Specs_DLA_Standby_Generator_Pre-Alteration_Assessment_Report_-_Vol_2.pdf

PDF 18 MB Posted

Attached to
FY18 DLA Standby Generator Replacement
Solicitation number
W911XK18R0011
Issued by

About this file

Attachment - Asbestos Assessment Vol 2

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix C – Photographs

Appendix A to Specification Section 02 82 13.00 10 VOL 2

Appendix C – PHOTOGRAPHS

BUILDING #1 SAMPLE PHOTOGRAPHS

Hart-Dole-Inouye Federal Center Page 1 of 29

Battle Creek, Michigan

Hygieneering Project #: 2017-3589-ENV

BUILDING #1A SAMPLE PHOTOGRAPHS

Hart-Dole-Inouye Federal Center Page 2 of 29

Hart-Dole-Inouye Federal Center Page 3 of 29

Hart-Dole-Inouye Federal Center Page 4 of 29

Hart-Dole-Inouye Federal Center Page 5 of 29

Hart-Dole-Inouye Federal Center Page 6 of 29

Hart-Dole-Inouye Federal Center Page 7 of 29

Hart-Dole-Inouye Federal Center Page 8 of 29

BUILDING #1B SAMPLE PHOTOGRAPHS

Hart-Dole-Inouye Federal Center Page 9 of 29

BUILDING #1C SAMPLE PHOTOGRAPHS

Hart-Dole-Inouye Federal Center Page 10 of 29

BUILDING #2 SAMPLE PHOTOGRAPHS

Hart-Dole-Inouye Federal Center Page 11 of 29

BUILDING #2A SAMPLE PHOTOGRAPHS

Hart-Dole-Inouye Federal Center Page 12 of 29

Hart-Dole-Inouye Federal Center Page 13 of 29

Hart-Dole-Inouye Federal Center Page 14 of 29

Hart-Dole-Inouye Federal Center Page 15 of 29

BUILDING #2B SAMPLE PHOTOGRAPHS

Hart-Dole-Inouye Federal Center Page 16 of 29

BUILDING #2B SAMPLE PHOTOGRAPHS

Hart-Dole-Inouye Federal Center Page 17 of 29

BUILDING #5 SAMPLE PHOTOGRAPHS

Hart-Dole-Inouye Federal Center Page 18 of 29

Hart-Dole-Inouye Federal Center Page 19 of 29

Hart-Dole-Inouye Federal Center Page 20 of 29

Hart-Dole-Inouye Federal Center Page 21 of 29

Hart-Dole-Inouye Federal Center Page 22 of 29

Hart-Dole-Inouye Federal Center Page 23 of 29

Hart-Dole-Inouye Federal Center Page 24 of 29

Hart-Dole-Inouye Federal Center Page 25 of 29

Hart-Dole-Inouye Federal Center Page 26 of 29

BUILDING #8 SAMPLE PHOTOGRAPHS

Hart-Dole-Inouye Federal Center Page 27 of 29

BUILDING #8 SAMPLE PHOTOGRAPHS

Hart-Dole-Inouye Federal Center Page 28 of 29

BUILDING #20 SAMPLE PHOTOGRAPHS

Hart-Dole-Inouye Federal Center Page 29 of 29

Appendix D – Inspector Certifications

Appendix E – GSA Alteration Assessment Worksheet sdsd

REGION BUILDING NUMBER BUILDING NAME

BUILDING

CONSTRUCTION

DATE

(system generated field)

BUILDING SIZE (GSF)

(system generated field)

BUILDING COMMENTS

FLOOR NUMBER

(can be text or number or combination)

FLOOR AREA

(GSF of the floor)

(system generated)

FLOOR COMMENTS

LOCATION NUMBER

(any unique number assigned to an area or room)

LOCATION COMMENTS

HOMOGENEOUS

AREA NUMBER

DATE OF SURVEY

SURVEY ID NUMBER

(system generated)

RESULTS

(Asbestos Status)

LONG DESCRIPTION RESULTS

(Asbestos Status)

FRIABILITY CONDITION ACCESSIBILITY

ASBESTOS

QUANTITY

ASBESTOS

QUANTITY

UNITS

TYPE AND DESCRIPTION OF

ASBESTOS

Abatement Cost Estimate (only acm abatement and only acm on this row)

Variability (approximate +/- accuracy of estimate)

Estimate Comments

01 CT0013ZZ WILLIAM R. COTTER FB 1/1/1933 191445 EXAMPLE DATA POINTS ONLY Bsmnt 32000 00001.0 Boiler room on west end 01 03/04/2014 A000000000000001 Asbestos-Containing Material => 1% ACM=>1 YES GoodOOD LOW 300 LF 3" hot water pipe $6,000.00 5%

Estimates are based on prior professional experience for unit costs. Costs are generally + or - 5% of actual.

01 CT0013ZZ WILLIAM R. COTTER FB 1/1/1933 191445 EXAMPLE DATA POINTS ONLY Bsmnt 32000 00001.0 Boiler room on west end 01A 03/04/2014 A000000000000001 Asbestos-Containing Material => 1% ACM=>1 YES DAMAGoodED MEDIUM 200 SF Boiler insulation $2,000.00 5%

03/13-16/2017

05 MI0501BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 1 BUILDING #1 - Areas Impacted by DLA Standby GeneratorReplacment Project Basement Miscellaneous Pipes within Mechanical Room 1-B-1A 1-TPA

03/13-16/2017 Presumed Asbestos-Containing Material PACM YES

Potential for

Damage HIGH

35 LF

Corrugated Paper Pipe Length

Insulation $1,200.00 15%

Estimates based on man-day rate for removal of material, with respect to accesibilty and locations

05 MI0501BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 1 BUILDING #1 - Areas Impacted by DLA Standby GeneratorReplacment Project Basement Miscellaneous Pipes within Mechanical Room 1-B-1A 1-TJA

03/13-16/2017 Asbestos-Containing Material =>1% ACM=>1 YES

Potential for

Damage MEDIUM

6 LF

Mudded Fittings on Corrugated Paper

Pipe Length Insulation $1,200.00 15%

Estimates based on man-day rate for removal of material, with respect to accesibilty and locations

05 MI0501BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 1 BUILDING #1 - Areas Impacted by DLA Standby GeneratorReplacment Project Basement

Steam Header and Miscellaneous Pipes within

Mechanical Room 1-B-1A

1-TPB

03/13-16/2017 Asbestos-Containing Material =>1% ACM=>1 YES

Potential for

Damage MEDIUM

120 LF

Cementitious Block Pipe Length

Insulation $4,800.00 15%

Estimates based on man-day rate for removal of material, with respect to accesibilty and locations

05 MI0501BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 1 BUILDING #1 - Areas Impacted by DLA Standby GeneratorReplacment Project Basement

Steam Header and Miscellaneous Pipes within

Mechanical Room 1-B-1A

1-TJB

03/13-16/2017

Asbestos-Containing Material =>1% ACM=>1 YES Damaged

MEDIUM

~30 LF

Mudded Fittings on Cementitious

Block Pipe Length Insulation $2,400.00 15% Estimates based on man-day rate for removal of material, with respect to accesibilty and locations

05 MI0502BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 1A BUILDING #1A - Areas Impacted by DLA Standby GeneratorReplacment Project

Sub-basement, Basement, Ground

Floor

Walls in Room 1A-SB-13 and 1A-SB-14 1A-MBA

03/13-16/2017

No Asbestos Detectecd NND NO Good N/A N/A N/A 4” Black Basecove & Adhesive N/A N/A

05 MI0502BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 1A BUILDING #1A - Areas Impacted by DLA Standby GeneratorReplacment Project

Sub-basement, Basement, Ground

Floor

Ceiling in Basement Level Former Data Center Rooms

1A-B-9, and Presumed in Rooms 1A-B-11 & 1A-B-13

(Secured Areas - Restricted Access)

1A-MCA

03/13-16/2017

No Asbestos Detectecd NND YES Good N/A N/A N/A

2’ x 4’ Dot and Fissure Ceiling Tile with Pattern (Labeled with “Danger”-

Asbestos Warning Labels)

N/A N/A

05 MI0502BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 1A BUILDING #1A - Areas Impacted by DLA Standby GeneratorReplacment Project

Sub-basement, Basement, Ground

Floor

Ceiling in Storage Room 1A-SB-14 1A-MCB

03/13-16/2017

No Asbestos Detectecd NND YES Good N/A N/A N/A 2’ x 2’ Dot and Gouge Recessed

Ceiling Tile N/A N/A

05 MI0502BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 1A BUILDING #1A - Areas Impacted by DLA Standby GeneratorReplacment Project

Sub-basement, Basement, Ground

Floor

On Terrazzo Beneath Raised Floor of Data Center

Room 1A-B-9, and Presumed in Rooms 1A-B-11 & 1A-

B-13 (Secured Areas - Restricted Access)

1A-MFA

03/13-16/2017

Asbestos-Containing Material =>1% ACM=>1 NO Good

LOW

5,500 SF

Brown and Black Adhesive on

Terrazzo $27,500.00 15%

Estimates based on price per square foot rate for removal of material.

05 MI0502BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 1A BUILDING #1A - Areas Impacted by DLA Standby GeneratorReplacment Project

Sub-basement, Basement, Ground

Floor

Wall Sleeve Between Rooms 1A-SB 13 and 1A-SB-14 1A-MGA

03/13-16/2017

No Asbestos Detectecd NND YES Potential for

Damage N/A N/A N/A

Dark Brown Fibrous Pipe Sleeve

Backer N/A N/A

05 MI0502BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 1A BUILDING #1A - Areas Impacted by DLA Standby GeneratorReplacment Project

Sub-basement, Basement, Ground

Floor

Overhead on Wall Above Lower Ceiling Line in Room

1A-SB-13

1A-MMA

03/13-16/2017

Asbestos-Containing Material =>1% ACM=>1 NO Good

LOW

2 SF Black Tar Sealant on Wall $1,200.00 15% Estimates based on man-day rate for removal of material, with respect to accesibilty and locations

05 MI0502BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 1A BUILDING #1A - Areas Impacted by DLA Standby GeneratorReplacment Project

Sub-basement, Basement, Ground

Floor

On Terrazzo Beneath Raised Floor of Data Center Room

1A-B-9, and Presumed in Rooms 1A-B-11 & 1A-B-13

(Secured Areas - Restricted Access)

1A-MMB

03/13-16/2017

No Asbestos Detectecd NND NO Good N/A N/A N/A Tan Pedestal Adhesive N/A N/A

05 MI0502BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 1A BUILDING #1A - Areas Impacted by DLA Standby GeneratorReplacment Project

Sub-basement, Basement, Ground

Floor

On Terrazzo Beneath Raised Floor of Data Center Room

1A-B-9, and Presumed in Rooms 1A-B-11 & 1A-B-13

(Secured Areas - Restricted Access)

1A-MMC

03/13-16/2017

No Asbestos Detectecd NND NO Good N/A N/A N/A Tan Over Black Residual Pedestal

Adhesive N/A N/A

05 MI0502BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 1A BUILDING #1A - Areas Impacted by DLA Standby GeneratorReplacment Project

Sub-basement, Basement, Ground

Floor

Sub-Basement Corridor on Plaster Above Chilled

Water Piping South of Stair #1

1A-MTA

03/13-16/2017

Presumed Asbestos-Containing Material PACM NO Good

LOW

30 SF Flex Cement Board Panels (Transite) $2,400.00 15% Estimates based on man-day rate for removal of material, with respect to accesibilty and locations

05 MI0502BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 1A BUILDING #1A - Areas Impacted by DLA Standby GeneratorReplacment Project

Sub-basement, Basement, Ground

Floor

Walls of Storage Area in Room 1A-SB-14 1A-MWA

03/13-16/2017

Presumed Asbestos-Containing Material PACM YES Damaged

MEDIUM

120 SF Drywall Tape and Joint Compound $2,400.00 15% Estimates based on man-day rate for removal of material, with respect to accesibilty and locations

05 MI0502BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 1A BUILDING #1A - Areas Impacted by DLA Standby GeneratorReplacment Project

Sub-basement, Basement, Ground

Floor

Wall in Room 1A-G-18 & 1A-G-20 1A-MWB

03/13-16/2017

No Asbestos Detectecd NND YES/NO Good N/A N/A N/A 1’ x 1’ Large Fissure Acoustic Wall Tile and Brown Mastic N/A N/A

05 MI0502BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 1A BUILDING #1A - Areas Impacted by DLA Standby GeneratorReplacment Project

Sub-basement, Basement, Ground

Floor

Foundation Walls of Rooms 1A-SB-13 & 1A-SB-14 1A-SCA

03/13-16/2017

No Asbestos Detectecd NND YES Good N/A N/A N/A White Paint Over Gray Coating on

Concrete N/A N/A

05 MI0502BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 1A BUILDING #1A - Areas Impacted by DLA Standby GeneratorReplacment Project

Sub-basement, Basement, Ground

Floor

Ceilings in Sub-Basement Corridor and Rooms 1A-SB-01, 1A-SB-02 & 1A-SB-04

1A-SPA

03/13-16/2017

No Asbestos Detectecd NND YES Good N/A N/A N/A White Plaster Over Gray Scratch Coat N/A N/A

05 MI0502BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 1A BUILDING #1A - Areas Impacted by DLA Standby GeneratorReplacment Project

Sub-basement, Basement, Ground

Floor

Ductwork Along Est Side of Room 1A-SB-01; and

Section of Ductwork in Corridor at Wall North of

Room 1A-SB-03

1A-TDA

03/13-16/2017

Asbestos-Containing Material =>1% by

PC

ACM=>1 by PC YES

Potential for

Damage

HIGH

160 SF

Cementitious Block Compound and

Wire Mesh Duct Insulation $4,800.00 15% Estimates based on man-day rate for removal of material, with respect to accesibilty and locations

05 MI0502BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 1A BUILDING #1A - Areas Impacted by DLA Standby GeneratorReplacment Project

Sub-basement, Basement, Ground

Floor

Piping in Rooms 1A-SB-04, 1A-SB-13, 1A-SB-14, 1A-SB-

15 and Sub-Basement Corridors and Basement Tunnel

1A-TJA

03/13-16/2017

Asbestos-Containing Material =>1% ACM=>1 YES Damaged

MEDIUM

25 LF

Mudded Fittings on White and Gray

Cementitious Block Pipe Length

Insulation

$2,400.00 15% Estimates based on man-day rate for removal of material, with respect to accesibilty and locations

05 MI0502BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 1A BUILDING #1A - Areas Impacted by DLA Standby GeneratorReplacment Project

Sub-basement, Basement, Ground

Floor

Miscellaneous Piping in Rooms 1A-SB-01, 1A-SB-04, 1A-SB-14, 1A-SB-15 and Sub-Basement Corridors and

Basement Tunnel

1A-TJB

03/13-16/2017

Presumed Asbestos-Containing Material PACM YES Good

MEDIUM

~20 LF

Cementitious Fittings on Fiberglass

Pipe Length $2,400.00 15% Estimates based on man-day rate for removal of material, with respect to accesibilty and locations

05 MI0502BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 1A BUILDING #1A - Areas Impacted by DLA Standby GeneratorReplacment Project

Sub-basement, Basement, Ground

Floor

Miscellaneous Pipes in Room 1A-SB-01 and Extending into Corridor; Pips Along ceiling in Corridor South of

Stair #1 in Sub-Basement; Pipes in Ceiling Cavity of

Data Center Room 1-B-9

1A-TJE

03/13-16/2017

Asbestos-Containing Material =>1% ACM=>1 YES Potential for

Damage

MEDIUM

~30 LF

Mudded Fittings on Layered Paper

Pipe Length Insulation $2,400.00 15%

Estimates based on man-day rate for removal of material, with respect to accesibilty and locations

05 MI0502BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 1A BUILDING #1A - Areas Impacted by DLA Standby GeneratorReplacment Project

Sub-basement, Basement, Ground

Floor

Chilled Water Piping in Sub-Basement in Sub-

Basement Mechanical Rooms, Corridors, and Tunnel in Basement

1A-TJF

03/13-16/2017

Presumed Asbestos-Containing Material PACM YES Potential for

Damage

MEDIUM

~20 LF

Woven Canvas Wrapped Mudded

Fitting Compound on Fiberglass Pipe

Insulation

$2,400.00 15% Estimates based on man-day rate for removal of material, with respect to accesibilty and locations

05 MI0502BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 1A BUILDING #1A - Areas Impacted by DLA Standby GeneratorReplacment Project

Sub-basement, Basement, Ground

Floor

Piping in Rooms 1A-SB-04, 1A-SB-13, 1A-SB-14, 1A-SB-

15 and Miscellaneous Corridors and Basement Tunnel

1A-TPA

03/13-16/2017

Presumed Asbestos-Containing Material PACM YES Potential for

Damage

MEDIUM

150 LF

White and Gray Cementitious Block

Pipe Length Insulation $4,800.00 15% Estimates based on man-day rate for removal of material, with respect to accesibilty and locations

05 MI0502BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 1A BUILDING #1A - Areas Impacted by DLA Standby GeneratorReplacment Project

Sub-basement, Basement, Ground

Floor

Pipes Along Ceiling and in Walls of Rooms 1A-SB-13 and

1A-SB-14, Water Piping in Corridor and Room 1A-SB-01

1A-TPC

03/13-16/2017

No Asbestos Detectecd NND YES Damaged N/A N/A N/A Cork Pipe Length Insulation N/A N/A

05 MI0502BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 1A BUILDING #1A - Areas Impacted by DLA Standby GeneratorReplacment Project

Sub-basement, Basement, Ground

Floor

Pipes Along Ceiling of Room 1A-SB-14; at North Wall of Room 1A-SB-04; and in Mechanical Rooms 1A-SB-

01 & 1A-SB-15

1A-TPD

03/13-16/2017

Asbestos-Containing Material =>1% ACM=>1 YES Potential for

Damage

MEDIUM

120 LF

Corrugated Paper Pipe Length

Insulation $4,800.00 15% Estimates based on man-day rate for removal of material, with respect to accesibilty and locations

05 MI0502BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 1A BUILDING #1A - Areas Impacted by DLA Standby GeneratorReplacment Project

Sub-basement, Basement, Ground

Floor

Miscellaneous Pipes in Room 1A-SB-01 and Extending into Corridor; Pipes Along ceiling in Corridor South of

Stair #1 in Sub-Basement; Pipes in Ceiling Cavity of

Data Center Room 1-B-9

1A-TPE

03/13-16/2017

Asbestos-Containing Material =>1% by

PC

ACM=>1 by PC YES Damaged

MEDIUM

200 LF Layered Paper Pipe Insulation $6,000.00 15%

05 MI0538BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 1B BUILDING #1B - Areas Impacted by DLA Standby GeneratorReplacment Project

Sub-basement, Ground Floor

Heating Supply Piping along Ceiling and Feeding AHUs in Tunnel and Fan Room 1B-SB-15

1B-TJA

03/13-16/2017

No Asbestos Detectecd NND YES Good N/A N/A N/A Mudded Fittings Associated with

Fiberglass Pipe Length Insulation N/A N/A

05 MI0538BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 1B BUILDING #1B - Areas Impacted by DLA Standby GeneratorReplacment Project

Sub-basement, Ground Floor

Mounting Pads from Former AHU on Concrete Slab in

Room 1B-SB-15

1B-MMA

03/13-16/2017 No Asbestos Detectecd NND NO Good N/A N/A N/A Red Rubberized Vibration Pads N/A N/A

05 MI0538BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 1B BUILDING #1B - Areas Impacted by DLA Standby GeneratorReplacment Project

Sub-basement, Ground Floor

Residual on Concrete Pad and on Wall at Former AHU

Room 1B-SB-15

1B-MMB

03/13-16/2017 Asbestos-Containing Material =>1% ACM=>1 NO Good

MEDIUM

4 SF Hard Tan Sealant $1,200.00 15%

Estimates based on man-day rate for removal of material, with respect to accesibilty and locations

05 MI0503BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 2 BUILDING #2 - Areas Impacted by DLA Standby GeneratorReplacment Project Basement Wall Opening in Rooms 2-B-33, 2- B-29, 2-B-31 2-MMA

03/13-16/2017 No Asbestos Detectecd NND NO Good N/A N/A N/A

White Caulk Between Drywall Panel and Brick N/A N/A

05 MI0503BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 2 BUILDING #2 - Areas Impacted by DLA Standby GeneratorReplacment Project Basement Wall Opening in Rooms 2-B-33, 2- B-29, 2-B-31 2-MWA

03/13-16/2017 No Asbestos Detectecd NND NO Good N/A N/A N/A

Drywall Panel Partition Walls in

Former Opening N/A N/A

05 MI0503BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 2 BUILDING #2 - Areas Impacted by DLA Standby GeneratorReplacment Project Basement Walls in Rooms 2-B-31 & 2- B-29 2-SPA

03/13-16/2017 No Asbestos Detectecd NND YES Good N/A N/A N/A White Plaster Finish on Brick Walls N/A N/A

05 MI0503BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 2 BUILDING #2 - Areas Impacted by DLA Standby GeneratorReplacment Project Basement

Residual Length in North Brick Wall Penetration

Between 2-B-31 & 2-B-33

2-TPA

03/13-16/2017 Presumed Asbestos-Containing Material PACM YES Good

MEDIUM

4 LF Wool Felt Pipe Length Insulation $1,200.00 15%

Estimates based on man-day rate for removal of material, with respect to accesibilty and locations

05 MI0503BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 2 BUILDING #2 - Areas Impacted by DLA Standby GeneratorReplacment Project Basement

Miscellaneous Piping within Basement Corridors of

Building #2

2-TPB

03/13-16/2017

No Suspect Asbestos Containing Material NSACM YES Good N/A N/A N/A Fiberglass Pipe Length Insulation and

PVC Booted Fittings N/A N/A

05 MI504BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 2A BUILDING #2A - Areas Impacted by DLA Standby GeneratorReplacment Project

Basement, 1st, 2nd, 3rd Floors Walls of Fitness Center (Room 2A-B-1) 2A-MBA

03/13-16/2017 No Asbestos Detectecd NND NO Good N/A N/A N/A 4” Black Basecove N/A N/A

05 MI504BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 2A BUILDING #2A - Areas Impacted by DLA Standby GeneratorReplacment Project

Basement, 1st, 2nd, 3rd Floors 3rd Floor Electrical Closet at Stair 2A on Back Wall 2A-MBB

03/13-16/2017 Asbestos-Containing Material =>1% ACM=>1 NO

Potential for

Damage LOW

3 SF

4” Black Hard and Brittle Basecove and Adhesive $1,200.00 15%

Estimates based on man-day rate for removal of material, with respect to accesibilty and locations

05 MI504BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 2A BUILDING #2A - Areas Impacted by DLA Standby GeneratorReplacment Project

Basement, 1st, 2nd, 3rd Floors

Ceiling of Fitness Center (Room 2A-B-1); Ceilings in

Room 2A-B-5 and Corridor Adjacent to Fitness Room

2A-MCA

03/13-16/2017

No Asbestos Detectecd NND YES Good N/A N/A N/A 2’ x 2’ White Pinhole Ceiling Tile N/A N/A

05 MI504BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 2A BUILDING #2A - Areas Impacted by DLA Standby GeneratorReplacment Project

Basement, 1st, 2nd, 3rd Floors Under Carpet in Fitness Center (Room 2A-B-1) 2A-MFA

03/13-16/2017 No Asbestos Detectecd NND NO Good N/A N/A N/A

12” x 12” Tan Mottled Floor Tile and

Glue Under Black Mastic N/A N/A

05 MI504BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 2A BUILDING #2A - Areas Impacted by DLA Standby GeneratorReplacment Project

Basement, 1st, 2nd, 3rd Floors Under Carpet in Fitness Center (Room 2A-B-1) 2A-MFB

03/13-16/2017 No Asbestos Detectecd NND NO Good N/A N/A N/A

12” x 12” White with Tan Streak with

Tan Glue Over Black Mastic N/A N/A

05 MI504BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 2A BUILDING #2A - Areas Impacted by DLA Standby GeneratorReplacment Project

Basement, 1st, 2nd, 3rd Floors 1st & 3rd Floor Electrical Closet at Stair 2A 2A-MFC

03/13-16/2017

Asbestos-Containing Material =>1% Tile

Only ACM=>1 Tile Only NO Good

LOW

25 SF

9” x 9” Dark Brown with Red and

Cream Streak Over Black Mastic on

Felt Paper (1/4” Depth)

$2,400.00 15% Estimates based on man-day rate for removal of material, with respect to accesibilty and locations

05 MI504BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 2A BUILDING #2A - Areas Impacted by DLA Standby GeneratorReplacment Project

Basement, 1st, 2nd, 3rd Floors Floor in 2nd Floor Electrical Closet at Stair 2A 2A-MFD

03/13-16/2017 No Asbestos Detectecd NND NO Good N/A N/A N/A

Dark Brown Carpet Adhesive Over

Black Mastic N/A N/A

05 MI504BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 2A BUILDING #2A - Areas Impacted by DLA Standby GeneratorReplacment Project

Basement, 1st, 2nd, 3rd Floors

Wall Seam between Drywall and Plaster in Fitness

Center (Rooms 2A-B-1)

2A-MMA

03/13-16/2017 No Asbestos Detectecd NND NO Good N/A N/A N/A White Caulk on Wall N/A N/A

05 MI504BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 2A BUILDING #2A - Areas Impacted by DLA Standby GeneratorReplacment Project

Basement, 1st, 2nd, 3rd Floors Walls of Fitness Center (Rooms 2A-B-1) 2A-MWA

03/13-16/2017 No Asbestos Detectecd NND NO Good N/A N/A N/A Drywall, Tape and Joint Compound N/A N/A

05 MI504BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 2A BUILDING #2A - Areas Impacted by DLA Standby GeneratorReplacment Project

Basement, 1st, 2nd, 3rd Floors Building 4 (MI0507BC)

Ceiling Deck of Fitness Center (Room 2A-B-1) above

Suspended Ceiling

2A-SPA

03/13-16/2017 No Asbestos Detectecd NND YES Damaged N/A N/A N/A Plaster Finish on Concrete Ceiling N/A N/A

05 MI504BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 2A BUILDING #2A - Areas Impacted by DLA Standby GeneratorReplacment Project

Basement, 1st, 2nd, 3rd Floors Building 4A (MI0508BC)

Walls of Elevator #13 Shaft Inside Fitness Center (Room

2A-B-1) and Room 2A-B-5

2A-SPB

03/13-16/2017 No Asbestos Detectecd NND YES Good N/A N/A N/A

Textured Plaster on Concrete/CMU

Wall N/A N/A

05 MI504BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 2A BUILDING #2A - Areas Impacted by DLA Standby GeneratorReplacment Project

Basement, 1st, 2nd, 3rd Floors Building 5 (MI0509BC) Ceiling of 1st & 2nd Floor Electrical Closet at Stair 2A 2A-SPC

03/13-16/2017

Asbestos-Containing Material =>1% by

PC

ACM=>1 by PC YES Damaged

LOW

20 SF

Plaster over Scratchcoat on Brown

Cellulose Board $3,600.00 15%

Estimates based on man-day rate for removal of material, with respect to accesibilty and locations

05 MI504BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 2A BUILDING #2A - Areas Impacted by DLA Standby GeneratorReplacment Project

Basement, 1st, 2nd, 3rd Floors Building 8 (MI0527BC) Ceiling Cavity of Rooms 2A-B-1 & 2A-B-5, and 2A-TPA

03/13-16/2017 No Suspect Asbestos Containing Material NSACM YES Good N/A N/A N/A

Fiberglass Insulated Piping with PVC

Boot Fittings N/A N/A

05 MI504BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 2A BUILDING #2A - Areas Impacted by DLA Standby GeneratorReplacment Project

Basement, 1st, 2nd, 3rd Floors Building 20 (MI0528BC) Ceiling Cavity of Rooms 2A-B-1 & 2A-B-5, and 2A-TPB

03/13-16/2017 No Suspect Asbestos Containing Material NSACM YES Good N/A N/A N/A

Black Foam Pipe Insulation

(“Armaflex”) N/A N/A

05 MI0505BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 2B BUILDING #2B - Areas Impacted by DLA Standby GeneratorReplacment Project

Basement, 1st, 2nd

Floors Walls in Room 2B-B-1 and Adjacent Corridor 2B-MBA

03/13-16/2017 No Asbestos Detectecd NND NO Good N/A N/A N/A 4” Black Basecove and Adhesive N/A N/A

05 MI0505BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 2B BUILDING #2B - Areas Impacted by DLA Standby GeneratorReplacment Project

Basement, 1st, 2nd

Floors Ceiling Inside Room 2B-B-1 and Adjacent Corridor 2B-MCA

03/13-16/2017 No Asbestos Detectecd NND NO Good N/A N/A N/A

2’ x 2’ Dot and Gouge Pattern

Suspended Ceiling Tile N/A N/A

05 MI0505BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 2B BUILDING #2B - Areas Impacted by DLA Standby GeneratorReplacment Project

Basement, 1st, 2nd

Floors

Inner and Outer Walls of Room 2B-B-1 and Men’s

Locker Room (2B-B-3)

2B-MWA

03/13-16/2017 No Asbestos Detectecd NND NO Good N/A N/A N/A Drywall, Tape and Joint Compound N/A N/A

05 MI0505BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 2B BUILDING #2B - Areas Impacted by DLA Standby GeneratorReplacment Project

Basement, 1st, 2nd

Floors

Portions of Building 2 and 2B Basement Corridor

Outside Rooms 2B-B-1 & 2B-B-1A

2B-SPA

03/13-16/2017 No Asbestos Detectecd NND YES Damaged N/A N/A N/A Beige Fibered Plaster on Ceiling N/A N/A

05 MI0505BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 2B BUILDING #2B - Areas Impacted by DLA Standby GeneratorReplacment Project

Basement, 1st, 2nd

Floors Ceiling in Electrical Room 2B-B-1A 2B-SPB

03/13-16/2017 No Asbestos Detectecd NND YES

Potential for

Damage N/A N/A N/A

Gray Light Weight Plaster on Rock

Lathe N/A N/A sdsd

05 MI0505BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 2B BUILDING #2B - Areas Impacted by DLA Standby GeneratorReplacment Project

Basement, 1st, 2nd

Floors Ceiling Above Suspended Ceiling in Room 2B-B-1 2B-SPC

03/13-16/2017 No Asbestos Detectecd NND YES Damaged N/A N/A N/A Plaster on Walls and Ceiling N/A N/A

05 MI0505BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 2B BUILDING #2B - Areas Impacted by DLA Standby GeneratorReplacment Project

Basement, 1st, 2nd

Floors

Pipes Along Ceilings in Basement Corridor of Building 2

& 2B Adjacent to Rooms 2B-B-1 & 2B-B-1A

2B-TPA

03/13-16/2017

No Suspect Asbestos Containing Material NSACM YES Good N/A N/A N/A Fiberglass Pipe Length Insulation with

PVC Booted Fittings N/A N/A

05 MI0507BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 4 BUILDING #4 - Areas Impacted by DLA Standby GeneratorReplacment Project

Basement, 1st, 2nd

Floors Basement – Dock Gated Area (Room 4-B-2) 4-TPA

03/13-16/2017 Asbestos-Containing Material =>1% ACM=>1 YES

Potential for

Damage LOW 70 LF White TSI Surrounding 1” Pipe $2,400.00 15%

Estimates based on man-day rate for removal of material, with respect to accesibilty and locations

05 MI0507BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 4 BUILDING #4 - Areas Impacted by DLA Standby GeneratorReplacment Project

Basement, 1st, 2nd

Floors Basement – Garage Gated Area (Room 4-B-2) 4-TPB

03/13-16/2017 Asbestos-Containing Material =>1% ACM=>1 YES

Potential for

Damage LOW 260 LF White TSI Surrounding 4” Pipe $6,000.00 15%

Estimates based on man-day rate for removal of material, with respect to accesibilty and locations

05 MI0508BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 4A BUILDING #4A - Areas Impacted by DLA Standby GeneratorReplacment Project Ground Floor

Continuation of Chilled Water Return Lines from

Building 4A

4A-TJA

03/13-16/2017

No Asbestos Detectecd NND YES Good N/A N/A N/A Hard Packed Elbows (on Fiberglass

Pipe Length Insulation) N/A N/A

05 MI0508BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 4A BUILDING #4A - Areas Impacted by DLA Standby GeneratorReplacment Project Ground Floor

Chilled Water Return Lines (Colored Blue) in

Warehouse/Dock

4A-TPA

03/13-16/2017 No Asbestos Detectecd NND YES Good N/A N/A N/A

Blue Fiberglass Pipe Wrap and

Backing Coating N/A N/A

05 MI0508BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 4A BUILDING #4A - Areas Impacted by DLA Standby GeneratorReplacment Project Ground Floor

Chilled Water Return Lines (Colored Blue) in

Warehouse/Dock

4A-TJA

03/13-16/2017

No Asbestos Detectecd NND YES Good N/A N/A N/A Hard Packed Elbows (on Fiberglass

Pipe Length Insulation) N/A N/A

05 MI0509BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 5 BUILDING #5 - Areas Impacted by DLA Standby GeneratorReplacment Project

Basement, 1st

Floor, 2nd Floor, Roof

Gaskets on Top of Day Tanks in Room 5-B-6 5-MGA

03/13-16/2017

No Asbestos Detectecd NND NO Good N/A N/A N/A Red Flange Gasket N/A N/A

05 MI0509BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 5 BUILDING #5 - Areas Impacted by DLA Standby GeneratorReplacment Project

Basement, 1st

Floor, 2nd Floor, Roof

Seam of Louver and CMU Wall in Rooms 5-B-7 and 5-2-

5-MMA

03/13-16/2017

No Asbestos Detectecd NND NO Good N/A N/A N/A Gray Caulk N/A N/A

05 MI0509BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 5 BUILDING #5 - Areas Impacted by DLA Standby GeneratorReplacment Project

Basement, 1st

Floor, 2nd Floor, Roof

Cooling Water Piping at Rooftop Radiators above Room

5-2-21

5-MMB

03/13-16/2017

No Asbestos Detectecd NND NO Good N/A N/A N/A Gray Caulk Sealant on Metal Jacketed

Fiberglass Pipe Insulation N/A N/A

05 MI0509BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 5 BUILDING #5 - Areas Impacted by DLA Standby GeneratorReplacment Project

Basement, 1st

Floor, 2nd Floor, Roof

Gaskets on Generator Engine Components in Room 5-B-

5-MMC

03/13-16/2017

No Asbestos Detectecd NND NO D N/A N/A N/A Gray and Black Paper Gaskets N/A N/A

05 MI0509BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 5 BUILDING #5 - Areas Impacted by DLA Standby GeneratorReplacment Project

Basement, 1st

Floor, 2nd Floor, Roof

Seam of Rotary Fan Louvers and CMU on East Wall of

Room 5-B-7

5-MMD

03/13-16/2017

Asbestos-Containing Material =>1% ACM=>1 NO Good

LOW

4 LF

Green and Gray Caulk Sealant at Fan

Housing $1,200.00 15% Estimates based on man-day rate for removal of material, with respect to accesibilty and locations

05 MI0509BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 5 BUILDING #5 - Areas Impacted by DLA Standby GeneratorReplacment Project

Basement, 1st

Floor, 2nd Floor, Roof

Caps of Generator Exhaust on Roof Above Room 5-2-21 5-SCA

03/13-16/2017

No Asbestos Detectecd NND YES D N/A N/A N/A Black Over Silver Red Paint N/A N/A

05 MI0509BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 5 BUILDING #5 - Areas Impacted by DLA Standby GeneratorReplacment Project

Basement, 1st

Floor, 2nd Floor, Roof

Basement of Building 5 (Room 5-B- 2) 5-SFA

03/13-16/2017

No Asbestos Detectecd NND YES Potential for

Damage N/A N/A N/A

Fireproofing (White/Gray Spray

Applied Fireproofing) N/A N/A

05 MI0509BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 5 BUILDING #5 - Areas Impacted by DLA Standby GeneratorReplacment Project

Basement, 1st

Floor, 2nd Floor, Roof

Generator Exhaust Extending From 5-B-7 up through

Room 5-2-21

5-TBA

03/13-16/2017

No Asbestos Detectecd NND YES Good N/A N/A N/A White Block Stack Insulation with

Gray Mud N/A N/A

05 MI0509BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 5 BUILDING #5 - Areas Impacted by DLA Standby GeneratorReplacment Project

Basement, 1st

Floor, 2nd Floor, Roof

Low Pressure Steam Pipes Room 5-B-6, 5-B-7 & 5-2-21 5-TJA

03/13-16/2017

No Asbestos Detectecd NND YES Good N/A N/A N/A Fittings Associated with White Block

Insulation N/A N/A

05 MI0509BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 5 BUILDING #5 - Areas Impacted by DLA Standby GeneratorReplacment Project

Basement, 1st

Floor, 2nd Floor, Roof

Roof Drain Line in Room 5-B-6, 5-B-7 & 5-2-21 5-TJB

03/13-16/2017

No Asbestos Detectecd NND YES Good N/A N/A N/A Cementitious Fittings on Fiberglass

Insulation N/A N/A

05 MI0509BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 5 BUILDING #5 - Areas Impacted by DLA Standby GeneratorReplacment Project

Basement, 1st

Floor, 2nd Floor, Roof

Miscellaneous Pipes (Small Diameter Steam and Chilled

Water Piping) on West Side of 5-1-1 by Chillers (in area of Proposed Electrical Room)

5-TJC

03/13-16/2017

No Asbestos Detectecd NND YES Good N/A N/A N/A

Canvas Covered Cementitious Fittings on Fiberglass Pipeline with Woven

Mesh Jacket

N/A N/A

05 MI0509BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 5 BUILDING #5 - Areas Impacted by DLA Standby GeneratorReplacment Project

Basement, 1st

Floor, 2nd Floor, Roof

Steam/Condensate Piping Near Column C6 & Staircase in Room 5-B-2 (on Piping to be Relocated)

5-TJD

03/13-16/2017

No Asbestos Detectecd NND YES Potential for

Damage N/A N/A N/A

Cementitious Fittings on Fiberglass

Insulation with Craft Paper Jacketing N/A N/A

05 MI0509BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 5 BUILDING #5 - Areas Impacted by DLA Standby GeneratorReplacment Project

Basement, 1st

Floor, 2nd Floor, Roof

Steam Piping Near Column C6 in Room 5-B-2 (on

Piping to be Relocated)

5-TJE

03/13-16/2017

Asbestos-Containing Material =>1% ACM=>1 YES Damaged

MEDIUM

1 LF

Fibrous Mudded Fittings Associated with White Fibrous Block Pipe

Insulation

$1,200.00 15% Estimates based on man-day rate for removal of material, with respect to accesibilty and locations

05 MI0509BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 5 BUILDING #5 - Areas Impacted by DLA Standby GeneratorReplacment Project

Basement, 1st

Floor, 2nd Floor, Roof

Generator Unit Silencers in Room 5-B-7 5-TJG

03/13-16/2017

No Asbestos Detectecd NND YES Potential for

Damage N/A N/A N/A

Beige Cementitious Compound Over

White Block Insulation N/A N/A

05 MI0509BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 5 BUILDING #5 - Areas Impacted by DLA Standby GeneratorReplacment Project

Basement, 1st

Floor, 2nd Floor, Roof

Cooling Water Piping for Generators in Room 5-B-7 5-TJG

03/13-16/2017

No Asbestos Detectecd NND YES Potential for

Damage N/A N/A N/A

Canvas Covered Mudded Fittings on

Fiberglass Pipe Insulation N/A N/A

05 MI0509BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 5 BUILDING #5 - Areas Impacted by DLA Standby GeneratorReplacment Project

Basement, 1st

Floor, 2nd Floor, Roof

Miscellaneous Pipes in Basement and on Ground Floor 5-TJJ

03/13-16/2017

No Asbestos Detectecd NND YES Potential for

Damage N/A N/A N/A

Fiberglass Elbows with Hard Pack

Wrap N/A N/A

05 MI0509BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 5 BUILDING #5 - Areas Impacted by DLA Standby GeneratorReplacment Project

Basement, 1st

Floor, 2nd Floor, Roof

Low Pressure Steam Pipes Room 5-B-6, 5-B-7 & 5-2-21 5-TPA

03/13-16/2017

No Asbestos Detectecd NND YES Good N/A N/A N/A White Block Pipe Length Insulation N/A N/A

05 MI0509BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 5 BUILDING #5 - Areas Impacted by DLA Standby GeneratorReplacment Project

Basement, 1st

Floor, 2nd Floor, Roof

Steam Piping Near Column C6 in Room 5-B-2 (on

Piping to be Relocated)

5-TPE

03/13-16/2017

Asbestos-Containing Material =>1% ACM=>1 YES Potential for

Damage

MEDIUM

3 LF

White Fibrous Block Pipe Length

Insulation $1,200.00 15% Estimates based on man-day rate for removal of material, with respect to accesibilty and locations

05 MI0509BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 5 BUILDING #5 - Areas Impacted by DLA Standby GeneratorReplacment Project

Basement, 1st

Floor, 2nd Floor, Roof

Condensate Piping Near Column C6 & Staircase in

Room 5-B-2 (on Piping to be Relocated)

5-TPF

03/13-16/2017

Asbestos-Containing Material =>1% ACM=>1 YES Potential for

Damage

MEDIUM

3 LF

Corrugated Paper Pipe Length

Insulation (Aircell) $1,200.00 15% Estimates based on man-day rate for removal of material, with respect to accesibilty and locations

05 MI0509BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 5 BUILDING #5 - Areas Impacted by DLA Standby GeneratorReplacment Project

Basement, 1st

Floor, 2nd Floor, Roof

Piping Outside Door into Room 5-B-7 Running Along 5-TPG

03/13-16/2017

Presumed Asbestos-Containing Material PACM YES Good

MEDIUM

~25 LF

Black Sulfur Block Pipe Length

Insulation (Painted White) $1,200.00 15% Estimates based on man-day rate for removal of material, with respect to accesibilty and locations

05 MI0509BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 5 BUILDING #5 - Areas Impacted by DLA Standby GeneratorReplacment Project

Basement, 1st

Floor, 2nd Floor, Roof

Miscellaneous Areas Throughout Basement of

Building 5

5-TPH

03/13-16/2017

Asbestos-Containing Material =>1% ACM=>1 YES Potential for

Damage

MEDIUM

1,500 LF Mag TSI Pipe Insulation $52,500.00 15%

Estimates based on price per lineal foot rate for removal of material

05 MI0509BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 5 BUILDING #5 - Areas Impacted by DLA Standby GeneratorReplacment Project

Basement, 1st

Floor, 2nd Floor, Roof

Miscellaneous Areas Throughout Basement of

Building 5

5-TPI

03/13-16/2017

Asbestos-Containing Material =>1% ACM=>1 YES Potential for

Damage

MEDIUM

200 SF High Density Fiber Insulation $7,200.00 15% Estimates based on man-day rate for removal of material, with respect to accesibilty and locations

05 MI0527BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 8 BUILDING #8 - Areas Impacted by DLA Standby GeneratorReplacment Project 1st, 2nd Floors

Doorway Between Building 8 and Corridor to Northwest on 2nd Floor (Between Rooms 8-2-2 & 8-2-11)

8-MWA

03/13-16/2017

No Asbestos Detectecd NND YES Potential for

Damage N/A N/A N/A

Plaster Over Paper Seam Tape on

Drywall N/A N/A

05 MI0527BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 8 BUILDING #8 - Areas Impacted by DLA Standby GeneratorReplacment Project 1st, 2nd Floors

Piping Along Walls and Ceiling Throughout Ground

Floor Storage Areas West of Garage (Rooms 8-1-3 & 8-

1-8)

8-TJA

03/13-16/2017

Presumed Asbestos-Containing Material PACM YES Potential for

Damage

MEDIUM

~20 LF

Fittings on Mag Block Pipe Length

Insulation $2,400.00 15% Estimates based on man-day rate for removal of material, with respect to accesibilty and locations

05 MI0527BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 8 BUILDING #8 - Areas Impacted by DLA Standby GeneratorReplacment Project 1st, 2nd Floors

Piping Along Walls and Ceiling Throughout Ground

Floor Storage Areas West of Garage (Rooms 8-1-3 & 8-

1-8)

8-TJB

03/13-16/2017

Asbestos-Containing Material =>1% ACM=>1 YES Potential for

Damage

MEDIUM

~ 68 LF Hard Packed Elbows $2,400.00 15% Estimates based on man-day rate for removal of material, with respect to accesibilty and locations

05 MI0527BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 8 BUILDING #8 - Areas Impacted by DLA Standby GeneratorReplacment Project 1st, 2nd Floors

Piping Along Walls and Ceiling Throughout Ground

Floor Storage Areas West of Garage (Rooms 8-1-3 & 8-

1-8)

8-TPA

03/13-16/2017

Presumed Asbestos-Containing Material PACM YES Potential for

Damage

MEDIUM

200 LF Mag Block Pipe Length Insulation $7,200.00 15%

Estimates based on price per lineal foot rate for removal of material

05 MI0527BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 8 BUILDING #8 - Areas Impacted by DLA Standby GeneratorReplacment Project 1st, 2nd Floors

Piping Along Walls and Ceiling Throughout Ground

Floor Storage Areas West of Garage (Rooms 8-1-3 & 8-

1-8)

8-TPB

03/13-16/2017

Asbestos-Containing Material =>1% ACM=>1 YES Potential for

Damage

MEDIUM

~400 LF Aircell Pipe Insulation $14,000.00 15%

Estimates based on price per lineal foot rate for removal of material

05 MI0528BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 20 BUILDING #20 - Areas Impacted by DLA Standby GeneratorReplacment Project 1st Floor

Ends of Pipe Hangers at North Side of Building #20 in

“Low Ceiling Area”

20-MMA

03/13-16/2017

Asbestos-Containing Material =>1% ACM=>1 YES Potential for

Damage

HIGH

10 SF

Gray Cementitious Mudded

Compound Over Brown Fibrous

Insulation

$2,400.00 15% Estimates based on man-day rate for removal of material, with respect to accesibilty and locations

05 MI0528BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 20 BUILDING #20 - Areas Impacted by DLA Standby GeneratorReplacment Project 1st Floor

Miscellaneous Piping in Building #20 & Adjacent

Tunnels

20-TPA

03/13-16/2017 Asbestos-Containing Material =>1% ACM=>1 YES Good

MEDIUM

400 LF Air Cell Pipe Insulation $14,000.00 15%

Estimates based on price per lineal foot rate for removal of material

05 MI0528BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 20 BUILDING #20 - Areas Impacted by DLA Standby GeneratorReplacment Project 1st Floor

Miscellaneous Piping in Building #20 & Adjacent

Tunnels

20-TJB

03/13-16/2017 Asbestos-Containing Material =>1% ACM=>1 YES Good

MEDIUM

~60 LF Hard Packed Elbows $4,800.00 15%

Estimates based on man-day rate for removal of material, with respect to accesibilty and locations

05 MI0528BC

HART-DOLE-INOUYE FEDERAL

CENTER - BLDG. 20 BUILDING #20 - Areas Impacted by DLA Standby GeneratorReplacment Project 1st Floor

Miscellaneous Piping in Building #20 & Adjacent

Tunnels

20-TPC

03/13-16/2017 Asbestos-Containing Material =>1% ACM=>1 YES Good

MEDIUM

200 LF Hard Pack Mag Pipe Insulation $7,200.00 15%

Estimates based on price per lineal foot rate for removal of material

Appendix F – Prior Asbestos and Lead-Based Paint

Building Inspection Reports for Reference

Asbestos and Lead-Based Paint Building Inspections in Region 5

At

Hart-Dole-Inouye Building 1 (Bldg. MI0501BC) 74 North Washington Avenue

For

GSA Public Buildings Service Great Lakes Region

U.S. General Services Administration 230 South Dearborn Street, Room 3500

Chicago, Michigan 60604-1696

Report Date: August 26, 2014

7600 N. 16th Street, Suite 110 Phoenix, AZ 85020

(602) 266-8288

Contract Number: GS-05P-13-FA-A-0035 Task Order No.: GS-P-0514-FA-5007

ADN: PJ4EA0656

Asbestos and Limited Lead-Based Paint Building Inspection Report TRC Project No: 220533

TABLE OF CONTENTS

EXECUTIVE SUMMARY ...................................................................................................... I

1.0 INTRODUCTION

2.0 ASBESTOS SAMPLING AND ANALYSIS

2.1 SAMPLING PROCEDURES

2.2 PHYSICAL ASSESSMENT

2.3 PLM ANALYSIS METHODOLOGY

2.4 FINDINGS AND RESULTS

2.5 ACM CONCLUSIONS AND RECOMMENDATIONS

2.5.1 Identified ACMs

2.5.2 Trace Asbestos Detected (<1%)

2.5.3 Assumed ACMs

2.5.3 Recommendations

2.5.5 Materials Containing Trace (<1%) Asbestos

3.0 ASBESTOS MANAGEMENT

3.1 RESPONSE ACTION OPTIONS

3.2 RECOMMENDED RESPONSE ACTIONS

3.2.1 ACM in Poor Condition:

3.2.2 ACM in Fair Condition:

3.2.3 ACM in Good Condition:

3.3 PREVENTATIVE MEASURES

3.3.1 Maintenance

3.3.2 Condition Monitoring

3.3.3 Notification

3.3.4 Training

3.4 RECOMMENDATIONS FOR FUTURE BUILDING INSPECTIONS AND RECORDKEEPING

4.0 LIMITED LEAD-BASED PAINT SAMPLING AND ANALYSIS

4.1 GENERAL INFORMATION

4.2 SAMPLING PROCEDURES

4.3 LEAD ANALYTICAL METHODOLOGY

4.4 DEFINITION OF LEAD-BASED PAINT (LBP)

4.5 FINDINGS AND RESULTS

4.6 LBP CONCLUSIONS AND RECOMMENDATIONS

4.6.1 Non-Mandatory Best Practices

5.0 EXCLUSIONS

5.1 ASBESTOS BUILDING INSPECTION EXCLUSIONS

5.2 LIMITED LEAD-BASED PAINT BUILDING INSPECTION EXCLUSIONS

6.0 DISCLAIMER

7.0 STATEMENT OF COMPLETION & REPORT SIGNATORY

APPENDICES

GSA IRIS Asbestos-Containing Materials Spreadsheet .................................................. Appendix A Building Floor Plans and Sample Locations .................................................................... Appendix B Photographs ...................................................................................................................... Appendix C Cost Estimates to Remove ACM & Laboratory Analytical Reports ................................ Appendix D Project Personnel Certifications ....................................................................................... Appendix E i

EXECUTIVE SUMMARY

TRC Environmental Corporation (TRC) contracted with the U.S. General Services Administration (GSA) to perform asbestos and limited lead-based paint building inspections for the Hart-Dole-Inouye Building 1 (Building MI0501BC) located at 74 North Washington Avenue in Battle Creek, Michigan (Site). The purpose of the building inspection was to complete baseline building inspections, in general accordance with the AHERA regulations, and cost estimates to establish GSA’s environmental liability for asbestos. As directed by GSA, the collection of bulk material samples was to target discrete locations (insofar as reasonably practical) without damaging the esthetics of the facility. The building inspection encompassed suspect asbestos-containing materials (ACMs) and lead-based paint (LBP) associated with the building. The inspection was performed July 15, 2014 by Mr. Paul Semper of TRC, a State of Michigan Licensed Asbestos Inspector and Lead Risk Assessor. Bulk PLM samples were submitted to TRC’s laboratory in Woburn, Massachusetts, a National Voluntary Laboratory Approval Program (NVLAP) accredited laboratory. Paint chip samples were submitted to EMC Laboratories in Phoenix, Arizona, an Environmental Lead Laboratory Accreditation Program (ELLAP) certified laboratory.

ASBESTOS FINDINGS

The following building materials were determined to contain asbestos or were assumed to contain asbestos:

HM Material Location Asbestos Content

Approx.

Quantity

Friable/ Non-

Friable Condition

2.

9" x 9" Black with

Green Spots

Floor Tile

P1004 13% Chrysotile

Square

Feet (SF)

Non- Friable

(NF)

Good

18.* Rubber

Membrane Roof

Throughout Roof Assumed

ACM

17,000

SF

NF Good

19.* Gray

Flashing Caulk

Throughout Roof Assumed

ACM 120 SF NF Good

20.* Gray

Parapet Wall Caulk

Throughout Roof Assumed

ACM

65 SF NF Good

31.**

12" x 12" Peach with

Black Streaks

Floor Tile and Mastic

14002, 14018 Assumed

ACM 36 SF NF Good

37.

Brown Mastic associated with 1' x 1' Acoustical

Tile

12007 3%

Chrysotile 1,200 SF NF Good

- ii -

Content

Approx.

Quantity

Friable/ Non-

Friable Condition

42.

Hard Pack Mag Pipe

Insulation

B1005, B1007C, B1009A, B1009C, B1003, B1010, B1012, B1015, B1037, B1044, 2034, 2035, 3026, 3028, 4008, 4012, 5027, 5035, 6030, 6037, 7014, 7018, 8042, 8044, 9033, 9036, 10029, 10037, 11007, 11014, 12041, 12044, 13045, 13047, M101, 14004, 14005

45% Chrysotile

2,560 Linear

Feet (LF)

Friable (F)

Good

55.

Drywall System Floor 1

Trace <1%*** NA F Good

65.

Frame

Caulking

G1008, G1025, G1026, G1027, 1024, 1026, 1027

8% Chrysotile 220 SF NF Good

68.

Hard

Packed Elbows

B1005, B1007C, B1009A, B1009C, B1003, B1010, B1012, B1015, B1037, B1044

60% Chrysotile

268 SF F Good

70.

Hard Pack

Pipe Insulation

B1005, B1007C, B1009A, B1009C, B1003, B1010, B1012, B1015, B1037, B1044

40% Chrysotile 1,260 LF F Good

83.

9" x 9" Maroon Streaked Floor Tile

B1040 12%

Chrysotile 20 SF NF Good

HM = Homogenous Material; meaning a building material of the same composition, application, appearance, age, texture, color, etc.

*HM-18, 19, and 20 not sampled to preserve material integrity (non-destructive sampling methodology) **HM-31 was only observed in an elevator lobby on the 14th floor and was not sampled to preserve material integrity (non-destructive sampling methodology) ***HM-55 Laboratory composite analysis of the material indicated trace (<1%) chrysotile

LEAD-BASED PAINT FINDINGS

The following paint colors were determined to be lead-based paint (LBP) in accordance with GSA’s criteria in the locations noted:

- iii -

Sample/ Paint ID Location Color Condition

Square Footage

Reporting Limit

Lead Content

LP-4 Window Sill Brown Good 18,816 Square

Feet (SF)

0.10 1.58

LP-6 1113C

Light Blue

Good 4,000 SF 0.10 3.51

LP-7 1113 Off-White Good 1,250 SF 0.10 8.82 LP-8 Stairwell Walls Beige Good 14,400 SF 1.0 15.1

Asbestos and Limited Lead-Based Building Inspection Report TRC Project No: 220533

- 1 -

1.0 INTRODUCTION

TRC Environmental Corporation (TRC) contracted with the U.S. General Services Administration (GSA) to perform an asbestos and limited lead-based paint building inspection for the Hart-Dole-Inouye Building 1 (Building MI0501BC) located at 74 North Washington Avenue in Battle Creek, Michigan (Site). The purpose of the building inspection was to complete baseline building inspections, in general accordance with the AHERA regulations, and cost estimates to establish GSA’s environmental liability for asbestos. As directed by GSA, the collection of bulk material samples was to target discrete locations (insofar as reasonably practical) without damaging the esthetics of the facility. The building inspection encompassed suspect asbestos-containing materials (ACMs) and lead-based paint (LBP) associated with the building. The inspection was performed July 15, 2014 by Mr. Paul Semper of TRC, a State of Michigan Licensed Asbestos Inspector and Lead Risk Assessor. Copies of training certificates and state licenses (where applicable) are presented in Appendix E, Project Personnel Certifications.

2.0 ASBESTOS SAMPLING AND ANALYSIS

2.1 Sampling Procedures

The asbestos building inspection, bulk material sampling, material condition assessments, and analytical procedures were performed in accordance with the United States Environmental Protection Agency’s (USEPA) Asbestos Hazard Emergency Response Act (AHERA) 40 CFR Part

763. In general the building inspection procedures included first identifying materials suspected to contain asbestos and then collecting samples of the suspect materials for laboratory analysis to determine if the materials are ACMs. The USEPA-AHERA defines ACM as any material containing greater than one percent (>1.0%) asbestos.

Suspect material homogeneity determination is based on the following criteria:

Similar physical characteristics (e.g., same age, color, and texture, etc.);

Application (e.g., sprayed-on, troweled-on, assembly into a system, etc.); and Material function (e.g., thermal insulation, floor tile, wallboard system, stucco plaster, fireproofing, adhesives, asphalt roofing, etc.).

In accordance with USEPA-AHERA sampling methodology, multiple samples are collected for each suspect homogenous material application in order to reduce chances of reporting false negatives. The number of samples collected for each material type was based on the information listed in the following table, and found in the AHERA regulation.

Bulk Sampling Strategy*

Material Homogeneous Areas Units Minimum Number of Samples*

Thermal System Insulation Less than 6 SF or LF of patched

Less than 6 SF or LF of non-patched

More than 6 SF

SF/LF

3 samples per homogenous area

- 2 -

Material Homogeneous Areas Units Minimum Number of Samples*

Friable Surfacing less than 1,000 1,000 to 5,000 more than 5,000

SF

SF

SF

Non-friable Surfacing - - - SF 3 Friable and Non-friable Miscellaneous Materials

- - - LF / SF / EA 3

*Fewer samples may be collected of materials found in limited quantity or accessibility as determined by the Inspector SF = square feet; LF = linear feet; EA = each

Sampling of building materials was conducted using hand tools to cut or bore small samples of materials. Once a piece of material is dislodged, the sample was placed into a laboratory provided sampling container and labeled with a unique identification number. The material condition was also inspected and assessed for damage.

2.2 Physical Assessment

A physical assessment of each suspect homogenous material was performed by the TRC inspector to determine the condition of the materials. The following describes how the material was assessed by the TRC inspector. Assessment includes visual inspection and physically touching the material as well as making considerations for future disturbance to a material.

This information is combined to determine appropriate response actions and developing management plans/procedures for identified ACMs. In accordance with GSA’s Inventory Reporting and Information System (IRIS) and based on the physical assessment findings, the ACMs were placed into one of the following three categories:

Good = Undamaged Fair = Damaged (less than 10% locally or 25% distributed) Poor = Significantly damaged (at or over 10% locally or 25% distributed)

Because the physical assessment is used to determine which response actions will be chosen to manage the asbestos, proper identification and assessment of ACM are vital to the effective implementation of the management program.

2.3 PLM Analysis Methodology

Laboratory analytical services were provided by TRC Industrial Hygiene Laboratory in Windsor Connecticut, a National Voluntary Laboratory Approval Program (NVLAP) accredited laboratory

(NVLAP# 101424-0).

PLM samples were analyzed utilizing the USEPA’s Test Methods: Methods for the determination of Asbestos in Bulk Building Materials [USEPA/600/R-93/116 (1993)], and the McCrone Research Institute’s The Asbestos…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.