Sonic Drilling, in Rock, 4" Nominal, 0-200
3025 Sonic Drilling, in Rock, 4" Nominal, 200-400
3026 Sonic Drilling, in Rock, 8" Nominal, 0-200
3027 Sonic Drilling, in Rock, 8" Nominal, 200-400
3028 Piezometer Installation - Regular EA 8 3029 Piezometer Installation - Flush Mount EA 8 3030 Piezometer Surface Protection Rehab EA 4 3031 Inclinometer Installation EA 4 3032 Surface Displacement Monument EA 4
Other 3033 Directed Installation of Casing LF 10 3034 Cribbing Construction HR 100 3035 Flagger HR 100 3036 Movement of Equipment MI 1000 3037 Mob/Demob of Drill Rig (Land) EA 10 3038 Mob/Demob of Drill Rig (Sonic) EA 10 3039 Mob & Demob of ATV Rig EA 10 3040 Surveying EA 10 3041 Geophysical Logging Mobilization EA 20 3042 Geophysical Logging Video LF 2000 3043 Geophysical Logging Acoustic LF 2000 3044 Geophysical Logging Acoustic and Video LF 2000
Floating Plant 3045 Overburden Drilling without Sampling LF 50
Drive Sampling without HS Augers:
3046 0-60 feet LF 125 3047 60-120 feet LF 50 3048 120-400 feet LF 25
Drive Sampling with HS Augers:
3049 0-60 feet LF 125 3050 60-120 feet LF 50 3051 120-400 feet LF 25
General Sampling 3052 Drilling in rock and concrete without sampling
3053 Drilling in reinforced concrete without
3054 Coring in rock and concrete, 2.125"
3055 Coring in rock and concrete, NQ Wireline LF 500 3056 Coring in reinforced concrete, 2.125" or NQ
3057 Coring in rock and concrete, Vertical 4" LF 500 3058 Coring in rock and concrete, 4" Nominal PQ
3059 Coring in reinforced concrete, 4" or PQ
3060 Coring in rock and concrete, 6" cores LF 500 3061 Coring in reinforced concrete, 6" cores LF 500 3062 Sonic Drilling, in Soil, 4" Nominal, 0-200 Feet To Be Negotiated
3063 Sonic Drilling, in Soil, 4" Nominal, 200-400
3064 Sonic Drilling, in Soil, 8" Nominal, 0-200 Feet To Be Negotiated 3065 Sonic Drilling, in Soil, 8" Nominal, 200-400
3066 Sonic Drilling, in Rock, 4" Nominal, 0-200
3067 Sonic Drilling, in Rock, 4" Nominal, 200-400
3068 Sonic Drilling, in Rock, 8" Nominal, 0-200
3069 Sonic Drilling, in Rock, 8" Nominal, 200-400
3070 Movement of Equipment MI 825 3071 Surveying EA 10 3072 Mobilization and Demobilization of Helper
3073 Mob/Demob of Floating Plant EA 5 3074 Floating Plant DA 100 3075 Helper Boat 1 DA 100 3076 Helper Boat 2 DA 0 3077 Geophysical Logging Mobilization EA 20 3078 Geophysical Logging Video LF 1000 3079 Geophysical Logging Acoustic LF 1000 3080 Geophysical Logging Acoustic and Video LF 1000
Combined Other 3081 Security Clearance & Training EA 50 3082 Inspection Registered Professional SH 500 3083 Inspection non-Registered Professional TBN 0 3084 Other Direct costs (to be negotiated) To Be Negotiated 3085 gINT Logs EA 200 3086 Mileage To Be Negotiated 3087 Energy Calibration of Hammers EA 3 3088 Hydraulic Pressure Test Abbreviated EA 350 3089 Hydraulic Pressure Test Standard EA 500
TOTAL OPTION PERIOD THREE:
OPTION PERIOD FOUR
QTY
U/P Estimated Price
4001 Overburden Drilling without Sampling LF 250 Drive Sampling without HS Augers:
4002 0-60 Feet LF 125 4003 60-120 Feet LF 50
4004 120-400 Feet LF 20
4005 0-60 Feet LF 125 4006 60-120 Feet LF 50 4007 120-400 Feet LF 25
General Sampling 4008 Undisturbed Sampling 3" EA 10 4009 Undisturbed Sampling 5" EA 15 4010 Drilling in Rock and Concrete without
4011 Drilling in reinforced concrete without
4012 Coring in Rock and Concrete, 2.125" or
4013 Coring in rock and concrete, NQ Wireline LF 300 4014 Coring in reinforced concrete, 2.125" or NQ
4015 Coring in rock and concrete, Vertical 4" LF 300 4016 Coring in rock and concrete, 4" Nominal PQ
4017 Coring in reinforced concrete, 4" or PQ
4018 Coring in rock and concrete, 6" cores LF 75 4019 Coring in reinforced concrete, 6" cores LF 25 4020 Sonic Drilling, in Soil, 4" Nominal, 0-200 Feet LF 50 4021 Sonic Drilling, in Soil, 4" Nominal, 200-400
4022 Sonic Drilling, in Soil, 8" Nominal, 0-200 Feet LF 50 4023 Sonic Drilling, in Soil, 8" Nominal, 200-400
4024 Sonic Drilling, in Rock, 4" Nominal, 0-200
4025 Sonic Drilling, in Rock, 4" Nominal, 200-400
4026 Sonic Drilling, in Rock, 8" Nominal, 0-200
4027 Sonic Drilling, in Rock, 8" Nominal, 200-400
4028 Piezometer Installation - Regular EA 8 4029 Piezometer Installation - Flush Mount EA 8 4030 Piezometer Surface Protection Rehab EA 4 4031 Inclinometer Installation EA 4 4032 Surface Displacement Monument EA 4
Other 4033 Directed Installation of Casing LF 10 4034 Cribbing Construction HR 100 4035 Flagger HR 100 4036 Movement of Equipment MI 1000
4037 Mob/Demob of Drill Rig (Land) EA 10 4038 Mob/Demob of Drill Rig (Sonic) EA 10 4039 Mob & Demob of ATV Rig EA 10 4040 Surveying EA 10 4041 Geophysical Logging Mobilization EA 20 4042 Geophysical Logging Video LF 2000 4043 Geophysical Logging Acoustic LF 2000 4044 Geophysical Logging Acoustic and Video LF 2000
Floating Plant 4045 Overburden Drilling without Sampling LF 50
Drive Sampling without HS Augers:
4046 0-60 feet LF 125 4047 60-120 feet LF 50 4048 120-400 feet LF 25
Drive Sampling with HS Augers:
4049 0-60 feet LF 125 4050 60-120 feet LF 50 4051 120-400 feet LF 25
General Sampling
4052 Drilling in rock and concrete without sampling
4053 Drilling in reinforced concrete without
4054 Coring in rock and concrete, 2.125"
4055 Coring in rock and concrete, NQ Wireline LF 500 4056 Coring in reinforced concrete, 2.125" or NQ
4057 Coring in rock and concrete, Vertical 4" LF 500 4058 Coring in rock and concrete, 4" Nominal PQ
4059 Coring in reinforced concrete, 4" or PQ
4060 Coring in rock and concrete, 6" cores LF 500 4061 Coring in reinforced concrete, 6" cores LF 500 4062 Sonic Drilling, in Soil, 4" Nominal, 0-200 Feet
4063 Sonic Drilling, in Soil, 4" Nominal, 200-400
4064 Sonic Drilling, in Soil, 8" Nominal, 0-200 Feet To Be Negotiated 4065 Sonic Drilling, in Soil, 8" Nominal, 200-400
4066 Sonic Drilling, in Rock, 4" Nominal, 0-200
4067 Sonic Drilling, in Rock, 4" Nominal, 200-400
4068 Sonic Drilling, in Rock, 8" Nominal, 0-200
4069 Sonic Drilling, in Rock, 8" Nominal, 200-400
Movement of Equipment
MI
4071 Surveying
4072 Mobilization and Demobilization of Helper
4073 Mob/Demob of Floating Plant EA 5 4074 Floating Plant DA 100 4075 Helper Boat 1 DA 100 4076 Helper Boat 2 DA 0 4077 Geophysical Logging Mobilization EA 20 4078 Geophysical Logging Video LF 1000 4079 Geophysical Logging Acoustic LF 1000 4080 Geophysical Logging Acoustic and Video
4081 Security Clearance & Training EA 50 4082 Inspection Registered Professional SH 500 4083 Inspection non-Registered Professional TBN 0 4084 Other Direct costs (to be negotiated) To Be Negotiated 4085 gINT Logs EA 200 4086 Mileage To Be Negotiated 4087 Energy Calibration of Hammers EA 3 4088 Hydraulic Pressure Test Abbreviated EA 350 4089 Hydraulic Pressure Test Standard
TOTAL OPTION PERIOD FOUR
GRAND TOTAL: BASE and ALL OPTION PERIODS _______________
Legend: TBN = To Be Negotiated DA = Day HR = Hour LF = Linear Feet MI = Miles EA = Each SH = Shift
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0001 1 Job Base Period
FFP
Contractor shall furnish all necessary management, personnel, materials, supplies, tools, equipment, fuel and vehicles, except as otherwise noted in the Performane Work Statement, required to perform national inland floating plant and land drilling services for the U.S. Army Corps of Engineers Dam Safety Modification Mandatory Center of Expertise. All work shall be completed in accordance with the Performance Work Statement and conditions of the contract.
FOB: Destination
MAX
NET AMT
UNIT UNIT PRICE MAX AMOUNT
0002 1 Job OPTION Option Period 1
FFP
Contractor shall furnish all necessary management, personnel, materials, supplies, tools, equipment, fuel and vehicles, except as otherwise noted in the Performane Work Statement, required to perform national inland floating plant and land drilling services for the U.S. Army Corps of Engineers Dam Safety Modification Mandatory Center of Expertise. All work shall be completed in accordance with
UNIT UNIT PRICE MAX AMOUNT
0003 1 Job OPTION Option Period 2
FFP
Contractor shall furnish all necessary management, personnel, materials, supplies, tools, equipment, fuel and vehicles, except as otherwise noted in the Performane Work Statement, required to perform national inland floating plant and land drilling services for the U.S. Army Corps of Engineers Dam Safety Modification Mandatory Center of Expertise. All work shall be completed in accordance with
UNIT UNIT PRICE MAX AMOUNT
0004 1 Job OPTION Option Period 3
FFP
Contractor shall furnish all necessary management, personnel, materials, supplies, tools, equipment, fuel and vehicles, except as otherwise noted in the Performane Work Statement, required to perform national inland floating plant and land drilling services for the U.S. Army Corps of Engineers Dam Safety Modification Mandatory Center of Expertise. All work shall be completed in accordance with
UNIT UNIT PRICE MAX AMOUNT
0005 1 Job OPTION Option Period 4
FFP
Contractor shall furnish all necessary management, personnel, materials, supplies, tools, equipment, fuel and vehicles, except as otherwise noted in the Performane Work Statement, required to perform national inland floating plant and land drilling services for the U.S. Army Corps of Engineers Dam Safety Modification Mandatory Center of Expertise. All work shall be completed in accordance with
Section C - Descriptions and Specifications
PWS_REV01
U.S. ARMY CORPS OF ENGINEERS (USACE) DAM SAFETY MODIFICATION MANDATORY
CENTER OF EXPERTISE (DSMMCX) NATIONAL INLAND FLOATING PLANT AND LAND
DRILLING SERVICES - REVISED
1. CHARACTER AND EXTENT OF SERVICES
This contract is for use by the U.S. Army Corps of Engineers (USACE) Dam Safety Modification Mandatory Center of Expertise (MCX), the Great Lakes and Ohio River Division (LRD), and other Districts and Divisions within the continental United States granted capacity by the Contracting Officer. The Contractor shall perform all or part of the services described in these specifications, and those added by Task Orders that fall within the scope of this base contract.
This contract is for all types of geotechnical exploratory land drilling and inland floating plant drilling within the contiguous United States. Where special regulations exist, the Contractor shall notify the USACE prior to submitting a proposal in order to allow the USACE to clarify its needs based on the Contractor’s knowledge.
Work required under this Contract will generally fall under these categories:
a. Subsurface exploration, potentially in areas where Hazardous Toxic or Radioactive Waste may be encountered.
(HTRW work will be negotiated according to level of production and conditions.)
b. Subsurface exploration from a floating plant,
c. Inspection of Subsurface Explorations,
d. Instrumentation of exploratory borings,
e. Other tasked exploratory drilling services.
The purpose of the work described in this document is to determine the type, nature, characteristics, extent, and condition of various subsurface materials located in the borings drilled. The USACE anticipates that most of the land drilling will be at depths less than 200 feet and will in no case exceed 400 feet and most of the barge drilling will be performed at depths less than 100 feet, and will in no case exceed 200 feet.