This document is an amendment to a solicitation for the Skiffes Creek Maintenance Dredging project at Fort Eustis in Newport News, Virginia. The U.S. Army Corps of Engineers, Norfolk District is seeking dredging and earthworks services including removal of debris, surveying, compaction testing, and seeding/erosion control. Bidders may work 24/7 on dredging and have five days' notice for coordinating vessel traffic. Up to four side scan surveys will be compensated. Payment will be by cubic yard for dike raising after surveys establish quantities. The amendment provides responses to bidder questions on prevailing wages, surveying responsibilities, as-built requirements, testing responsibilities, debris disposal, and typical vessel schedules.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Solicitation W91236221B5021 Skiffes Creek maintenance dredging is hereby amended as follow s:

Please see continuation page for full amendment breakout.

Contracting POC: Allen Scott Brainerd, 757-201-7668 allen.s.brainerd@usace.army.mil CC'd dianne.k.grimes@usace.army.mil

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 25-Aug-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9123621B5021

X 9B. DATED (SEE ITEM 11)

04-Aug-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

25-Aug-2021

CODE

USACE NORFOLK DISTRICT OFFICE

CONTRACTING OFFICE

803 FRONT STREET

NORFOLK VA 23510-1011

W91236 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9123621B5021

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0005

Solicitation W9123621B5021 is hereby amended as follows:

Bidder Inquiry Number 9379230

1. Are there any prevailing/Davis Bacon wages for the earthwork contractor?

I have seen wages for dredging personnel but have not found any others.

2. Who will handle surveying & layout for the upland area work (borrow areas, LOD, embankment alignment etc.)?

3. Are As-Builts required for the upland work?

I read where the government will conduct & provide Pre-Construction and Post- Construction Surveys of the dredging site. It does not refer to the upland work.

4. Who will handle material testing & compaction testing?

5. Can the grass/clearing debris be buried with 2ft. of cover in the borrow areas after excavation is complete?

6. After seeding of the new embankment fill, is erosion control stabilization matting required?

If so, specify what kind.

Government Response to Bidder Inquiry 9379230

1. WD for earthworks (VA20210047) will be included via amendment. Wage Determination released in Amendment 0004.

2. Per Spec Section 01 22 00, paragraph 1.3.2.3, the Contractor is responsible for surveying of placement site.

Submittal requirement will be included in specifications via amendment.

3. Per Spec Section 01 22 00, para 1.3.2.3, the Contractor is responsible for providing as-built data in PDF and DWG formats for Government's review and approval for payment purposes. Submittal requirement will be included in specifications via amendment.

4. Refer to spec section 31 00 00, paragraph 3.18 for material and compaction testing requirements.

5. Refer to spec section 31 00 00, paragrpah 3.3 for disposal of cleared and grubbed material requirements.

6. Not required per plans and specs.

Bidder Inquiry Number 9384845

2) 00-21-00 - Under the Bidder Instructions in the solicitation they require the removal of what appears to be fairly substantial debris fields. This doesn't appear as explicitly anywhere else in the docs. Is it the USACE intent to remove the referenced debris fields with a clamshell dredge?

Government Response to Bidder Inquiry 9384845 Refer to spec section 01 14 00, para 1.4.1 and 1.4.2, section 01 22 00 para. 1.3.2.2 and others for debris removal requirements. The contractor is responsible for complete debris removal with appropriate means and methods. Also see appendix E of specifications.

Bidder Inquiry Number 9384848

5) Work Hours stated as 730-1700 M-F, We would request we be allowed to work 24/7 on the dredging portion of the project Government Response to Bidder Inquiry 9384848

W9123621B5021

Refer to spec section 01 11 00.00 50, para 1.6.2.3 for Hours of Work requirements.

Bidder Inquiry Number 9384853

7) 01-14-00 1.4.2 States that "Contractor will be compensated for up to 4 side scan surveys." This is isn't mentioned elsewhere and there is no pay item. Please clarify

Government Response to Bidder Inquiry 9384853 Contractor should anticipate up to 4 side scan surveys to be completed during the project when preparing the bid.

Bidder Inquiry Number 9384854 For the Dike Raising b. Payment is by CY but I have not seen where it calls out who pays for surveys and the methodology.

Please Clarify

Government Response to Bidder Inquiry 9384854 Refer to spec section 01 22 00 and drawings for specific survey requirements and data.

Bidder Inquiry Number 9384856 Channel Traffic

a. Can you provide typical ship traffic schedule so that we can plan our work

b. Will you move ships and vessels from piers and bulkheads as needed to complete dredging?

Government Response to Bidder Inquiry 9384856 Traffic in the channel consist of commercial tug with barges in tow and Army traffic from 3rd Port. The commercial tug with barges comes through port at least twice a week. He goes out of port lite and comes back with 400 foot of sand and rock scows in tow. The Army traffic and moorings can be coordinated with a five days notice to avoid dredging operation interruptions.

SECTION 00 10 00 - SOLICITATION

The Issued By organization has changed from

USACE, NORFOLK DISTRICT OFFICE

CONTRACTING OFFICE

803 FRONT STREET

NORFOLK VA 23510-1011

to

USACE NORFOLK DISTRICT OFFICE

CONTRACTING OFFICE

803 FRONT STREET

NORFOLK VA 23510-1011

(End of Summary of Changes)