About this file

Combined Spec- VOL 2

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUANTICO NATIONAL CEMETERY

BUILDING RENOVATION

AND GRAVESITE IMPROVEMENTS

Triangle, Virginia

USACE Project Number W91236-13-D-0035 / Contract #872CM3038 WTS Project Number 1303-II

SPECIFICATIONS

Volume 2

Corrected 100% Submittal

Date: 03 November 2017

Waller, Todd & Sadler Architects, Inc.

1909 Cypress Avenue

Virginia Beach, Virginia 23451

QUANTICO NATIONAL CEMETERY BUILDING RENOVATION 872CM3038

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 01 15 LIST OF DRAWINGS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00.00 50 SUMMARY OF WORK FOR NORFOLK DISTRICT PROJECTS

01 30 00.20 50 ADMINISTRATIVE REQUIREMENTS

01 31 19.00 50 PROJECT MEETINGS

01 32 01.00 50 PROJECT SCHEDULE

01 33 00.00 50 SUBMITTAL PROCEDURES

01 35 26.00 50 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 02.00 50 QUALITY CONTROL SYSTEM (QCS)

01 45 04.00 50 CONTRACTOR QUALITY CONTROL

01 50 02.00 50 TEMPORARY CONSTRUCTION FACILITIES

01 57 20.00 10 ENVIRONMENTAL PROTECTION

01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL

01 62 35 RECYCLED/RECOVERED/BIOBASED MATERIALS

01 74 19.00 50 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 78 02.00 50 CLOSEOUT SUBMITTALS

01 78 23.00 50 OPERATION AND MAINTENANCE DATA

01 91 00.80 COMMISSIONING

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

02 42 51 CARPET REMOVAL AND RECLAMATION

02 82 14.00 10 ASBESTOS HAZARD CONTROL ACTIVITIES

02 83 13.00 20 LEAD IN CONSTRUCTION

02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs

AND MERCURY

DIVISION 03 - CONCRETE

03 30 00 CAST-IN-PLACE CONCRETE

03 48 24 PRECAST CONCRETE COLUMBARIUM UNITS

03 48 26 CONCRETE MEMORIAL WALL UNITS

DIVISION 04 - MASONRY

04 43 00 NATURAL STONE VENEER

04 73 00 COLUMBARIUM NICHE COVERS

04 73 10 MEMORIAL WALL MARKERS

DIVISION 05 - METALS

05 12 00 STRUCTURAL STEEL

05 50 13 MISCELLANEOUS METAL FABRICATIONS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 20 00 FINISH CARPENTRY

06 41 16.00 10 LAMINATE CLAD ARCHITECTURAL CASEWORK

06 61 16 SOLID POLYMER (SOLID SURFACING) FABRICATIONS

PROJECT TABLE OF CONTENTS Page 1

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 21 16 MINERAL FIBER BLANKET INSULATION

07 60 00 FLASHING AND SHEET METAL

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 14 00 WOOD DOORS

08 60 45 SKYLIGHTS AND TRANSLUCENT PANELS

08 71 00 DOOR HARDWARE

DIVISION 09 - FINISHES

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 30 13 CERAMIC TILING

09 51 00 ACOUSTICAL CEILINGS

09 65 00 RESILIENT FLOORING

09 68 00 CARPETING

09 90 00 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 14 00.20 SIGNAGE

10 21 13 TOILET COMPARTMENTS

10 28 13 TOILET ACCESSORIES

DIVISION 12 - FURNISHINGS

12 24 13 ROLLER WINDOW SHADES

12 48 13 ENTRANCE FLOOR MATS

DIVISION 21 - FIRE SUPPRESSION

21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

21 13 17.00 10 DRY PIPE SPRINKLER SYSTEM, FIRE PROTECTION

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 08 00.00 10 COMMISSIONING OF HVAC SYSTEMS

23 82 02.00 10 UNITARY HEATING AND COOLING EQUIPMENT

23 82 46.00 40 ELECTRIC UNIT HEATERS

DIVISION 26 - ELECTRICAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS

26 41 00 LIGHTNING PROTECTION SYSTEM

PROJECT TABLE OF CONTENTS Page 2

26 51 00 INTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 05 26.00 40 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY

28 16 00.00 20 BASIC INTRUSION DETECTION SYSTEMS (IDS)

28 20 01.00 10 ELECTRONIC SECURITY SYSTEM

28 23 23.00 10 CLOSED CIRCUIT TELEVISION SYSTEMS

28 31 64.00 10 FIRE DETECTION AND ALARM SYSTEM, ADDRESSABLE

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

31 05 19 GEOTEXTILE

31 11 00 CLEARING AND GRUBBING

31 31 16.13 CHEMICAL TERMITE CONTROL

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 05 33 LANDSCAPE ESTABLISHMENT

32 11 16 BASE COURSE FOR RIGID AND SUBBASES FOR FLEXIBLE PAVING

32 11 26 BITUMINOUS BASE COURSE

32 12 10 BITUMINOUS TACK AND PRIME COATS

32 12 21 BITUMINOUS ROAD-MIX SURFACE COURSE

32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE

FACILITIES

32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS

32 16 15 CONCRETE BLOCK PAVEMENTS

32 17 23.00 20 PAVEMENT MARKINGS

32 30 00 SITE FURNISHINGS

32 84 00 PLANTING IRRIGATION

32 92 19 SEEDING

32 93 00 EXTERIOR PLANTS

DIVISION 33 - UTILITIES

33 40 00 STORM DRAINAGE UTILITIES

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 3

SECTION 10 14 00.20

SIGNAGE

11/12

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

36 CFR 1191 Americans with Disabilities Act (ADA) Accessibility Guidelines for Buildings and Facilities; Architectural Barriers Act (ABA) Accessibility Guidelines

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00.00 50 SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

Detail Drawings

SD-03 Product Data

Installation Warranty

SD-04 Samples

Interior Signage

1.3 QUALITY ASSURANCE

1.3.1 Samples

Submit interior signage samples of each of the sign types showing typical quality, workmanship and color: Submit two sets; one set of samples will be retained by the COR; other set returned to the Contractor. The samples may be installed in the work, provided each sample is identified and location recorded.

a. Sign Panel, 8 inches by 10 inches, with letters.

b. Color samples of each color, 6 inches by 6 inches. Show anticipated range of color and texture.

c. Sample of typeface, arrow and symbols in a typical full size layout.

SECTION 10 14 00.20 Page 1

1.3.2 Detail Drawings

Submit detail drawings showing elevations of each type of sign, dimensions, details and methods of mounting or anchoring, mounting height, shape and thickness of materials, and details of construction. Include a schedule showing the location, each sign type, and message.

1.4 DELIVERY, STORAGE, AND HANDLING

Materials shall be packaged to prevent damage and deterioration during shipment, handling, storage and installation. Product shall be delivered to the jobsite in manufacturer's original packaging and stored in a clean, dry area in accordance with manufacturer's instructions.

1.5 WARRANTY

Warrant the interior signage for a period of 2 years against defective workmanship and material. Warranties shall be signed by the authorized representative of the manufacturer. Submit warranty accompanied by the document authenticating the signer as an authorized representative of the guarantor. Guarantee that the signage products and the installation are free from any defects in material and workmanship from the date of delivery.

PART 2 PRODUCTS

2.1 STANDARD PRODUCTS

Signs, plaques, directories, and dimensional letters shall be the standard product of a manufacturer regularly engaged in the manufacture of such products that essentially duplicate signs that have been in satisfactory use at least 2 years prior to bid opening. Obtain signage from a single manufacturer with edges and corners of finished letterforms and graphics true and clean.

2.2 ROOM IDENTIFICATION/DIRECTIONAL SIGNAGE SYSTEM

2.2.1 Standard Room Signs

a. Tactile and Braille Characters, raised minimum 1/32 inch; characters must be accompanied by Grade 2 Braille.

b. Topography:

1. Type Style: Helvetica Bold. Initial caps or all caps as indicated in Sign Message Schedule.

2. Provide text, arrows, and symbols in size, colors, typefaces and letter spacing shown; provide a true, clean, accurate reproduction of typeface(s) shown. Text shown in drawings is for layout purposes only; final text for signs is listed in Sign Message Schedule.

c. Character Height: Minimum 5/8 inch high, Maximum 2 inches.

d. Symbols (Pictograms): Place equivalent written description directly below symbol, outside of symbol's background field. Border dimensions of symbol background must be minimum 6 inches high.

SECTION 10 14 00.20 Page 2

e. Finish and Contrast: Characters and background to be eggshell, matte or other non-glare finish with adequate contrast with background.

f. Mounting Location and Height: As shown or mounted on wall adjacent to the latch side of the door and to avoid door swing and protruding objects.

2.2.2 Building Evacuation Route Signs

The insert shall be mounted on paper card stock. Provide evacuation sign insert showing building floor plan with evacuation routes indicated.

Provide paper and software for creating text and symbols for computers identified by owner for Owner production of paper inserts after project completion. Furnish one device to assist in removing face sheet. Sliding inserts or slide knobs that slide horizontally exposing different graphic information shall be provided as identified in the signage placement schedule and drawings.

a. Frames shall be aluminum, 1/4 inch thick.

b. End caps shall be aluminum with radius style corners.

2.2.3 Type of Mounting For Signs

Provide extruded aluminum brackets for hanging, projecting, and double-sided signs. Mounting for framed, hanging, and projecting signs shall be by mechanical fasteners. Surface mounted signs shall be mounted with countersunk mounting holes in plaques and mounting screws or silicone adhesive hook and loop tape consisting of hooked part on sign back and looped side on mounting surface for textile surfaces. Mounting system shall be fabricated from materials that are not corrosive to sign material and mounting surface.

2.2.4 Graphics

Signage graphics for modular signs shall conform to the following.

2.2.4.1 Surface Applied Photopolymer

Integral graphics and Braille achieved by photomechanical stratification processes. Photopolymer used for ADA compliant graphics shall be of the type that has a minimum durometer reading of 90. Tactile graphics shall be raised 1/32 inch from the first surface of plaque by photomechanical stratification process.

2.2.4.2 Graphic Blast Raised Copy

Background is sandblasted to a uniform depth of 1/32 inch leaving raised text and Braille. Background shall be painted with polyurethane paint.

2.2.5 Character Proportions and Heights

Letters and numbers on signs conform to 36 CFR 1191 .

2.2.6 Tactile Letters, Symbols and Braille

Raised letters and numbers on signs shall conform to 36 CFR 1191 .

SECTION 10 14 00.20 Page 3

2.3 PRODUCTS

a. Cast Acrylic Sheet: MIL-PRF-8184F; Type II, class 1, Water white non-glare optically clear. Matt finish water white clear acrylic is not acceptable.

b. Vinyl: 0.1 mm thick machine cut, having pressure sensitive adhesive and integral colors.

2.4 FABRICATION AND MANUFACTURE

a. Design components to allow for expansion and contraction for a minimum material temperature range of 100 degrees F, without causing buckling, excessive opening of joints or over stressing of adhesives, welds and fasteners.

b. Form work to required shapes and sizes, with true curve lines and angles. Provide necessary rebates, lugs and brackets for assembly of units. Use concealed fasteners whenever and wherever possible.

c. Shop fabricate so far as practicable. Joints fastened flush to conceal reinforcement, or welded where thickness or section permits.

d. Contact surfaces of connected members must be true and assembled so joints are tight and practically unnoticeable, without use of filling compound.

e. Provide signs with fine, even texture, flat and sound. Lines and miters sharp, arises unbroken, profiles accurate and ornament true to pattern. Plane surfaces to be smooth flat and without oil-canning, free of rack and twist. Maximum variation from plane of surface is plus or minus 0.015 inches. Restore texture to filed or cut areas.

f. Level or straighten wrought work. Provide members with sharp lines and angles, and smooth surfaces.

g. Extruded members to be free from extrusion marks. Square turns and corners sharp, curves true.

h. Drill holes for bolts and screws. Conceal fastenings where possible.

Exposed ends and edges mill smooth, with corners slightly rounded.

Form joints exposed to weather to exclude water.

i. Finish hollow signs with matching material on all faces, tops, bottoms and ends. Edge joints tightly mitered to give appearance of solid material.

j. All painted surfaces properly primed. Finish coating of paint to have complete coverage with no light or thin applications allowing substrate or primer to show. Finished surface must be smooth, free of scratches, gouges, drips, bubbles, thickness variations, foreign matter and other imperfections.

k. Movable parts, including hardware, are be cleaned and adjusted to operate as designed without binding of deformation of members. Doors and covers centered in opening or frame. All contact surfaces fit tight and even without forcing or warping components.

l. Pre-assemble items in shop to greatest extent possible to minimize

SECTION 10 14 00.20 Page 4 field splicing and assembly. Disassemble units only as necessary for shipping and handling limitations. Clearly mark units for re-assembly and coordinated installation.

m. No signs are to be manufactured until final sign message schedule and location review has been completed by the RE/COR and forwarded to Contractor.

PART 3 EXECUTION

3.1 INSTALLATION

a. Protect products against damage during field handling and installation. Protect adjacent existing and newly placed construction, landscaping and finishes as necessary to prevent damage during installation. Paint and touch up any exposed fasteners and connecting hardware to match color and finish of surrounding surface.

b. Mount signs in proper alignment, level and plumb according to the sign location plan and the dimensions given on elevation and sign location drawings. Install signs where best suited to provide a consistent appearance throughout the project, where otherwise not dimensioned.

Contact RE/COR for clarification, when exact position, angle, height or location is in doubt.

c. Contractor is responsible for all signs that are damaged, lost or stolen while materials are on the job site, until the completion and final acceptance of the job.

d. Remove or correct signs or installation work RE/COR determines as unsafe or as an unsafe condition.

e. At completion of sign installation, clean exposed sign surfaces.

Clean and repair any adjoining surfaces and landscaping that became soiled or damaged as a result of installation of signs.

f. Locate signs as shown on the Sign Location Plans.

g. Certain signs may be installed on glass. A blank glass back up is required to be placed on opposite side of glass exactly behind sign being installed. This blank glass back up is to be the same size as sign being installed.

h. Contractor will be responsible for verifying that behind each sign location there are no utility lines that will be affected by installation of signs. Any damage during installation of signs to utilities will be the sole responsibility of the Contractor to correct and repair.

i. Furnish inserts and anchoring devices which must be set in concrete or other material for installation of signs. Provide setting drawings, templates, instructions and directions for installation of anchorage devices which may involve other trades.

-- End of Section --

SECTION 10 14 00.20 Page 5

SECTION 10 21 13

TOILET COMPARTMENTS

01/07

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ALUMINUM ASSOCIATION (AA)

AA DAF45 (2003; Reaffirmed 2009) Designation System for Aluminum Finishes

ASTM INTERNATIONAL (ASTM)

ASTM B221 (2014) Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes

INTERNATIONAL CODE COUNCIL (ICC)

ICC A117.1 (2009) Accessible and Usable Buildings and Facilities

U.S. GENERAL SERVICES ADMINISTRATION (GSA)

CID A-A-60003 (Basic) Partitions, Toilet, Complete

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

36 CFR 1191 Americans with Disabilities Act (ADA) Accessibility Guidelines for Buildings and Facilities; Architectural Barriers Act (ABA) Accessibility Guidelines

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00.00 50 SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

Fabrication Drawings Installation Drawings

SD-03 Product Data

Cleaning and Maintenance Instructions Colors And Finishes

SECTION 10 21 13 Page 1

Doors, Panels and Pilasters Anchoring Devices and Fasteners Hardware and Fittings Brackets Door Hardware Toilet Enclosures Urinal Screens

Pilaster Shoes

SD-04 Samples

Colors and Finishes Hardware and Fittings Anchoring Devices and Fasteners

SD-07 Certificates

Warranty

1.3 REGULATORY REQUIREMENTS

Conform to ICC A117.1 code for access for the handicapped operation of toilet compartment door and hardware.

1.4 DELIVERY, STORAGE, AND HANDLING

Deliver materials in the manufacturer's original unopened packages with the brand, item identification, and project reference clearly marked.

Store components in a dry location that is adequately ventilated; free from dust, water, other contaminants, and damage during delivery, storage, and construction.

1.5 WARRANTY

Provide certification or warranties that metal toilet partitions will be free of defects in materials, fabrication, finish, and installation and will remain so for a period of not less than 15 years after completion.

PART 2 PRODUCTS

2.1 SYSTEM REQUIREMENTS

Provide a complete and usable toilet partition system, including toilet enclosures, room entrance screens, urinal screens, system of panels, hardware, and support components. Furnish the partition system from a single manufacturer, with a standard product as shown in the most recent catalog data. Submit Fabrication Drawings for metal toilet partitions and urinal screens consisting of fabrication and assembly details to be performed in the factory. Submit manufacturer's Cleaning and Maintenance Instructions with Fabrication Drawings for review.

2.2 MATERIALS

2.2.1 Doors, Panels and Pilasters

Doors, panels, and pilasters shall be 1 inch thick, constructed from High Density Polyethylene (HDPE) resins. Partitions shall be fabricated from polymer resins compounded under high pressure, forming a single component

SECTION 10 21 13 Page 2 which is waterproof, nonabsorbent and has a self-lubricating surface that resists marks from pens, pencils, markers, and other writing instruments.

All plastic components shall be covered with a protective plastic masking.

2.2.2 Anchoring Devices and Fasteners

Provide stainless steel torx head with pin anchoring devices and fasteners after fabrication. Conceal all stainless steel anchoring devices.

2.2.3 Brackets

Continuous brackets are fabricated from heavy-duty aluminum, are 54 inches long, and are two rear panel bracket style.

2.2.4 Hardware and Fittings

2.2.4.1 General Requirements

Conform hardware for the toilet partition system to CID A-A-60003 for the specified type and style of partitions. Provide hardware finish highly resistant to alkalis, urine, and other common toilet room acids. Comply latching devices and hinges for handicap compartments with 36 CFR 1191 ;

provide stainless steel devices and hinges with door latches that operate without either tight grasping or twisting of the wrist of the operator.

Material Conformance Standard

Aluminum ASTM B221

2.2.4.2 Finishes

a. Aluminum shall have a clear anodic coating conforming to AA DAF45.

b. Exposed fasteners shall match the hardware and fittings.

2.2.5 Door Hardware

2.2.5.1 Hinges

Provide integral hinge system to consist of 1/2 inch diameter nylon gravity CAM unit with a 3/16 inch stainless steel center pin for the bottom, and a 1/2 inch nylon rod for the top. The closing position of each hinge shall be fully adjustable.

Hinge shall be adjustable to hold in-swinging doors open at any angle up to 90 degrees and out-swinging doors to 10 degrees.

2.2.5.2 Latch and Pull

Latch and pull shall be fabricated from heavy-duty extruded aluminum (6463-T5 Alloy). Slide bolt shall have a black anodized finish. Latch is mounted to the door with stainless steel theft-resistant bolts.

2.2.5.3 Coat Hooks

Coat hooks shall be in a Zamac Alloy with satin finish.

SECTION 10 21 13 Page 3

2.3 PARTITION PANELS AND DOORS

2.3.1 Toilet Enclosures

Conform toilet enclosures to CID A-A-60003 , Type I, Style C, overhead braced. Furnish width, length, and height of toilet enclosures as shown.

Provide a width of 1 inch. Finish surface of panels shall be solid HDPE plastic, Finish 5; water resistant; graffiti resistant; non-absorbent; 1/4 inch radius beveled edges. Provide grab bars to withstand a bending stress, shear stress, shear force, and a tensile force induced by 250 lbf.

Grab bars shall not rotate within their fittings. This item may contain post-consumer or post-industrial recycled content.

2.3.2 Urinal Screens

Conform urinal screens to CID A-A-60003 , Type III, Style A, floor supported, wall hung.. Provide finish for surface of screens as solid HDPE plastic, Finish 5; water resistant; graffiti resistant; non-absorbent; 1/4 inch radius beveled edges. This item may contain post-consumer or post-industrial recycled content. Furnish width and height of urinal screens as shown. Provide thickness of 1 inch. Secure wall hung urinal screens with a minimum of three wall stirrup brackets. Fabricate screens from the same types of panels and pilasters as the toilet partitions. Use corrosion-resistant steel fittings and fasteners.

2.4 FLOOR-ANCHORED PARTITIONS

Pilasters shall be not less than 1-1/4 inch thick with face sheets not less than 0.0635 inch thick. Provide anchoring device at the bottom of the pilaster consisting of a steel bar not less than 1/2 by 7/8 inch welded to the reinforced face sheets and having not less than two 3/8 inch round anchorage devices for securing to the floor slab. Provide anchorage devices complete with threaded rods, expansion shields, lock washers, and leveling-adjustment nuts. Trim piece at the floor shall be 3 inch high and fabricated from not less than 0.030 inch thick corrosion-resistant steel.

2.5 OVERHEAD-BRACED PARTITIONS

Pilasters shall be not less than 1-1/4 inch thick with face sheets not less than 0.0393 inch thick. Provide anchoring device at the bottom of the pilaster consisting of a channel-shaped floor stirrup fabricated from not less than 0.0635 inch thick material and a leveling bolt. Secure the stirrup to the pilaster with not less than a 3/16 inch bolt and nut after the pilaster is leveled. Secure the stirrup to the floor with not less than two lead expansion shields and sheetmetal screws. Fabricate overhead brace from a continuous extruded aluminum tube not less than 1 inch wide by 1-1/2 inch high, 0.125-inch wall thickness. Finish shall be AA-C22A31 in accordance with AA DAF45. Set and secure brace into the top of each pilaster. Fabricate 3 inch high trim piece at the floor from not less than 0.030 inch thick corrosion-resistant steel.

2.6 PILASTER SHOES

Provide shoes at pilasters to conceal floor-mounted anchorage. Pilaster shoes shall be stainless steel. Height shall be 3 inches.

SECTION 10 21 13 Page 4

2.7 HARDWARE

Provide hardware for the toilet partition system that conforms to CID A-A-60003 for the specified type and style of partitions. Provide hardware pre-drilled by manufacturer. Use a hardware finish that is highly resistant to alkalis, urine, and other common toilet room acids.

Provide latching devices and hinges for handicap compartments complying with 36 CFR 1191 and stainless steel door latches that operate without either tight grasping or twisting of the wrist of the operator. Use stainless steel, tamper proof type screws and bolts. Wall mounting brackets must be continuous, full height, stainless steel, in accordance with toilet compartment manufacturer's instructions. Provide floor-mounted anchorage consisting of corrosion-resistant anchoring assemblies with threaded rods, lock washers, and leveling adjustment nuts at pilasters for structural connection to floor.

2.8 COLORS AND FINISHES

2.8.1 Colors

Provide manufacturer's standard color charts for color of finishes for toilet partition system components.

2.8.2 Finishes No. 5

Provide solid plastic fabricated of solid HDPE plastic formed under high pressure rendering a single component section not less than one inch thick. Colors shall extend throughout the panel thickness. Provide exposed finish surfaces: smooth, waterproof, non-absorbent, and resistant to staining and marking with pens, pencils, or other writing devices.

Solid plastic partitions shall not show any sign of deterioration when immersed in the following chemicals and maintained at a temperature of 80 degrees F for a minimum of 30 days:

Acetic Acid (80 percent) Hydrochloric Acid (40 percent)

Acetone Hydrogen Peroxide (30 percent)

Ammonia (liquid) Isopropyl Alcohol

Ammonia Phosphate Lactic Acid (25 percent)

Bleach (12 percent) Lime Sulfur

Borax Nicotine

Brine Potassium Bromide

Caustic Soda Soaps

Chlorine Water Sodium Bicarbonate

Citric Acid Trisodium Phosphate

SECTION 10 21 13 Page 5

Copper Chloride Urea; Urine

Core Oils Vinegar

PART 3 EXECUTION

3.1 PREPARATION

Take field measurements prior to the preparation of drawing and fabrication to ensure proper fits. Verify that field measurements, surfaces, substrates and conditions are as required, and ready to receive work. Verify correct spacing of plumbing fixtures. Verify correct location of built in framing, anchorage, and bracing. Report in writing to Contracting Officer prevailing conditions that will adversely affect satisfactory execution of the work of this section. Do not proceed with work until unsatisfactory conditions have been corrected.

3.2 INSTALLATION

Install partitions rigid, straight, plumb, and level, with the panels centered between the fixtures. Provide a panel clearance of not more than 1/2 inch and secure the panels to walls and pilasters with not less than two wall brackets attached near the top and bottom of the panel. Locate wall brackets so that holes for wall bolts occur in masonry or tile joints. Secure Panels to pilasters with brackets matching the wall brackets. Provide for adjustment due to minor floor variations. Locate head rail joints at pilaster center lines. Install adjacent components for consistency of line and plane. Equip each door with hinges, one door latch, and one coat hook and bumper. Align hardware to uniform clearance at vertical edges of doors.

a. Secure panels to hollow plastered walls with toggle bolts using not less than 1/4-20 screws of the length required for the wall thickness. Toggle bolts shall have a load-carrying strength of not less than 600 pounds per anchor.

b. Secure panels to ceramic tile on hollow plastered walls or hollow concrete-masonry walls with toggle bolts using not less than 1/4-20 screws of the length required for the wall thickness. Toggle bolts shall have a load-carrying strength of not less than 600 pounds per anchor.

c. Secure panels to solid masonry or concrete with lead or brass expansion shields designed for use with not less than 1/4-20 screws, with a shield length of not less than 1-1/2 inch. Expansion shields shall have a load-carrying strength of not less than 600 pounds per anchor.

d. Submit Installation Drawings for metal toilet partitions and urinal screens showing plans, elevations, details of construction, hardware, reinforcing and blocking, fittings, mountings and escutcheons.

Indicate on drawings the type of partition, location, mounting height, cutouts, and reinforcement required for toilet-room accessories.

3.3 FLOOR-ANCHORED PARTITIONS

Secure pilasters to the floor with the anchorage device specified. Make all leveling devices readily accessible for leveling, plumbing, and

SECTION 10 21 13 Page 6 tightening the installation. Level tops of doors with tops of pilasters when doors are in a closed position. Expansion shields shall have a minimum 2-inch penetration into the concrete slab.

3.4 OVERHEAD-BRACED PARTITIONS

Secure pilasters to the floor with the anchorage device specified. Make all leveling devices readily accessible for leveling, plumbing, and tightening the installation. Secure overhead brace to the pilaster face with not less than two fasteners per face. Expansion shields shall have a minimum 2-inch penetration into the concrete slab. Make tops of doors parallel with the overhead brace when doors are in a closed position.

3.5 FINAL ADJUSTMENT

After completion of the installation, make final adjustments to the pilaster-leveling devices, door hardware, and other working parts of the partition assembly. Doors shall have a uniform vertical edge clearance of approximately 3/16 inch and shall rest open at approximately 30 degrees when unlatched.

3.6 CLEANING

Clean all surfaces of the work, and adjacent surfaces soiled as a result of the work, in an approved manner compliant with the manufacturer's recommended cleaning and protection from damage procedures until accepted. Remove all equipment, tools, surplus materials, and work debris from the site.

SECTION 10 21 13 Page 7

SECTION 10 28 13

TOILET ACCESSORIES

07/06

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM C1036 (2010; E 2012) Standard Specification for Flat Glass

UNDERWRITERS LABORATORIES (UL)

UL 507 (1999; Reprint Jun 2012) Standard for Electric Fans

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00.00 50 SUBMITTAL PROCEDURES:

SD-03 Product Data

Finishes Accessory Items

SD-07 Certificates

Accessory Items

SD-10 Operation and Maintenance Data

Electric Hand Dryer; G

1.3 DELIVERY, STORAGE, AND HANDLING

Wrap toilet accessories for shipment and storage, then deliver to the jobsite in manufacturer's original packaging, and store in a clean, dry area protected from construction damage and vandalism.

1.4 WARRANTY

Provide manufacturer's standard performance guarantees or warranties that extend beyond a 1 year period.

SECTION 10 28 13 Page 1

PART 2 PRODUCTS

2.1 MANUFACTURED UNITS

Provide each accessory item complete with the necessary mounting plates of sturdy construction with corrosion resistant surface.

2.1.1 Anchors and Fasteners

Provide anchors and fasteners capable of developing a restraining force commensurate with the strength of the accessory to be mounted and suited for use with the supporting construction. Provide tamperproof design exposed fasteners with finish to match the accessory.

2.1.2 Finishes

Except where noted otherwise, provide the following finishes on metal:

Metal Finish

Stainless steel No. 4 satin finish

2.2 ACCESSORY ITEMS

Conform to the requirements for accessory items specified below. Submit fasteners proposed for use for each type of wall construction, mounting, operation, and cleaning instructions and one sample of each other accessory proposed for use. Incorporate approved samples into the finished work, provided they are identified and their locations noted.

Submit certificate for each type of accessory specified, attesting that the items meet the specified requirements.

2.2.1 Grab Bar (GB)

Provide an 18 gauge, 1-1/4 inch grab bar OD Type 304 stainless steel.

Provide form and length for grab bar as indicated. Provide concealed mounting flange. Provide grab with satin finish. Furnish installed bars capable of withstanding a 500 pound vertical load without coming loose from the fastenings and without obvious permanent deformation. Allow 1-1/2 inch space between wall and grab bar.

2.2.2 Mirrors, Glass (MG)

Provide Type I transparent flat type, Class 1-clear glass for mirrors.

Glazing Quality q1 1/4 inch thick conforming to ASTM C1036. Coat glass on one surface with silver coating, copper protective coating, and mirror backing paint. Provide highly adhesive pure silver coating of a thickness which provides reflectivity of 83 percent or more of incident light when viewed through 1/4 inch thick glass, free of pinholes or other defects.

Provide copper protective coating with pure bright reflective copper, homogeneous without sludge, pinholes or other defects, of proper thickness to prevent "adhesion pull" by mirror backing paint. Provide mirror backing paint with two coats of special scratch and abrasion-resistant paint and baked in uniform thickness to provide a protection for silver and copper coatings which will permit normal cutting and edge fabrication.

SECTION 10 28 13 Page 2

2.2.3 Combination Paper Towel Dispenser/Waste Receptacle (PTDWR)

Provide semi-recessed dispenser/receptacle with a capacity of 400 sheets of C-fold, single-fold, or quarter-fold towel. Design waste receptacle to be locked in unit and removable for service. Provide tumbler key locking mechanism. Provide waste receptacle capacity of 12 gallons. Fabricate a minimum 0.03 inch stainless steel welded construction unit with all exposed surfaces having a satin finish. Provide waste receptacle that accepts reusable liner standard for unit manufacturer.

2.2.4 Sanitary Napkin Disposer (SND)

Construct a Type 304 stainless steel sanitary napkin disposal with removable leak-proof receptacle for disposable liners. Provide fifty disposable liners of the type standard with the manufacturer. Retain receptacle in cabinet by tumbler lock. Provide disposer with a door for inserting disposed napkins, surface mounted.

2.2.5 Soap Dispenser (SD)

Provide soap dispenser surface mounted, liquid type consisting of a vertical Type 304 stainless steel tank with holding capacity of 40 fluid ounces with a corrosion-resistant all-purpose valve that dispenses liquid soaps, lotions, detergents and antiseptic soaps.

2.2.6 Shelf, Metal, Heavy Duty (SMHD)

Furnish a minimum 18 gauge stainless steel heavy duty metal shelf with hemmed edges. Provide shelves over 30 inch with intermediate supports.

Provide minimum of 16 gauge supports, welded to the shelf, and spaced no more than 30 inch apart.

2.2.7 Hand Sanitizer Dispenser (HSD)

Provide hand sanitizer dispensers complete with mounting brackets, batteries as recommended by manufacturer, sanitizer solution, and one bottle of refill sanitizer solution for each dispenser installed.

Dispenser properties and characteristics:

a. Wall mounted

b. Battery operated

c. Automatic, touchless type that dispenses sanitizer when a hand is placed in proximity of a sensor

d. Integral tray below the dispensing portal to catch wasted sanitizer

e. Operated using standard size batteries such as AA cells

2.2.8 Toilet Tissue Dispenser (TTD)

Furnish Type II - surface mounted toilet tissue holder with two rolls of standard tissue stacked vertically. Provide stainless steel, satin finish cabinet.

2.2.9 Electric Hand Dryer (EHD)

Provide polycarbonate casing, touch-free infrared activation hand dryer;

110-120V, AC, 60 Hz 1400 W rated power. Motor speed 92,000 rpm. Airspeed at aperture 400 mph (minimum). Color finish shall be silver/gray gloss lacquer; anti-microbial integrated external plastics and seal and pressed anti-rust steel backplate. Include tamperproof exterior screws. Dryer

SECTION 10 28 13 Page 3 shall include anti-microbial HEPA filter. Hand dryer shall be ETL listed in accordance with UL 507 and ADAAG compliant, HACCP certified.

2.2.10 Mop and Broom Holder (MH)

Stainless steel with grip jaw cam mechanism securing 4 mop or broom handles. Also includes hooks and storage shelf.

PART 3 EXECUTION

3.1 INSTALLATION

Provide the same finish for the surfaces of fastening devices exposed after installation as the attached accessory. Provide oval exposed screw heads. Install accessories at the location and height indicated. Protect exposed surfaces of accessories with strippable plastic or by other means until the installation is accepted. After acceptance of accessories, remove and dispose of strippable plastic protection. Coordinate accessory manufacturer's mounting details with other trades as their work progresses. After installation, thoroughly clean exposed surfaces and restore damaged work to its original condition or replace with new work.

3.1.1 Recessed Accessories

Fasten accessories with wood screws to studs, blocking or rough frame in wood construction. Set anchors in mortar in masonry construction. Fasten to metal studs or framing with sheet metal screws in metal construction.

3.1.2 Surface Mounted Accessories

Mount on concealed backplates, unless specified otherwise. Conceal fasteners on accessories without backplates. Install accessories with sheet metal screws or wood screws in lead-lined braided jute, PTFE or neoprene sleeves, or lead expansion shields, or with toggle bolts or other approved fasteners as required by the construction. Install backplates in the same manner, or provide with lugs or anchors set in mortar, as required by the construction. Fasten accessories mounted on gypsum board and plaster walls without solid backing into the metal or wood studs or to solid wood blocking secured between wood studs, or to metal backplates secured to metal studs.

3.2 CLEANING

Clean material in accordance with manufacturer's recommendations. Do not use alkaline or abrasive agents. Take precautions to avoid scratching or marring exposed surfaces.

SECTION 10 28 13 Page 4

SECTION 12 24 13

ROLLER WINDOW SHADES

08/10

PART 1 GENERAL

1.1 GENERAL REQUIREMENTS

Provide roller window shades, complete with necessary brackets, fittings, and hardware as indicated. Mount and operate equipment in accordance with manufacturer's instructions. Windows to receive a shade shall be completely covered.

a. Submit drawings showing plans, elevations, sections, product details, installation details, operational clearances, wiring diagrams and relationship to adjacent work. Include the use of same room designations as indicated on the drawings.

b. Provide manufacturer's data composed of catalog cuts, brochures, product information, and operating and maintenance instructions on each product to be used. Include styles, profiles and features.

c. Furnish samples of each type and color of roller shade fabric and roller shade channel. Shade material shall be minimum6 by 6 inch in size. Mark face of material to indicate interior faces.

d. Mock up: Install shade in area designated by Contracting Officer. Do not proceed with remaining work until the Contracting Officer approves workmanship and operation. Re-work mock-up as required to produce acceptable work. The approved shade can be used in installation.

e. Submit fire resistance data, flame spread and smoke contribution data.

1.2 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM G21 (2013) Determining Resistance of Synthetic Polymeric Materials to Fungi

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 701 (2015) Standard Methods of Fire Tests for Flame Propagation of Textiles and Films

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00.00 50 SUBMITTAL PROCEDURES

SECTION 12 24 13 Page 1

SD-02 Shop Drawings

Installation

SD-03 Product Data

Window Shades

SD-04 Samples

Window Shades

SD-06 Test Reports

Window Shades

SD-08 Manufacturer's Instructions

Window Shades

SD-10 Operation and Maintenance Data

Window Shades

1.4 QUALITY ASSURANCE

1.4.1 Qualifications

1.4.1.1 Manufacturer's Qualifications

Obtain motor-controlled roller shades through one source from a single manufacturer with a minimum of twenty years experience and minimum of three projects of similar scope and size in manufacturing products comparable to those specified in this section.

1.4.1.2 Installer's Qualifications

Installer trained and certified by the manufacturer with a minimum of ten years experience in installing products comparable to those specified in this section.

1.4.2 Flammability Requirements

Passes in accordance with NFPA 701 small and large-scale vertical burn.

Materials tested shall be identical to products proposed for use.

1.4.3 Anti-Microbial Requirements

'No Growth' per ASTM G21 results for fungi ATCC9642, ATCC 9644, ATCC9645.

1.5 DELIVERY, STORAGE, AND HANDLING

Deliver components to the jobsite in the manufacturer's original packaging with the brand or company name, item identification, and project reference clearly marked. Store components in a dry location that is adequately ventilated and free from dust, water, or other contaminants and has easy access for inspection and handling. Store materials flat in a clean dry area with temperature maintained above 50 degrees F. Do not open

SECTION 12 24 13 Page 2 containers until needed for installation unless verification inspection is required.

1.6 WARRANTY

Provide 10 year minimum limited warranty.

PART 2 PRODUCTS

2.1 WINDOW SHADES

Roller tube shall operate smoothly and be of sufficient diameter and thickness to prevent excessive deflection. Provide brackets that are appropriate for outside ceiling mount. The shade cloth shall meet the performance described in NFPA 701 , small scale test. Treat steel features for corrosion resistance.

2.1.1 Light Filtering Shades

Provide light filtering window shades to conform with the following:

a. Roller tube shall be extruded aluminum or steel. Diameter, wall thickness, and material to be selected by the manufacturer to accommodate the shade size. Provide roller idler assembly of molded nylon and zinc-plated steel pin. Sliding pin shall allow easy installation and removal of roller. Fabric shall be connected to the roller tube with double sided adhesive specifically developed to attach coated textiles to metal to eliminate horizontal impressions in fabric or attached with a spline lock system.

b. Fascia shall be L-shaped aluminum extrusion to conceal shade roller and hardware that snaps onto end caps without requiring exposed fasteners of any kind. Fascia can be mounted continuously across two or more shade bands.

c. End caps shall be stamped steel with universal design suitable for mounting to window mullions. Provide size compatible with roller size. End cap covers shall match fascia/headbox finish.

d. Provide hardware that allows for field adjustment or removal of shade roller tube and other operable hardware component without requiring removal of brackets and end or center supports. Provide hardware system that allows for operation of multiple shade bands by a single operator. Connectors shall be offset to assure alignment from the first to the last shade band. Provide shade hardware constructed of minimum 1/8 inch thick plated steel or heavier as required to support 150 percent of the full weight of each shade.

e. Manual Operated Chain Drive Hardware shall provide for universal, regular and offset drive capacity, allowing drive chain to fall at front, rear or non-offset for all shade drive end brackets. Universal offset shall be adjustable for future change. Provide positive mechanical engagement of drive mechanism to shade roller tube. The drive bracket shall be fully integrated with all accessories. Drive chain shall be #10 stainless steel chain rated to 90 lb. minimum breaking strength.

f. Shades at Office Spaces: Fabric shall have 5 percent openness.

SECTION 12 24 13 Page 3

2.2 COLOR

Provide color, pattern and texture for metal and shade fabric as indicated.

Color listed is not intended to limit the selection of equal colors from other manufacturers. Openness factor of shade fabric must be 5 percent.

PART 3 EXECUTION

3.1 FIELD MEASUREMENTS

After becoming familiar with details of the work, verify all dimensions in the field, and advise the Contracting Officer of any discrepancy before performing the work.

3.2 INSTALLATION

Perform installation in accordance with the approved detail drawings and manufacturer's installation instructions. Install units level, plumb, secure, and at proper height and location relative to window units.

Provide and install supplementary or miscellaneous items in total, including clips, brackets, or anchorages incidental to or necessary for a sound, secure, and complete installation. Do not start installation until completion of room painting and finishing operations.

3.3 CLEAN-UP

Upon completion of the installation, clean window treatments and adjust them for form and appearance and proper operating condition. Repair or replace damaged units as directed by the Contracting Officer. Isolate metal parts from direct contact with concrete, mortar, or dissimilar metals. Ensure shades installed in recessed pockets can be removed without disturbing the pocket. The entire shade, when retracted, shall be contained inside the pocket. For shades installed outside the jambs and mullions, overlap each jamb and mullion 0.75 inch or more when the jamb and mullion sizes permit. Include all hardware, brackets, anchors, fasteners, and accessories necessary for a complete, finished installation.

SECTION 12 24 13 Page 4

SECTION 12 48 13

ENTRANCE FLOOR MATS

02/14

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM D2047 (2011) Static Coefficient of Friction of Polish-Coated Floor Surfaces as Measured by the James Machine

ASTM D5793 (2013) Binding Sites Per Unit Length or Width of Pile Yarn Floor Coverings

ASTM D6859 (2011) Standard Test Method for Pile Thickness of Finished Level Pile Yarn Floor Coverings

ASTM E648 (2014c) Standard Test Method for Critical Radiant Flux of Floor-Covering Systems Using a Radiant Heat Energy Source

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

36 CFR 1191 Americans with Disabilities Act (ADA) Accessibility Guidelines for Buildings and Facilities; Architectural Barriers Act (ABA) Accessibility Guidelines

1.2 SUSTAINABILITY

Materials in this technical specification may contribute towards contract compliance with sustainability requirements.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00.00 50 SUBMITTAL PROCEDURES:

SD-03 Product Data

Entrance Floor Mats

Adhesives and Concrete Primers

SD-04 Samples

SECTION 12 48 13 Page 1

Entrance Floor Mats

SD-08 Manufacturer's Instructions

Manufacturer's Instructions

SD-10 Operation and Maintenance Data

Protection, Maintenance, and Repair Information

1.4 QUALITY ASSURANCE

Comply with 36 CFR 1191 Americans with Disabilities Act (ADA) Accessibility Guidelines for Buildings and Facilities; Architectural Barriers Act (ABA) Accessibility Guidelines for installed entrance floor mats and frames. Ensure entrance floor mats and frames are slip resistant in accordance with ASTM D2047, Coefficient of Friction, minimum 0.60 for accessible routes and be structurally capable of withstanding a Uniform floor load of 300 lbf/sq. ft. and wheel load of 350 lb./wheel. Ensure flammability is in accordance with ASTM E648, Class 1, Critical Radiant Flux, minimum 0.45 watts/m2.

1.5 DELIVERY OF MATERIALS

Deliver materials to the project site in their original packages or containers bearing labels clearly identifying the manufacturer, brand name, and quality or grade.

Store materials in their original unbroken packages or containers in the area in which they will be installed. Unwrap, inspect, and place mats at indicated location. Remove all excess packing materials.

PART 2 PRODUCTS

2.1 Entrance Floor Mats

Submit manufacturer's catalog data. Submit sample of assembled sections of floor mat showing corners, intersections, and other details of construction. Submit samples of exposed floor mat, frame finish and accessories.

2.1.1 Carpet-Type Mats

Nylon carpet bonded to 1/8 inch to 1/4 inch thick, flexible vinyl backing to form mats 7/16 inch thick with non-raveling edges.

2.1.2 Entry Floor Tile F1

2.1.2.1 Carpet Selection

As indicated on drawings, or approved equal.

2.1.2.2 Type

Tile 24 by 24 inch.

2.1.2.3 Pile Type

Patterned loop.

SECTION 12 48 13 Page 2

2.1.2.4 Pile Fiber

Commercial 100 percent branded (federally registered trademark) nylon.

2.1.2.5 Gauge or Pitch

Minimum 1/2 inch in accordance with ASTM D5793.

2.1.2.6 Stitches or Rows/Wires

Minimum 8.0 per square inch.

2.1.2.7 Pile Height

Minimum .187 inch in accordance with ASTM D6859.

2.1.2.8 Dye Method

Solution dyed.

2.1.2.9 Backing

Non-woven synthetic fiber.

2.1.2.10 Cushion

As indicated on drawings, or approved equal.

2.2 ADHESIVES AND CONCRETE PRIMERS

Provide adhesives and concrete primers, where required, according to manufacturer's recommendations.

2.3 COLOR AND SIZE

Ensure color is in accordance with the drawings, as indicated. Size of mat is as indicated.

PART 3 EXECUTION

3.1 EXAMINATION

Comply with manufacturer's requirements of substrates and floor…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.