Amended SUBMITTAL REGISTER.pdf

PDF 71 KB Posted

Attached to
Skiffes Creek Maintenance Dredging at Ft. Eustis in Newport News, Virginia
Solicitation number
W9123621B5021
Issued by

About this file

This submittal register outlines required submissions for a dredging project at Fort Eustis in Newport News, Virginia. The project involves maintenance dredging of Skiffes Creek and is solicited by the U.S. Army Corps of Engineers Norfolk District under solicitation number W9123621B5021. The submittal register lists over 50 required submissions across 15 specification sections, including the contractor's quality control plan, accident prevention plan, dredging plans and notifications, testing reports, and certificates of operator authorizations and equipment inspections. Dredging is to be completed by January 2023, and submissions are due prior to the start of dredging, with some reports required periodically throughout the project duration.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 4 PAGES

Ft. Eustis, 3rd Port Maintenance Dredging

01 22 00 SD-03 Product Data

1.3.2.2Weight Scale Certification

SD-05 Design Data

1.3.2.3 GPre-Construction And

After-Construction Survey Data

SD-11 Closeout Submittals

1.3.2.3 GAs-Built Drawings

01 30 00 SD-01 Preconstruction Submittals

1.3Progress and Completion

Pictures

1.8 GList Of Subcontractors

01 32 01.00 10 SD-01 Preconstruction Submittals

3.4.1 GPreliminary Project Schedule

3.4.3 GPeriodic Schedule Update

3.4.2 GInitial Project Schedule

01 33 00 SD-01 Preconstruction Submittals

1.7 GSubmittal Register

01 35 26 SD-01 Preconstruction Submittals

1.7 GAccident Prevention Plan (APP)

SD-06 Test Reports

1.4Monthly Exposure Reports

1.12Notifications and Reports

1.12.2 GAccident Reports

1.12.3LHE Inspection Reports

SD-07 Certificates

1.6.1.3Crane Operators/Riggers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r) e4eceag9 Polygon

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 4 PAGES

01 35 26 1.7.3.1 GStandard Lift Plan

1.7.1 GCritical Lift Plan

1.7.3.2 GCritical Lift Plan

1.7.3.3 GNaval Architecture Analysis

1.8Activity Hazard Analysis (AHA)

1.9.1Confined Space Entry Permit

1.9.1Hot Work Permit

1.12.4Certificate of Compliance

01 45 00.00 10 SD-01 Preconstruction Submittals

3.2 GContractor Quality Control (CQC)

Plan

SD-11 Closeout Submittals

3.10Daily Quality Control Reports

01 50 00 SD-01 Preconstruction Submittals

1.3 GConstruction Site Plan

2.2.1 GTraffic Control Plan

2.2.1 GHaul Road Plan

01 57 19 SD-01 Preconstruction Submittals

1.9Solid Waste Management Permit

1.7 GEnvironmental Protection Plan

1.7.2.1 GDirt and Dust Control Plan

3.2.3 GErosion And Sediment Controls

SD-06 Test Reports

1.9.1 GMonthly Solid Waste Disposal

Report

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 4 PAGES

01 57 19 3.9.1 GWaste Determination

Documentation

3.11.1.1 GProject Solid Waste Disposal

Documentation Report

3.9.3.1 GHazardous Waste/Debris

Management

3.11.2.1 GHazardous Waste/Debris

Management

3.11.1.1 GSales Documentation

31 00 00 SD-01 Preconstruction Submittals

1.5.2 GDewatering Work Plan

3.5 GExcavation And Placement Plan

SD-03 Product Data

3.11 GUtilization of Excavated Materials

SD-06 Test Reports

3.18Testing

SD-07 Certificates

3.18Testing

35 20 23 SD-01 Preconstruction Submittals

1.17.1 GList of Floating Plant

1.3Dredging Intent Notifications

1.3.1Dredging Intent Notifications

1.4.5Request for Before Dredging

Survey

1.4.4Designated Acceptance Section

Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 4 PAGES

35 20 23 1.17.1.1 GProposed Pipeline Routing

3.8.4 GOff-Site Debris Disposal Plan

1.17.1.2 GCurrent Marine Survey Inspection

Certificate

SD-06 Test Reports

3.3.3Discharge Water Quality Tests

SD-07 Certificates

1.17.1Equipment and Machinery

Operator Authorization

1.17.1.4Equipment and Machinery

Operator Authorization

1.4.6After Dredging Survey Request

3.11Dredging Completion Report

35 20 23.13 SD-01 Preconstruction Submittals

- Dredge Plant Instrumentation

Plan Revisions or Addendum

G, SAM-OP-J

SD-07 Certificates

G NAO-- Letter of National Dredging

Quality Management Program

Certification

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

File details come from the government source that posted it. Updated .