DEQ Plan Approval letter

View the file

Other files

File Type Posted
Amendment_0006_-_W91236-17-R-0001.pdf PDF
Amendment_0005_-_W91236-17-R-0001.pdf PDF
Amendment_0004_-_W91236-17-R-0001_Aircraft_Apron_Airfield_Site_Improvement.pdf PDF
Bidder_Inquiry_FINAL_23_Jan_18_-_ProjNet.pdf PDF
AM04_AVC_Phase_I.pdf PDF
Bidder_Inquiry_FINAL_22_Jan_18_-_ProjNet.pdf PDF
Amendment_0004_-_W91236-17-R-0001_Aircraft_Apron_Airfield_Site_Improvement.pdf PDF
Bidder_Inquiry_FINAL_22_Jan_18_-_ProjNet.pdf PDF
CJ113.pdf PDF
GC106.pdf PDF
CS113.pdf PDF
CS304.pdf PDF
LP113.pdf PDF
CS303.pdf PDF
CS107.pdf PDF
Amendment_0003_-_W91236-17-R-0001_Aircraft_Apron_Airfield_Site_Improvement.pdf PDF
CS301.pdf PDF
CP515.pdf PDF
CG143.pdf PDF
LP114.pdf PDF
LP107.pdf PDF
CS407.pdf PDF
Aircraft_Apron__Airfield_Timber_Inventory_-_Jul-2016.pdf PDF
CS402.pdf PDF
G-005.pdf PDF
CS403.pdf PDF
CS302.pdf PDF
CG137.pdf PDF
GC107.pdf PDF
GC105.pdf PDF
Sheets_621_631_721_731.pdf PDF
G-006.pdf PDF
AC_Revised_Sheets_2017-12-04.pdf PDF
AC_RTA_Geotech_Vert_2017-07-12.pdf PDF
FT_Eustis_CY17_Utility_Rates_Combined.pdf PDF
Amendment_0002_-_W91236-17-R-0001.pdf PDF
01_11_00.00_50_Revised_12.13.2017.pdf PDF
Aviation_Complex_Phase_I_Sign_in_Sheet_and_Summary.pdf PDF
ACPh1RTAPlansVol320171109.pdf PDF
ACPh1RTASpecsPart120171109.pdf PDF
AC_RTA_Geotech_Horiz_2017-07-12.pdf PDF
ACPh1RTAPlansVol1PartB20171109.pdf PDF
Amendment_0001_-_W91236-17-R-0001_Aircraft_Apron_Airfield_Site_Improvement.pdf PDF
W91236-17-R-0001_Aircraft_Apron_Airfield_Site_Improvement.pdf PDF
ACPh1RTAPlansVol1PartA20171109.pdf PDF
ACPh1RTASpecsPart320171109.pdf PDF
ACPh1RTAPlansVol220171109.pdf PDF
ACPh1RTASpecsPart220171109.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Molly JosqA Ward Secretary of Natural Resources

COMMONWEALTH of VIRGINIA

DEPARTMENT OF ENVIRONMENTAL QUALITY

Street address: 629 East Main Street, Richmond, Virginia 23219 Mailing address: P.O. Box 1 105, Richmond, Virginia 23218 www.deq. virginia. gov

August 31, 2017

David K. Paylor Director

(804) 698-4000 1-800-592-5482

Mr. John D. Wall, Jr., PE, CFM Us Army Corps of Engineers Norfolk District Norfolk, Virginia (757)201-7648

Re: Aviation Complex Newport News, Virginia

DEQ SWM #: TRO-16-299

Stormwater Management (SWM) / Erosion and Sediment Control (ESC) Plan and Flooding Criteria Exception

The Dq)artment of Environmental Quality (DEQ) has reviewed the combined Stonnwater Management and Erosion & Sediment Control Plan received on July 26, 2017 containing the exception from the flooding criteria and the deviations from the ESC Handbook in accordance with the Virginia Stormwater Management Act and attendant Regulations and the Virginia Erosion and Sediment Control Law and attendant Regulations. The Plan, design date-stamped on July 5, 2017, the flooding criteria exception, and the deviations from the ESC Handbook are hereby approved and a copy of the Plan is enclosed. No changes may be made to the approved Plan without obtaining prior approval from DEQ.

As provided by Rule 2A:2 of the Supreme Court of Virginia, you have thirty (30) days from the date you received this decision within which to appeal this decision by filing a notice of appeal in accordance with the Rules of the Supreme Court of Virginia with the Director, Virginia Department of Environmental Quality.

At your earliest convenience, please submit one digital copy (PDF preferred) of the approved Plan and accompanying specifications to DEQ at the following address:

Department of Environmental Quality Attn: Erin Belt, Stormwater Plan Reviewer

5636 Southern Boulevard

Virginia Beach, Virginia 23462

August 31, 2017 Re: DEQ Plan #: TRO-16-299

It is the responsibility of the owner and/or operator to ensure that the project is constructed in accordance with the approved Plan and accompanying specifications. Upon completion of the project, the owner and/or operator will be required to submit a construction record drawing for all permanent stonnwater management facilities (i. e., post-development best management practices) constructed in accordance with the approved Plan.

Prior to the commencement of construction, all land-disturbing activities equal to or greater than one acre, or less than one acre and part of a larger common plan of development or sale, must register for coverage under the General VPDES Permit for Discharges of Stormwater from Constmction Activities (VAR10). If not already submitted, a copy of the 2014 General Permit registration statement can be obtained from DEQ's website at the following location:

http://www.deq. Virginia. gov/Portals/0/DEO/Water/Publications/CGPRegistrationStatement2014.

pdf

Please contact Erin Belt at (757) 374-4621 or erin.belt@deq. virginia. gov if you have any questions about this letter.

Sincerely, Cyu inJL^^vL^^- Jaime L. Bauer, Manager Office of Stormwater Management

Cc: Janet Weyland, DEQ-TRO Ben Leach, DEQ-CO Larry Gavan, DEQ-CO Johnny L. Grandison Jr., USAGE - Norfolk District Pete Jarchow, PE, HNTB Corporation Selim Zaman, PE, HNTB Corporation File