This pre-solicitation notice announces an upcoming competitive 8(a) set-aside solicitation for facility asset management services. The U.S. Army Corps of Engineers, Norfolk District will award an indefinite-delivery, indefinite-quantity contract with a maximum value of $25 million over a one-year base period and four one-year options to assist the Department of Defense Education Activity's facility asset management program. Services will include asbestos inspections, facility condition assessments, real property inventory updates, and database management across DoDEA's portfolio of over 240 schools and facilities totaling more than 19 million square feet located in 14 countries. The receipt date for proposals is April 19, 2019, with the solicitation to be issued on March 18, 2019 and available on FBO.gov.
ATTACHMENT 10
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Copy_of_Copy_of_DoDEA_Europe_School_Portfolio_08202018_w_Location_REV2.XLSX | XLSX spreadsheet | |
| AMENDMENT_0003.pdf | ||
| AMENDMENT_0002.pdf | ||
| NAO-DoDEA_FAM_Pre-Brief.pdf | ||
| ATTACHMENT_J.2._Schedule_of_Services_(formula_corrected).xlsx | XLSX spreadsheet | |
| SF30_19R0002.pdf | ||
| ATTACHMENT_J.12._Army-DoDEA-Reconciliation.xlsx | XLSX spreadsheet | |
| ATTACHMENT_J.6._Guidance_for_Contractor_SOFA_Designation.pdf | ||
| ATTACHMENT_J.11._Asset_Evaluation_Worksheet.pdf | ||
| ATTACHMENT_J.5._USFJ_Instruction_64-100.pdf | ||
| ATTACHMENT_J.1._PPQ_DoDEA_FAM.pdf | ||
| ATTACHMENT_J.9._DoDEA_Europe_School_Portfolio_w_Location.pdf | ||
| ATTACHMENT_J.2._Schedule_of_Services.xlsx | XLSX spreadsheet | |
| ATTACHMENT_J.4._USFJ_Form_28.pdf | ||
| ATTACHMENT_J.8._SOW_DoDEA_FAM_Europe.docx | DOCX document | |
| ATTACHMENT_J.3.__USFJ_Form_27.pdf | ||
| SOLICITATION.pdf | ||
| ATTACHMENT_J.7._SOW_DoDEA_FAM_5_Year_Base.docx | DOCX document | |
| PRE_SOLICITATION.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0 Table of Contents
| Table of Contents | |
| Name | Description |
| 1 At-a-Glance Q-Ratings | Overview of 2016 Annual Q-Rating Lock information and current monthly Q-Rating and supplemental information supporting Q-Rating movement throughout the Fiscal Year. |
| 2 April 2017 Q-Rating Report | Summary of 2011, 2012, 2013, 2014, 2015 and 2016 Annual Q-Rating Lock information. Please note that GSF values may vary slightly due to rounding associated with shared facilities. |
| 3 April 2017 Building Info | Summary of the DoDEA portfolio of schools and DSO facilities including, campus CI rating, building CI/Q–rating, Year Built, RPUID/RPSUID references and GSF data. The Gross Square Footage (GSF) reflects data as of April 30, 2017. GSF values are updated routinely at the direction of DoDEA while conducting real property inventory reconciliation activities at both the Service and installation level. Additionally, GSF values are updated as a result of triennial assessment activities and associated drawing updates. Please note that GSF values may vary slightly due to rounding associated with shared facilities. |
| 4 Portfolio | This tab represents the Building Summary Worksheet Report run from DFAM as of April 30, 2017 containing GSF values for semi-permanent and permanent buildings for schools in the DoDEA portfolio. The GSF values on this tab are considered the most accurate based on DoDEA records. The buildings listed in this tab are a representation of buildings DoDEA recognizes as active. |
Please note that Rows 686-875 reference the summary of closed buildings in the DoDEA portfolio which DoDEA recogonizes as being closed. All assets highlighted in yellow represent buildings that have either been archived, are Agency-Only records or do not reside within the OSD RPI database.
| 5 2016 Lock | Summary of the 2016 Annual Q-Rating publication data together with a percent of total schools that have a Q-1 or Q-2 Rating. (The 2016 Lock tab is updated on monthly basis to monitor current Q-Ratings and any changes associated with the total number of Q-1, Q-2, Q-3 and Q-4 ratings.) |
| 6 2016 Lock Building Info | Summary of the 2016 Annual Q-Rating publication data for the buildings. |
| 7 2016 Lock DSO Overview | Summary of the 2016 Annual Q-Rating publication data for the District Superintendent Offices. |
| 8 2016 Lock DSO Building Info | Summary of the 2016 Annual Q-Rating publication data for the DSO buildings. |
| 9 2015 Lock | Summary of the 2015 Annual Q-Rating publication data together with a percent of total schools that have a Q-1 or Q-2 Rating. (The 2015 Lock tab is updated on monthly basis to monitor current Q-Ratings and any changes associated with the total number of Q-1, Q-2, Q-3 and Q-4 ratings.) |
| 10 2015 Lock Building Info | Summary of the 2015 Annual Q-Rating publication data for the buildings. |
| 11 2015 Lock DSO Overview | Summary of the 2015 Annual Q-Rating publication data for the District Superintendent Offices. |
| 12 2015 Lock DSO Building Info | Summary of the 2015 Annual Q-Rating publication data for the DSO buildings. |
| 13 2014 Lock | Summary of the 2014 Annual Q-Rating publication data together with a percent of total schools that have a Q-1 or Q-2 Rating. (The 2014 Lock tab is updated on monthly basis to monitor current Q-Ratings and any changes associated with the total number of Q-1, Q-2, Q-3 and Q-4 ratings.) |
| 14 2014 Lock Building Info | Summary of the 2014 Annual Q-Rating publication data for the buildings. |
| 15 2014 Lock DSO Overview | Summary of the 2014 Annual Q-Rating publication data for the District Superintendent Offices. |
| 16 2014 Lock DSO Building Info | Summary of the 2014 Annual Q-Rating publication data for the DSO buildings. |
1 At-a-Glance Q-Ratings Region School Name Pre-decisional MILCON School
| Year | Official LOCKED | ||
| June 2016 | Current Q-Rating | ||
| April 2017 | Comments | Date of Last |
Assessment
| School Name | Q-Rating | Condition | |||||
| Index | Q-Rating | Condition | |||||
| Index | Date of Last Assessment | ||||||
| Europe | AFNORTH ES | Q-3 | 79 | Q-2 | 81 | October 2016 - The Q-Rating changed from a Q-3 to a Q-2 due to the DoD pricing guide updates and to BUILDER removing repair dollars from the overall requirements for the following systems: HVAC - Distribution. |
| October 2015 - The Q-Rating changed from a Q-2 to a Q-3 due to systems expiration at fiscal year rollover: Electrical Service & Distribution, Exterior Doors, Distribution Systems, Fire Alarm and Detection Systems, Other Electrical Services and Roof Coverings. | 9/9/14 | ||||||
| Europe | AFNORTH MS/HS | Q-3 | 79 | Q-2 | 81 | October 2016 - The Q-Rating changed from a Q-3 to a Q-2 due to the DoD pricing guide updates and to BUILDER removing repair dollars from the overall requirements for the following systems: HVAC - Distribution. |
| October 2015 - The Q-Rating changed from a Q-2 to a Q-3 due to systems expiration at fiscal year rollover: Electrical Service & Distribution, Exterior Doors, Distribution Systems, Fire Alarm and Detection Systems, Other Electrical Services and Roof Coverings. | 9/9/14 | |||||||
| Americas | Albritton MS | 2022 | Q-2 | 85 | Q-1 | 93 | July 2016 - The Q-Rating changed from a Q-2 to a Q-1. |
| Building 43331 improved from a Q-2 to a Q-1. Since the time of the previous assessment the exterior enclosure, exterior doors, exterior windows, floor finishes and wall finishes remain expired, however, BUILDER requirements are lower than previous cost models predicted. | 3/29/16 | ||||||||
| Europe | Alconbury ES | Q-3 | 79 | Q-2 | 80 | October 2016 - The Q-Rating changed from a Q-3 to a Q-2 due to the DoD pricing guide updates and to BUILDER removing repair dollars from the overall requirements for the following systems: HVAC - Distribution and Interior Construction - Interior Doors By Type. | 12/11/14 | ||
| Europe | Alconbury MS/HS | 2012 | Q-2 | 86 | Q-2 | 88 | 12/9/14 | ||
| Americas | Andersen ES | Q-3 | 77 | Q-3 | 76 | October 2015 - The Q-Rating changed from a Q-2 to a Q-3 due to systems expiration at fiscal year rollover: Ceiling Finishes, Emergency Lights, Exterior Doors, Intercom / PA System, LAN, Lighting, Security System and Specialities. | 7/22/13 | ||
| Americas | Andersen MS | Q-2 | 81 | Q-3 | 79 | October 2016 - The Q-Rating changed from a Q-2 to a Q-3 due to systems expiration at fiscal year rollover: Exterior Finishes and Wall Finishes. |
| October 2015 - The Q-Rating changed from a Q-1 to a Q-2 due to systems expiration at fiscal year rollover: Ceiling Finishes, Emergency Lights, Exterior Doors, Intercom / PA System, LAN, Lighting, Roof Coverings, Security System and Specialities. | 7/18/13 | ||||||||
| Europe | Ankara ES/HS | 2020 | Q-3 | 77 | Q-3 | 73 | 2/2/15 | ||
| Europe | Ansbach ES | Q-1 | 99 | Q-1 | 99 | 5/6/14 | |||
| Europe | Ansbach MS/HS | 2012 | Q-1 | 96 | Q-1 | 96 | 5/13/14 | ||
| Americas | Antilles ES | Q-1 | 100 | Q-1 | 100 | June 2016 - The Q-Rating changed from a Q-4 to a Q-1. The new Antilles ES replaces the old Antilles ES. | 8/21/13 | ||
| Americas | Antilles HS | 2020 | Q-3 | 68 | Q-3 | 66 | 8/19/13 | ||
| Americas | Antilles MS | Q-2 | 89 | Q-2 | 83 | 8/26/13 | |||
| Pacific | Arnn ES | Q-1 | 99 | Q-1 | 99 | 9/29/15 | |||
| Americas | Ashurst ES | Closed | Closed | 5/14/13 | |||||
| Europe | Aukamm ES | 2021 | Q-3 | 76 | Q-3 | 79 | 9/18/14 | ||
| Europe | Aviano ES | Q-1 | 91 | Q-1 | 93 | 2/17/14 | |||
| Europe | Aviano MS/HS | Q-2 | 89 | Q-1 | 92 | October 2016 - The Q-Rating changed from a Q-2 to a Q-1 due to BUILDER removing repair dollars from the overall requirements for the following systems: Fire Alarm and Detection, HVAC - Cooling Generating, HVAC - Distribution, and HVAC - Energy Supply. |
| October 2015 - The Q-Rating changed from a Q-1 to a Q-2 due to systems expiration at fiscal year rollover: Cooling Generating Systems, Distribution Systems, Terminal & Package Units and Roof Coverings. | 2/17/14 | ||||||||
| Europe | Bahrain ES | Closed | Closed | 1/21/15 | |||||
| Europe | Bahrain ES/HS | Leased | 98 | Leased | 97 | June 2016 - The School GSF was increased to 212,799 SF with the consolidation of Bahrain ES and Bahrain MS/HS into Bahrain ES/HS. | 1/21/15 | ||
| Europe | Bamberg ES | Closed | Closed | 5/9/11 | |||||
| Europe | Bamberg HS | Closed | Closed | 5/11/11 | |||||
| Americas | Barkley ES | 2013 | Q-3 | 73 | Q-3 | 76 | 4/15/13 | ||
| Americas | Barsanti ES | 2020 | Q-1 | 98 | Q-1 | 100 | 10/12/16 | ||
| Europe | Baumholder MS/HS | 2022 | Q-3 | 74 | Q-3 | 77 | 9/22/14 | ||
| Pacific | Bechtel ES | 2019 | Q-3 | 75 | Q-3 | 75 | 6/5/15 | ||
| Europe | Bitburg ES | 2012 | Closed | Closed | 7/15/14 | ||||
| Europe | Bitburg MS/HS | 2012 | Q-2 | 82 | Q-2 | 83 | 7/17/14 | ||
| Europe | Bitburg MS | Closed | Closed | 7/17/14 | |||||
| Americas | Bitz IS | Q-1 | 97 | Q-1 | 99 | 1/10/17 | |||
| Americas | Bolden ES/MS | 2014 | Q-3 | 78 | Q-2 | 81 | February 2017 - The Q-Rating changed from a Q-3 to a Q-2. Outlined below is the updated summary information as per the final FCAR. |
Building 1523 remained a Q-3.
Building 1634 remained a Q-1.
| Building 2120 decreased from a Q-1 to a Q-4 at the time of assessment. Exterior doors, electrical service and distribution, and lighting and branch wiring have expired since the last assessment. | 7/13/16 | ||||||||
| Americas | Bowley ES | Q-1 | 93 | Q-1 | 97 | 4/12/16 | |||
| Americas | Brewster MS | Q-1 | 92 | Q-1 | 100 | 1/12/17 | |||
| Americas | Brittin ES | 2020 | Q-3 | 75 | Q-2 | 81 | March 2017 - The Q-Rating changed from a Q-3 to a Q-2. Outlined below is the updated summary information as per the final FCAR. |
Building 7392 improved from a Q-3 to a Q-2 at the time of assessment. Since the time of the previous assessment interior doors, specialties, roof coverings, exterior windows, communication security, floor finishes, and ceiling finishes are no longer expired due to BUILDER rating methodology.
Building 7393 remained a Q-2.
Building 7394 degraded from a Q-2 to a Q-3 at the time of assessment. Since the time of the previous assessment roof coverings, distribution systems, fire alarm and detection system, electrical service and distribution system, lighting and branch wiring remain expired, however, BUILDER requirements are lower than the previous cost models predicted.
| Building 7395 degraded from a Q-1 to a Q-2 at the time of assessment. Since the time of the previous assessment exterior doors, roof coverings, floor finishes, fire alarm and detection system, lighting and branch wiring remain expired, however, BUILDER requirements are lower than the previous cost models predicted. | 8/29/16 | ||||||||
| Europe | Brussels ES/HS | 2015 | Q-2 | 84 | Q-2 | 81 | 1/30/15 | ||
| Americas | Burrows ES | Closed | Closed | 5/16/13 | |||||
| Americas | Butner PS | 2016 | Closed | Closed | 4/1/16 | ||||
| Pacific | Byrd ES | Closed | Closed | 8/27/12 | |||||
| Pacific | Casey ES | Closed | Closed | 6/4/15 | |||||
| Americas | Crossroads ES | Q-1 | 100 | Q-1 | 100 | 11/16/16 | |||
| Europe | Croughton ES | 2017 | Q-3 | 76 | Q-3 | 76 | 12/17/14 | ||
| Pacific | Cummings ES | Closed | Closed | 7/30/15 | |||||
| Pacific | Daegu American School | 2019 | Q-3 | 75 | Q-3 | 78 | June 2016 - The school GSF was reduced by 813 SF due to the transfer of Building 3016 to the installation. |
October 2015 - The Q-Rating changed from a Q-2 to a Q-3. Outlined below is the updated summary information as per the final FCAR which includes feedback from the Area Office.
Building 3000 degraded from a Q-2 to a Q-3 at the time of assessment. Since the time of the previous assessment Chilled water distribution, hot water distribution, emergency lighting and power and interior construction have expired due to BUILDER methodology.
Building 3008 remained a Q-3.
Building 3013 improved from a Q-2 to a Q-1 at the time of assessment.
Building 3016 remained a Q-4.
Building 3018 remained a Q-1.
Building 3019 remained a Q-1.
Building 3210 degraded from a Q-2 to a Q-3 at the time of assessment. Since the time of the previous assessment Chilled water distribution and hot water distribution, have expired due to BUILDER methodology.
Building 3008 remained a Q-3.
| Building Storage improved from a Q-3 to a Q-1 at the time of assessment. Since the time of the previous assessment roof coverings and exterior doors are no longer expired due to BUILDER rating methodology. | 5/21/15 | ||||||||
| Pacific | Daegu HS | 2014 | Q-1 | 98 | Q-1 | 98 | 5/26/15 | ||
| Americas | Dahlgren ES/MS | 2022 | Q-3 | 70 | Q-3 | 61 | 11/8/16 | ||
| Pacific | Darby ES | Q-1 | 92 | Q-1 | 94 | February 2016 - The Q-Rating changed from a Q-2 to a Q-1. |
Building 5114 improved from a Q-2 to a Q-1 at the time of the assessment.
Building 5160 remained a Q-1.
| Building 5161 degraded from a Q-1 to a Q-4 at the time of the assessment. Since the time of the previous assessment exterior doors and exterior door hardware have expired. | 9/30/15 | |||||||
| Americas | DeLalio ES | 2012 | Q-4 | 58 | Q-3 | 73 | April 2017 - The Q-Rating changed from a Q-4 to a Q-3. |
Building TC1500 improved from a Q-4 to a Q-3 at the time of the assessment. Since the time of previous assessment roof coverings, domestic water distribution, sanitary waste, distribution systems, lighting and branch wiring, and other electrical services are still expired; however, BUILDER requirements are lower than the previous cost models predicted.
Building TC1502 degraded from a Q-1 to a Q-2 at the time of the assessment. Since the time of previous assessment terminal package units and lighting and branch wiring are still expired; however, BUILDER requirements are lower than the previous cost models predicted.
| October 2015 - The Q-Rating changed from a Q-3 to a Q-4 due to systems expiration at fiscal year rollover: Fire Alarm System, Floor Finishes, HVAC Distribution, LAN and Wall Finishes. | 1/17/17 | ||||||
| Americas | Devers ES | Q-3 | 67 | Q-1 | 93 | July 2016 - The Q-Rating changed from a Q-3 to a Q-1. |
Building 95536 improved from a Q-3 to a Q-1. Since the time of the previous assessment casework, ceiling finishes, exterior doors, exterior finishes, roof coverings, wall finishes and branch circuits are no longer expired due to BUILDER methodology.
| October 2015 - The Q-Rating changed from a Q-1 to a Q-3 due to systems expiration at fiscal year rollover: Branch Circuits, Casework, Ceiling Finishes, Emergency Lights, Exit Lights, Fire Alarm System, HVAC Cooling Equipment, Lighting and Roof Coverings. | 4/5/16 | ||||||||
| Americas | Dexter ES | Q-1 | 90 | Q-1 | 92 | 12/8/16 | |||
| Americas | Diamond ES | 2014 | Q-3 | 72 | Q-3 | 61 | 9/2/16 | ||
| Pacific | Earhart IS | Q-2 | 86 | Q-2 | 87 | 4/2/15 | |||
| Pacific | Edgren HS | 2015 | Q-3 | 78 | Q-3 | 79 | 8/3/15 | ||
| Americas | Elliott ES | Q-1 | 93 | Q-1 | 99 | 7/19/16 | |||
| Americas | Faith MS | 2014 | Q-3 | 69 | Q-3 | 74 | 12/5/16 | ||
| Europe | Feltwell ES | 2013 | Q-3 | 75 | Q-3 | 78 | 12/4/14 | ||
| Americas | Fort Campbell HS | 2014 | Q-2 | 85 | Q-3 | 76 | March 2017 - The Q-Rating changed from a Q-2 to a Q-3. Outlined below is the updated summary information as per the final FCAR. |
Building 902 degraded from a Q-2 to a Q-3 at the time of the assessment. Since the time of the previous assessment various portions of distribution systems and partitions have been expired due to BUILDER rating methodology. In addition, the domestic water distribution system has been replaced or their life cycles extended.
Building 903 degraded from a Q-1 to a Q-3 at the time of the assessment. Since the time of the previous assessment, exterior doors remain expired, however, BUILDER requirements are lower than the previous cost models predicted. In addition, roof coverings, and lighting and branch wiring have been expired.
Building 904 degraded from a Q-2 to a Q-3 at the time of the assessment. Since the time of the previous assessment, exterior doors remain expired, however, BUILDER requirements are lower than the previous cost models predicted. In addition, roof coverings, and lighting and branch wiring have been expired.
Building 905 degraded from a Q-1 to a Q-4 at the time of the assessment. Since the time of the previous assessment, roof coverings remain expired, however, BUILDER requirements are lower than the previous cost models predicted. In addition, roof coverings, and plumbing fixtures have been expired.
Building A902 remained a Q-1.
| 10/10/16 | ||||||||
| Americas | Fort Knox HS | 2016 | Q-2 | 86 | Q-2 | 86 | 9/18/13 | |
| Americas | Fort Rucker ES | 2016 | Q-3 | 66 | Q-3 | 66 | 5/7/13 | |
| Americas | Fort Rucker PS | 2016 | Q-3 | 73 | Q-4 | 54 | March 2017 - The Q-Rating changed from a Q-3 to a Q-4. Outlined below is the updated summary information as per the final FCAR. |
| Building 22210 degraded from a Q-3 to a Q-4 at the time of assessment. Since the time of the previous assessment partitions have been expired due to BUILDER rating methodology. | 11/11/16 | ||||||||
| Americas | Galer ES | Q-3 | 76 | Q-3 | 76 | 7/15/16 | |||
| Europe | Garmisch ES | 2016 | Q-1 | 95 | Q-1 | 92 | 4/10/14 | ||
| Americas | Gordon ES | Q-1 | 98 | Q-1 | 100 | 7/12/16 | |||
| Europe | Grafenwoehr ES | 2016 | Q-3 | 63 | Q-3 | 62 | 5/2/14 | ||
| Americas | Guam HS | Q-1 | 97 | Q-1 | 90 | 7/26/13 | |||
| Europe | Hainerberg ES | 2014 | Q-3 | 74 | Q-3 | 77 | 9/19/14 | ||
| Americas | Hampton PS | Q-1 | 100 | Q-1 | 100 | 7/26/16 | |||
| Americas | Hanscom MS | 2012 | Q-1 | 100 | Q-1 | 100 | June 2016 - The Q-Rating changed from a Q-4 to a Q-1. The new Hanscom MS replaces the old Hanscom MS. | 8/19/13 | |
| Americas | Hanscom PS | 2014 | Q-3 | 70 | Q-3 | 70 | June 2016 - The School GSF was reduced by 3,901 SF due to the closing of Hanscom MS building 1997 which was shared with Hanscom Primary School. | 8/20/13 | |
| Europe | Heidelberg HS | Closed | Closed | 11/10/11 | |||||
| Europe | Heidelberg MS | Closed | Closed | 11/8/11 | |||||
| Americas | Heroes ES | Q-1 | 97 | Q-1 | 99 | 1/12/17 | |||
| Europe | Hohenfels ES | Q-1 | 91 | Q-1 | 91 | 5/19/14 | |||
| Europe | Hohenfels MS/HS | Q-1 | 100 | Q-1 | 100 | 5/14/14 | |||
| Americas | Holbrook ES | 2014 | Closed | Closed | 2/5/13 | ||||
| Pacific | Hope PS | Q-2 | 87 | Q-2 | 88 | 3/23/15 | |||
| Pacific | Humphreys Central ES | Q-1 | 100 | Q-1 | 100 | 8/3/15 | |||
| Pacific | Humphreys ES/MS | Closed | Closed | 6/20/12 | |||||
| Pacific | Humphreys HS | Q-1 | 100 | Q-1 | 100 | 8/7/15 | |||
| Pacific | Humphreys MS | Q-1 | 100 | Q-1 | 100 | 2016 - New School. | 12/31/99 | ||
| Pacific | Ikego ES | Q-1 | 100 | Q-1 | 100 | 2014 - The new Ikego ES replaces the old Ikego ES. | 10/23/15 | ||
| Europe | Illesheim ES | Closed | Closed | 5/9/14 | |||||
| Europe | Incirlik ES/HS | 2022 | Q-3 | 78 | Q-2 | 80 | October 2016 - The Q-Rating changed from a Q-3 to a Q-2 due to the DoD pricing guide updates and to BUILDER removing repair dollars from the overall requirements for the following systems: Electrical - Lighting and Branch Wiring, Electrical - Other Electrical Services, Electrical Service and Distribution, HVAC - Heating Generating, and Plumbing Fixtures. | ||
| 2/5/15 | |||||||||
| Americas | Irwin IS | Q-1 | 100 | Q-1 | 100 | 2012 - The new Irwin IS replaces the old Irwin IS. | 4/7/16 | ||
| Americas | Jackson ES | Closed | Closed | 10/6/16 | |||||
| Americas | Johnson PS | Q-1 | 97 | Q-1 | 100 | 1/17/17 | |||
| Pacific | Joy ES | Q-1 | 91 | Q-1 | 91 | January 2016 - The Q-Rating changed from a Q-2 to a Q-1. Outlined below is the updated summary information as per the final FCAR which includes feedback from the Area Office. |
Building 142 remained a Q-1.
Building 409 improved from a Q-2 to a Q-1 at the time of assessment.
| Building 723 improved from a Q-2 to a Q-1. | 5/29/15 | ||||||||
| Pacific | Kadena ES | 2017 | Q-4 | 58 | Q-4 | 58 | 2/14/12 | ||
| Pacific | Kadena HS | 2021 | Q-2 | 80 | Q-2 | 81 | 3/25/15 | ||
| Pacific | Kadena MS | 2014 | Q-4 | 58 | Q-4 | 58 | 2/27/12 | ||
| Europe | Kaiserslautern ES | 2014 | Q-2 | 84 | Q-2 | 85 | 9/11/14 | ||
| Europe | Kaiserslautern HS | Q-3 | 74 | Q-3 | 73 | 9/11/14 | |||
| Europe | Kaiserslautern MS | 2019 | Q-3 | 72 | Q-3 | 74 | 9/11/14 | ||
| Americas | Kessler ES | Q-1 | 98 | Q-1 | 99 | 8/31/16 | |||
| Pacific | Killin ES | 2015 | Q-3 | 72 | Q-3 | 71 | 5/28/15 | ||
| Pacific | King HS | 2015 | Q-3 | 71 | Q-3 | 74 | 9/28/15 | ||
| Americas | Kingsolver ES | 2012 | Closed | Closed | 9/24/13 | ||||
| Pacific | Kinnick HS | 2018 | Q-3 | 60 | Q-3 | 62 | 10/12/15 | ||
| Pacific | Kinser ES | Q-3 | 75 | Q-3 | 70 | 6/2/15 | |||
| Europe | Kleine Brogel ES | Leased | 88 | Leased | 90 | October 2016 - The Q-Rating changed from a Q-2 to a Q-1 due to BUILDER removing repair dollars from the overall requirements for the following systems: Fire Alarm and Detection, HVAC - Distribution and Electrical - Lighting and Branch Wiring. | 9/8/14 | ||
| Pacific | Kubasaki HS | 2015 | Q-3 | 71 | Q-3 | 72 | 5/21/15 | ||
| Europe | Lajes ES/HS | Closed | Closed | 5/16/12 | |||||
| Europe | Lakenheath ES | Q-1 | 93 | Q-1 | 93 | 12/8/14 | |||
| Europe | Lakenheath HS | 2014 | Q-3 | 75 | Q-3 | 76 | 12/15/14 | ||
| Europe | Lakenheath MS | Q-1 | 100 | Q-1 | 98 | 12/3/14 | |||
| Europe | Landstuhl ES/MS | 2020 | Q-3 | 76 | Q-3 | 78 | 9/8/14 | ||
| Pacific | Lanham ES | Q-3 | 62 | Q-3 | 63 | February 2016 - The Q-Rating changed from a Q-2 to a Q-3. |
Building 989 degraded from a Q-2 to a Q-3 at the time of the assessment.
Building 991 remained a Q-1.
Building 992 degraded from a Q-2 to a Q-3 at the time of assessment.
Building 993 remained a Q-3.
Building 994 remained a Q-2.
Building 995 degraded from a Q-3 to a Q-4 at the time of assessment.
Building 996 degraded from a Q-2 to a Q-4 as a result of the DoDEA policy regarding temporary facilities.
Building 997 degraded from a Q-1 to a Q-4 as a result of the DoDEA policy regarding temporary facilities.
Building 998 remained a Q-3.
| Building 999 degraded from a Q-2 to a Q-4 as a result of the DoDEA policy regarding temporary facilities. | 9/24/15 | |||||||
| Americas | Lejeune HS | 2015 | Q-3 | 74 | Q-2 | 89 | April 2017 - The Q-Rating changed from a Q-4 to a Q-2. |
Building 1947 degraded from a Q-1 to a Q-4 at the time of the assessment. Since the time of previous assessment roof coverings, plumbing fixtures, and terminal and package units have expired due to BUILDER rating methodology.
Building 821 remained a Q-1.
Building 835 improved from a Q-3 to a Q-2 at the time of the assessment. Since the time of previous assessment interior doors, specialties, floor finishes, heat generating systems, and lighting and branch wiring are no longer expired due to BUILDER rating methodology.
Building 835B remained a Q-1.
Building 836 degraded from a Q-1 to a Q-2 at the time of the assessment. Since the time of previous assessment roof coverings, sanitary waste, and distribution systems have expired due to BUILDER rating methodology.
| Building S589 remained a Q-1. | 1/19/17 | |||||||
| Pacific | Lester MS | Q-2 | 83 | Q-2 | 85 | 4/10/15 | ||
| Europe | Liberty IS | Q-1 | 93 | Q-1 | 94 | 12/11/14 | ||
| Americas | Lincoln ES | Closed | Closed | 4/10/13 | ||||
| Europe | Livorno ES/MS | Q-3 | 77 | Q-3 | 78 | 1/29/14 | ||
| Americas | Loyd ES | Closed | Closed | 12/12/16 | ||||
| Americas | Lucas ES | Q-2 | 82 | Q-3 | 67 | March 2017 - The Q-Rating changed from a Q-2 to a Q-3. Outlined below is the updated summary information as per the final FCAR. |
| Building 2115 degraded from a Q2 to a Q3 at the time of assessment. Since the time of the previous assessment specialties, floor finishes, plumbing fixtures, cooling generating systems, terminal and package units, and distribution systems have been expired due to BUILDER rating methodology. | 10/10/16 | ||||||||
| Americas | MacDonald IS | Q-3 | 60 | Q-3 | 60 | 9/23/13 | |||
| Americas | Mahaffey MS | Q-3 | 77 | Q-3 | 79 | 10/6/16 | |||
| Europe | Mannheim ES | Closed | Closed | 11/2/11 | |||||
| Americas | Marshall ES | 2014 | Q-1 | 100 | Q-1 | 100 | 2016 - The new Marshall ES replaces the old Marshall ES. | 10/14/16 | |
| Americas | Maxwell AFB ES/MS | 2016 | Q-2 | 83 | Q-3 | 70 | March 2017 - The Q-Rating changed from a Q-2 to a Q-3. Outlined below is the updated summary information as per the final FCAR. |
Building 538 degraded from a Q-2 to a Q-3 at the time of the assessment. Since the time of the previous assessment distribution systems have been expired due to BUILDER rating methodology.
| 11/15/16 | ||||||||
| Americas | McBride ES | 2012 | Q-1 | 100 | Q-1 | 100 | June 2016 - The Q-Rating changed from a Q-3 to a Q-1. The new McBride ES replaces the old McBride ES. | 12/14/16 |
| Americas | McCool ES/MS | Q-1 | 97 | Q-2 | 89 | October 2016 - The Q-Rating changed from a Q-1 to a Q-2 due to systems expiration at fiscal year rollover: Toilet Partitions and Accessories and HVAC Cooling Equipment. | 7/30/13 | |
| Pacific | Mendel ES | 2019 | Q-2 | 81 | Q-2 | 82 | January 2016 - The Q-Rating changed from a Q-4 to a Q-2. |
Building 4355 was demolished and Building 4360 was constructed since the last assessment.
Building 4306 was under renovation including asbestos abatement at the time of the assessment. Building 4306 improved from a Q-4 to a Q-3 at the time of assessment.
Building 4307 improved from a Q-4 to a Q-3 at the time of assessment.
Building 4315 improved from a Q-4 to a Q-3 at the time of assessment.
Building 4319 improved from a Q-4 to a Q-2 at the time of assessment. Since the time of the previous assessment various portions of the exterior doors, windows, interior doors, casework and specialties were extended due to condition. Branch circuits, electrical service distribution and emergency lights were extended due to the increase in BUILDER for these hidden systems.
Building 4320 improved from a Q-3 to a Q-2 at the time of assessment.
| Building 4360 is a Q-1. | 8/11/15 | ||||||||
| Europe | Menwith Hill ES/HS | 2013 | Closed | Closed | 12/15/14 | ||||
| Americas | Mudge ES | 2014 | Closed | Closed | 9/25/13 | ||||
| Americas | Murray ES | Q-1 | 100 | Q-1 | 100 | 9/7/16 | |||
| Americas | Murray PS | Closed | Closed | 2/7/13 | |||||
| Europe | Naples ES | Leased | 84 | Leased | 83 | 2/6/14 | |||
| Europe | Naples MS/HS | Leased | 82 | Leased | 83 | 2/11/14 | |||
| Europe | Netzaberg ES | Q-1 | 100 | Q-1 | 100 | 5/6/14 | |||
| Europe | Netzaberg MS | 2012 | Q-1 | 100 | Q-1 | 100 | June 2016 - The School GSF was increased by 6,134 SF with the addition of Bldg 9065. | 5/9/14 | |
| Pacific | Osan ES | 2013 | Q-1 | 100 | Q-1 | 100 | June 2016 - The Q-Rating changed from a Q-3 to a Q-1. The new Osan ES replaces the old Osan ES. | 7/30/15 | |
| Pacific | Osan HS | Q-3 | 78 | Q-3 | 79 | January 2016 - The Q-Rating changed from a Q-2 to a Q-3. |
Building 470 degraded from a Q-1 to a Q-4 at the time of assessment. Since the time of the previous assessment various portions of the exterior doors, wall finishes, ceiling finishes, terminal package units, controls and instrumentation, fire alarm and detection systems and lighting have been expired.
Building 471 degraded from a Q-1 to a Q-3 at the time of assessment. Since the time of the previous assessment various portions of the exterior doors, exterior door hardware, floor finishes, heat generating, fire alarm distribution, lighting, communications and security, and other electrical systems have all expired.
Building 472 degraded from a Q-2 to a Q-3 at the time of assessment.
Building 473 degraded from a Q-2 to a Q-3 at the time of assessment.
Building 493 remained a Q-1.
Building 494 remained a Q-1.
Building 495 remained a Q-1.
Building 727 remained a Q-1.
| Building 730 remained a Q-1. | 7/27/15 | ||||||||
| Pacific | Osan MS | Q-1 | 100 | Q-1 | 99 | 7/23/15 | |||
| Europe | Patch ES | 2016 | Closed | Closed | 2016 - Old Patch ES closed. | 3/31/14 | |||
| Europe | Patch ES (Formerly Boeblingen ES/MS) | Q-1 | 95 | Q-1 | 95 | 4/2/14 | |||
| Europe | Patch MS (Formerly Patch HS) | Q-2 | 88 | Q-2 | 87 | June 2016 - The School GSF was reduced by 11,684 SF due to the closing of Patch ES building 2387 which was shared with Patch MS (Formerly Patch HS). |
| October 2015 - The Q-Rating changed from a Q-1 to a Q-2 due to systems expiration at fiscal year rollover: Fire Alarm and Detection Systems, Other Electrical Services and Roof Construction. | 3/26/14 | |||||||
| Europe | Patrick Henry ES | Closed | Closed | 11/3/11 | ||||
| Pacific | Perry ES | Q-3 | 61 | Q-3 | 63 | February 2016 - The Q-Rating changed from a Q-2 to a Q-3. |
Building 553 degraded from a Q-1 to a Q-3 at the time of assessment. Since the time of the previous assessment various portions of emergency egress doors, service sinks, water coolers, fan coil units, fire alarm detection system, fire alarm distribution, energy management control, emergency lighting and lighting equipment systems have expired.
Building 554 degraded from a Q-3 to a Q-4 as a result of the DoDEA policy regarding temporary facilities.
Building 555 remained a Q-3.
Building 556 degraded from a Q-1 to a Q-3 at the time of assessment. Since the time of the previous assessment various portions of roof coverings, composition sheet floor finishes, sinks, acoustical tile ceiling finishes, hot and chilled water distribution, fan coils, lighting equipment and electrical service have expired.
| Building 564 degraded from a Q-2 to a Q-4 as a result of the DoDEA policy regarding temporary facilities. | 10/5/15 | ||||||||
| Pacific | Perry HS | Q-3 | 71 | Q-3 | 74 | 10/7/15 | |||
| Americas | Pierce ES | 2012 | Closed | Closed | 9/16/13 | ||||
| Americas | Pierce Terrace ES | 2016 | Q-3 | 72 | Q-3 | 79 | 8/23/16 | ||
| Americas | Pinckney ES | Q-1 | 94 | Q-3 | 77 | February 2017 - The Q-Rating changed from a Q-1 to a Q-3. Outlined below is the updated summary information as per the final FCAR. |
| Building 5900 decreased from a Q-1 to a Q-3 at the time of assessment. Since the time of the previous assessment casework, toilet partitions, wall finishes, and LAN systems are no longer expired due to BUILDER rating methodology. Portions of the interior flooring, plumbing fixtures, chilled and hot water Hydronic piping, fire alarm distribution system, intercom system, and the telephone system have expired since the time of the previous assessment. | 7/25/16 | ||||||||
| Americas | Pope ES | 2014 | Closed | Closed | 2/15/13 | ||||
| Americas | Quantico MS/HS | 2014 | Q-4 | 55 | Q-3 | 64 | March 2017 - The Q-Rating changed from a Q-4 to a Q-3. Outlined below is the updated summary information as per the final FCAR. |
Building 3307 improved from a Q-4 to a Q-3 at the time of assessment. Since the time of the previous assessment heat generating systems, specialties, wall finishes, ceiling finishes, and lighting and branch wiring are no longer expired due to BUILDER rating methodology.
Building 3307B improved from a Q-4 to a Q-2 at the time of assessment. Since the time of the previous assessment communications and security is no longer expired due to BUILDER rating methodology.
Building 3307C improved from a Q-4 to a Q-2 at the time of assessment. Since the time of the previous assessment communications and security is no longer expired due to BUILDER rating methodology.
Building 3307S degraded from a Q-1 to a Q-2 at the time of assessment. Since the time of the previous assessment lighting and branch wiring and exterior walls have been expired due to BUILDER rating methodology.
| 11/10/16 | ||||||||
| Europe | Rainbow ES | Closed | Closed | 5/7/14 | ||||
| Americas | Ramey School | 2018 | Q-4 | 56 | Q-4 | 55 | 8/13/13 | |
| Europe | Ramstein ES | Q-1 | 98 | Q-1 | 95 | 7/18/14 | ||
| Europe | Ramstein HS | 2014 | Q-3 | 78 | Q-3 | 78 | 7/28/14 | |
| Europe | Ramstein IS | Q-1 | 97 | Q-1 | 93 | 7/10/14 | ||
| Europe | Ramstein MS | Q-1 | 97 | Q-1 | 97 | 7/15/14 | ||
| Europe | Robinson Barracks ES | 2018 | Q-3 | 76 | Q-3 | 78 | 4/4/14 | |
| Europe | Rota ES | 2016 | Q-1 | 99 | Q-1 | 98 | 1/21/15 | |
| Europe | Rota MS/HS | 2016 | Q-1 | 100 | Q-1 | 99 | 1/21/15 | |
| Americas | Russell ES | Closed | Closed | 5/20/13 | ||||
| Pacific | Ryukyu MS | Q-1 | 99 | Q-1 | 99 | 3/17/15 | ||
| Pacific | Sasebo ES | 2013 | Q-4 | 43 | Q-4 | 50 | June 2016 - The School GSF was reduced by 25,384 SF due to building 1425 being demolished. |
February 2016 - The Q-Rating changed from a Q-3 to a Q-4.
Building 502 remained a Q-4.
Building 1425 remained a Q-3.
| Building 1530 remained a Q-3. | 9/21/15 | ||||||||
| Europe | Schweinfurt ES/MS | Closed | Closed | 4/28/11 | |||||
| Europe | Schweinfurt HS | Closed | Closed | 4/24/11 | |||||
| Americas | Scott MS | Q-3 | 76 | Q-3 | 72 | 9/20/13 | |||
| Europe | Sembach ES | 2017 | Q-3 | 67 | Q-3 | 68 | 7/22/14 | ||
| Europe | Sembach MS | 2017 | Q-3 | 76 | Q-3 | 72 | 7/24/14 | ||
| Pacific | Seoul ES | Q-3 | 79 | Q-2 | 80 | October 2016 - The Q-Rating changed from a Q-3 to a Q-2 due to BUILDER removing repair dollars from the overall requirements for the following systems: Electrical - Communications and Security, Electrical - Lighting and Branch Wiring, Electrical Service and Distribution, HVAC - Cooling Generating, HVAC - Distribution, HVAC - Energy Supply, Fire Protection - Standpipe Systems, HVAC - Terminal and Package Units, Other Electrical Services and Plumbing Fixtures. |
January 2016 - The Q-Rating changed from a Q-4 to a Q-3. The summary posted in the October 2015 Q-Rating Report inadvertantly reflected "in-progress data". Outlined below is the updated summary information as per the final FCAR which includes feedback from the Area Office.
Building 3579 degraded from a Q-1 to a Q-2 at the time of the assessment.
Building 3580 degraded from a Q-2 to a Q-3 at the time of the assessment.
Building 7000 degraded from a Q-2 to a Q-3 at the time of the assessment.
Building 7001 degraded from a Q-1 to a Q-2 at the time of the assessment.
Building 7002 degraded from a Q-2 to a Q-4 at the time of assessment. Since the time of the previous assessment exterior doors, exterior finishes, steep slope roof system, domestic water equipment, gas supply, hot water distribution system and lighting equipment have expired due to BUILDER methodology.
Building 7007 improved from a Q-3 to a Q-2 at the time of assessment.
Building 7008 remained a Q-2.
Building 7009 improved from a Q-2 to a Q-1 at the time of assessment.
Building 7097 remained from a Q-3.
October 2015 - The Q-Rating changed from a Q-2 to a Q-4.
Building 3579 degraded from a Q-1 to a Q-3 at the time of the assessment.
Building 3580 degraded from a Q-2 to a Q-3 at the time of the assessment.
Building 7000 degraded from a Q-2 to a Q-3 at the time of the assessment.
Building 7001 degraded from a Q-1 to a Q-4 at the time of the assessment.
Building 7002 degraded from a Q-2 to a Q-4 at the time of assessment. Since the time of the previous assessment exterior doors, exterior finishes, roof coverings, domestic waste, sanitary waste, heating generating systems, distribution systems, lighting and branch wiring, energy supply, electrical service and distribution, fire alarm and detection systems are expired due to BUILDER methodology.
Building 7007 remained a Q-3.
Building 7008 degraded from a Q-1 to a Q-2 at the time of the assessment..
Building 7009 improved from a Q-2 to a Q-1 at the time of assessment.
| Building 7097 remained a Q-3. | 6/15/15 | ||||||
| Pacific | Seoul HS | Q-2 | 83 | Q-2 | 86 | October 2015 - The Q-Rating changed from a Q-3 to a Q-2. |
Building 1182 improved from a Q-3 to a Q-2 at the time of assessment.
Building 3642 degraded from a Q-1 to a Q-3 at the time of assessment. Since the time of the previous assessment various portions of the communications, electrical service and distribution, terminal and package units, distributions systems, heating and generating systems, sanitary waste, domestic water distribution, floor finishes and roof coverings have expired.
Building 3643 remained a Q-3.
Building 3644 improved from a Q-3 to a Q-2 at the time of assessment.
Building 3646 improved from a Q-4 to a Q-3 at the time of assessment.
| Building 3649 remained a Q-1. | 6/19/15 | ||||||
| Pacific | Seoul MS | Q-2 | 83 | Q-2 | 84 | January 2016 - The Q-Rating changed from a Q-3 to a Q-2. Outlined below is the updated summary information as per the final FCAR which includes feedback from the Area Office. |
Building 3559 remained a Q-2.
Building 3560 improved from a Q-2 to a Q-1 at the time of assessment.
Building 3561 improved from a Q-2 to a Q-1 at the time of assessment.
Building 3562 improved from a Q-3 to a Q-1 at the time of assessment. Branch circuits, exterior doors and windows are no longer expired due to BUILDER rating methodology.
Building 3563 remained a Q-2.
Building 3564 improved from a Q-3 to a Q-1 at the time of assessment. Exterior doors, exterior windows and roof coverings are no longer expired due to increased life cycles BUILDER for these systems. Exterior walls and exterior finishes remain expired, however, BUILDER requirements are lower then the previous cost models predicted.
Building 3565 improved from a Q-3 to a Q-2 at the time of assessment.
Building 3567 degraded from a Q-1 to a Q-2 at the time of assessment.
Building 3568 degraded from a Q-1 to a Q-3 at the time of assessment. Since the time of the previous assessment various portions of plumbing fixtures, heating and computer cooling generating system, exhaust system and telecommunications system have expired.
Building 3569 remained a Q-3.
Building 3577 remained a Q-3.
Building 3641 remained a Q-1.
Building 4104 improved from a Q-3 to a Q-2 at the time of assessment.
| Building Studio remained a Q-1. | 6/9/15 | ||||||||
| Europe | Sevilla ES/MS | Q-2 | 86 | Q-2 | 82 | 1/29/15 | |||
| Europe | SHAPE ES | Q-1 | 100 | Q-1 | 100 | 2/24/12 | |||
| Europe | SHAPE HS | Q-1 | 90 | Q-1 | 90 | 2/4/15 | |||
| Europe | SHAPE MS | Q-1 | 100 | Q-1 | 100 | 2/24/12 | |||
| Americas | Shughart ES | Q-1 | 98 | Q-1 | 100 | 7/14/16 | |||
| Americas | Shughart MS | Q-1 | 98 | Q-1 | 100 | 7/14/16 | |||
| Europe | Sigonella ES | Q-1 | 100 | Q-1 | 97 | 1/29/14 | |||
| Europe | Sigonella MS/HS | Q-1 | 100 | Q-1 | 97 | 1/31/14 | |||
| Europe | Smith ES | 2022 | Q-3 | 73 | Q-3 | 76 | 9/25/14 | ||
| Pacific | Sollars ES | Q-2 | 85 | Q-2 | 84 | 7/23/15 | |||
| Europe | Spangdahlem ES | 2018 | Q-3 | 78 | Q-3 | 79 | 7/11/14 | ||
| Europe | Spangdahlem MS | Q-2 | 81 | Q-2 | 83 | 7/9/14 | |||
| Pacific | Stearley Heights ES | 2020 | Q-2 | 81 | Q-2 | 84 | 4/7/15 | ||
| Americas | Stowers ES | Q-1 | 90 | Q-2 | 86 | April 2017 - The Q-Rating changed from a Q-1 to a Q-2. |
Building 9610 degraded from a Q-1 to a Q-2 at the time of assessment. Since the time of the previous assessment distribution systems are expired due to BUILDER rating methodology.
| Building 9611 degraded from a Q-1 to a Q-2 at the time of assessment. Since the time of the previous assessment distribution systems are expired due to BUILDER rating methodology. | 12/12/16 | ||||||||
| Europe | Stuttgart ES | Q-1 | 100 | Q-1 | 100 | 2016 - New School | 12/31/99 | ||
| Europe | Stuttgart HS | Q-1 | 100 | Q-1 | 100 | 2016 - New School | 12/31/99 | ||
| Pacific | Sullivans ES | 2021 | Q-3 | 79 | Q-2 | 81 | October 2016 - The Q-Rating changed from a Q-3 to a Q-2 due to the DoD pricing guide updates and to BUILDER removing repair dollars from the overall requirements for the following systems: Electrical - Lighting and Branch Wiring, Electrical - Other Electrical Services, Electrical Service and Distribution, HVAC - Cooling Generating, HVAC - Distribution, Plumbing Fixtures, and Roof Coverings. | ||
| 10/12/15 | |||||||||
| Americas | Tarawa Terrace ES | Q-1 | 96 | Q-1 | 100 | 1/20/17 | |||
| Americas | Van Voorhis ES | 2014 | Q-4 | 49 | Q-4 | 46 | 9/18/13 | ||
| Europe | Vicenza ES | Q-1 | 100 | Q-1 | 100 | 2/6/14 | |||
| Europe | Vicenza HS | 2018 | Q-3 | 78 | Q-3 | 78 | 1/31/14 | ||
| Europe | Vicenza MS | Q-1 | 100 | Q-1 | 100 | 2/6/14 | |||
| Europe | Vilseck ES | Q-1 | 95 | Q-1 | 96 | 4/30/14 | |||
| Europe | Vilseck HS | Q-1 | 95 | Q-1 | 95 | 4/30/14 | |||
| Europe | Vogelweh ES | 2013 | Q-1 | 90 | Q-1 | 92 | 7/23/14 | ||
| Americas | W.T. Sampson School | 2015 | Q-4 | 50 | Q-3 | 64 | March 2017 - The Q-Rating changed from a Q-4 to a Q-3. Outlined below is the updated summary information as per the final FCAR. |
Building 1681 improved from a Q4 to a Q-3 at the time of assessment. Since the previous assessment, the distribution systems have expired due to BUILDER rating methodology. The exterior windows, roof coverings, specialties, floor finishes, ceiling finishes, plumbing fixtures, domestic water distribution, and heat generating systems remain expired; however, BUILDER requirements are lower than the previous cost models predicted.
Building 2124 improved from a Q-4 to a Q3 at the time of assessment. The distribution system and roof coverings have expired since the last assessment. In addition, the domestic water distribution and specialties remain expired; however, BUILDER requirements are lower than the previous cost models predicted.
Building 2124F degraded from a Q-3 to a Q4 at the time of assessment. Floor finishes, domestic water distribution systems, and specialties remain expired, however, BUILDER requirements are lower than the previous cost models predicted. The distribution systems and plumbing fixtures have expired since the last assessment due to BUILDER rating methodology.
Building 2124G remained a Q3.
| Building 2124H degraded from a Q1 to a Q-4 at the time of assessment. Since the previous assessment exterior doors and roof covering remain expired; however, BUILDER requirements are high than the previous cost models predicted. In addition, the plumbing Fixtures, branch wiring, and other electrical services have expired due to BUILDER rating methodology. | 9/6/16 | ||||||||
| Americas | Walker IS | Closed | Closed | 9/16/13 | |||||
| Americas | Wassom MS | Q-3 | 74 | Q-3 | 63 | 10/4/16 | |||
| Americas | Welch ES / Dover AFB MS | 2017 | Q-3 | 63 | Q-3 | 63 | 8/13/13 | ||
| Americas | West Point ES | 2016 | Q-3 | 68 | Q-3 | 70 | 8/25/16 | ||
| Americas | West Point MS | Q-1 | 97 | Q-1 | 93 | September 2015 - The Q-Rating changed from a Q-2 to a Q-1. Building 705D was added to the inventory. Additionally, Building 705 had an addition that was demolished. | 8/23/16 | ||
| Europe | Wetzel ES | 2012 | Closed | Closed | 9/4/14 | ||||
| Americas | White ES | 2014 | Q-3 | 69 | Q-3 | 66 | 12/8/16 | ||
| Europe | Wiesbaden HS | 2013 | Q-1 | 100 | Q-1 | 100 | 5/19/14 | ||
| Europe | Wiesbaden MS | 2014 | Q-3 | 76 | Q-3 | 78 | 9/19/14 | ||
| Americas | Wilson ES | Q-2 | 80 | Q-2 | 84 | October 2015 - The Q-Rating changed from a Q-1 to a Q-2 due to systems expiration at fiscal year rollover: Plumbing Fixtures, Wall Finishes and Roof Coverings. | 12/14/16 | ||
| Pacific | Yokosuka MS | Q-1 | 98 | Q-1 | 99 | 10/16/15 | |||
| Pacific | Yokota HS | 2012 | Q-3 | 77 | Q-2 | 81 | October 2016 - The Q-Rating changed from a Q-3 to a Q-2 due to the DoD pricing guide updates and to BUILDER removing repair dollars from the overall requirements for the following systems: Electrical - Communications and Security, Electrical - Lighting and Branch Wiring, Electrical Service and Distribution, Fire Alarm and Detection, HVAC - Cooling Generating, HVAC - Distribution, HVAC - Energy Supply, HVAC - Terminal and Package Units, Other Electrical Services, Plumbing - Sanitary Waste, and Plumbing Fixtures. |
January 2016 - The Q-Rating changed from a Q-4 to a Q-3.
Building 4117 improved from a Q-4 to a Q-3 at the time of assessment.
Building 4118 remained a Q-3.
Building 4156 improved from a Q-4 to a Q-3 at the time of assessment.
Building 4157 improved from a Q-4 to a Q-2 at the time of assessment. Since the time of the previous assessment exterior doors, exterior windows, ceiling finishes, interior doors, specialties, wall finishes are no longer expired due to Builder rating methodology. Plumbing and piping, branch circuits, sprinklers and air distribution heat and cooling ductwork were extended due to increased life cycles in Builder for these concealed systems.
Building 4158 improved from a Q-4 to a Q-3 at the time of the assessment.
Building 4159 improved from a Q-4 to a Q-3 at the time of the assessment.
Building 4160 degraded from a Q-1 to a Q-2 at the time of the assessment.
Building 4161 degraded from a Q-1 to a Q-2 at the time of the assessment.
Building 4189 improved from a Q-4 to a Q-3 at the time of assessment.
| Yokota High School Maintenance improved from a Q-4 to a Q-1 at the time of the assessment. The previous assessment was truncated and the one-line cost model had expired; current BUILDER assessment classifies the building as a Q-1. | 8/24/15 | ||||||
| Pacific | Yokota MS | Q-1 | 96 | Q-1 | 96 | January 2016 - The Q-Rating changed from a Q-2 to a Q-1. |
Building 4154 was not accessible due to construction at the time of the visit. Building 4154 improved from a Q-2 to a Q-1 at the time of assessment.
| Building 4155 improved from a Q-2 to a Q-1 at the time of assessment. | 8/19/15 | |||||||
| Pacific | Yokota West ES | 2022 | Q-2 | 82 | Q-2 | 83 | January 2016 - The Q-Rating changed from a Q-3 to a Q-2. |
Building 1236 remained a Q-1.
Building 1238 degraded from a Q-3 to a Q-4.
Building 1239 improved from a Q-3 to a Q-2.
| Building 1240 remained a Q-3. | 8/14/15 | ||||||
| Pacific | Zama American MS | Q-2 | 82 | Q-2 | 84 | February 2016 - The Q-Rating changed from a Q-3 to a Q-2. |
Building 906 improved from a Q-4 to a Q-3 at the time of assessment.
Building 912 remained a Q-3.
Building 913 improved from a Q-4 to a Q-2. Since the time of the previous assessment interior doors, casework and the exterior enclosure are no longer expired due to BUILDER methodology.
Building 9131 improved from a Q-3 to a Q-2 at the time of the assessment.
| Building 915 improved from a Q-3 to a Q-2 at the time of assessment. | 10/2/15 | |||||||
| Pacific | Zama HS | 2013 | Q-2 | 80 | Q-3 | 79 | October 2016 - The Q-Rating changed from a Q-2 to a Q-3 due to systems expiration at fiscal year rollover: Exterior Enclosure - Exterior Doors By Type, HVAC - Distribution, Interior Construction - Partitions, Interior Construction - Specialties, Interior Construction - Interior Doors By Type, Interior Finishes - Ceiling Finishes, Interior Finishes - Wall Finishes, and Plumbing Fixtures. |
February 2016 - The Q-Rating changed from a Q-3 to a Q-2.
Building 1729 improved from a Q-3 to a Q-1 at the time of assessment. Since the time of the previous assessment exterior metal wall panels have been renewed.
Building 906 improved from a Q-4 to a Q-3 at the time of assessment.
Building 911 remained a Q-1.
Building 915 improved from a Q-3 to a Q-2 at the time of assessment.
Building 917 Improved from a Q-3 to a Q-1 at the time of assessment. Since the time of the previous assessment plumbing piping, branch wiring and lighting were extended due to increased life cycles in BUILDER for these concealed systems.
Building 918 remained a Q-4.
Building 919 remained a Q-1.
Building 997 degraded from a Q-3 to a Q-4 at the time of assessment.
| Building 998 degraded from a Q-2 to a Q-4 as a result of the DoDEA policy regarding temporary facilities. | 10/6/15 | |||||||
| Pacific | Zukeran ES | 2013 | Q-4 | 52 | Q-4 | 52 | 4/9/12 |
Denotes schools that have experienced Q-Rating change since the Annual Lock.
2 April 2017 Q-Rating Report
| Annual Condition (July 2011) | Condition as of August 2011 | Condition as of September 2011 | Condition as of October 2011 | Condition as of November 2011 | Condition as of December 2011 | Condition as of January 2012 | |||||||||||||||||||||||||||||||||||||||||||
| (June 2014) | Condition as of July 2014 | Condition as of August 2014 | Condition as of September 2014 | Condition as of October 2014 | Condition as of November 2014 | Condition as of December 2014 | Condition as of January 2015 | ||||||||||||||||||||||||||||||||||||||||||
| (July 2015) | Condition as of August 2015 | Condition as of September 2015 | Condition as of October 2015 | Condition as of November 2015 | Condition as of December 2015 | Condition as of January 2016 | Condition as of February 2016 | ||||||||||||||||||||||||||||||||||||||||||
| BAND | SERVICE | DISTRICT | INSTALLATION as completed by Paul and Scott | ||||||||||||||||||||||||||||||||||||||||||||||
| (Legacy) | INSTALLATION as completed by Irene, Russ, and Sheila | ||||||||||||||||||||||||||||||||||||||||||||||||
| (Legacy) | Location on 2013 1391s | ||||||||||||||||||||||||||||||||||||||||||||||||
| (Legacy) | MAP LOCATION | ||||||||||||||||||||||||||||||||||||||||||||||||
| (Legacy) | REGION | SCHOOL NAME | INSTALLATION | STATE OR COUNTRY | 2009 CONGR Q-RATING | Q RATING | CONDITION INDEX | Q RATING | CONDITION INDEX | Q/CI CHANGE COMMENTS AUGUST 2011 | Q RATING | CONDITION INDEX | EFCI Q RATING | EFCI | DATE OF LAST ASSESSMENT | Q/CI CHANGE COMMENTS SEPTEMBER 2011 | Q RATING | CONDITION INDEX | EFCI Q RATING | EFCI | DATE OF LAST ASSESSMENT | GSF | Q/CI CHANGE COMMENTS OCTOBER 2011 | Q RATING | CONDITION INDEX | EFCI Q RATING | EFCI | DATE OF LAST ASSESSMENT | GSF | Q/CI CHANGE COMMENTS NOVEMBER 2011 | Q RATING | CONDITION INDEX | EFCI Q RATING | EFCI | DATE OF LAST ASSESSMENT | GSF | Q/CI CHANGE COMMENTS DECEMBER 2011 | Q RATING | CONDITION INDEX | EFCI Q RATING | EFCI | DATE OF LAST ASSESSMENT | GSF | Q/CI CHANGE COMMENTS JANUARY 2012 | Q RATING | CONDITION INDEX | EFCI Q RATING | EFCI | DATE OF LAST ASSESSMENT |
| 9 | Army | Europe West District | USAG Benelux | USAG Schinnen | USAG Schinnen | Europe | AFNORTH ES | US Army Garrison Benelux | Netherlands | Q-2 | Q-2 | 86 | Q-2 | 86 | Q-2 | 86 | Sep-11 | Q-2 | 86 | Q-3 | 72 | Sep-11 | 292,972 | Q-1 | 93 | Q-2 | 83 | Sep-11 | 292,972 | The flooring project was completed in 2010 thereby improving the overall CI/Q-Rating. | Q-1 | 93 | Q-2 | 83 | Sep-11 | 290,262 | ALPHA is aware the total GSF does not reflect the current GSF data submitted in the 95% submittal to DoDEA (sent on 12/29/11 by Michael Schneider). The January 2012 Q-Rating Report will reflect the GSF changes. | Q-1 | 92 | Q-2 | 81 | Sep-11 | |||||||
| 9 | Army | Europe West District | USAG Benelux | USAG Schinnen | USAG Schinnen | Europe | AFNORTH MS/HS | US Army Garrison Benelux | Netherlands | ||||||||||||||||||||||||||||||||||||||||
| 8 | Army | Americas Mid-Atlantic District | Fort Bragg | USAG Ft Bragg | USAG Ft Bragg | Americas | Albritton MS | Fort Bragg | North Carolina | Q-3 | Q-1 | 93 | Q-1 | 93 | Q-1 | 93 | Q-1 | 93 | Q-3 | 65 | Mar-10 | 98,865 | Q-1 | 93 | Q-3 | 65 | Mar-10 | 98,865 | Q-1 | 93 | Q-3 | 65 | Mar-10 | 98,865 | Q-1 | 93 | Q-3 | 65 | Mar-10 | ||||||||||
| 4 | Air Force | Europe West District | RAF Alconbury | RAF Alconbury | RAF Alconbury | Europe | Alconbury ES | RAF Alconbury | United Kingdom | Q-4 | Q-3 | 73 | Q-3 | 73 | Q-3 | 73 | Q-3 | 73 | Q-4 | 44 | Feb-09 | 37,349 | Q-3 | 73 | Q-4 | 44 | Feb-09 | 37,349 | Q-3 | 73 | Q-4 | 44 | Feb-09 | 37,349 | Q-3 | 63 | Q-4 | 44 | Feb-09 | ||||||||||
| 4 | Air Force | Europe West District | RAF Alconbury | RAF Alconbury | RAF Alconbury | Europe | Alconbury MS/HS | RAF Alconbury | United Kingdom | Q-4 | Q-3 | 68 | Q-3 | 68 | Q-3 | 68 | Q-3 | 68 | Q-4 | 39 | Feb-09 | 81,029 | Q-3 | 68 | Q-4 | 39 | Feb-09 | 81,029 | Q-3 | 68 | Q-4 | 39 | Feb-09 | 81,029 | Q-4 | 53 | Q-4 | 38 | Feb-09 | ||||||||||
| 9 | Air Force | Pacific South District | Anderson AB | Anderson AB | Anderson AB | Pacific | Andersen ES | NSA Andersen | Guam | Q-2 | Q-1 | 91 | Q-1 | 91 | Q-1 | 91 | Q-1 | 91 | Q-3 | 70 | Aug-10 | 196,807 | Q-1 | 91 | Q-3 | 70 | Aug-10 | 196,807 | Q-1 | 91 | Q-3 | 70 | Aug-10 | 196,807 | Q-2 | 88 | Q-3 | 70 | Aug-10 | ||||||||||
| 9 | Air Force | Pacific South District | Anderson AB | Anderson AB | Anderson AB | Pacific | Andersen MS | NSA Andersen | Guam | Q-2 | Q-1 | 90 | Q-1 | 90 | Q-1 | 90 | Q-1 | 90 | Q-3 | 70 | Jul-10 | 94,258 | Q-1 | 90 | Q-3 | 70 | Jul-10 | 94,258 | Q-1 | 90 | Q-3 | 70 | Jul-10 | 94,258 | Q-1 | 90 | Q-3 | 70 | Jul-10 | ||||||||||
| 4 | Air Force | Europe South District | Incirlik AB | Ankara Air Station | Ankara Air Station | Europe | Ankara ES/HS | Incirlik AB | Turkey | Q-4 | Q-3 | 69 | Q-3 | 69 | Q-3 | 69 | Q-3 | 69 | Q-4 | 49 | Apr-09 | 81,860 | Q-3 | 69 | Q-4 | 49 | Apr-09 | 81,860 | Q-3 | 69 | Q-4 | 49 | Apr-09 | 81,860 | Q-3 | 67 | Q-4 | 48 | Apr-09 | ||||||||||
| 7 | Army | Europe East District | USAG Ansbach | Barton Barracks - Ansbach | USAG Ansbach | Europe | Ansbach ES | US Army Garrison Ansbach | Germany | Q-3 | Q-3 | 64 | Q-2 | 89 | Q-2 | 89 | Jun-11 | Q-2 | 89 | Q-4 | 47 | Jun-11 | 41,384 | Q-2 | 89 | Q-4 | 47 | Jun-11 | 41,384 | Q-2 | 89 | Q-4 | 47 | Jun-11 | 41,384 | Q-1 | 90 | Q-4 | 49 | Jun-11 | |||||||||
| 7 | Army | Europe East District | USAG Ansbach | Barton Barracks - Ansbach | USAG Ansbach | Europe | Ansbach MS/HS | US Army Garrison Ansbach | Germany | Q-3 | Q-3 | 70 | Q-2 | 81 | Q-2 | 81 | Jun-11 | Q-2 | 81 | Q-4 | 46 | Jun-11 | 102,648 | Q-2 | 81 | Q-4 | 46 | Jun-11 | 102,648 | Q-2 | 81 | Q-4 | 46 | Jun-11 | 102,648 | Q-2 | 81 | Q-4 | 41 | Jun-11 | |||||||||
| 1 | Army | Americas Mid-Atlantic District | Fort Buchanan | USAG Ft Buchanan | USAG Ft Buchanan | Americas | Antilles ES | Fort Buchanan | Puerto Rico | Q-4 | Q-4 | 59 | Q-3 | 60 | Q-3 | 60 | Q-3 | 60 | Q-4 | 51 | Oct-10 | 69,767 | Q-3 | 60 | Q-4 | 51 | Oct-10 | 69,767 | Q-3 | 60 | Q-4 | 51 | Oct-10 | 69,767 | Q-4 | 56 | Q-4 | 45 | Oct-10 | ||||||||||
| 7 | Army | Americas Mid-Atlantic District | Fort Buchanan | USAG Ft Buchanan | USAG Ft Buchanan | Americas | Antilles HS | Fort Buchanan | Puerto Rico | Q-3 | Q-3 | 70 | Q-3 | 70 | Q-3 | 70 | Q-3 | 70 | Q-4 | 53 | Oct-10 | 94,694 | Q-3 | 70 | Q-4 | 53 | Oct-10 | 94,694 | Q-3 | 70 | Q-4 | 53 | Oct-10 | 94,694 | Q-3 | 69 | Q-4 | 53 | Oct-10 | ||||||||||
| 9 | Army | Americas Mid-Atlantic District | Fort Buchanan | USAG Ft Buchanan | USAG Ft Buchanan | Americas | Antilles MS | Fort Buchanan | Puerto Rico | Q-3 | Q-2 | 86 | Q-2 | 86 | Q-2 | 86 | Q-2 | 86 | Q-3 | 64 | Oct-10 | 83,757 | Q-2 | 86 | Q-3 | 64 | Oct-10 | 83,757 | Q-2 | 86 | Q-3 | 64 | Oct-10 | 83,757 | Q-3 | 74 | Q-4 | 59 | Oct-10 | ||||||||||
| 9 | Army | Pacific East District | Camp Zama | Sagamihara MFH Area - Camp Zama | Camp Zama | Pacific | Arnn ES | Camp Zama | Japan | Q-1 | Q-1 | 98 | Q-1 | 98 | Q-1 | 98 | Q-1 | 98 | Q-1 | 93 | Sep-09 | 109,678 | Q-1 | 98 | Q-1 | 93 | Sep-09 | 109,678 | Q-1 | 98 | Q-1 | 93 | Sep-09 | 109,678 | Q-1 | 98 | Q-1 | 93 | Sep-09 | ||||||||||
| 4 | Marine Corps | Americas Mid-Atlantic District | MCB Quantico | MCB Quantico | MCB Quantico | Americas | Ashurst ES | Marine Corps Base Quantico | Virginia | Q-3 | Q-3 | 77 | Q-3 | 77 | Q-3 | 77 | Q-3 | 77 | Q-3 | 60 | Jun-10 | 49,095 | Q-3 | 77 | Q-3 | 60 | Jun-10 | 49,095 | Q-3 | 77 | Q-3 | 60 | Jun-10 | 49,095 | Q-3 | 72 | Q-4 | 47 | Jun-10 | ||||||||||
| 4 | Army | Europe East District | USAG Wiesbaden | USAG Wiesbaden | USAG Wiesbaden | Europe | Aukamm ES | US Army Garrison Wiesbaden | Germany | Q-3 | Q-4 | 49 | Q-4 | 49 | Q-4 | 49 | Q-4 | 49 | Q-4 | 44 | Dec-08 | 50,170 | Q-4 | 49 | Q-4 | 44 | Nov-11 | 50,170 | Q-2 | 83 | Q-3 | 65 | Nov-11 | 41,593 | Numerous projects were completed since last site survey. | Q-2 | 87 | Q-3 | 69 | Nov-11 | |||||||||
| 9 | Air Force | Europe South District | Aviano AB | Aviano AB | Aviano AB | Europe | Aviano ES | Aviano Air Base | Italy | Q-1 | Q-1 | 98 | Q-1 | 98 | Q-1 | 97 | Q-1 | 97 | Q-1 | 92 | Jun-09 | 145,254 | Q-1 | 97 | Q-1 | 92 | Jun-09 | 145,254 | Q-1 | 97 | Q-1 | 92 | Jun-09 | 145,254 | Q-1 | 97 | Q-2 | 85 | Jun-09 |