Pre-Proposal Slides
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI_5-05June2013.pdf | ||
| RFI_4-22May2013.pdf | ||
| Pre-Proposal_Meeting_Minutes_-_13-R-2202_-_Signed.pdf | ||
| Sign_In_Sheet.pdf | ||
| RFI__3_-_16_May_2013.pdf | ||
| Prototypical_Proj_B55_100percent_Half_Size_Dwgs.pdf | ||
| Utah_Prototypical_Proj-B55_100_percent_Specs.pdf | ||
| A-11_MATOC_Exhibits_A_-C_-_1_May.docx | DOCX document | |
| A-11_MATOC_Exhibit_D_-_1_May.docx | DOCX document | |
| RFI__1_-_08_May_2013.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRE-PROPOSAL CONFERENCE
21 May 2013
8a Competitive Multiple Award
Indefinite Delivery, Indefinite Quantity(IDIQ)
Contract
5 YEARS
BASE is 2 YEAR PERIOD
PLUS
3 ONE YEAR OPTIONS
“SCOPE”
Covers a broad range of maintenance, repair, & construction services to include Design Build services
FEDERAL CONTRACTING OFFICERS
AT
ANY NATIONAL GUARD UNIT
IN UTAH MAY AWARD TASK ORDERS
DoD FEDERAL CONTRACTING OFFICERS IN STATE OF
UTAH WITH PRIOR APPROVAL FROM PCO
Utah Air National Guard Salt Lake City International Airport
Utah Army National Guard
Draper Camp Williams
West Jordan St. George
$20,000,000.00 per contractor over the life of the contract
• Once you reach a total of $20M no more offers will be made
$5,000,000.00 Per Task Order for the General Task Order Contract
(In Rare Cases Over $5M)
$200 MINIMUM ORDER which will be issued at time of basic contract award
A Minimum Of Seven (7) 8a Business Awards Anticipated
• All awards will be to SBA Certified 8(a) firms located within the geographical area serviced by the Utah District SBA Office, and other 8(a) construction firms with a bona fide place of business within the geographical competitive area, and the assigned NAICS code (subject to Utah District SBA approval).
NOTE:
8(a) Contractors must have approved business plans on file and serviced by Utah District Office SBA
THE FOLLOWING IS A BRIEF OVERVIEW OF
THE PROPOSAL REQUIREMENTS
OFFERORS ARE CAUTIONED TO
CAREFULLY READ THE REQUIREMENTS
OF THE SOLICITATION AND COMPLY
ACCORDINGLY
Section 00110 of the RFP details required information and format
• 3 Volumes In 2 Binders are required
• BINDER 1
VOLUME 1 PRICE/COST, PRO FORMA DOCUMENTS
• BINDER 2
VOLUME 2 PAST PERFORMANCE REQUIREMENTS
VOLUME 3 TECHNICAL REQUIREMENTS
Cover Letter SF 1442 - Signed AREAS of CONSIDERATION- Section 00010
EXHIBIT E
• Price for Prototypical Project(s) REPS & CERTIFICATIONS – Section 00600
Volume 2 - Past Performance Proposal
• Complete Exhibit A -Performance Relevancy
Form: Up to 6 each Part 1/ One each Part 2
Have Subcontractors Complete- Exhibit B
• Subcontractor Consent and Information Form
List of Clients (name and number) you sent Exhibit C questionnaires to and/or final CCASS forms for the Exhibit A Part 1 projects
(Exhibit C Package) Send Questionnaires to References Introduction Letter, Exhibit C and Questionnaire
• References must return NLT the Closing Date to KO
Not to You – Closing date is 11 Jun 2013
• Email and Fax addresses available
• Do not include copies of what was sent in the proposal !
If you have a CCASS Final Evaluation for the project that may be included in lieu of sending form- place behind applicable Exhibit A
Offerors should carefully read section 00800- and DIVISION 01 before preparing proposal
• Important basic contract requirements and conditions are contained in these sections
Volume 3 -TECHNICAL PROPOSAL
• Read the sub factor requirements in Exhibit D LIMIT to
10 double sided pages (20 single pages) exclusive of tabs, indexes, dividers, and attachments listed in this exhibit. Any additional attachments you provide will be included in the page count provided
• Complete Exhibit D Answer questions carefully and thoroughly Include required Attachments Consider evaluating your proposal IAW
Section 00120 before submitting
Represents type of smaller projects that may be awarded under this contract
Measures contractors’ estimating system
Detailed in Section 00120 of the RFP CAREFULLY review sections 00100, 00110
& 00120 and 00800 through Division 01 (Section 01001-01700) when preparing proposal
Comply with Section 00100 AND 00110 requirements
Inquire in writing if you have questions
Failure to furnish a complete proposal may result in elimination from consideration
Choose your dollar levels carefully
• Consider bonding
• Experience and staff
These contracts let you grow over time
• If you are not found technically capable for the high of the price range you chose at the sole discretion of the contracting officer you may be offered an award at a lower price category but this is NOT a guarantee
Past Performance and Technical when combined are
SIGNIFICANTLY MORE
IMPORTANT than price
Best Value is defined as an award based on the greatest overall benefit in response to the requirement.
Award is based on other factors in addition to price.
The Contractors whose proposals provide the best value to the
Government, price and other non-cost factions considered will be awarded contracts
Every Contractor who is awarded a MATOC contract will be given a FAIR OPPORTUNITY to compete for the award of Task or Projects unless an exemption applies
Urgent or emergency requirements
Services are unique or highly specialized interest of economy and efficiency
Satisfy the minimum guarantee
NOTE: THIS IS NOT A
REQUIREMENTS CONTRACT
KO May limit competition or exclude a contractor for the following reasons:
• Satisfy Agency Small Business Program Goals Task Order Projects will be set-aside for HUB Zone and/or SDVB MATOC Contractors and/or Women Owned Business
• Failure to prosecute the work diligently on a current Task Order Award
• Order outside your areas of consideration
• The Master specification, also referred to as the default specification
• Establishes an industrial and/or commercial standards for maintenance and repair of Government Facilities •If SOW does not address a specification for an element of work, the master/default specification applies
Normal response time is two (2) days for site visit and three (3) days to thirty (30) for proposal depending on complexity
Contractors must be able to respond within 120 Minutes in the event of an emergency to view a site and possibly give a price.
MATOC contractors are required to have insurance while under contract- not just when the task order is issued.
You will have access to base for contract related events
Must be in place if responding to emergencies
Most current Davis Bacon Wage rates will apply to each MATOC Request for Proposal
• Link to Web site will be provided- Note the most current wage determination at time of award of Task Order applies to the Task Order
Performance and Payment bonds are established by each Task Order
• PAYMENT BOND - T.O.>$30K
• PERFORMANCE BOND - T.O.>$150K
KO establishes site visit & notifies MATOC Contractors by email
• Provides MATOC Project synopsis, offering letter and basis for award & when available SOW/Plans/Wage Rates etc.(RFQ/RFP) (Note in some instances this will be provided at the site visit)
• KO & Engineer conducts the site visit with MATOC Contractors
• KO validates proposal due date with Contractors
Contractor submits questions to KO who will provide answers to all
If necessary, engineer makes changes via addendum and forwards to KO who issues Amendment
Contractor submits price or best value proposal by hand carried, email, or fax as applicable
KO does evaluation and makes award upon receipt of funds
KO emails award notice to awardees Notifies all others of award only
• Normal method of distribution will be via email
• When issued on CD/DVD one set of project plans & specifications will be provided to each MATOC contractor at no cost.
• It is the MATOC contractors responsibility to notify their subcontractors and provide them copies.
• Electronic versions when available will be via email.
12:00 P.M.
11 June 2013
DON’T FORGET TO HAVE REFERENCES SENT IN
BY THIS TIME & DATE
Award is contemplated to be made without discussions- Do Not anticipate a chance to make corrections or changes
Your first proposal will probably be your only proposal!!
Read the solicitation requirements carefully!!
Consider using Section 00120 to “rate” yourself before submitting the proposal-is it complete??
All Amendments Will On The FBO Web Site Check Site Regularly For Changes & Refresh
The Page After Closing No Information Will Be Available
Until Award
• Awards Will Be Posted To The Web
• Results should be announced in Approximately 90
Days
Questions Must Be Submitted In Writing Via Email to- shelley.schrader@ang.af.mil
Submit Questions NLT COB on 03 June 2013 Submit Questions To KO Only Do Not Call
Other Government Personnel Questions Received Late May Be Held And
Addressed After RFP Closing With Those Who Submitted Offerors
Questions And Answers Will Be Posted To The Web Site Only mailto:shelley.schrader@ang.af.mil
All Questions, On A Non-Attribution Basis, And The Answers Will Be Posted To The FBO Web Site
If Necessary Addendums, Issued By An Amendment, Will Also Be Posted
Check Web Site Regularly And Don’t Forget To Refresh Web Page https://sam.gov http://www.gpo.gov/davisbacon/allstates.html https://www.fbo.gov
| MULTIPLE AWARD�CONSTRUCTION SERVICES�TASK ORDER CONTRACT |
| Multiple Award Task�Order Contract "MATOC” |
| MATOC �PERIOD �OF �PERFORMANCE |
| Scope (work) of a MATOC Contract |
| Award of Task Orders |
| Choice of Locations |
| Dollar Limits of MATOC Contract |
| Dollar Limits of MATOC Contract |
| Number of Basic MATOC Awards |
| 8(A) Contractor Requirements |
| Disclaimer |
| What to Submit |
| VOLUME I�Original and 3 Copies |
| Slide Number 14 |
| Exhibit C |
| Section 00800- �Special Contract Provisions |
| VOLUME 3�Original and 3 Copies |
| The Prototypical Project |
| Proposal Evaluation |
| Proposal Evaluation� CONTINUED |
| Best Value Award Basis |
| Best Value Award Decision |
| MATOC Awards |
| Task Order Award & �Fair Opportunity |
| Fair Opportunity Exemptions |
| Other Times You May Not Be Given An Opportunity To Compete |
| Master Specification |
| Contractor’s Location |
| Insurance Requirements |
| Davis Bacon Wages & Bonds |
| Task Order Award�Execution Procedures |
| Task Order Award �Execution Procedures |
| Plans and Specifications |
| PROPOSALS ARE DUE� NOT �LATER THAN |
| Important Reminders |
| Important Reminders |
| Questions |
| Answers To Questions |
| Helpful Websites |