Utah_NG_MATOC_Preproposal_Conference_21_May_2013.pdf

PDF 3 MB Posted

Attached to
Multiple Award Task Order Contract (MATOC), Utah National Guard Federal contract opportunity
Solicitation number
W911YP-13-R-2202
Issued by
Department of the Army National Guard

About this file

Pre-Proposal Slides

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Task Order Contract (MATOC), Utah National Guard, newest first.
File Type Posted
RFI_5-05June2013.pdf PDF
RFI_4-22May2013.pdf PDF
Pre-Proposal_Meeting_Minutes_-_13-R-2202_-_Signed.pdf PDF
Sign_In_Sheet.pdf PDF
RFI__3_-_16_May_2013.pdf PDF
Prototypical_Proj_B55_100percent_Half_Size_Dwgs.pdf PDF
Utah_Prototypical_Proj-B55_100_percent_Specs.pdf PDF
A-11_MATOC_Exhibits_A_-C_-_1_May.docx DOCX document
A-11_MATOC_Exhibit_D_-_1_May.docx DOCX document
RFI__1_-_08_May_2013.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRE-PROPOSAL CONFERENCE

21 May 2013

8a Competitive Multiple Award

Indefinite Delivery, Indefinite Quantity(IDIQ)

Contract

5 YEARS

BASE is 2 YEAR PERIOD

PLUS

3 ONE YEAR OPTIONS

“SCOPE”

Covers a broad range of maintenance, repair, & construction services to include Design Build services

FEDERAL CONTRACTING OFFICERS

AT

ANY NATIONAL GUARD UNIT

IN UTAH MAY AWARD TASK ORDERS

DoD FEDERAL CONTRACTING OFFICERS IN STATE OF

UTAH WITH PRIOR APPROVAL FROM PCO

Utah Air National Guard Salt Lake City International Airport

Utah Army National Guard

Draper Camp Williams

West Jordan St. George

$20,000,000.00 per contractor over the life of the contract

• Once you reach a total of $20M no more offers will be made

$5,000,000.00 Per Task Order for the General Task Order Contract

(In Rare Cases Over $5M)

$200 MINIMUM ORDER which will be issued at time of basic contract award

A Minimum Of Seven (7) 8a Business Awards Anticipated

• All awards will be to SBA Certified 8(a) firms located within the geographical area serviced by the Utah District SBA Office, and other 8(a) construction firms with a bona fide place of business within the geographical competitive area, and the assigned NAICS code (subject to Utah District SBA approval).

NOTE:

8(a) Contractors must have approved business plans on file and serviced by Utah District Office SBA

THE FOLLOWING IS A BRIEF OVERVIEW OF

THE PROPOSAL REQUIREMENTS

OFFERORS ARE CAUTIONED TO

CAREFULLY READ THE REQUIREMENTS

OF THE SOLICITATION AND COMPLY

ACCORDINGLY

Section 00110 of the RFP details required information and format

• 3 Volumes In 2 Binders are required

• BINDER 1

VOLUME 1 PRICE/COST, PRO FORMA DOCUMENTS

• BINDER 2

VOLUME 2 PAST PERFORMANCE REQUIREMENTS

VOLUME 3 TECHNICAL REQUIREMENTS

Cover Letter SF 1442 - Signed AREAS of CONSIDERATION- Section 00010

EXHIBIT E

• Price for Prototypical Project(s) REPS & CERTIFICATIONS – Section 00600

Volume 2 - Past Performance Proposal

• Complete Exhibit A -Performance Relevancy

Form: Up to 6 each Part 1/ One each Part 2

Have Subcontractors Complete- Exhibit B

• Subcontractor Consent and Information Form

List of Clients (name and number) you sent Exhibit C questionnaires to and/or final CCASS forms for the Exhibit A Part 1 projects

(Exhibit C Package) Send Questionnaires to References Introduction Letter, Exhibit C and Questionnaire

• References must return NLT the Closing Date to KO

Not to You – Closing date is 11 Jun 2013

• Email and Fax addresses available

• Do not include copies of what was sent in the proposal !

If you have a CCASS Final Evaluation for the project that may be included in lieu of sending form- place behind applicable Exhibit A

Offerors should carefully read section 00800- and DIVISION 01 before preparing proposal

• Important basic contract requirements and conditions are contained in these sections

Volume 3 -TECHNICAL PROPOSAL

• Read the sub factor requirements in Exhibit D LIMIT to

10 double sided pages (20 single pages) exclusive of tabs, indexes, dividers, and attachments listed in this exhibit. Any additional attachments you provide will be included in the page count provided

• Complete Exhibit D Answer questions carefully and thoroughly Include required Attachments Consider evaluating your proposal IAW

Section 00120 before submitting

Represents type of smaller projects that may be awarded under this contract

Measures contractors’ estimating system

Detailed in Section 00120 of the RFP CAREFULLY review sections 00100, 00110

& 00120 and 00800 through Division 01 (Section 01001-01700) when preparing proposal

Comply with Section 00100 AND 00110 requirements

Inquire in writing if you have questions

Failure to furnish a complete proposal may result in elimination from consideration

Choose your dollar levels carefully

• Consider bonding

• Experience and staff

These contracts let you grow over time

• If you are not found technically capable for the high of the price range you chose at the sole discretion of the contracting officer you may be offered an award at a lower price category but this is NOT a guarantee

Past Performance and Technical when combined are

SIGNIFICANTLY MORE

IMPORTANT than price

Best Value is defined as an award based on the greatest overall benefit in response to the requirement.

Award is based on other factors in addition to price.

The Contractors whose proposals provide the best value to the

Government, price and other non-cost factions considered will be awarded contracts

Every Contractor who is awarded a MATOC contract will be given a FAIR OPPORTUNITY to compete for the award of Task or Projects unless an exemption applies

Urgent or emergency requirements

Services are unique or highly specialized interest of economy and efficiency

Satisfy the minimum guarantee

NOTE: THIS IS NOT A

REQUIREMENTS CONTRACT

KO May limit competition or exclude a contractor for the following reasons:

• Satisfy Agency Small Business Program Goals Task Order Projects will be set-aside for HUB Zone and/or SDVB MATOC Contractors and/or Women Owned Business

• Failure to prosecute the work diligently on a current Task Order Award

• Order outside your areas of consideration

• The Master specification, also referred to as the default specification

• Establishes an industrial and/or commercial standards for maintenance and repair of Government Facilities •If SOW does not address a specification for an element of work, the master/default specification applies

Normal response time is two (2) days for site visit and three (3) days to thirty (30) for proposal depending on complexity

Contractors must be able to respond within 120 Minutes in the event of an emergency to view a site and possibly give a price.

MATOC contractors are required to have insurance while under contract- not just when the task order is issued.

You will have access to base for contract related events

Must be in place if responding to emergencies

Most current Davis Bacon Wage rates will apply to each MATOC Request for Proposal

• Link to Web site will be provided- Note the most current wage determination at time of award of Task Order applies to the Task Order

Performance and Payment bonds are established by each Task Order

• PAYMENT BOND - T.O.>$30K

• PERFORMANCE BOND - T.O.>$150K

KO establishes site visit & notifies MATOC Contractors by email

• Provides MATOC Project synopsis, offering letter and basis for award & when available SOW/Plans/Wage Rates etc.(RFQ/RFP) (Note in some instances this will be provided at the site visit)

• KO & Engineer conducts the site visit with MATOC Contractors

• KO validates proposal due date with Contractors

Contractor submits questions to KO who will provide answers to all

If necessary, engineer makes changes via addendum and forwards to KO who issues Amendment

Contractor submits price or best value proposal by hand carried, email, or fax as applicable

KO does evaluation and makes award upon receipt of funds

KO emails award notice to awardees Notifies all others of award only

• Normal method of distribution will be via email

• When issued on CD/DVD one set of project plans & specifications will be provided to each MATOC contractor at no cost.

• It is the MATOC contractors responsibility to notify their subcontractors and provide them copies.

• Electronic versions when available will be via email.

12:00 P.M.

11 June 2013

DON’T FORGET TO HAVE REFERENCES SENT IN

BY THIS TIME & DATE

Award is contemplated to be made without discussions- Do Not anticipate a chance to make corrections or changes

Your first proposal will probably be your only proposal!!

Read the solicitation requirements carefully!!

Consider using Section 00120 to “rate” yourself before submitting the proposal-is it complete??

All Amendments Will On The FBO Web Site Check Site Regularly For Changes & Refresh

The Page After Closing No Information Will Be Available

Until Award

• Awards Will Be Posted To The Web

• Results should be announced in Approximately 90

Days

Questions Must Be Submitted In Writing Via Email to- shelley.schrader@ang.af.mil

Submit Questions NLT COB on 03 June 2013 Submit Questions To KO Only Do Not Call

Other Government Personnel Questions Received Late May Be Held And

Addressed After RFP Closing With Those Who Submitted Offerors

Questions And Answers Will Be Posted To The Web Site Only mailto:shelley.schrader@ang.af.mil

All Questions, On A Non-Attribution Basis, And The Answers Will Be Posted To The FBO Web Site

If Necessary Addendums, Issued By An Amendment, Will Also Be Posted

Check Web Site Regularly And Don’t Forget To Refresh Web Page https://sam.gov http://www.gpo.gov/davisbacon/allstates.html https://www.fbo.gov

MULTIPLE AWARD�CONSTRUCTION SERVICES�TASK ORDER CONTRACT
Multiple Award Task�Order Contract "MATOC”
MATOC �PERIOD �OF �PERFORMANCE
Scope (work) of a MATOC Contract
Award of Task Orders
Choice of Locations
Dollar Limits of MATOC Contract
Dollar Limits of MATOC Contract
Number of Basic MATOC Awards
8(A) Contractor Requirements
Disclaimer
What to Submit
VOLUME I�Original and 3 Copies
Slide Number 14
Exhibit C
Section 00800- �Special Contract Provisions
VOLUME 3�Original and 3 Copies
The Prototypical Project
Proposal Evaluation
Proposal Evaluation� CONTINUED
Best Value Award Basis
Best Value Award Decision
MATOC Awards
Task Order Award & �Fair Opportunity
Fair Opportunity Exemptions
Other Times You May Not Be Given An Opportunity To Compete
Master Specification
Contractor’s Location
Insurance Requirements
Davis Bacon Wages & Bonds
Task Order Award�Execution Procedures
Task Order Award �Execution Procedures
Plans and Specifications
PROPOSALS ARE DUE� NOT �LATER THAN
Important Reminders
Important Reminders
Questions
Answers To Questions
Helpful Websites
Questions