QUANTICO NATIONAL CEMETERY

BUILDING RENOVATION

AND GRAVESITE IMPROVEMENTS

Triangle, Virginia

USACE Project Number W91236-13-D-0035 / Contract #872CM3038 WTS Project Number 1303-II

BASIS OF DESIGN

Corrected 100% Submittal

Date: 03 November 2017

Waller, Todd & Sadler Architects, Inc.

1909 Cypress Avenue

Virginia Beach, Virginia 23451

TABLE OF CONTENTS

BASIS OF DESIGN

GENERAL

CHAPTER I ARCHITECTURAL

CHAPTER II SITE / CIVIL

CHAPTER III STRUCTURAL

CHAPTER IV PLUMBING

CHAPTER V MECHANICAL

CHAPTER VI ELECTRICAL

CHAPTER VII TELECOM/DATA, CATV, ACCESS CONTROL

CHAPTER VIII FIRE PROTECTION

CHAPTER IX SUSTAINABILITY

CHAPTER X HAZARDOUS MATERIALS

APPENDICES

TAB A GEOTECHNICAL REPORT

TAB B HAZARDOUS MATERIALS REPORT

TAB C FIRE PROTECTION DESIGN ANALYSIS

TAB D STRUCTURAL CALCULATIONS

TAB E PLUMBING CALCULATIONS

TAB F MECHANICAL CALCULATIONS

TAB G ELECTRICAL CALCULATIONS

TAB H GUIDING PRINCIPLES CHECKLIST – LEED/SUSTAINABILITY

GENERAL

1. Directive Authorization

a. Project Title: Quantico National Cemetery Building Renovation & Gravesite Improvements

b. Project Location: Triangle, Virginia

c. Contract Number: W91236-13-D-0035 / Contract #872CM3038

d. Scope:

(1) The purpose of this project is to renovate portions of the existing one-story, 6,023 square foot original Administration Building (circa 1983) at Quantico National Cemetery (QNC), Triangle, Virginia, and provide gravesite expansions in the form of standard burial sites and cremains plots. Additionally, this project will provide several cemetery enhancements, including a Memorial Wall, Ossuary, and Columbarium Plaza.

2. Purpose and Function

The Administration Building facility shall be adequately configured to support the operational requirements for National Cemetery Administration (NCA) Finance and Contracting Services. The facility shall be renovated to provide updated toilet facilities, conference room, and office space for the various functions of the Finance and Contracting Services departments. The cemetery shall be expanded to provide additional burial sites in the form of standard burial sites, a Columbarium, in-ground cremains sites, and an Ossuary.

3. Design Scope

The design scope of work includes the execution of field surveys of all as-built conditions, site surveys and Design Development of the ideas presented in the Final Charrette Report, dated 14 May 2015, a collaborative effort between the Designers, the Veteran’s Administration, Quantico National Cemetery Stakeholders, and the USACE, Norfolk District.

4. Cost Estimating

A professional cost estimate will be developed as part of the scope of work.

5. Government-Furnished Equipment

Those components that would be considered “built-in” shall be protected/preserved for installation upon the completion of Construction. Government-furnished equipment included in this Contract includes Modular Furniture and the Niche Cover. Power and

Data requirements of all equipment, if known, have been shared with the Design Team for implementation to the project.

6. Construction Phasing/Bid Options

As a public entity that shall remain open throughout construction and renovation, there are several logistical matters to be considered as a construction schedule is created.

Therefore, construction phasing will be required and shall be coordinated in accordance with the notes defining the Phasing requirements within the drawings. The Contractor shall also coordinate all phasing criteria with the Contracting Officer and QNC before construction commences. Project phasing is described as:

Base Bid:

• Construction Mobilization

• All Site requirements affected by Department of Environmental Quality criteria

• Building Renovation

Bid Options:

• Standard Burial Plots (Bid Option 1)

• Ossuary, Memorial Wall, and In-Ground Cremains Plots (Bid Option 2)

• Columbarium Plaza (Bid Option 3)

7. Waste Areas and Haul Routes

All debris and material resulting from the Contractor's operations will be disposed of off

Cemetery Property, unless directed otherwise. Construction traffic will be routed as directed by the Contracting Officer. Laydown areas will be established per the Government, as directed at the pre-construction meeting.

8. Security Provisions

Security provisions shall comply with requirements of QNC.

9. Constructability

The proposed design shall utilize readily available materials. All materials utilized shall comply with the requirements of the Buy American Act. No unusual trades will be required for this project. Standard construction methods and practices shall be employed.

CHAPTER I - ARCHITECTURAL

1. Applicable Criteria

a. International Building Code (IBC), 2012 edition National Fire Protection Association

(NFPA).

b. Americans with Disabilities Act and Architectural Barriers Act Accessibility Guidelines

(ADA/ABA), 2004.

c. NFPA 101, Life Safety Code (LSC), 2012 edition.

d. National Cemetery Administration (NCA) Design Guide, June 1999/March 2010

2. General Summary Statement

This project will renovate portions of the original QNC Administration Building (circa 1983), a 6,023 SF, one-story facility. The facility will house the NCA Finance and Contracting Services.

3. Existing Site Conditions

The site to the south of the Admin Building is the entrance drive to Quantico National Cemetery and the cemetery proper. The site to the east of the Admin Building is the entrance drive to the facility. The site to the west of the Admin Building is the employee parking and wooded areas. The site to the north of the Admin Building is the entrance road and visitor parking for the facility and wooded areas.

4. Demolition of Existing Elements

All waste as the result of selective demolition shall be removed from the facility and disposed of offsite in accordance with local governing regulations. Where hazardous materials are encountered, they shall be disposed in accordance with Federal HazMat regulations.

5. Architectural Design Solution

a. The renovation shall provide administrative and support space for the NCA Finance and Contracting Services. The renovated facility will be designed to provide defined separations of departments, while providing shared spaces that include a Kitchen, Conference/Multi-Purpose Room and a central Operations Center.

b. The entire facility will be upgraded to support Administrative type functions, including new floor, wall and ceiling finishes throughout. Access to existing toilet rooms will be modified as necessary to provide a barrier-free design and a fully accessible facility. Within the existing toilet room areas, new furnishings, fixtures and finishes shall be provided.

c. The building exterior will remain largely “as-is”. Some minor masonry repairs will be necessary near the main entrance. Two structural cracks in the masonry shall be repaired as recommended through collaboration with the Structural Engineer.

d. The existing skylight shall be replaced. The existing skylight shows evidence of moisture penetration and discoloration within the insulated glass panels. Due to the age of the feature, and the placement of fabric filters on the interior of the skylight well, it is recommended that the new skylight be constructed of translucent fiberglass panels. This will provide light filtration as well as thermal improvements.

e. Existing windows shall remain.

f. The existing roof and building perimeter appear to be resisting any water infiltration issues at the QNC facility. A preliminary visual roof inspection was performed and no issues were discovered. It appears that the existing roof is relatively new, therefore, replacement is not recommended at this time.

i. Any repairs and/or modifications required to support the replacement of rooftop mechanical units and equipment shall be considered as part of the work.

g. Furniture shall be provided under separate funding, but in accordance with conceptual layouts provided within the Design documents.

CHAPTER II - SITE / CIVIL

a. National Cemetery Administration (NCA) Facilities Design Guide.

b. 2011 Public rights-of-Way Accessibility Guidelines (PROWAG).

c. Americans with Disabilities Act and Architectural Barriers Act Accessibility Guidelines

(ADA/ABA), 2004.

d. 2010 ADA Standards for Accessible Design.

e. 2011 A Policy on Geometric Design of Highways and Streets, AASHTO.

f. 2009 Manual on Uniform Traffic Control Devices (MUTCD) with revisions 1 and 2, May 2012.

g. Prince William County Design and Construction Standards Manual (DCSM).

h. The Virginia Department of Environmental Quality (DEQ) Regulations and

Requirements for Stormwater Management Program (SWMP) and Erosion and

Sediment Control Program (ESCP).

i. Virginia Department of Transportation Road and Bridge Standards

2. Additional Guidelines

a. Modified roads and parking lot shall be designed to accommodate a Single Unit Truck

(AASHTO [SU-30]).

b. Four (4) ADAAG compliant parking spaces shall be provided at the administrative building parking lot.

c. Proposed modifications to the Administrative building utilities shall be verified by the

Engineer prior to construction.

d. Gravesites are not to be terraced and shall be graded to slope away from the roadway at 2% - 5%. Grades shall not exceed 5% without permission from NCA PM. Cut and fill slopes are not to exceed 25% grade. Slopes are to be seeded for stability.

e. Gravesites are to be located no closer than 20’ and shall not extend more than 200’ from the road.

f. In-ground cremains shall not exceed 999 plots.

g. All utility boxes, inlets, culverts, and manholes shall match final finished grades, pavement, sidewalks, or swales. All existing utility structures impacted by construction shall be inspected, documented and evaluated. All grates and top rims within the project limits shall be constructed, modified, or replaced meet ANSI A112.21.1M medium duty requirements. All drainage inlets shall be ADA compliant.

h. Pavement shall be designed to accommodate anticipated cemetery traffic including, but not limited to, personal vehicles, fire department vehicles, trash collection trucks, and construction vehicles.

i. Proposed road signs or markers shall match those currently on cemetery grounds.

j. The use of retaining walls (except for those proposed at the Ossuary and Columbarium sites) is discouraged; especially if the retaining wall exceeds 6 feet in height.

k. The use of organic shapes for site layouts is encouraged.

3. Construction Phasing and Staging

a. All construction vehicles are to access the site through the main entrance at the north end of the cemetery, off Joplin Road. Interstate traffic should use Exit 150 to access the maintenance entrance.

b. Construction phasing shall be coordinated such that cemetery operations are not impeded.

c. Staging shall be limited to areas south of the developed cemetery. Staging areas are shown on sheet GC001 and includes the area of standard burial.

d. Road signs or markers removed or damaged during construction shall be promptly replaced in kind after substantial completion.

e. Roadways damaged or demolished during construction phases shall be repaired or replaced and accepted by NCA PM.

4. Materials

a. Excavated material from construction may be used in as fill within the project limits with written approval from the Geotechnical Engineer. Excess material shall be hauled offsite and disposed of in accordance with local governing regulations.

b. Offsite excavation material shall not be used inside the cemetery without permission from NCA PM.

c. Site materials shall echo those previously used on the cemetery grounds. Brick and stone colors shall be approved by NCA PM.

5. Preservation

a. The small whorled pogonia survey was performed by the US Fish and Wildlife Service

(FWS) since it is listed as threatened species on the U.S. List of Endangered and Threatened Wildlife and Plants. It was determined that it is not present at this time.

b. The northern long-eared bat was recently listed as threatened on April 2, 2015. The QNC Expansion and Improvements Project is located within the Northern Long-Eared Bat White Nose Syndrome Buffer Zone which can restrict tree removal and noise disturbances (surrounding forested areas) during certain times of the year if this species is present. A survey of the affected area was performed, and it was determined that it is not present at this time.

c. A Native American archaeological site has been discovered within the cemetery grounds. The boundaries of this site have not been finalized, but will be coordinated with the design upon completion.

d. A full investigation of the archaeological site will require approximately 3 months and shall be contracted separately.

e. Proposed construction sites shall not overlap with the boundaries of the archaeological site.

6. Gravesite Improvements

c. Burial Areas

i. The proposed burial expansion will be established on the east sides of Quantico Drive and provide capacity for approx. 533+ burials and irrigation.

1. The standard burials will be located east of and along Quantico Drive. The burial field will consist of 1 section consisting of approx. 500+ standard 5’ x 10’ plots. The section will contain a 5’ wide irrigation isles.

a. The burial field will be offset 20’ from the roadway and extend no more than 125’ from the roadway. The grade will be established with fill, with a 5% slope falling away from the roadway. Additional fill will be required to establish a 4:1 back slope from the eastern edge of the burial section to the eastern edge of the existing cleared burial site.

b. The plots will be 5’ x 10’ in size and oriented perpendicular to the roadway with the monuments facing the roadway.

b. Memorial Wall/Ossuary

i. The memorial wall and ossuary site will replace existing shelter C location.

ii. A retaining wall/memorial wall will replace the existing timber retaining wall and create a space for 500 marble memorial wall markers.

1. The retaining wall will be approximately 48” in height and consist of a poured in place reinforced concrete footing and 8” thick reinforced concrete retaining wall with a brick masonry façade to complement the existing brick found on the entry gate structure and other built structures amongst the cemetery.

The retaining wall will be capped with a limestone cap to complement the existing entry gate design.

2. Marble memorial wall markers will be attached to the wall as veterans are interred in the ossuary.

3. Memorial wall markers shall be located no lower than 15½” from the ground.

iii. An 18” height seat wall is located at the end of the retaining wall.

1. The seat wall will consist of a poured in place concrete reinforced footing and retaining wall with a brick masonry façade and limestone cap matching the retaining wall/memorial wall design.

iv. An Ossuary shaft will be located in the center of the plaza.

1. The Ossuary shaft will be approx. 50” in height and clad in granite veneer.

2. A subsurface precast concrete vault will have capacity for over 500 cremains will be located directly beneath the ossuary shaft.

v. The plaza will consist of brick and/or concrete pavers.

vi. A 4” concrete sidewalk adjacent to the roadway and leading into the plaza space will replace the existing walkway and connect the plaza to the roadway.

1. All plaza and sidewalk area will accessible and comply with ADA requirement standards.

vii. An in-ground cremains field with the capacity of 750+ plots will be established north, east and south of the memorial wall/ossuary plaza in the open lawn area.

1. No section shall exceed 999 plots.

2. The in-ground cremains will be 4’x4’ plots.

3. All plots and markers shall be oriented to face the roadway.

viii. A proposed parking pullout will be established along the south side of the roadway directly across from the proposed sidewalk.

1. The proposed parking pullout will be a 13’ wide asphalt widening of the existing asphalt roadway approx. 175’ long to accommodate 8 vehicles.

Landscape enhancement will consist of a groundcover and shrub bed adjacent and behind the memorial wall, ornamental trees behind the memorial wall and 3 to 5 shade trees north of the wall and plaza.

c. Columbarium Site

i. The columbarium site establishes an open columbarium wall plaza with capacity for 2,640 niches located on the south east side of the proposed site. The siting of the columbarium wall plaza allows for future expansion of in-ground burial and an additional columbarium north and west of the proposed columbarium wall plaza.

1. The columbarium site consists of 1 large columbarium retaining wall set into the southeastern slope. The retaining wall would provide the needed grade differential to establish a plaza and additionally would accommodate niches along its exposed face.

a. The proposed retaining wall will consist of a poured in place concrete reinforced footing and retaining wall with a brick masonry or granite façade to complement the other built structures amongst the cemetery.

Precast niches will be (10 ½” W x 15” H x 20” D) 5 units high.

2. The columbarium site would consist of 6 two-sided columbarium niche walls.

a. The proposed columbarium niche wall will consist of a poured in place concrete reinforced footing and core wall with a brick masonry façade and limestone cap to complement the other built structures amongst the cemetery. Precast niches will be (10 ½” W x 15” H x 20” D) 5 units high.

b. Columbarium niche walls shall be placed 10’ apart.

ii. The plaza will consist of brick and or stone paving.

iii. A 4” thick concrete sidewalk adjacent to the roadway and leading into the plaza space will replace the existing walkway and connect the plaza to the roadway.

1. All sidewalks and plazas shall comply with the latest Public Rights-of-Way

Accessibility Guidelines (PROWAG).

2. All plaza and sidewalk areas will be accessible and comply with ADA requirement standards.

iv. A parking pullout will be established along the south side of the roadway directly adjacent to the proposed sidewalk.

1. The parking pullout will be a 13’ wide asphalt widening of the existing asphalt roadway approx. 150’ long to accommodate 7 vehicles.

v. Landscape enhancement will consist of a groundcover and shrub bed north of the plaza, ornamental trees behind the retaining wall and 3 to 5 shade trees west amongst plaza.

7. Stormwater Management and Drainage

The site is designed in accordance with the Virginia Department of Environmental Quality (DEQ). The Stormwater Management and Erosion and Sedimentation Control plans and supporting documentation will be submitted to and approved by the DEQ such that the Contractor may create a Storm Water Pollution Prevention Plan and apply for coverage under the Construction General Permit after award.

a. Project Description

i. There are four (4) separate site locations in the Burial expansion and cemetery improvements project at Quantico National Cemetery. These sites include (1) Administrative Building renovation/ Parking lot expansion, (2) Memorial Wall/Ossuary and demolition of existing shelter C, (3) Standard burial, and (4) Columbarium niches.

ii. The Base Bid and each Bid Option have been designed such that water quality and quantity are treated at their respective sites per the Virginia Department of Environmental Quality (DEQ) standards. If a Bid Option is not constructed, there is no impact on the Base Bid or other Bid Options in terms of stormwater management. Refer to the “Erosion and Sediment Control & Stormwater Report” for additional information regarding water quality and quantity calculations.

b. Stormwater Management Requirements and Best Management Practices (BMP)

iii. This project will comply with EISA 438, LID, and the State of Virginia Storm

Water Management regulation.

iv. A Storm Water Study will be completed and submitted to the Virginia

Department of Environmental Quality (DEQ). The Runoff Reduction Method will be utilized as required by the DEQ.

v. Storm water quality and quantity will be accomplished via a combination of sheet flow to conserved open space, bioretention cells, and vegetated grass channels.

Routing storm water runoff through BMPs allows for an adjusted Cn, which is then used to calculate and compare the runoff volumes.

vi. The calculated runoff rates and volumes will be used to comply with the Energy Balance Equation to ensure storm water discharge from the site(s) does not adversely impact receiving channels.

CHAPTER III – STRUCTURAL

a. UFC 1-200-01, General Building Requirements, 1 July 2013.

b. UFC 3-301-01, Structural Engineering, 1 June 2013.

c. International Building Code (IBC), 2012.

d. ACI 318-11, Building Code Requirements for Structural Concrete.

e. AISC 360-10, Specification for Structural Steel Buildings.

2. Project Description

The structural scope of work consists of providing support for the architectural renovations of the original Quantico National Cemetery Administration Building and support of various Cemetery Improvement projects.

3. Mechanical Unit Support

The original Quantico National Cemetery Administration Building has been analyzed for new mechanical units which will be installed on the roof. Based on the current weights and locations, reinforcement of the existing structure is not necessary to support the mechanical units. However, in some locations, supplemental framing will be added to support the curb.

4. Column Removal and Supplemental Support

A column on existing gridline 3/E will be removed. In order to support the framing, a new column will be added approximately 5 feet plan north of the proposed removed column on gridline 3. Additional framing and reinforcement will be added to support the roof framing, along with a new footing.

5. Brick Crack Repair

There are brick cracks in two locations of the building exterior of the original Quantico National Cemetery Administration Building. The field visit revealed that there are no control joints on the outside of the building, which is most likely the reason that this cracking occurred. For aesthetic purposes, the brick will be removed in these areas and a control joint will be added. Then new brick will be toothed in at the joint.

6. Gravesite Expansion & Cemetery Improvements

Structural design/foundation design will be provided, as required, for gravesite expansion/improvements including the memorial wall, columbarium designs and site retaining walls.

7. Design Loads

a. Structural design criteria shall be in accordance with UFC 3-301-01, Structural

Engineering.

(1) Live Loads:

Roof 20 psf

(2) Snow Loading:

Ground Snow Load: 25 psf Exposure Factor 1.0 Thermal Factor: 1.0

(3) Wind Loading Risk Category II Ultimate Wind Speed: 115 mph Exposure C Topographical Factor 1.0

8. Material Properties

a. Cast in Place Concrete Compressive Strength: 3,000 psi Normal Weight

b. Reinforcing Steel Yield Strength: ASTM A615, 60,000 psi

c. All Other Steel: ASTM A36

CHAPTER IV – PLUMBING

1. Plumbing Criteria

a. International Plumbing Code, (IPC), 2012 edition.

b. Unified Facilities Criteria UFC-3-420-01 Design: Plumbing Systems.

c. ASHRAE Handbooks, 2009-2012.

d. ASHRAE Standard 90.1-2010.

e. American National Standard for Accessible and Useable Buildings and Facilities

(CABO A117.l).

2. Domestic Water Supply

a. The existing 3” water service has sufficient capacity to handle the facilities maximum probable flow of 75 GPM. Provide a 3” backflow preventer at service entrance.

Additionally, provide a water meter at service entrance.

b. There is an existing 2” branch from our service main out to Restroom Building. The size of this pipe has not been investigated, but we are unaware of any issues at the Restroom building. Provide sub-meter at the 2” branch to Restroom Building.

c. Remove existing Water Treatment System complete. The facility is now served by city water (not well water).

d. Based on an anticipated water pressure of 40 PSI static and the addition of main service components such as a backflow preventer and water meter, a booster pump is required. Provide a minimum of 40 PSI boost at 75 GPM via a packaged 3 HP duplex system with integral VFD.

3. Domestic Water Supply Distribution Piping

a. Water piping shall be copper and be run concealed.

b. Existing water piping shall be re-used to the maximum extent possible.

c. All piping will be insulated per ASHRAE 90.1-2010.

4. Sanitary Sewer

a. The existing 4” sanitary waste piping has sufficient capacity to handle 37 (DFUs) Drainage Fixture Units.

b. Waste and vent piping shall match existing (cast iron pipe anticipated).

c. The existing VTRs shall be re-used to the maximum extent possible (no additional

VTRs are anticipated). Contractor shall provide additional flashing and counter-flashing for all existing VTRs.

d. Existing waste and vent piping shall be re-used to the maximum extent possible.

e. Contractor shall inspect existing piping and provide recommendations/results within a report. The report shall include pressure test, pipe thickness test and video scope.

5. Plumbing Fixtures

a. Replace existing plumbing fixtures with water conserving fixtures.

b. Five water closets will be floor mounted, dual flush valve with 1.6/1.1 gallon per flush battery operated sensors.

c. One urinal will be wall mounted, flush valve with 0.125 gallon per flush battery operated sensors.

d. Four lavatories will be counter mounted 0.5 gallon per minute battery operated sensor faucets.

e. One break room sink will be counter mounted single compartment stainless steel with 1.0 gallon per minute faucet.

f. One service sink will be stainless steel with galvanized steel legs with adjustable feet and vacuum breaker.

g. Two electric water coolers will be dual height with bottle filling station.

6. Domestic Hot Water Generation

a. The existing 40 gallon, 3kW electric water heater has sufficient capacity to handle 32 gallons of stored hot water. The existing hot water recirculation pump and aquastat with integral timer shall be reused. The Aquastat shall switch pump off at 110˚F and energize pump at 90˚F.

b. Provide thermostatic mixing valve and expansion tank to the existing domestic hot water system.

CHAPTER V – MECHANICAL

1. Mechanical Criteria

a. International Mechanical Code (IMC), 2012 edition

b. International Building Code (IBC), 2012 edition

c. UFC 3-410-01 Heating Ventilating and Air Conditioning Systems, October 2014

d. ASHRAE Handbooks, 2012-2015

e. ASHRAE Standard 90.1-2010 and 62.1-2010

f. SMACNA HVAC Duct Construction Standards, Metal and Flexible

g. SMACNA, HVAC Air Duct Leakage Test Manual

2. Functional and Technical Requirements

3. Heating and Cooling System

a. Replace existing mechanical HVAC system(s) complete.

b. Provide a minimum of four (4) properly zoned HVAC units that are meet sustainability design guide and ASHRAE 90.1-2013 minimum efficiency requirements.

Provide semi-custom heat pumps for the following zones:

� Zone 1: 7.5 ton Packaged Rooftop Heat Pump

� Zone 2: 1.5 ton Split system Heat Pump � Zone 3: 7.5 ton Packaged Rooftop Heat Pump � Zone 4: 7.5 ton Packaged Rooftop Heat Pump

c. Provide associated ductwork, volume dampers and diffusers/grilles for a complete system.

d. Ductwork will be galvanized steel constructed with Seal Class A. All supply ductwork and all conditioned air ductwork will be insulated. Manual balancing devices will be installed in duct systems as required for system balancing and access will be provided. Grilles, registers, and diffusers will be color coordinated with the architectural finishes.

4. Auxiliary Space Heating, Cooling and/or Ventilating Equipment

a. Provide 0.75 ton, R410A ductless split system to serve the Electrical/Comm space.

b. Provide roof top exhaust fan and associated ductwork for restrooms, janitor closet and Operations room.

c. Provide ceiling mounted cabinet exhaust fan and associated ductwork for kitchenette.

d. Provide wall mounted electric unit heater for Women’s restroom.

e. Provide ceiling mounted electric unit heater for vestibule.

Design Conditions Winter Summer Outdoor 20°F DB 93°F DB, 78°F WB

Indoor Office Spaces 68°F DB 75°F DB, 50% RH

5. Ventilation

a. Fresh air ventilation will be provided through each roof top unit for zones 1, 3, and

4.

b. Fresh air ventilation will be provided through roof cap and inline supply fan ducted to indoor unit for zone 2.

c. Exhaust air will be removed via dedicated roof fan.

d. Ventilation and exhaust calculations shall be performed per ASHRAE 62.1-2010.

e. All ventilation and exhaust openings to the exterior shall have a low leakage motorized damper interlocked with the operation of the associated control system.

6. HVAC Controls

a. Packaged rooftop heat pumps shall be controlled by stand-alone 7-day programmable thermostats.

b. Mini-split system heat pumps shall be controlled by stand-alone 7-day programmable thermostats.

c. Roof mounted exhaust fan EF-1 shall be controlled by a 7-day programmable timeclock.

d. Kitchen exhaust fan EF-2 shall be controlled by a 30-minute spring wound timer switch.

e. Ventilation fan SF-1 shall be controlled by a wall mounted stand-alone carbon dioxide sensor/controller.

7. Testing, Adjusting, and Balancing and Commissioning

a. The HVAC air systems will be tested, adjusted and balanced (TAB) in accordance with UFGS 23 05 93 Testing, Adjusting, and Balancing for HVAC.

b. Provide fundamental building commissioning for the HVAC system and the domestic water service equipment. Commissioning shall include review of construction documents, a commissioning plan, verification of the installation/performance of the systems and a commissioning report.

CHAPTER VI - ELECTRICAL

1. Electrical Criteria

a. TIA TIA Standards for Telecommunication

b. ETL 99-4 Emergency Lighting and Marking of Exit

c. NEC National Electric Code

d. NESC National Electric Safety Code

e. UFC 3-501-01 Electrical Engineering

f. UFC 3-520-01 Interior Electrical Systems

g. UFC 3-530-01 Design: Interior and Exterior Lighting and Control

h. UFC 4-020-01 DoD Security Engineering Facilities Planning Manual

i. UFC 4-020-04A Security Engineering: Electronic Security Systems

j. UFC-3-580-01 Telecommunications Building Cabling Systems Planning And Design

2. Electrical Characteristics

a. The existing exterior electrical distribution system is owned by Northern Virginia

Electric Cooperative. The existing transformer is adequate for the new use of the building and will remain for reuse.

b. The interior electrical system was manufactured by Federal Pacific. Circuit breakers are no longer available. The entire system will be replaced.

c. A new 400-amp, 480Y/277-volt, 3-phase service panel for 480/277-volt equipment, a step-down transformer for the 208Y/120-volt utilization power and 208Y/120-volt panels will be provided.

d. All wiring will be in rigid or metal conduits. All circuits including branch circuit will be provided with an individual ground wire. All computer and server outlets and connections will be provided with separate neutral wires; neutral wires shall not be shared. Stand alone, portable UPS units will be owner provided where required at desktop computers and at a data/com racks.

3. Lighting

a. The existing light fixtures and controls consist of recessed T-12 fluorescent troffers, incandescent down lights with fluorescent lamps and wall switches for control.

b. The interior lighting system will be replaced. Maintained lighting intensities will conform to those recommended in the current UFC and the latest edition of the IES Lighting Handbook. Lighting intensities will be as follows:

Maintained Lighting Intensities

Area Type Footcandles Light Type Controls

General Office Space 30 Volumetric LED Dimming & Occupancy

Sensors

Conference Rooms 30 Volumetric LED & LED Downlights

Dimming & Occupancy Sensors

Mechanical & Electrical Equipment Rooms 30 Industrial LED Switches (Safety)

Toilets 20 Volumetric LED or LED Downlights Occupancy Sensors

Corridors 5 LED Downlights Circuit Breaker

c. LED, direct and indirect, lighting will be provided in office areas, and typically throughout the facility. Local switching and/ or occupancy sensor switches will be provided as required by UFC 3-530-01.

d. Emergency battery lighting will be provided throughout the facility. Emergency lights will be individual LED battery packs. Exit lights will be provided throughout the facility utilizing LED lamps. Emergency lighting will be connected to the local lighting circuit ahead of all switches and controls.

4. Electrical Power Wiring System

a. Conductors will be type THW, THHN or THWN, with 600 volt insulation. The building wiring system will consist of copper conductors. All conductors will be in rigid conduit or electrical metallic tubing. Conduits will be installed concealed in walls or above the finished ceiling. Conduits will be run exposed in spaces without finished ceiling.

b. Conductors will be sized to limit the voltage drop for feeders to two percent, and branch circuits to three percent.

c. General-purpose outlets will be provided throughout the facility.

d. Motors larger than 1/2 horsepower shall be three phase. Motors 1/2 horsepower and smaller shall be single phase.

5. Grounding and Lightning Systems

a. The electrical distribution system for this facility will be grounded in accordance with the NEC Article 250. The existing lightning protection system is in good condition and will be modified as required to protect new HVAC equipment on roof.

6. Energy Conservation

a. Energy conservation of electrical systems will include lighting controls, energy efficient dry type transformers, variable frequency drives for motors, and high efficiency motors.

CHAPTER VII – TELECOM/DATA, CATV, ACCESS CONTROL

1. Interior Telecommunications System

a. The existing incoming telephone and data service is located in the telecommunications closet located inside the electrical room.

b. A complete structured cabling and pathway interior distribution system for the telecommunications and data systems will be provided.

c. This system extension will be made ready for the Government to install their equipment (switches, and keyed systems equipment) into racks, then “plug and play.”

d. Telecommunications Design Standards and Criteria: Applicable design and construction criteria references are listed in below.

(1) TIA 568-C.1 Commercial Building Telecommunications Cabling Standards

(2) TIA 569-C Commercial Building Standard for Telecommunications

Pathways and Spaces

(3) TIA 607-B Commercial Building Grounding and Bonding Requirements for

Telecommunications

(4) National Fire Protection Association (NFPA)

(5) NFPA 70 National Electrical Code

(6) ITA Telecommunications Methods 0001-SOP0385

2. Voice Telecommunications Systems

a. Outlet jacks will be RJ45 category 6. All copper horizontal cabling will be terminated on 110 patch panels in the rack and backbone cable patched to wall mounted 110 cross connect blocks, in the Telecommunication Room (TR). All backbone cable shall be run in conduit and cable tray. Horizontal normal voice cabling will be 4 pair 23 AWG copper Cat 6, type CMP, UTP to each RJ45 jack.

The standard telecomm outlets will consist of two (2) jacks, one for data and one for voice, per I3A criteria.

3. Data LAN System

a. The Data LAN system is the facility’s standard network system. A structured cabling system will be provided for the data jacks in accordance with ANSI/TIA/EIA standards and will include racks, patch panels, pathways, cabling, outlet boxes, pull boxes and jacks. The system will consist of CAT 6 horizontal cabling, RJ45 CAT 6 jacks, rack mounted patch panels and racks. Shared pathways and cable trays may be utilized where the system can remain secure.

Any new active equipment (switches, servers, hubs, etc.) for the data LAN will be furnished and installed by the Government. The standard telecomm outlets will consist of two (2) jacks, one for data and one for voice, per I3A criteria.

4. Telecommunications Grounding and Surge Protection

a. A new main telecommunications ground bar (TMGB) will be provided in the telecommunications closet and connected to the existing grounding system. The cable trays and equipment racks will all be connected to this ground busbar.

5. Exterior Telecommunications System

a. The existing outside plant copper cable will remain for reuse. A new 12 strand, single mode fiber optic cable will be provided in 4” direct buried conduit from the existing administration building to the telecommunications closet located in the electrical room using existing and new conduit and pull boxes.

6. Cable Television System (CATV)

a. The existing direct TV satellite dish will be removed from the roof. A new CATV system is not required for this facility.

7. Access Control System

a. The new security and access control system will consist of the following: Security cameras at the communications room and the visitor entrance, Card readers at exterior doors and the communications rooms, Electric door lock and buzzer for visitor door.

CHAPTER VIII – FIRE PROTECTION

1. Criteria and Codes

a. Unified Facilities Criteria (UFC).

UFC 1-200-01 General Building Requirements, 1 Nov 2014.

UFC 3-600-01 Fire Protection Engineering for Facilities, 1 Mar 2013.

b. VA Fire Protection Design Manual, 6th Edition (FPDM).

c. ICC International Building Code, 2012 Edition (IBC).

d. National Fire Protection Association (NFPA).

NFPA 10 Standard for Portable Fire Extinguishers, 2013 Edition.

NFPA 13 Standard for the Installation of Sprinkler Systems, 2013 Edition.

NFPA 70 National Electrical Code, 2014 Edition.

NFPA 72 National Fire Alarm and Signaling Code, 2013 Edition.

NFPA 90A Standard for the Installation of Air-Conditioning and Ventilating

Systems, 2015 Edition.

NFPA 101 Life Safety Code, 2015 Edition (LSC).

2. Classification of Occupancy

The renovated facility will be a 1-story building with a building area of approximately 7,572-sf as defined in the IBC. The primary use of the building is for office spaces and support spaces (e.g. break rooms, and MEP spaces).

The building will be classified as a 1-story business (Group B).

3. Minimum Construction Type

The minimum construction type of a structure is required to comply with the fire resistance requirements and fire area limitations in UFC 3-600-01 and the IBC. The minimum construction type of a building is based on the height, area, occupancy, open street frontage, and automatic sprinkler protection provided in the building.

The following height and area limitations apply to the building for verifying the minimum required construction type.

Group B Fully Sprinklered Type V-B

Base Height [IBC Table 503]

40-ft 2-stories

Height Increase

[IBC §504.2]

20-ft 1-story

Allowable Height

[IBC §504.1]

60-ft 3-stories

Base Area per Floor [IBC Table 503]

9,000-sf

Sprinkler Area Increase

[IBC §506.3]

27,000-sf

Allowable Area per Floor

[IBC §506.1]

36,000-sf

In accordance with the IBC, the renovated facility will be a 22-ft high, 1-story, 7,572-sf building; therefore, the facility can be classified as Type V-B construction.

The following required fire-resistance ratings apply to the building structural elements as specified in IBC Table 601:

Building Elements IBC Type V-B Primary Structural Framea 0-hr Bearing Walls, Exterior 0-hr Bearing Walls, Interiorc 0-hr Non-bearing Walls, Exteriorb 0-hr Non-bearing Walls, Interiorc 0-hr Floor Construction and Associated Secondary Members 0-hr Roof Construction and Associated Secondary Members 0-hr a The structural frame is considered to be the columns and the girders, beams, trusses, and spandrels having a direct connection to the columns and bracing members designed to carry gravity loads.

b Based on IBC Table 602 for a fire separation distance of 10-ft or more.

c Not less than the fire resistance required by other sections of the code.

The requirements for providing fire-resistance rated exterior walls and opening also depends on the fire separation distance (FSD) between buildings, the occupancy groups within the buildings, and the construction type. The following required fire-resistance ratings apply to the exterior walls as specified in IBC Table 602:

Fire Separation Distance (FSD) Group B Type V-B

FSD < 10-ft 1-hr FSD ≥ 10-ft 0-hr

The new facility will have a fire separation distance of at least 10-ft to the imaginary lot lines and to the centerline of the closest street.

4. Automatic Sprinkler System

Automatic sprinkler systems are required in all renovated facilities where the loss of real or personal property does not exceed $500,000 [FPDM 6.1.A.1.b]. The sprinkler system shall be installed in compliance with NFPA 13 as modified by the VA Fire Protection Design Manual.

The incoming sprinkler service will be provided with a double check backflow preventer.

A wet pipe sprinkler system with quick response sprinklers will be provided throughout the facility. Sprinklers will be provided above and below the suspended ceiling. A dry pipe system will be provided throughout the mansard.

A hydrant flow test was performed on 7 August 2015 to determine the available water system pressure and capacity. Hydraulic calculations determined that a fire pump and storage tank is not required for the facility.

5. Fire Alarm System

A complete, electrically supervised, addressable intelligent, manual and automatic, annunciated fire alarm system shall be provided throughout the building. This system will be installed in accordance with the VA Fire Protection Design Manual, LSC, and NFPA 72.

Audible notification is required to be provided within all occupied spaces in accordance with NFPA 72 criteria. The audible notification will consist of horns throughout the building.

Visible notification is required to be provided in all general usage areas of the building, including restrooms, meeting/conference rooms, hallways, lobbies, and any other areas of common use, public use, or employee work areas.

The new fire alarm system design and installation will include initiation of the fire alarm system by actuation of any sprinkler system water-flow devices or any installed smoke detector, manual pull stations, or heat detection devices.

Smoke detection is required in HVAC ducts in accordance with NFPA 90A.

Manual fire alarm pull stations will be provided at each building exit and where travel distances exceed 200-ft.

The system is required to be connected to a central alarm location, fire department or alarm monitoring location [UFC 3-600-01 §5-3.2].

6. Fire Department Access

Fire department vehicle access is required to comply with UFC 3-600-01 Section 2-10.

All buildings greater than 5,000-sf are required to have at least one means of all-weather ground access to allow emergency vehicles unimpeded access to the building.

The all-weather ground access is required to be paved, start from the road, and terminate no farther than 33-ft from the building. Where approved by the AHJ, an engineered all-weather surface that is not paved may be provided.

Facilities with fire department connections for sprinkler systems must be provided with suitable all-weather ground access surface for pumper apparatus within 150-ft of such fire department connections.

The fire department access shall meet the dimensions for fire lanes and turnarounds contained in NFPA 1, Uniform Fire Code. All force protection equipment, such as bollards or gates, must not require more than one person to remove or open. Access may require fire apparatus to drive over a curb. Any locking device controlling vehicle access must be under control of the Fire Department or 24-hr security personnel located at the facility.

CHAPTER IX – SUSTAINABILITY

1. Guiding Principles Checklist

In accordance with Veterans Administration Design criteria, the “Guiding Principles Checklist” for sustainable building designs shall be used to guide the major renovation processes for the original Administration Building renovations project. Whereas this project is not required to meet any specific sustainable design levels of performance, sustainable design principles shall be applied to all aspects of design, where feasible.

The “Guiding Principles Checklist” is provided in the Appendix, TAB H.

CHAPTER X – HAZARDOUS MATERIALS

1. General

The environmental/hazmat scope of work for the Quantico National Cemetery former Administration Building (building) is to perform a hazardous materials investigation of the building as required to support the renovation project.

Our scope of work includes: (1) identifying, collecting and analyzing bulk samples of suspect asbestos-containing materials (ACM), (2) identifying, collecting and analyzing samples of existing paint in the building to determine lead, cadmium and chromium concentrations and (3) inspecting a percentage of existing fluorescent light fixtures for the presence of Polychlorinated Biphenyl (PCB) light ballasts and light tubes containing mercury vapor.

Bulk samples of suspect ACM and existing paints were collected from visibly accessible materials expected to be disturbed by the renovation/demolition work. Destructive activities such as breaking into wall cavities or entering confined spaces were not performed. For a more detailed description of the work performed and recommendations, refer to the hazardous material report.

2. Design Criteria

The hazmat design will be performed in accordance with the USACE Norfolk District Design Guide dated May 28, 2010.

3. Building Description

The building can generally be described as a one-story office building. The ground floor contains approximately 6,000 square feet.

The building is constructed of noncombustible materials such as steel structural members, masonry exterior walls, and concrete floors.

4. Asbestos

a. In March 2015 we collected bulk samples of suspect ACM from the interior and exterior of the building. Building materials which were sampled included 12” floor tile and mastic, drop ceiling tiles, thermal system insulation, drywall and joint compound, various mastics and caulks, etc.

b. The following materials were reported to contain asbestos: 12” x 12” brown floor tile mastic, black mastic/waterproofing on the interior of CMU black walls and silver paint on roofing components. Doors area assumed to contain ACM until they can be destructively sampled and confirmed to be asbestos free.

c. For the renovation/demolition of the building, all friable and non-friable asbestos-containing materials to be disturbed must be removed by a Virginia licensed asbestos abatement contractor prior to renovation/demolition. Any non-friable asbestos-containing material may be left in place during the demolition but the contractor must perform work in accordance with National Emissions Standard for Hazardous Air Pollutants (NESHAP) regulations.

5. Lead, Cadmium, and Chromium

a. In March 2015, we collected paint chip samples from existing painted surfaces in the building. The purpose of our sampling was to obtain representative data on the total concentrations of lead, cadmium and chromium in the existing painted surfaces scheduled to be disturbed by the renovation/demolition. Sampling results show all of the samples collected and analyzed were found to have lead concentrations above the laboratory's minimum detection limit.

b. As the results indicate, the samples were determined to contain lead, cadmium and chromium concentrations. Therefore, all painted surfaces must be considered lead, cadmium and chromium containing. Appropriate precautions should be taken during the disturbance of all painted surfaces to ensure protection of workers and the environment as established by the Occupational Safety and Health Administration (OSHA) for lead, cadmium and chromium.

6. PCB Ballasts

a. Our field investigation of existing light fixtures indicated that light fixtures in the building were the fluorescent type. Most of the light fixtures observed incorporated T8 light tubes and electronic ballasts. Some T12 fixtures were also observed.

Electronic ballasts are not PCB-containing. Based on observations of existing ballasts, we recommend assuming that 10% of all light ballasts for the project contain PCBs and all of the light tubes are mercury containing.

b. All light ballasts which are not labeled “NON-PCB” should be handled and disposed of in accordance with 40 CFR 761 “Polychlorinated Biphenyls (PCBs) Manufacturing, Processing, Distribution in Commerce, and Use Prohibitions.” All fluorescent light tubes containing mercury vapor shall be handled and disposed of as universal waste in accordance with the Virginia Solid Waste Management Regulations.

7. Design

Design documents will address the removal and disposal of ACM, paints containing lead, cadmium and chromium, fluorescent light ballasts containing PCBs, and fluorescent light tubes containing mercury vapor.

Hazardous materials will be indicated on contract drawings, and technical specifications will be provided to address the removal and disposal of hazardous materials.

TAB A

GEOTECHNICAL REPORT

Quantico National Cemetery, Triangle Virginia

Subsurface Exploration and Geotechnical Engineering Report

October 2015

PREPARED BY:

Geo Environmental Section, Norfolk District

U.S. Army Corps of Engineers

Fort Norfolk, 803 Front Street

Norfolk, VA 23510

Quantico National Cemetery

Contents

1.0 PURPOSE

2.0 PROJECT INFORMATION

2.1 Site Description and Existing Conditions

2.2 Proposed Facilities

3.0 SUBSURFACE EXPLORATION

3.1 General

3.2 Locations

3.3 Soil Testing and Sampling

3.4 Laboratory Soil Testing

4.0 SUBSURFACE CONDITIONS

4.1 Regional Geology

4.2 Subsurface Stratigraphy

5.0 GEOTECHNICAL CONSIDERATIONS

5.1 Geotechnical Considerations

5.2 Pavement Design Recommendations

6.0 FOUNDATION/ EARTHWORK CONSIDERATIONS

6.1 Construction Preparation

6.2 Foundation Construction

6.3 Controlled Structural Fill

6.4 Suitability of Onsite Material

6.5 Compaction Requirements

LIST OF APPENDICES

Appendix A: Details

Appendix B: Site Location

Appendix C: Boring Location Plan

Appendix D: Soil Stratigraphy

Appendix E: Boring Logs

Appendix F: Laboratory Data

1.0 PURPOSE

The report summarizes the results of a subsurface exploration performed in August 2015 and a subsequent geotechnical evaluation. The purpose of the report is to provide our representation of the subsurface conditions at the site and to provide geotechnical recommendations for the proposed cemetery expansion and improvements. Information in the report is based on the 35% design drawing submittal titled “ Quantico National

Cemetery, Expansion and Improvements” prepared by Waller, Todd and Sadler

Architects, Inc., dated 24 August 2015. Revisions to this report may be required…