Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
W91236-18-B-0005 Gravesite and Cemetery Improvements Project, Administration Building, located at Quantico National Cemetery, Triangle, Virginia is hereby Amended as follow s:
Please see continuation page for Amendment details. Please note that the bid opening date has been extended from 20 February 2018 at 2:00 PM EST to 22 February 2018 at 2:00 PM EST. Please acknow ledge all amendments (0001-0004).
Contracting POC: Stormie Wicks (757) 201.7215 Stormie.B.Wicks@usace.army.mil
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 16-Feb-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9123618B0005
X 9B. DATED (SEE ITEM 11)
12-Jan-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-Feb-2018
CODE
USA ENGINEER DISTRICT, NORFOLK
803 FRONT STREET
NORFOLK VA 23510-1096
W91236 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9123618B0005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SECTION 00 11 00 - SF 1442 AND CLIN SCHEDULE
SUMMARY OF CHANGES
SECTION 00 11 00 - SF 1442 AND CLIN SCHEDULE
The required response date/time has changed from 20-Feb-2018 02:00 PM to 22-Feb-2018 02:00 PM.
SECTION 00 21 00 - INSTRUCTIONS, CONDITIONS & NOTICES TO OFFERORS
The following have been added by full text:
AMENDMENT 0004
Amendment 0004:
Solicitation W91236-18-B-0005 is hereby amended as follows:
1. Please note that the Bid Opening date has been extended from 20 February 2018 at 2:00 PM EST to 22 February 2018 at 2:00 PM EST.
2. Bidders are reminded of the Definitive Responsibility Criteria outlined in section 00 21 00, No. 2 “RESPONSIBILITY DETERMINATION WITH DEFINITIVE RESPONSIBILITY CRITERIA”. While bidders are not required to submit additional documentation related to these criteria at the time of bid, the Government will request supporting documentation in relation to the Definitive Responsibility Criteria from the bidder anticipated to receive the award shortly after bid opening. The apparent low offeror should be prepared to supply the required information within 1 business day of the bid opening.
3. Drawings sheets CG102, CG301, CG302 are deleted. Drawing sheets CD102, GC006, V-102 are hereby incorporated. The three drawings have been revised to reflect the existing conditions based on recent projects completed in the area. The revisions are clouded.
SECTION 00 72 00 - CONTRACT CLAUSES
The following have been modified:
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready
W9123618B0005 for use not later than 209 Calendar days, with all identifiable work associated with the base bids CLIN 0001"Construction of Administration Building" being completed NLT 20 September 2018 and CLIN 0002 “Administration Bldg. Site Work” being completed NLT 15 November 2018. The time stated for completion shall include final cleanup of the premises.
The Government anticipates award on/around 28 February 2018. THE CONTRACTOR MUST FURNISH THE
REQUIRED PERFORMANCE AND PAYMENT BONDS WITHIN 10 DAYS FROM DATE OF CONTRACT
AWARD. The Government intends to issue the Notice to Proceed Modification as soon as possible after Payment and Performance bonds have reviewd and approved.
Please see Section 00 73 00- Special Contract Requirements, No. 3 “Interim Milestone for Construction of Administration Building and Subsequent Protection Measures” for information concerning the Interim Milestone of 20 September 2018 for CLIN 0001: Construction of the Administration Building.
(End of clause)