Appendix C – Photographs
Appendix A to Specification Section 02 82 13.00 10 VOL 2
Appendix C – PHOTOGRAPHS
BUILDING #1 SAMPLE PHOTOGRAPHS
Hart-Dole-Inouye Federal Center Page 1 of 29
Battle Creek, Michigan
Hygieneering Project #: 2017-3589-ENV
BUILDING #1A SAMPLE PHOTOGRAPHS
Hart-Dole-Inouye Federal Center Page 2 of 29
Hart-Dole-Inouye Federal Center Page 3 of 29
Hart-Dole-Inouye Federal Center Page 4 of 29
Hart-Dole-Inouye Federal Center Page 5 of 29
Hart-Dole-Inouye Federal Center Page 6 of 29
Hart-Dole-Inouye Federal Center Page 7 of 29
Hart-Dole-Inouye Federal Center Page 8 of 29
BUILDING #1B SAMPLE PHOTOGRAPHS
Hart-Dole-Inouye Federal Center Page 9 of 29
BUILDING #1C SAMPLE PHOTOGRAPHS
Hart-Dole-Inouye Federal Center Page 10 of 29
BUILDING #2 SAMPLE PHOTOGRAPHS
Hart-Dole-Inouye Federal Center Page 11 of 29
BUILDING #2A SAMPLE PHOTOGRAPHS
Hart-Dole-Inouye Federal Center Page 12 of 29
Hart-Dole-Inouye Federal Center Page 13 of 29
Hart-Dole-Inouye Federal Center Page 14 of 29
Hart-Dole-Inouye Federal Center Page 15 of 29
BUILDING #2B SAMPLE PHOTOGRAPHS
Hart-Dole-Inouye Federal Center Page 16 of 29
BUILDING #2B SAMPLE PHOTOGRAPHS
Hart-Dole-Inouye Federal Center Page 17 of 29
BUILDING #5 SAMPLE PHOTOGRAPHS
Hart-Dole-Inouye Federal Center Page 18 of 29
Hart-Dole-Inouye Federal Center Page 19 of 29
Hart-Dole-Inouye Federal Center Page 20 of 29
Hart-Dole-Inouye Federal Center Page 21 of 29
Hart-Dole-Inouye Federal Center Page 22 of 29
Hart-Dole-Inouye Federal Center Page 23 of 29
Hart-Dole-Inouye Federal Center Page 24 of 29
Hart-Dole-Inouye Federal Center Page 25 of 29
Hart-Dole-Inouye Federal Center Page 26 of 29
BUILDING #8 SAMPLE PHOTOGRAPHS
Hart-Dole-Inouye Federal Center Page 27 of 29
BUILDING #8 SAMPLE PHOTOGRAPHS
Hart-Dole-Inouye Federal Center Page 28 of 29
BUILDING #20 SAMPLE PHOTOGRAPHS
Hart-Dole-Inouye Federal Center Page 29 of 29
Appendix D – Inspector Certifications
Appendix E – GSA Alteration Assessment Worksheet sdsd
REGION BUILDING NUMBER BUILDING NAME
BUILDING
CONSTRUCTION
DATE
(system generated field)
BUILDING SIZE (GSF)
(system generated field)
BUILDING COMMENTS
FLOOR NUMBER
(can be text or number or combination)
FLOOR AREA
(GSF of the floor)
(system generated)
FLOOR COMMENTS
LOCATION NUMBER
(any unique number assigned to an area or room)
LOCATION COMMENTS
HOMOGENEOUS
AREA NUMBER
DATE OF SURVEY
SURVEY ID NUMBER
(system generated)
RESULTS
(Asbestos Status)
LONG DESCRIPTION RESULTS
(Asbestos Status)
FRIABILITY CONDITION ACCESSIBILITY
ASBESTOS
QUANTITY
ASBESTOS
QUANTITY
UNITS
TYPE AND DESCRIPTION OF
ASBESTOS
Abatement Cost Estimate (only acm abatement and only acm on this row)
Variability (approximate +/- accuracy of estimate)
Estimate Comments
01 CT0013ZZ WILLIAM R. COTTER FB 1/1/1933 191445 EXAMPLE DATA POINTS ONLY Bsmnt 32000 00001.0 Boiler room on west end 01 03/04/2014 A000000000000001 Asbestos-Containing Material => 1% ACM=>1 YES GoodOOD LOW 300 LF 3" hot water pipe $6,000.00 5%
Estimates are based on prior professional experience for unit costs. Costs are generally + or - 5% of actual.
01 CT0013ZZ WILLIAM R. COTTER FB 1/1/1933 191445 EXAMPLE DATA POINTS ONLY Bsmnt 32000 00001.0 Boiler room on west end 01A 03/04/2014 A000000000000001 Asbestos-Containing Material => 1% ACM=>1 YES DAMAGoodED MEDIUM 200 SF Boiler insulation $2,000.00 5%
03/13-16/2017
05 MI0501BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 1 BUILDING #1 - Areas Impacted by DLA Standby GeneratorReplacment Project Basement Miscellaneous Pipes within Mechanical Room 1-B-1A 1-TPA
03/13-16/2017 Presumed Asbestos-Containing Material PACM YES
Potential for
Damage HIGH
35 LF
Corrugated Paper Pipe Length
Insulation $1,200.00 15%
Estimates based on man-day rate for removal of material, with respect to accesibilty and locations
05 MI0501BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 1 BUILDING #1 - Areas Impacted by DLA Standby GeneratorReplacment Project Basement Miscellaneous Pipes within Mechanical Room 1-B-1A 1-TJA
03/13-16/2017 Asbestos-Containing Material =>1% ACM=>1 YES
Potential for
Damage MEDIUM
6 LF
Mudded Fittings on Corrugated Paper
Pipe Length Insulation $1,200.00 15%
Estimates based on man-day rate for removal of material, with respect to accesibilty and locations
05 MI0501BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 1 BUILDING #1 - Areas Impacted by DLA Standby GeneratorReplacment Project Basement
Steam Header and Miscellaneous Pipes within
Mechanical Room 1-B-1A
1-TPB
03/13-16/2017 Asbestos-Containing Material =>1% ACM=>1 YES
Potential for
Damage MEDIUM
120 LF
Cementitious Block Pipe Length
Insulation $4,800.00 15%
Estimates based on man-day rate for removal of material, with respect to accesibilty and locations
05 MI0501BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 1 BUILDING #1 - Areas Impacted by DLA Standby GeneratorReplacment Project Basement
Steam Header and Miscellaneous Pipes within
Mechanical Room 1-B-1A
1-TJB
03/13-16/2017
Asbestos-Containing Material =>1% ACM=>1 YES Damaged
MEDIUM
~30 LF
Mudded Fittings on Cementitious
Block Pipe Length Insulation $2,400.00 15% Estimates based on man-day rate for removal of material, with respect to accesibilty and locations
05 MI0502BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 1A BUILDING #1A - Areas Impacted by DLA Standby GeneratorReplacment Project
Sub-basement, Basement, Ground
Floor
Walls in Room 1A-SB-13 and 1A-SB-14 1A-MBA
03/13-16/2017
No Asbestos Detectecd NND NO Good N/A N/A N/A 4” Black Basecove & Adhesive N/A N/A
05 MI0502BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 1A BUILDING #1A - Areas Impacted by DLA Standby GeneratorReplacment Project
Sub-basement, Basement, Ground
Floor
Ceiling in Basement Level Former Data Center Rooms
1A-B-9, and Presumed in Rooms 1A-B-11 & 1A-B-13
(Secured Areas - Restricted Access)
1A-MCA
03/13-16/2017
No Asbestos Detectecd NND YES Good N/A N/A N/A
2’ x 4’ Dot and Fissure Ceiling Tile with Pattern (Labeled with “Danger”-
Asbestos Warning Labels)
N/A N/A
05 MI0502BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 1A BUILDING #1A - Areas Impacted by DLA Standby GeneratorReplacment Project
Sub-basement, Basement, Ground
Floor
Ceiling in Storage Room 1A-SB-14 1A-MCB
03/13-16/2017
No Asbestos Detectecd NND YES Good N/A N/A N/A 2’ x 2’ Dot and Gouge Recessed
Ceiling Tile N/A N/A
05 MI0502BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 1A BUILDING #1A - Areas Impacted by DLA Standby GeneratorReplacment Project
Sub-basement, Basement, Ground
Floor
On Terrazzo Beneath Raised Floor of Data Center
Room 1A-B-9, and Presumed in Rooms 1A-B-11 & 1A-
B-13 (Secured Areas - Restricted Access)
1A-MFA
03/13-16/2017
Asbestos-Containing Material =>1% ACM=>1 NO Good
LOW
5,500 SF
Brown and Black Adhesive on
Terrazzo $27,500.00 15%
Estimates based on price per square foot rate for removal of material.
05 MI0502BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 1A BUILDING #1A - Areas Impacted by DLA Standby GeneratorReplacment Project
Sub-basement, Basement, Ground
Floor
Wall Sleeve Between Rooms 1A-SB 13 and 1A-SB-14 1A-MGA
03/13-16/2017
No Asbestos Detectecd NND YES Potential for
Damage N/A N/A N/A
Dark Brown Fibrous Pipe Sleeve
Backer N/A N/A
05 MI0502BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 1A BUILDING #1A - Areas Impacted by DLA Standby GeneratorReplacment Project
Sub-basement, Basement, Ground
Floor
Overhead on Wall Above Lower Ceiling Line in Room
1A-SB-13
1A-MMA
03/13-16/2017
Asbestos-Containing Material =>1% ACM=>1 NO Good
LOW
2 SF Black Tar Sealant on Wall $1,200.00 15% Estimates based on man-day rate for removal of material, with respect to accesibilty and locations
05 MI0502BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 1A BUILDING #1A - Areas Impacted by DLA Standby GeneratorReplacment Project
Sub-basement, Basement, Ground
Floor
On Terrazzo Beneath Raised Floor of Data Center Room
1A-B-9, and Presumed in Rooms 1A-B-11 & 1A-B-13
(Secured Areas - Restricted Access)
1A-MMB
03/13-16/2017
No Asbestos Detectecd NND NO Good N/A N/A N/A Tan Pedestal Adhesive N/A N/A
05 MI0502BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 1A BUILDING #1A - Areas Impacted by DLA Standby GeneratorReplacment Project
Sub-basement, Basement, Ground
Floor
On Terrazzo Beneath Raised Floor of Data Center Room
1A-B-9, and Presumed in Rooms 1A-B-11 & 1A-B-13
(Secured Areas - Restricted Access)
1A-MMC
03/13-16/2017
No Asbestos Detectecd NND NO Good N/A N/A N/A Tan Over Black Residual Pedestal
Adhesive N/A N/A
05 MI0502BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 1A BUILDING #1A - Areas Impacted by DLA Standby GeneratorReplacment Project
Sub-basement, Basement, Ground
Floor
Sub-Basement Corridor on Plaster Above Chilled
Water Piping South of Stair #1
1A-MTA
03/13-16/2017
Presumed Asbestos-Containing Material PACM NO Good
LOW
30 SF Flex Cement Board Panels (Transite) $2,400.00 15% Estimates based on man-day rate for removal of material, with respect to accesibilty and locations
05 MI0502BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 1A BUILDING #1A - Areas Impacted by DLA Standby GeneratorReplacment Project
Sub-basement, Basement, Ground
Floor
Walls of Storage Area in Room 1A-SB-14 1A-MWA
03/13-16/2017
Presumed Asbestos-Containing Material PACM YES Damaged
MEDIUM
120 SF Drywall Tape and Joint Compound $2,400.00 15% Estimates based on man-day rate for removal of material, with respect to accesibilty and locations
05 MI0502BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 1A BUILDING #1A - Areas Impacted by DLA Standby GeneratorReplacment Project
Sub-basement, Basement, Ground
Floor
Wall in Room 1A-G-18 & 1A-G-20 1A-MWB
03/13-16/2017
No Asbestos Detectecd NND YES/NO Good N/A N/A N/A 1’ x 1’ Large Fissure Acoustic Wall Tile and Brown Mastic N/A N/A
05 MI0502BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 1A BUILDING #1A - Areas Impacted by DLA Standby GeneratorReplacment Project
Sub-basement, Basement, Ground
Floor
Foundation Walls of Rooms 1A-SB-13 & 1A-SB-14 1A-SCA
03/13-16/2017
No Asbestos Detectecd NND YES Good N/A N/A N/A White Paint Over Gray Coating on
Concrete N/A N/A
05 MI0502BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 1A BUILDING #1A - Areas Impacted by DLA Standby GeneratorReplacment Project
Sub-basement, Basement, Ground
Floor
Ceilings in Sub-Basement Corridor and Rooms 1A-SB-01, 1A-SB-02 & 1A-SB-04
1A-SPA
03/13-16/2017
No Asbestos Detectecd NND YES Good N/A N/A N/A White Plaster Over Gray Scratch Coat N/A N/A
05 MI0502BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 1A BUILDING #1A - Areas Impacted by DLA Standby GeneratorReplacment Project
Sub-basement, Basement, Ground
Floor
Ductwork Along Est Side of Room 1A-SB-01; and
Section of Ductwork in Corridor at Wall North of
Room 1A-SB-03
1A-TDA
03/13-16/2017
Asbestos-Containing Material =>1% by
PC
ACM=>1 by PC YES
Potential for
Damage
HIGH
160 SF
Cementitious Block Compound and
Wire Mesh Duct Insulation $4,800.00 15% Estimates based on man-day rate for removal of material, with respect to accesibilty and locations
05 MI0502BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 1A BUILDING #1A - Areas Impacted by DLA Standby GeneratorReplacment Project
Sub-basement, Basement, Ground
Floor
Piping in Rooms 1A-SB-04, 1A-SB-13, 1A-SB-14, 1A-SB-
15 and Sub-Basement Corridors and Basement Tunnel
1A-TJA
03/13-16/2017
Asbestos-Containing Material =>1% ACM=>1 YES Damaged
MEDIUM
25 LF
Mudded Fittings on White and Gray
Cementitious Block Pipe Length
Insulation
$2,400.00 15% Estimates based on man-day rate for removal of material, with respect to accesibilty and locations
05 MI0502BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 1A BUILDING #1A - Areas Impacted by DLA Standby GeneratorReplacment Project
Sub-basement, Basement, Ground
Floor
Miscellaneous Piping in Rooms 1A-SB-01, 1A-SB-04, 1A-SB-14, 1A-SB-15 and Sub-Basement Corridors and
Basement Tunnel
1A-TJB
03/13-16/2017
Presumed Asbestos-Containing Material PACM YES Good
MEDIUM
~20 LF
Cementitious Fittings on Fiberglass
Pipe Length $2,400.00 15% Estimates based on man-day rate for removal of material, with respect to accesibilty and locations
05 MI0502BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 1A BUILDING #1A - Areas Impacted by DLA Standby GeneratorReplacment Project
Sub-basement, Basement, Ground
Floor
Miscellaneous Pipes in Room 1A-SB-01 and Extending into Corridor; Pips Along ceiling in Corridor South of
Stair #1 in Sub-Basement; Pipes in Ceiling Cavity of
Data Center Room 1-B-9
1A-TJE
03/13-16/2017
Asbestos-Containing Material =>1% ACM=>1 YES Potential for
Damage
MEDIUM
~30 LF
Mudded Fittings on Layered Paper
Pipe Length Insulation $2,400.00 15%
Estimates based on man-day rate for removal of material, with respect to accesibilty and locations
05 MI0502BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 1A BUILDING #1A - Areas Impacted by DLA Standby GeneratorReplacment Project
Sub-basement, Basement, Ground
Floor
Chilled Water Piping in Sub-Basement in Sub-
Basement Mechanical Rooms, Corridors, and Tunnel in Basement
1A-TJF
03/13-16/2017
Presumed Asbestos-Containing Material PACM YES Potential for
Damage
MEDIUM
~20 LF
Woven Canvas Wrapped Mudded
Fitting Compound on Fiberglass Pipe
Insulation
$2,400.00 15% Estimates based on man-day rate for removal of material, with respect to accesibilty and locations
05 MI0502BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 1A BUILDING #1A - Areas Impacted by DLA Standby GeneratorReplacment Project
Sub-basement, Basement, Ground
Floor
Piping in Rooms 1A-SB-04, 1A-SB-13, 1A-SB-14, 1A-SB-
15 and Miscellaneous Corridors and Basement Tunnel
1A-TPA
03/13-16/2017
Presumed Asbestos-Containing Material PACM YES Potential for
Damage
MEDIUM
150 LF
White and Gray Cementitious Block
Pipe Length Insulation $4,800.00 15% Estimates based on man-day rate for removal of material, with respect to accesibilty and locations
05 MI0502BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 1A BUILDING #1A - Areas Impacted by DLA Standby GeneratorReplacment Project
Sub-basement, Basement, Ground
Floor
Pipes Along Ceiling and in Walls of Rooms 1A-SB-13 and
1A-SB-14, Water Piping in Corridor and Room 1A-SB-01
1A-TPC
03/13-16/2017
No Asbestos Detectecd NND YES Damaged N/A N/A N/A Cork Pipe Length Insulation N/A N/A
05 MI0502BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 1A BUILDING #1A - Areas Impacted by DLA Standby GeneratorReplacment Project
Sub-basement, Basement, Ground
Floor
Pipes Along Ceiling of Room 1A-SB-14; at North Wall of Room 1A-SB-04; and in Mechanical Rooms 1A-SB-
01 & 1A-SB-15
1A-TPD
03/13-16/2017
Asbestos-Containing Material =>1% ACM=>1 YES Potential for
Damage
MEDIUM
120 LF
Corrugated Paper Pipe Length
Insulation $4,800.00 15% Estimates based on man-day rate for removal of material, with respect to accesibilty and locations
05 MI0502BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 1A BUILDING #1A - Areas Impacted by DLA Standby GeneratorReplacment Project
Sub-basement, Basement, Ground
Floor
Miscellaneous Pipes in Room 1A-SB-01 and Extending into Corridor; Pipes Along ceiling in Corridor South of
Stair #1 in Sub-Basement; Pipes in Ceiling Cavity of
Data Center Room 1-B-9
1A-TPE
03/13-16/2017
Asbestos-Containing Material =>1% by
PC
ACM=>1 by PC YES Damaged
MEDIUM
200 LF Layered Paper Pipe Insulation $6,000.00 15%
05 MI0538BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 1B BUILDING #1B - Areas Impacted by DLA Standby GeneratorReplacment Project
Sub-basement, Ground Floor
Heating Supply Piping along Ceiling and Feeding AHUs in Tunnel and Fan Room 1B-SB-15
1B-TJA
03/13-16/2017
No Asbestos Detectecd NND YES Good N/A N/A N/A Mudded Fittings Associated with
Fiberglass Pipe Length Insulation N/A N/A
05 MI0538BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 1B BUILDING #1B - Areas Impacted by DLA Standby GeneratorReplacment Project
Sub-basement, Ground Floor
Mounting Pads from Former AHU on Concrete Slab in
Room 1B-SB-15
1B-MMA
03/13-16/2017 No Asbestos Detectecd NND NO Good N/A N/A N/A Red Rubberized Vibration Pads N/A N/A
05 MI0538BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 1B BUILDING #1B - Areas Impacted by DLA Standby GeneratorReplacment Project
Sub-basement, Ground Floor
Residual on Concrete Pad and on Wall at Former AHU
Room 1B-SB-15
1B-MMB
03/13-16/2017 Asbestos-Containing Material =>1% ACM=>1 NO Good
MEDIUM
4 SF Hard Tan Sealant $1,200.00 15%
Estimates based on man-day rate for removal of material, with respect to accesibilty and locations
05 MI0503BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 2 BUILDING #2 - Areas Impacted by DLA Standby GeneratorReplacment Project Basement Wall Opening in Rooms 2-B-33, 2- B-29, 2-B-31 2-MMA
03/13-16/2017 No Asbestos Detectecd NND NO Good N/A N/A N/A
White Caulk Between Drywall Panel and Brick N/A N/A
05 MI0503BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 2 BUILDING #2 - Areas Impacted by DLA Standby GeneratorReplacment Project Basement Wall Opening in Rooms 2-B-33, 2- B-29, 2-B-31 2-MWA
03/13-16/2017 No Asbestos Detectecd NND NO Good N/A N/A N/A
Drywall Panel Partition Walls in
Former Opening N/A N/A
05 MI0503BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 2 BUILDING #2 - Areas Impacted by DLA Standby GeneratorReplacment Project Basement Walls in Rooms 2-B-31 & 2- B-29 2-SPA
03/13-16/2017 No Asbestos Detectecd NND YES Good N/A N/A N/A White Plaster Finish on Brick Walls N/A N/A
05 MI0503BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 2 BUILDING #2 - Areas Impacted by DLA Standby GeneratorReplacment Project Basement
Residual Length in North Brick Wall Penetration
Between 2-B-31 & 2-B-33
2-TPA
03/13-16/2017 Presumed Asbestos-Containing Material PACM YES Good
MEDIUM
4 LF Wool Felt Pipe Length Insulation $1,200.00 15%
Estimates based on man-day rate for removal of material, with respect to accesibilty and locations
05 MI0503BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 2 BUILDING #2 - Areas Impacted by DLA Standby GeneratorReplacment Project Basement
Miscellaneous Piping within Basement Corridors of
Building #2
2-TPB
03/13-16/2017
No Suspect Asbestos Containing Material NSACM YES Good N/A N/A N/A Fiberglass Pipe Length Insulation and
PVC Booted Fittings N/A N/A
05 MI504BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 2A BUILDING #2A - Areas Impacted by DLA Standby GeneratorReplacment Project
Basement, 1st, 2nd, 3rd Floors Walls of Fitness Center (Room 2A-B-1) 2A-MBA
03/13-16/2017 No Asbestos Detectecd NND NO Good N/A N/A N/A 4” Black Basecove N/A N/A
05 MI504BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 2A BUILDING #2A - Areas Impacted by DLA Standby GeneratorReplacment Project
Basement, 1st, 2nd, 3rd Floors 3rd Floor Electrical Closet at Stair 2A on Back Wall 2A-MBB
03/13-16/2017 Asbestos-Containing Material =>1% ACM=>1 NO
Potential for
Damage LOW
3 SF
4” Black Hard and Brittle Basecove and Adhesive $1,200.00 15%
Estimates based on man-day rate for removal of material, with respect to accesibilty and locations
05 MI504BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 2A BUILDING #2A - Areas Impacted by DLA Standby GeneratorReplacment Project
Basement, 1st, 2nd, 3rd Floors
Ceiling of Fitness Center (Room 2A-B-1); Ceilings in
Room 2A-B-5 and Corridor Adjacent to Fitness Room
2A-MCA
03/13-16/2017
No Asbestos Detectecd NND YES Good N/A N/A N/A 2’ x 2’ White Pinhole Ceiling Tile N/A N/A
05 MI504BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 2A BUILDING #2A - Areas Impacted by DLA Standby GeneratorReplacment Project
Basement, 1st, 2nd, 3rd Floors Under Carpet in Fitness Center (Room 2A-B-1) 2A-MFA
03/13-16/2017 No Asbestos Detectecd NND NO Good N/A N/A N/A
12” x 12” Tan Mottled Floor Tile and
Glue Under Black Mastic N/A N/A
05 MI504BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 2A BUILDING #2A - Areas Impacted by DLA Standby GeneratorReplacment Project
Basement, 1st, 2nd, 3rd Floors Under Carpet in Fitness Center (Room 2A-B-1) 2A-MFB
03/13-16/2017 No Asbestos Detectecd NND NO Good N/A N/A N/A
12” x 12” White with Tan Streak with
Tan Glue Over Black Mastic N/A N/A
05 MI504BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 2A BUILDING #2A - Areas Impacted by DLA Standby GeneratorReplacment Project
Basement, 1st, 2nd, 3rd Floors 1st & 3rd Floor Electrical Closet at Stair 2A 2A-MFC
03/13-16/2017
Asbestos-Containing Material =>1% Tile
Only ACM=>1 Tile Only NO Good
LOW
25 SF
9” x 9” Dark Brown with Red and
Cream Streak Over Black Mastic on
Felt Paper (1/4” Depth)
$2,400.00 15% Estimates based on man-day rate for removal of material, with respect to accesibilty and locations
05 MI504BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 2A BUILDING #2A - Areas Impacted by DLA Standby GeneratorReplacment Project
Basement, 1st, 2nd, 3rd Floors Floor in 2nd Floor Electrical Closet at Stair 2A 2A-MFD
03/13-16/2017 No Asbestos Detectecd NND NO Good N/A N/A N/A
Dark Brown Carpet Adhesive Over
Black Mastic N/A N/A
05 MI504BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 2A BUILDING #2A - Areas Impacted by DLA Standby GeneratorReplacment Project
Basement, 1st, 2nd, 3rd Floors
Wall Seam between Drywall and Plaster in Fitness
Center (Rooms 2A-B-1)
2A-MMA
03/13-16/2017 No Asbestos Detectecd NND NO Good N/A N/A N/A White Caulk on Wall N/A N/A
05 MI504BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 2A BUILDING #2A - Areas Impacted by DLA Standby GeneratorReplacment Project
Basement, 1st, 2nd, 3rd Floors Walls of Fitness Center (Rooms 2A-B-1) 2A-MWA
03/13-16/2017 No Asbestos Detectecd NND NO Good N/A N/A N/A Drywall, Tape and Joint Compound N/A N/A
05 MI504BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 2A BUILDING #2A - Areas Impacted by DLA Standby GeneratorReplacment Project
Basement, 1st, 2nd, 3rd Floors Building 4 (MI0507BC)
Ceiling Deck of Fitness Center (Room 2A-B-1) above
Suspended Ceiling
2A-SPA
03/13-16/2017 No Asbestos Detectecd NND YES Damaged N/A N/A N/A Plaster Finish on Concrete Ceiling N/A N/A
05 MI504BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 2A BUILDING #2A - Areas Impacted by DLA Standby GeneratorReplacment Project
Basement, 1st, 2nd, 3rd Floors Building 4A (MI0508BC)
Walls of Elevator #13 Shaft Inside Fitness Center (Room
2A-B-1) and Room 2A-B-5
2A-SPB
03/13-16/2017 No Asbestos Detectecd NND YES Good N/A N/A N/A
Textured Plaster on Concrete/CMU
Wall N/A N/A
05 MI504BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 2A BUILDING #2A - Areas Impacted by DLA Standby GeneratorReplacment Project
Basement, 1st, 2nd, 3rd Floors Building 5 (MI0509BC) Ceiling of 1st & 2nd Floor Electrical Closet at Stair 2A 2A-SPC
03/13-16/2017
Asbestos-Containing Material =>1% by
PC
ACM=>1 by PC YES Damaged
LOW
20 SF
Plaster over Scratchcoat on Brown
Cellulose Board $3,600.00 15%
Estimates based on man-day rate for removal of material, with respect to accesibilty and locations
05 MI504BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 2A BUILDING #2A - Areas Impacted by DLA Standby GeneratorReplacment Project
Basement, 1st, 2nd, 3rd Floors Building 8 (MI0527BC) Ceiling Cavity of Rooms 2A-B-1 & 2A-B-5, and 2A-TPA
03/13-16/2017 No Suspect Asbestos Containing Material NSACM YES Good N/A N/A N/A
Fiberglass Insulated Piping with PVC
Boot Fittings N/A N/A
05 MI504BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 2A BUILDING #2A - Areas Impacted by DLA Standby GeneratorReplacment Project
Basement, 1st, 2nd, 3rd Floors Building 20 (MI0528BC) Ceiling Cavity of Rooms 2A-B-1 & 2A-B-5, and 2A-TPB
03/13-16/2017 No Suspect Asbestos Containing Material NSACM YES Good N/A N/A N/A
Black Foam Pipe Insulation
(“Armaflex”) N/A N/A
05 MI0505BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 2B BUILDING #2B - Areas Impacted by DLA Standby GeneratorReplacment Project
Basement, 1st, 2nd
Floors Walls in Room 2B-B-1 and Adjacent Corridor 2B-MBA
03/13-16/2017 No Asbestos Detectecd NND NO Good N/A N/A N/A 4” Black Basecove and Adhesive N/A N/A
05 MI0505BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 2B BUILDING #2B - Areas Impacted by DLA Standby GeneratorReplacment Project
Basement, 1st, 2nd
Floors Ceiling Inside Room 2B-B-1 and Adjacent Corridor 2B-MCA
03/13-16/2017 No Asbestos Detectecd NND NO Good N/A N/A N/A
2’ x 2’ Dot and Gouge Pattern
Suspended Ceiling Tile N/A N/A
05 MI0505BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 2B BUILDING #2B - Areas Impacted by DLA Standby GeneratorReplacment Project
Basement, 1st, 2nd
Floors
Inner and Outer Walls of Room 2B-B-1 and Men’s
Locker Room (2B-B-3)
2B-MWA
03/13-16/2017 No Asbestos Detectecd NND NO Good N/A N/A N/A Drywall, Tape and Joint Compound N/A N/A
05 MI0505BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 2B BUILDING #2B - Areas Impacted by DLA Standby GeneratorReplacment Project
Basement, 1st, 2nd
Floors
Portions of Building 2 and 2B Basement Corridor
Outside Rooms 2B-B-1 & 2B-B-1A
2B-SPA
03/13-16/2017 No Asbestos Detectecd NND YES Damaged N/A N/A N/A Beige Fibered Plaster on Ceiling N/A N/A
05 MI0505BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 2B BUILDING #2B - Areas Impacted by DLA Standby GeneratorReplacment Project
Basement, 1st, 2nd
Floors Ceiling in Electrical Room 2B-B-1A 2B-SPB
03/13-16/2017 No Asbestos Detectecd NND YES
Potential for
Damage N/A N/A N/A
Gray Light Weight Plaster on Rock
Lathe N/A N/A sdsd
05 MI0505BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 2B BUILDING #2B - Areas Impacted by DLA Standby GeneratorReplacment Project
Basement, 1st, 2nd
Floors Ceiling Above Suspended Ceiling in Room 2B-B-1 2B-SPC
03/13-16/2017 No Asbestos Detectecd NND YES Damaged N/A N/A N/A Plaster on Walls and Ceiling N/A N/A
05 MI0505BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 2B BUILDING #2B - Areas Impacted by DLA Standby GeneratorReplacment Project
Basement, 1st, 2nd
Floors
Pipes Along Ceilings in Basement Corridor of Building 2
& 2B Adjacent to Rooms 2B-B-1 & 2B-B-1A
2B-TPA
03/13-16/2017
No Suspect Asbestos Containing Material NSACM YES Good N/A N/A N/A Fiberglass Pipe Length Insulation with
PVC Booted Fittings N/A N/A
05 MI0507BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 4 BUILDING #4 - Areas Impacted by DLA Standby GeneratorReplacment Project
Basement, 1st, 2nd
Floors Basement – Dock Gated Area (Room 4-B-2) 4-TPA
03/13-16/2017 Asbestos-Containing Material =>1% ACM=>1 YES
Potential for
Damage LOW 70 LF White TSI Surrounding 1” Pipe $2,400.00 15%
Estimates based on man-day rate for removal of material, with respect to accesibilty and locations
05 MI0507BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 4 BUILDING #4 - Areas Impacted by DLA Standby GeneratorReplacment Project
Basement, 1st, 2nd
Floors Basement – Garage Gated Area (Room 4-B-2) 4-TPB
03/13-16/2017 Asbestos-Containing Material =>1% ACM=>1 YES
Potential for
Damage LOW 260 LF White TSI Surrounding 4” Pipe $6,000.00 15%
Estimates based on man-day rate for removal of material, with respect to accesibilty and locations
05 MI0508BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 4A BUILDING #4A - Areas Impacted by DLA Standby GeneratorReplacment Project Ground Floor
Continuation of Chilled Water Return Lines from
Building 4A
4A-TJA
03/13-16/2017
No Asbestos Detectecd NND YES Good N/A N/A N/A Hard Packed Elbows (on Fiberglass
Pipe Length Insulation) N/A N/A
05 MI0508BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 4A BUILDING #4A - Areas Impacted by DLA Standby GeneratorReplacment Project Ground Floor
Chilled Water Return Lines (Colored Blue) in
Warehouse/Dock
4A-TPA
03/13-16/2017 No Asbestos Detectecd NND YES Good N/A N/A N/A
Blue Fiberglass Pipe Wrap and
Backing Coating N/A N/A
05 MI0508BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 4A BUILDING #4A - Areas Impacted by DLA Standby GeneratorReplacment Project Ground Floor
Chilled Water Return Lines (Colored Blue) in
Warehouse/Dock
4A-TJA
03/13-16/2017
No Asbestos Detectecd NND YES Good N/A N/A N/A Hard Packed Elbows (on Fiberglass
Pipe Length Insulation) N/A N/A
05 MI0509BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 5 BUILDING #5 - Areas Impacted by DLA Standby GeneratorReplacment Project
Basement, 1st
Floor, 2nd Floor, Roof
Gaskets on Top of Day Tanks in Room 5-B-6 5-MGA
03/13-16/2017
No Asbestos Detectecd NND NO Good N/A N/A N/A Red Flange Gasket N/A N/A
05 MI0509BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 5 BUILDING #5 - Areas Impacted by DLA Standby GeneratorReplacment Project
Basement, 1st
Floor, 2nd Floor, Roof
Seam of Louver and CMU Wall in Rooms 5-B-7 and 5-2-
5-MMA
03/13-16/2017
No Asbestos Detectecd NND NO Good N/A N/A N/A Gray Caulk N/A N/A
05 MI0509BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 5 BUILDING #5 - Areas Impacted by DLA Standby GeneratorReplacment Project
Basement, 1st
Floor, 2nd Floor, Roof
Cooling Water Piping at Rooftop Radiators above Room
5-2-21
5-MMB
03/13-16/2017
No Asbestos Detectecd NND NO Good N/A N/A N/A Gray Caulk Sealant on Metal Jacketed
Fiberglass Pipe Insulation N/A N/A
05 MI0509BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 5 BUILDING #5 - Areas Impacted by DLA Standby GeneratorReplacment Project
Basement, 1st
Floor, 2nd Floor, Roof
Gaskets on Generator Engine Components in Room 5-B-
5-MMC
03/13-16/2017
No Asbestos Detectecd NND NO D N/A N/A N/A Gray and Black Paper Gaskets N/A N/A
05 MI0509BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 5 BUILDING #5 - Areas Impacted by DLA Standby GeneratorReplacment Project
Basement, 1st
Floor, 2nd Floor, Roof
Seam of Rotary Fan Louvers and CMU on East Wall of
Room 5-B-7
5-MMD
03/13-16/2017
Asbestos-Containing Material =>1% ACM=>1 NO Good
LOW
4 LF
Green and Gray Caulk Sealant at Fan
Housing $1,200.00 15% Estimates based on man-day rate for removal of material, with respect to accesibilty and locations
05 MI0509BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 5 BUILDING #5 - Areas Impacted by DLA Standby GeneratorReplacment Project
Basement, 1st
Floor, 2nd Floor, Roof
Caps of Generator Exhaust on Roof Above Room 5-2-21 5-SCA
03/13-16/2017
No Asbestos Detectecd NND YES D N/A N/A N/A Black Over Silver Red Paint N/A N/A
05 MI0509BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 5 BUILDING #5 - Areas Impacted by DLA Standby GeneratorReplacment Project
Basement, 1st
Floor, 2nd Floor, Roof
Basement of Building 5 (Room 5-B- 2) 5-SFA
03/13-16/2017
No Asbestos Detectecd NND YES Potential for
Damage N/A N/A N/A
Fireproofing (White/Gray Spray
Applied Fireproofing) N/A N/A
05 MI0509BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 5 BUILDING #5 - Areas Impacted by DLA Standby GeneratorReplacment Project
Basement, 1st
Floor, 2nd Floor, Roof
Generator Exhaust Extending From 5-B-7 up through
Room 5-2-21
5-TBA
03/13-16/2017
No Asbestos Detectecd NND YES Good N/A N/A N/A White Block Stack Insulation with
Gray Mud N/A N/A
05 MI0509BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 5 BUILDING #5 - Areas Impacted by DLA Standby GeneratorReplacment Project
Basement, 1st
Floor, 2nd Floor, Roof
Low Pressure Steam Pipes Room 5-B-6, 5-B-7 & 5-2-21 5-TJA
03/13-16/2017
No Asbestos Detectecd NND YES Good N/A N/A N/A Fittings Associated with White Block
Insulation N/A N/A
05 MI0509BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 5 BUILDING #5 - Areas Impacted by DLA Standby GeneratorReplacment Project
Basement, 1st
Floor, 2nd Floor, Roof
Roof Drain Line in Room 5-B-6, 5-B-7 & 5-2-21 5-TJB
03/13-16/2017
No Asbestos Detectecd NND YES Good N/A N/A N/A Cementitious Fittings on Fiberglass
Insulation N/A N/A
05 MI0509BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 5 BUILDING #5 - Areas Impacted by DLA Standby GeneratorReplacment Project
Basement, 1st
Floor, 2nd Floor, Roof
Miscellaneous Pipes (Small Diameter Steam and Chilled
Water Piping) on West Side of 5-1-1 by Chillers (in area of Proposed Electrical Room)
5-TJC
03/13-16/2017
No Asbestos Detectecd NND YES Good N/A N/A N/A
Canvas Covered Cementitious Fittings on Fiberglass Pipeline with Woven
Mesh Jacket
N/A N/A
05 MI0509BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 5 BUILDING #5 - Areas Impacted by DLA Standby GeneratorReplacment Project
Basement, 1st
Floor, 2nd Floor, Roof
Steam/Condensate Piping Near Column C6 & Staircase in Room 5-B-2 (on Piping to be Relocated)
5-TJD
03/13-16/2017
No Asbestos Detectecd NND YES Potential for
Damage N/A N/A N/A
Cementitious Fittings on Fiberglass
Insulation with Craft Paper Jacketing N/A N/A
05 MI0509BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 5 BUILDING #5 - Areas Impacted by DLA Standby GeneratorReplacment Project
Basement, 1st
Floor, 2nd Floor, Roof
Steam Piping Near Column C6 in Room 5-B-2 (on
Piping to be Relocated)
5-TJE
03/13-16/2017
Asbestos-Containing Material =>1% ACM=>1 YES Damaged
MEDIUM
1 LF
Fibrous Mudded Fittings Associated with White Fibrous Block Pipe
Insulation
$1,200.00 15% Estimates based on man-day rate for removal of material, with respect to accesibilty and locations
05 MI0509BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 5 BUILDING #5 - Areas Impacted by DLA Standby GeneratorReplacment Project
Basement, 1st
Floor, 2nd Floor, Roof
Generator Unit Silencers in Room 5-B-7 5-TJG
03/13-16/2017
No Asbestos Detectecd NND YES Potential for
Damage N/A N/A N/A
Beige Cementitious Compound Over
White Block Insulation N/A N/A
05 MI0509BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 5 BUILDING #5 - Areas Impacted by DLA Standby GeneratorReplacment Project
Basement, 1st
Floor, 2nd Floor, Roof
Cooling Water Piping for Generators in Room 5-B-7 5-TJG
03/13-16/2017
No Asbestos Detectecd NND YES Potential for
Damage N/A N/A N/A
Canvas Covered Mudded Fittings on
Fiberglass Pipe Insulation N/A N/A
05 MI0509BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 5 BUILDING #5 - Areas Impacted by DLA Standby GeneratorReplacment Project
Basement, 1st
Floor, 2nd Floor, Roof
Miscellaneous Pipes in Basement and on Ground Floor 5-TJJ
03/13-16/2017
No Asbestos Detectecd NND YES Potential for
Damage N/A N/A N/A
Fiberglass Elbows with Hard Pack
Wrap N/A N/A
05 MI0509BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 5 BUILDING #5 - Areas Impacted by DLA Standby GeneratorReplacment Project
Basement, 1st
Floor, 2nd Floor, Roof
Low Pressure Steam Pipes Room 5-B-6, 5-B-7 & 5-2-21 5-TPA
03/13-16/2017
No Asbestos Detectecd NND YES Good N/A N/A N/A White Block Pipe Length Insulation N/A N/A
05 MI0509BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 5 BUILDING #5 - Areas Impacted by DLA Standby GeneratorReplacment Project
Basement, 1st
Floor, 2nd Floor, Roof
Steam Piping Near Column C6 in Room 5-B-2 (on
Piping to be Relocated)
5-TPE
03/13-16/2017
Asbestos-Containing Material =>1% ACM=>1 YES Potential for
Damage
MEDIUM
3 LF
White Fibrous Block Pipe Length
Insulation $1,200.00 15% Estimates based on man-day rate for removal of material, with respect to accesibilty and locations
05 MI0509BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 5 BUILDING #5 - Areas Impacted by DLA Standby GeneratorReplacment Project
Basement, 1st
Floor, 2nd Floor, Roof
Condensate Piping Near Column C6 & Staircase in
Room 5-B-2 (on Piping to be Relocated)
5-TPF
03/13-16/2017
Asbestos-Containing Material =>1% ACM=>1 YES Potential for
Damage
MEDIUM
3 LF
Corrugated Paper Pipe Length
Insulation (Aircell) $1,200.00 15% Estimates based on man-day rate for removal of material, with respect to accesibilty and locations
05 MI0509BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 5 BUILDING #5 - Areas Impacted by DLA Standby GeneratorReplacment Project
Basement, 1st
Floor, 2nd Floor, Roof
Piping Outside Door into Room 5-B-7 Running Along 5-TPG
03/13-16/2017
Presumed Asbestos-Containing Material PACM YES Good
MEDIUM
~25 LF
Black Sulfur Block Pipe Length
Insulation (Painted White) $1,200.00 15% Estimates based on man-day rate for removal of material, with respect to accesibilty and locations
05 MI0509BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 5 BUILDING #5 - Areas Impacted by DLA Standby GeneratorReplacment Project
Basement, 1st
Floor, 2nd Floor, Roof
Miscellaneous Areas Throughout Basement of
Building 5
5-TPH
03/13-16/2017
Asbestos-Containing Material =>1% ACM=>1 YES Potential for
Damage
MEDIUM
1,500 LF Mag TSI Pipe Insulation $52,500.00 15%
Estimates based on price per lineal foot rate for removal of material
05 MI0509BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 5 BUILDING #5 - Areas Impacted by DLA Standby GeneratorReplacment Project
Basement, 1st
Floor, 2nd Floor, Roof
Miscellaneous Areas Throughout Basement of
Building 5
5-TPI
03/13-16/2017
Asbestos-Containing Material =>1% ACM=>1 YES Potential for
Damage
MEDIUM
200 SF High Density Fiber Insulation $7,200.00 15% Estimates based on man-day rate for removal of material, with respect to accesibilty and locations
05 MI0527BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 8 BUILDING #8 - Areas Impacted by DLA Standby GeneratorReplacment Project 1st, 2nd Floors
Doorway Between Building 8 and Corridor to Northwest on 2nd Floor (Between Rooms 8-2-2 & 8-2-11)
8-MWA
03/13-16/2017
No Asbestos Detectecd NND YES Potential for
Damage N/A N/A N/A
Plaster Over Paper Seam Tape on
Drywall N/A N/A
05 MI0527BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 8 BUILDING #8 - Areas Impacted by DLA Standby GeneratorReplacment Project 1st, 2nd Floors
Piping Along Walls and Ceiling Throughout Ground
Floor Storage Areas West of Garage (Rooms 8-1-3 & 8-
1-8)
8-TJA
03/13-16/2017
Presumed Asbestos-Containing Material PACM YES Potential for
Damage
MEDIUM
~20 LF
Fittings on Mag Block Pipe Length
Insulation $2,400.00 15% Estimates based on man-day rate for removal of material, with respect to accesibilty and locations
05 MI0527BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 8 BUILDING #8 - Areas Impacted by DLA Standby GeneratorReplacment Project 1st, 2nd Floors
Piping Along Walls and Ceiling Throughout Ground
Floor Storage Areas West of Garage (Rooms 8-1-3 & 8-
1-8)
8-TJB
03/13-16/2017
Asbestos-Containing Material =>1% ACM=>1 YES Potential for
Damage
MEDIUM
~ 68 LF Hard Packed Elbows $2,400.00 15% Estimates based on man-day rate for removal of material, with respect to accesibilty and locations
05 MI0527BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 8 BUILDING #8 - Areas Impacted by DLA Standby GeneratorReplacment Project 1st, 2nd Floors
Piping Along Walls and Ceiling Throughout Ground
Floor Storage Areas West of Garage (Rooms 8-1-3 & 8-
1-8)
8-TPA
03/13-16/2017
Presumed Asbestos-Containing Material PACM YES Potential for
Damage
MEDIUM
200 LF Mag Block Pipe Length Insulation $7,200.00 15%
Estimates based on price per lineal foot rate for removal of material
05 MI0527BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 8 BUILDING #8 - Areas Impacted by DLA Standby GeneratorReplacment Project 1st, 2nd Floors
Piping Along Walls and Ceiling Throughout Ground
Floor Storage Areas West of Garage (Rooms 8-1-3 & 8-
1-8)
8-TPB
03/13-16/2017
Asbestos-Containing Material =>1% ACM=>1 YES Potential for
Damage
MEDIUM
~400 LF Aircell Pipe Insulation $14,000.00 15%
Estimates based on price per lineal foot rate for removal of material
05 MI0528BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 20 BUILDING #20 - Areas Impacted by DLA Standby GeneratorReplacment Project 1st Floor
Ends of Pipe Hangers at North Side of Building #20 in
“Low Ceiling Area”
20-MMA
03/13-16/2017
Asbestos-Containing Material =>1% ACM=>1 YES Potential for
Damage
HIGH
10 SF
Gray Cementitious Mudded
Compound Over Brown Fibrous
Insulation
$2,400.00 15% Estimates based on man-day rate for removal of material, with respect to accesibilty and locations
05 MI0528BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 20 BUILDING #20 - Areas Impacted by DLA Standby GeneratorReplacment Project 1st Floor
Miscellaneous Piping in Building #20 & Adjacent
Tunnels
20-TPA
03/13-16/2017 Asbestos-Containing Material =>1% ACM=>1 YES Good
MEDIUM
400 LF Air Cell Pipe Insulation $14,000.00 15%
Estimates based on price per lineal foot rate for removal of material
05 MI0528BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 20 BUILDING #20 - Areas Impacted by DLA Standby GeneratorReplacment Project 1st Floor
Miscellaneous Piping in Building #20 & Adjacent
Tunnels
20-TJB
03/13-16/2017 Asbestos-Containing Material =>1% ACM=>1 YES Good
MEDIUM
~60 LF Hard Packed Elbows $4,800.00 15%
Estimates based on man-day rate for removal of material, with respect to accesibilty and locations
05 MI0528BC
HART-DOLE-INOUYE FEDERAL
CENTER - BLDG. 20 BUILDING #20 - Areas Impacted by DLA Standby GeneratorReplacment Project 1st Floor
Miscellaneous Piping in Building #20 & Adjacent
Tunnels
20-TPC
03/13-16/2017 Asbestos-Containing Material =>1% ACM=>1 YES Good
MEDIUM
200 LF Hard Pack Mag Pipe Insulation $7,200.00 15%
Estimates based on price per lineal foot rate for removal of material
Appendix F – Prior Asbestos and Lead-Based Paint
Building Inspection Reports for Reference
Asbestos and Lead-Based Paint Building Inspections in Region 5
At
Hart-Dole-Inouye Building 1 (Bldg. MI0501BC) 74 North Washington Avenue
For
GSA Public Buildings Service Great Lakes Region
U.S. General Services Administration 230 South Dearborn Street, Room 3500
Chicago, Michigan 60604-1696
Report Date: August 26, 2014
7600 N. 16th Street, Suite 110 Phoenix, AZ 85020
(602) 266-8288
Contract Number: GS-05P-13-FA-A-0035 Task Order No.: GS-P-0514-FA-5007
ADN: PJ4EA0656
Asbestos and Limited Lead-Based Paint Building Inspection Report TRC Project No: 220533
TABLE OF CONTENTS
EXECUTIVE SUMMARY ...................................................................................................... I
1.0 INTRODUCTION
2.0 ASBESTOS SAMPLING AND ANALYSIS
2.1 SAMPLING PROCEDURES
2.2 PHYSICAL ASSESSMENT
2.3 PLM ANALYSIS METHODOLOGY
2.4 FINDINGS AND RESULTS
2.5 ACM CONCLUSIONS AND RECOMMENDATIONS
2.5.1 Identified ACMs
2.5.2 Trace Asbestos Detected (<1%)
2.5.3 Assumed ACMs
2.5.3 Recommendations
2.5.5 Materials Containing Trace (<1%) Asbestos
3.0 ASBESTOS MANAGEMENT
3.1 RESPONSE ACTION OPTIONS
3.2 RECOMMENDED RESPONSE ACTIONS
3.2.1 ACM in Poor Condition:
3.2.2 ACM in Fair Condition:
3.2.3 ACM in Good Condition:
3.3 PREVENTATIVE MEASURES
3.3.1 Maintenance
3.3.2 Condition Monitoring
3.3.3 Notification
3.3.4 Training
3.4 RECOMMENDATIONS FOR FUTURE BUILDING INSPECTIONS AND RECORDKEEPING
4.0 LIMITED LEAD-BASED PAINT SAMPLING AND ANALYSIS
4.1 GENERAL INFORMATION
4.2 SAMPLING PROCEDURES
4.3 LEAD ANALYTICAL METHODOLOGY
4.4 DEFINITION OF LEAD-BASED PAINT (LBP)
4.5 FINDINGS AND RESULTS
4.6 LBP CONCLUSIONS AND RECOMMENDATIONS
4.6.1 Non-Mandatory Best Practices
5.0 EXCLUSIONS
5.1 ASBESTOS BUILDING INSPECTION EXCLUSIONS
5.2 LIMITED LEAD-BASED PAINT BUILDING INSPECTION EXCLUSIONS
6.0 DISCLAIMER
7.0 STATEMENT OF COMPLETION & REPORT SIGNATORY
APPENDICES
GSA IRIS Asbestos-Containing Materials Spreadsheet .................................................. Appendix A Building Floor Plans and Sample Locations .................................................................... Appendix B Photographs ...................................................................................................................... Appendix C Cost Estimates to Remove ACM & Laboratory Analytical Reports ................................ Appendix D Project Personnel Certifications ....................................................................................... Appendix E i
EXECUTIVE SUMMARY
TRC Environmental Corporation (TRC) contracted with the U.S. General Services Administration (GSA) to perform asbestos and limited lead-based paint building inspections for the Hart-Dole-Inouye Building 1 (Building MI0501BC) located at 74 North Washington Avenue in Battle Creek, Michigan (Site). The purpose of the building inspection was to complete baseline building inspections, in general accordance with the AHERA regulations, and cost estimates to establish GSA’s environmental liability for asbestos. As directed by GSA, the collection of bulk material samples was to target discrete locations (insofar as reasonably practical) without damaging the esthetics of the facility. The building inspection encompassed suspect asbestos-containing materials (ACMs) and lead-based paint (LBP) associated with the building. The inspection was performed July 15, 2014 by Mr. Paul Semper of TRC, a State of Michigan Licensed Asbestos Inspector and Lead Risk Assessor. Bulk PLM samples were submitted to TRC’s laboratory in Woburn, Massachusetts, a National Voluntary Laboratory Approval Program (NVLAP) accredited laboratory. Paint chip samples were submitted to EMC Laboratories in Phoenix, Arizona, an Environmental Lead Laboratory Accreditation Program (ELLAP) certified laboratory.
ASBESTOS FINDINGS
The following building materials were determined to contain asbestos or were assumed to contain asbestos:
HM Material Location Asbestos Content
Approx.
Quantity
Friable/ Non-
Friable Condition
2.
9" x 9" Black with
Green Spots
Floor Tile
P1004 13% Chrysotile
Square
Feet (SF)
Non- Friable
(NF)
Good
18.* Rubber
Membrane Roof
Throughout Roof Assumed
ACM
17,000
SF
NF Good
19.* Gray
Flashing Caulk
Throughout Roof Assumed
ACM 120 SF NF Good
20.* Gray
Parapet Wall Caulk
Throughout Roof Assumed
ACM
65 SF NF Good
31.**
12" x 12" Peach with
Black Streaks
Floor Tile and Mastic
14002, 14018 Assumed
ACM 36 SF NF Good
37.
Brown Mastic associated with 1' x 1' Acoustical
Tile
12007 3%
Chrysotile 1,200 SF NF Good
- ii -
Content
Approx.
Quantity
Friable/ Non-
Friable Condition
42.
Hard Pack Mag Pipe
Insulation
B1005, B1007C, B1009A, B1009C, B1003, B1010, B1012, B1015, B1037, B1044, 2034, 2035, 3026, 3028, 4008, 4012, 5027, 5035, 6030, 6037, 7014, 7018, 8042, 8044, 9033, 9036, 10029, 10037, 11007, 11014, 12041, 12044, 13045, 13047, M101, 14004, 14005
45% Chrysotile
2,560 Linear
Feet (LF)
Friable (F)
Good
55.
Drywall System Floor 1
Trace <1%*** NA F Good
65.
Frame
Caulking
G1008, G1025, G1026, G1027, 1024, 1026, 1027
8% Chrysotile 220 SF NF Good
68.
Hard
Packed Elbows
B1005, B1007C, B1009A, B1009C, B1003, B1010, B1012, B1015, B1037, B1044
60% Chrysotile
268 SF F Good
70.
Hard Pack
Pipe Insulation
B1005, B1007C, B1009A, B1009C, B1003, B1010, B1012, B1015, B1037, B1044
40% Chrysotile 1,260 LF F Good
83.
9" x 9" Maroon Streaked Floor Tile
B1040 12%
Chrysotile 20 SF NF Good
HM = Homogenous Material; meaning a building material of the same composition, application, appearance, age, texture, color, etc.
*HM-18, 19, and 20 not sampled to preserve material integrity (non-destructive sampling methodology) **HM-31 was only observed in an elevator lobby on the 14th floor and was not sampled to preserve material integrity (non-destructive sampling methodology) ***HM-55 Laboratory composite analysis of the material indicated trace (<1%) chrysotile
LEAD-BASED PAINT FINDINGS
The following paint colors were determined to be lead-based paint (LBP) in accordance with GSA’s criteria in the locations noted:
- iii -
Sample/ Paint ID Location Color Condition
Square Footage
Reporting Limit
Lead Content
LP-4 Window Sill Brown Good 18,816 Square
Feet (SF)
0.10 1.58
LP-6 1113C
Light Blue
Good 4,000 SF 0.10 3.51
LP-7 1113 Off-White Good 1,250 SF 0.10 8.82 LP-8 Stairwell Walls Beige Good 14,400 SF 1.0 15.1
Asbestos and Limited Lead-Based Building Inspection Report TRC Project No: 220533
- 1 -
1.0 INTRODUCTION
TRC Environmental Corporation (TRC) contracted with the U.S. General Services Administration (GSA) to perform an asbestos and limited lead-based paint building inspection for the Hart-Dole-Inouye Building 1 (Building MI0501BC) located at 74 North Washington Avenue in Battle Creek, Michigan (Site). The purpose of the building inspection was to complete baseline building inspections, in general accordance with the AHERA regulations, and cost estimates to establish GSA’s environmental liability for asbestos. As directed by GSA, the collection of bulk material samples was to target discrete locations (insofar as reasonably practical) without damaging the esthetics of the facility. The building inspection encompassed suspect asbestos-containing materials (ACMs) and lead-based paint (LBP) associated with the building. The inspection was performed July 15, 2014 by Mr. Paul Semper of TRC, a State of Michigan Licensed Asbestos Inspector and Lead Risk Assessor. Copies of training certificates and state licenses (where applicable) are presented in Appendix E, Project Personnel Certifications.
2.0 ASBESTOS SAMPLING AND ANALYSIS
2.1 Sampling Procedures
The asbestos building inspection, bulk material sampling, material condition assessments, and analytical procedures were performed in accordance with the United States Environmental Protection Agency’s (USEPA) Asbestos Hazard Emergency Response Act (AHERA) 40 CFR Part
763. In general the building inspection procedures included first identifying materials suspected to contain asbestos and then collecting samples of the suspect materials for laboratory analysis to determine if the materials are ACMs. The USEPA-AHERA defines ACM as any material containing greater than one percent (>1.0%) asbestos.
Suspect material homogeneity determination is based on the following criteria:
Similar physical characteristics (e.g., same age, color, and texture, etc.);
Application (e.g., sprayed-on, troweled-on, assembly into a system, etc.); and Material function (e.g., thermal insulation, floor tile, wallboard system, stucco plaster, fireproofing, adhesives, asphalt roofing, etc.).
In accordance with USEPA-AHERA sampling methodology, multiple samples are collected for each suspect homogenous material application in order to reduce chances of reporting false negatives. The number of samples collected for each material type was based on the information listed in the following table, and found in the AHERA regulation.
Bulk Sampling Strategy*
Material Homogeneous Areas Units Minimum Number of Samples*
Thermal System Insulation Less than 6 SF or LF of patched
Less than 6 SF or LF of non-patched
More than 6 SF
SF/LF
3 samples per homogenous area
- 2 -
Material Homogeneous Areas Units Minimum Number of Samples*
Friable Surfacing less than 1,000 1,000 to 5,000 more than 5,000
SF
SF
SF
Non-friable Surfacing - - - SF 3 Friable and Non-friable Miscellaneous Materials
- - - LF / SF / EA 3
*Fewer samples may be collected of materials found in limited quantity or accessibility as determined by the Inspector SF = square feet; LF = linear feet; EA = each
Sampling of building materials was conducted using hand tools to cut or bore small samples of materials. Once a piece of material is dislodged, the sample was placed into a laboratory provided sampling container and labeled with a unique identification number. The material condition was also inspected and assessed for damage.
2.2 Physical Assessment
A physical assessment of each suspect homogenous material was performed by the TRC inspector to determine the condition of the materials. The following describes how the material was assessed by the TRC inspector. Assessment includes visual inspection and physically touching the material as well as making considerations for future disturbance to a material.
This information is combined to determine appropriate response actions and developing management plans/procedures for identified ACMs. In accordance with GSA’s Inventory Reporting and Information System (IRIS) and based on the physical assessment findings, the ACMs were placed into one of the following three categories:
Good = Undamaged Fair = Damaged (less than 10% locally or 25% distributed) Poor = Significantly damaged (at or over 10% locally or 25% distributed)
Because the physical assessment is used to determine which response actions will be chosen to manage the asbestos, proper identification and assessment of ACM are vital to the effective implementation of the management program.
2.3 PLM Analysis Methodology
Laboratory analytical services were provided by TRC Industrial Hygiene Laboratory in Windsor Connecticut, a National Voluntary Laboratory Approval Program (NVLAP) accredited laboratory
(NVLAP# 101424-0).
PLM samples were analyzed utilizing the USEPA’s Test Methods: Methods for the determination of Asbestos in Bulk Building Materials [USEPA/600/R-93/116 (1993)], and the McCrone Research Institute’s The Asbestos…