DLA_Generator_Drawings_RTA_Vol_2.pdf
PDF 10 MB Posted
- Attached to
- FY18 DLA Standby Generator Replacement Federal contract opportunity
- Solicitation number
- W911XK18R0011
About this file
DLA GENERATOR DRAWINGS RTA VOL 2
View the file
Other files for this federal contract opportunity
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M-107
M-107
S O
L
IC
IT
A
T
IO
N N
O
P L
O T
S C
A L E
D R
A W
N B
Y
C K
D B
Y
D E
S
IG
N B
Y
D
2 3
C
4 5
A
B
IS
S
U E
D A
T E
S
IZ
E
S B
M T
B Y
F
IL
E N
A M
E
D E
S C
R
IP
T
IO
N D
A T
E
C O
N T
R A
C T
N O
M A
R K
A P
P R
F
IL
E N
U M
B E
R
"x
J U
N E
Fort Worth District
US Army Corps of Engineers ®
P L
O T
D A
T E
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
F O
R T
W O
R T
H D
IS
T
R
IC
T D
L A
G E
N E
R A
T O
R R
E P
L A
C E
M E
N T
H A
R T
-D O
L E
-I N
O U
Y E
F E
D C
E N
T E
R
SHEET
IDENTIFICATION
N M
IC
H
IG
A
N A
V E
S
U
IT
E
C H
IC
A
G O
IL
T
.6
.7 w w w .e x p fe d e ra l.
c o m
P R
O J N
O
C H
I-
-A
/3
/2
KEY PLAN
N.T.S.
N
PROPERTY OF THE
UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
DO NOT REMOVE THIS NOTICE
PROPERLY DESTROY DOCUMENTS
WHEN NO LONGER NEEDED
A S
N O
T E
D
G G
O R
S L
IN
E
CERTIFIED FINAL
2A
2B 2C
1A
1B
4A
EXTERIOR
VAULT
1C
UPS
B
C O
E S
R E
V
IE
W
IN
T
E R
IM
D
E S
IG
N
R E
V
IE
W
D
E S
IG
N
R E
V
IE
W
/1 /1
/1 /1
/0 /1
B
C O
E S
B A
C K
C H
E C
K
/0
/1
C E
R T
IF
IE
D F
IN
A
L
/3
/1
W
X
K -1
-R
-0
M E
C H
A N
IC
A
L
B U
IL
D
IN
G
A
S U
B B
A S
E M
E N
T
M E
C H
A N
IC
A
L P
L A
N
M-101
S
B A
R R
E T
T
S
B A
R R
E T
T
H D
I_ M
-1 .D
W G
J
R U
T L E
D G
E
M-101
BUILDING 1A SUB BASEMENT MECHANICAL PLAN
SCALE: 1/8"=1'-0"
true north
N 8'0 4' 16'
SCALE:1/8"=1'-0"
LINE ITEM
LINE ITEM
ROOM 1ASB01AROOM 1ASB01A
LINE ITEM
LINE ITEM
ROOM 1ASB13BROOM 1ASB13B
W
1X K
-1 8-
R -0
S O
L
IC
IT
A
T
IO
N N
O
P L
O T
S C
A L E
D R
A W
N B
Y
C K
D B
Y
D E
S
IG
N B
Y
D
2 3
C
4 5
A
B
IS
S
U E
D A
T E
S
IZ
E
S B
M T
B Y
F
IL
E N
A M
E
D E
S C
R
IP
T
IO
N D
A T
E
C O
N T
R A
C T
N O
M A
R K
A P
P R
F
IL
E N
U M
B E
R
"x
J U
N E
Fort Worth District
US Army Corps of Engineers ®
P L
O T
D A
T E
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
F O
R T
W O
R T
H D
IS
T
R
IC
T D
L A
G E
N E
R A
T O
R R
E P
L A
C E
M E
N T
H A
R T
-D O
L E
-I N
O U
Y E
F E
D C
E N
T E
R
SHEET
IDENTIFICATION
N M
IC
H
IG
A
N A
V E
S
U
IT
E
C H
IC
A
G O
IL
T
.6
.7 w w w .e x p fe d e ra l.
c o m
P R
O J N
O
C H
I-
-A
/3
/2
KEY PLAN
N.T.S.
N
PROPERTY OF THE
UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
DO NOT REMOVE THIS NOTICE
PROPERLY DESTROY DOCUMENTS
WHEN NO LONGER NEEDED
A S
N O
T E
D
G G
O R
S L
IN
E
CERTIFIED FINAL
2A
2B 2C
1A
1B
4A
EXTERIOR
VAULT
1C
UPS
B
C O
E S
R E
V
IE
W
IN
T
E R
IM
D
E S
IG
N
R E
V
IE
W
D
E S
IG
N
R E
V
IE
W
/1 /1
/1 /1
/0 /1
B
C O
E S
B A
C K
C H
E C
K
/0
/1
C E
R T
IF
IE
D F
IN
A
L
/3
/1
W
X
K -1
-R
-0
M E
C H
A N
IC
A
L
B U
IL
D
IN
G
B
A S
E M
E N
T
M E
C H
A N
IC
A
L P
L A
N
M-102
S
B A
R R
E T
T
S
B A
R R
E T
T
H D
I_ M
-1 .D
W G
J
R U
T L E
D G
E
M-102
BUILDING 2 BASEMENT MECHANICAL PLAN
SCALE: 1/8"=1'-0" 8'0 4' 16'
SCALE:1/8"=1'-0"
true north N
1. REFER TO SHEET M-001 FOR GENERAL NOTES
AND ABBREVIATIONS.
2. BUILDING 2 SLAB CORING AND DRILLING SHALL
NOT PROCEED UNTIL THE MAIN SLAB
REINFORCING CABLES HAVE BEEN LOCATED BY
MEANS OF RADIOGRAPHIC TECHNIQUE OR OTHER
EFFECTIVE MEANS. THE CABLES CONSIST OF
SEVEN NO. 9 GALVANIZED IRON WIRES, PLACED
APPROXIMATELY 13 INCHES APART, SPANNING IN
THE EAST/WEST DIRECTION. HOLES SHALL
MAINTAIN MINIMUM CLEARANCE OF 1.0 INCH FROM
FACE OF CABLE.
GENERAL NOTES
LINE ITEM
LINE ITEM
LINE ITEM
W
1X K
-1 8-
R -0
W
1X K
-1 8-
R -0
FURNISH AND INSTALL
NEW 1 1/2" CONDENSATE
RETURN PIPE AT 10' AFF
1 1/2" CONDENSATE RETURN
PIPE TO REMAIN 1 1/2" STEAM SUPPLY PIPE
TO REMAIN
1 1/2" CONDENSATE RETURN
RISER TO REMAIN
FURNISH AND INSTALL
NEW 1 1/2" STEAM
SUPPLY PIPE AT 10' AFF
M E
C H
A N
IC
A
L
B U
IL
D
IN
G
B
A S
E M
E N
T
M E
C H
A N
IC
A
L P
L A
N
M-104
S
B A
R R
E T
T
H D
I_ M
-1 .D
W G
J
R U
T L E
D G
E
M-104
BUILDING 5 BASEMENT MECHANICAL PLAN
SCALE: 1/8"=1'-0"
true north
N
8'0 4' 16'
SCALE:1/8"=1'-0"
S O
L
IC
IT
A
T
IO
N N
O
P L
O T
S C
A L E
D R
A W
N B
Y
C K
D B
Y
D E
S
IG
N B
Y
D
2 3
C
4 5
A
B
IS
S
U E
D A
T E
S
IZ
E
S B
M T
B Y
F
IL
E N
A M
E
D E
S C
R
IP
T
IO
N D
A T
E
C O
N T
R A
C T
N O
M A
R K
A P
P R
F
IL
E N
U M
B E
R
"x
J U
N E
Fort Worth District
US Army Corps of Engineers ®
P L
O T
D A
T E
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
F O
R T
W O
R T
H D
IS
T
R
IC
T D
L A
G E
N E
R A
T O
R R
E P
L A
C E
M E
N T
H A
R T
-D O
L E
-I N
O U
Y E
F E
D C
E N
T E
R
SHEET
IDENTIFICATION
N M
IC
H
IG
A
N A
V E
S
U
IT
E
C H
IC
A
G O
IL
T
.6
.7 w w w .e x p fe d e ra l.
c o m
P R
O J N
O
C H
I-
-A
/3
/2
KEY PLAN
N.T.S.
N
PROPERTY OF THE
UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
DO NOT REMOVE THIS NOTICE
PROPERLY DESTROY DOCUMENTS
WHEN NO LONGER NEEDED
A S
N O
T E
D
G G
O R
S L
IN
E
CERTIFIED FINAL
2A
2B 2C
1A
1B
4A
EXTERIOR
VAULT
1C
UPS
B
C O
E S
R E
V
IE
W
IN
T
E R
IM
D
E S
IG
N
R E
V
IE
W
D
E S
IG
N
R E
V
IE
W
/1 /1
/1 /1
/0 /1
B
C O
E S
B A
C K
C H
E C
K
/0
/1
C E
R T
IF
IE
D F
IN
A
L
/3
/1
W
X
K -1
-R
-0
KEY NOTES
1. REFER TO SHEET M-001 FOR GENERAL NOTES
AND ABBREVIATIONS.
2. REFER TO M-600 FOR EQUIPMENT SCHEDULES.
GENERAL NOTES
LOW PRESSURE STEAM SUPPLY PIPING SHALL BE
BLACK SCHEDULE 40 STEEL. PIPE SHALL BE
INSULATED WITH 1" FIBERGLASS INSULATION
AND MARKED "STEAM SUPPLY".
CONDENSATE RETURN PIPING SHALL BE BLACK
SCHEDULE 80 STEEL. PIPE SHALL BE INSULATED
WITH 1" FIBERGLASS INSULATION AND MARKED
"CONDENSATE RETURN".
NEW RISERS SHALL BE SLOPED IN ORDER TO
ROUTE CONDENSATE FROM NEW STEAM SUPPLY
RISER AND NEW CONDENSATE RETURN RISER TO
DRAIN TO EXISTING STEAM TRAP LOCATED NEAR
THE POINT OF CONNECTION TO EXISTING PIPING.
EXISTING 60 HP COOLING TOWER WATER PUMPS.
REPLACE MOTOR CONTROLLERS WITH VARIABLE
FREQUENCY DRIVES. SEQUENCE OF OPERATION
TO MATCH EXISTING START/STOP CONDITIONS
AT BAS WITH SOFT START FROM 0% TO 100%
UPON PUMP RUN SIGNAL. MOTOR COMPATIBILITY
WITH VFD SHALL BE CONFIRMED.
LINE ITEM
ROOM 5B7
LINE ITEM
W
1X K
-1 8-
R -0
FURNISH AND INSTALL
NEW 1" CHILLED WATER
PIPE AT 11'6" AFF
STEAM UNIT HEATER AND ALL
RELATED APPURTENANCES TO
REMAIN
STEAM UNIT HEATER AND ALL
RELATED APPURTENANCES TO
REMAIN
CENTRIFUGAL CHILLER TO
REMAIN (TYPICAL)
CHILLED WATER PUMP TO
REMAIN (TYPICAL)
FURNISH AND INSTALL
NEW 1 1/2" STEAM
SUPPLY PIPE AT 11'6"
AFF
FURNISH AND INSTALL
NEW PIPE AT 11'6" AFF
EXHAUST FAN TO REMAIN
FURNISH AND INSTALL
NEW LOUVER AT 10' AFF
M E
C H
A N
IC
A
L
B U
IL
D
IN
G
F
IR
S
T F
L O
O R
M E
C H
A N
IC
A
L P
L A
N
M-105
S
B A
R R
E T
T
S
B A
R R
E T
T
H D
I_ M
-1 .D
W G
J
R U
T L E
D G
E
M-105
BUILDING 5 FIRST FLOOR MECHANICAL PLAN
SCALE: 1/8"=1'-0"
S O
L
IC
IT
A
T
IO
N N
O
P L
O T
S C
A L E
D R
A W
N B
Y
C K
D B
Y
D E
S
IG
N B
Y
D
2 3
C
4 5
A
B
IS
S
U E
D A
T E
S
IZ
E
S B
M T
B Y
F
IL
E N
A M
E
D E
S C
R
IP
T
IO
N D
A T
E
C O
N T
R A
C T
N O
M A
R K
A P
P R
F
IL
E N
U M
B E
R
"x
J U
N E
Fort Worth District
US Army Corps of Engineers ®
P L
O T
D A
T E
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
F O
R T
W O
R T
H D
IS
T
R
IC
T D
L A
G E
N E
R A
T O
R R
E P
L A
C E
M E
N T
H A
R T
-D O
L E
-I N
O U
Y E
F E
D C
E N
T E
R
SHEET
IDENTIFICATION
N M
IC
H
IG
A
N A
V E
S
U
IT
E
C H
IC
A
G O
IL
T
.6
.7 w w w .e x p fe d e ra l.
c o m
P R
O J N
O
C H
I-
-A
/3
/2
KEY PLAN
N.T.S.
N
PROPERTY OF THE
UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
DO NOT REMOVE THIS NOTICE
PROPERLY DESTROY DOCUMENTS
WHEN NO LONGER NEEDED
A S
N O
T E
D
G G
O R
S L
IN
E
CERTIFIED FINAL
2A
2B 2C
1A
1B
4A
EXTERIOR
VAULT
1C
UPS
B
C O
E S
R E
V
IE
W
IN
T
E R
IM
D
E S
IG
N
R E
V
IE
W
D
E S
IG
N
R E
V
IE
W
/1 /1
/1 /1
/0 /1
B
C O
E S
B A
C K
C H
E C
K
/0
/1
C E
R T
IF
IE
D F
IN
A
L
/3
/1
W
X
K -1
-R
-0
KEY NOTES
1. REFER TO SHEET M-001 FOR GENERAL NOTES
AND ABBREVIATIONS.
GENERAL NOTES
LOW PRESSURE STEAM SUPPLY PIPING SHALL BE
BLACK SCHEDULE 40 STEEL. PIPE SHALL BE
INSULATED WITH 1" FIBERGLASS INSULATION
AND MARKED "STEAM SUPPLY".
CONDENSATE RETURN PIPING SHALL BE BLACK
SCHEDULE 80 STEEL. PIPE SHALL BE INSULATED
WITH 1" FIBERGLASS INSULATION AND MARKED
"CONDENSATE RETURN".
CHILLED WATER LINES SHALL BE SCHEDULE 40
STEEL PIPES. PIPE SHALL BE INSULATED WITH 1
1/2" FIBERGLASS INSULATION AND PAINTED
GREEN TO MATCH EXISTING CONDITIONS.
INSULATION SHALL BE ALUMINUM JACKETED
FROM FLOOR PENETRATION TO 4' AFF. SEE
SHEET M-104 FOR CONTINUATION OF PIPE UNDER
FLOOR
FURNISH AND INSTALL NEW FUEL TANK
MONITORING SYSTEM.
LINE ITEM 0001.
LINE ITEM
ROOM 5221
LINE ITEM
W
1X K
-1 8-
R -0
1X K
-1 8-
R -0
1/2" CONDENSATE RETURN
LINE AT 6'0" AFF TO REMAIN
3" CONDENSATE
RETURN LINE
AT 3'0" AFF TO
REMAIN
1/2" PIPE SHALL BE CONNECTED TO
3" PIPE OUTSIDE NEW ELECTRICAL
ROOM
EXISTING DUCT TO REMAIN
8" EXHAUST DUCT TO BE
FURNISHED AND INSTALLED
AT 11'0" AFF. PROVIDE NEW
ALUMINUM ROOF CAP
12X8
3" BLACK SCHEDULE 40
STEEL PIPE TO BE
REPLACED IN KIND AT 12'6"
AFF
DRIP PAN TO BE
FURNISHED AND
INSTALLED
EF
FD
3/4" PVC DRAIN LINE
L
FD
FCU
1/2" INSULATED COPPER
PIPE TO REMAINFLEXIBLE
DOMESTIC COLD
WATER PIPE TO
REMAIN
FLEXIBLE DOMESTIC HOT
WATER PIPE TO REMAIN
CHILLED WATER/GLYCOL SUPPLY TO
REMAIN
CHILLED WATER/GLYCOL RETURN
TO REMAIN
SANITARY
SEWER PIPE TO
REMAIN
UNIDENTIFIED 2 1/2"
PIPE TO REMAIN
FD
HEATING HOT WATER
SUPPLY TO REMAIN
HEATING HOT WATER
RETURN TO REMAIN
EXISTING FLOOR DRAIN
3/4" PVC DRAIN LINE
EXISTING DUCT TO REMAIN
EXISTING DUCT TO REMAIN
L
FD
S O
L
IC
IT
A
T
IO
N N
O
P L
O T
S C
A L E
D R
A W
N B
Y
C K
D B
Y
D E
S
IG
N B
Y
D
2 3
C
4 5
A
B
IS
S
U E
D A
T E
S
IZ
E
S B
M T
B Y
F
IL
E N
A M
E
D E
S C
R
IP
T
IO
N D
A T
E
C O
N T
R A
C T
N O
M A
R K
A P
P R
F
IL
E N
U M
B E
R
"x
J U
N E
Fort Worth District
US Army Corps of Engineers ®
P L
O T
D A
T E
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
F O
R T
W O
R T
H D
IS
T
R
IC
T D
L A
G E
N E
R A
T O
R R
E P
L A
C E
M E
N T
H A
R T
-D O
L E
-I N
O U
Y E
F E
D C
E N
T E
R
SHEET
IDENTIFICATION
N M
IC
H
IG
A
N A
V E
S
U
IT
E
C H
IC
A
G O
IL
T
.6
.7 w w w .e x p fe d e ra l.
c o m
P R
O J N
O
C H
I-
-A
/3
/2
KEY PLAN
N.T.S.
N
PROPERTY OF THE
UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
DO NOT REMOVE THIS NOTICE
PROPERLY DESTROY DOCUMENTS
WHEN NO LONGER NEEDED
A S
N O
T E
D
G G
O R
S L
IN
E
CERTIFIED FINAL
2A
2B 2C
1A
1B
4A
EXTERIOR
VAULT
1C
UPS
B
C O
E S
R E
V
IE
W
IN
T
E R
IM
D
E S
IG
N
R E
V
IE
W
D
E S
IG
N
R E
V
IE
W
/1 /1
/1 /1
/0 /1
B
C O
E S
B A
C K
C H
E C
K
/0
/1
C E
R T
IF
IE
D F
IN
A
L
/3
/1
W
X
K -1
-R
-0
M E
C H
A N
IC
A
L
B U
IL
D
IN
G
A
S U
B B
A S
E M
E
L A
R G
E D
R O
O M
P L A
N S
M-107
S
B A
R R
E T
T
S
B A
R R
E T
T
H D
I_ M
-1 .D
W G
J
R U
T L E
D G
E true north
N
FURNISH AND INSTALL DRIP PAN LOCATED
BELOW THE 3" STEAM PIPE. SEE SHEET M-502
DETAIL 3 FOR INSTALLATION DETAIL.
ROUTE PVC DRAIN LINE TO EXISTING SINK
LOCATED IN ROOM 1A-SB-14 WITH 1/8" SLOPE PER
FOOT. APPROXIMATELY 30' OF 1" PVC PIPE.
DUCT SHALL BE MARKED AS "ABANDONED IN
PLACE".
INSTALL NEW FAN COIL UNIT NEARLY FLUSH WITH
THE CEILING. CONNECT TO BAS. SEE SHEET
M-502 DETAIL 1 FOR INSTALLATION DETAILS.
INSTALL THERMOSTAT AT 48" AFF.
EXISTING AIR HANDLING UNIT (AHU-9), LOCATED
IN 1A-SB-02, SHALL BE TESTED BEFORE
DEMOLITION TO DETERMINE AIRFLOW TO EACH
SUPPLY DIFFUSER. AFTER DEMOLITION, SYSTEM
SHALL BE RE-BALANCED SO THAT THE SUPPLY
DIFFUSER SHALL ACCOUNT FOR AIRFLOW
ORIGINALLY SUPPLIED BY THE DEMOLISHED
DIFFUSER.
ROUTE 3/4" PVC CONDENSATE DRAIN LINE TO
EXISTING FLOOR DRAIN. APPROXIMATELY 10' OF
3/4" PVC PIPE. SEE SHEET M-502 DETAIL 4 FOR
INSTALLATION DETAILS.
ROUTE DUCTWORK OVER EXISTING CHILLED
WATER LINES AND INTO NEW ELECTRICAL ROOM.
INSTALL LOUVER, 3 HR FIRE DAMPER, AND BIRD
SCREEN IN CMU WALL AT 7' AFF. CONNECT TO
BAS. SEE SHEET M-503 DETAIL 1 FOR
INSTALLATION DETAILS.
FURNISH AND INSTALL 1" FIBERGLASS
INSULATION ON NEW PIPE SECTION AND LABEL
"CONDENSATE RETURN".
FURNISH AND INSTALL 1" FIBERGLASS
INSULATION ON 3" BLACK STEEL PIPE.
FURNISH AND INSTALL 1" FIBERGLASS
INSULATION ON PIPE.
KEY NOTES
1. REFER TO SHEET M-001 FOR GENERAL NOTES
AND ABBREVIATIONS.
2. ALL DUCTWORK SHALL BE CONSTRUCTED TO
SMACNA SEAL CLASS A.
GENERAL NOTES
TYP.
M-107
ROOM 1A-SB-13B ENLARGED MECHANICAL PLAN
SCALE: 1/4"=1'-0"
M-101
M-107
ROOM 1A-SB-01A ENLARGED MECHANICAL PLAN
SCALE: 1/4"=1'-0"
M-101
SCALE: 1/4"=1'-0"
LINE ITEM
LINE ITEM
LINE ITEM
LINE ITEM
LINE ITEM
LINE ITEM
LINE ITEM
LINE ITEM
LINE ITEM
LINE ITEM
LINE ITEM
LINE ITEM
LINE ITEM
LINE ITEM
DETAIL 2DETAIL 2DETAIL 2DETAIL 2DETAIL 2DETAIL 2DETAIL 2DETAIL 2DETAIL 2DETAIL 2DETAIL 2DETAIL 2DETAIL 2DETAIL 2
LINE ITEM
LINE ITEM
LINE ITEM
LINE ITEM
LINE ITEM
LINE ITEM
LINE ITEM
LINE ITEM
LINE ITEM
LINE ITEM
LINE ITEM
LINE ITEM
LINE ITEM
LINE ITEM
DETAIL 1DETAIL 1DETAIL 1DETAIL 1DETAIL 1DETAIL 1DETAIL 1DETAIL 1DETAIL 1DETAIL 1DETAIL 1DETAIL 1DETAIL 1DETAIL 1
W
1X K
-1 8-
R -0
88"X110"
EXHAUST
LOUVER
L
L
L
L
M
M
M
M
C D
-1 ,2
C D
-3 ,4
CD-5,6
M
M
88"X110"
EXHAUST
LOUVER
CD-7,8
VF
VF
M
M
1. REFER TO M-001 FOR SYMBOLS AND ABBREVIATIONS.
2. UNDER NO CIRCUMSTANCES SHALL ANY WELDING BE
DONE ON THE GENERATOR/ENGINE UNLESS THE PATH
TO GROUND IS SITUATED SUCH THAT THERE IS NO
DIRECT ELECTRICAL PATH THROUGH THE CRANKSHAFT
OR ANY ROTATING COMPONENTS.
GENERAL NOTES
M E
C H
A N
IC
A
L
B U
IL
D
IN
G
B
A S
E M
E N
T
E N
L A
R G
E D
M E
C H
A N
IC
A
L P
L A
N
M-401
J
R U
T L E
D G
E
J
M
IL
L E
R
H D
I_ M
-4 .D
W G
J
R U
T L E
D G
E
M-401
BUILDING 5 BASEMENT MECHANICAL PLAN
SCALE: 1/4"=1'-0"
M-104 true north
N
SCALE: 1/4"=1'-0"
S O
L
IC
IT
A
T
IO
N N
O
P L
O T
S C
A L E
D R
A W
N B
Y
C K
D B
Y
D E
S
IG
N B
Y
D
2 3
C
4 5
A
B
IS
S
U E
D A
T E
S
IZ
E
S B
M T
B Y
F
IL
E N
A M
E
D E
S C
R
IP
T
IO
N D
A T
E
C O
N T
R A
C T
N O
M A
R K
A P
P R
F
IL
E N
U M
B E
R
"x
J U
N E
Fort Worth District
US Army Corps of Engineers ®
P L
O T
D A
T E
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
F O
R T
W O
R T
H D
IS
T
R
IC
T D
L A
G E
N E
R A
T O
R R
E P
L A
C E
M E
N T
H A
R T
-D O
L E
-I N
O U
Y E
F E
D C
E N
T E
R
SHEET
IDENTIFICATION
N M
IC
H
IG
A
N A
V E
S
U
IT
E
C H
IC
A
G O
IL
T
.6
.7 w w w .e x p fe d e ra l.
c o m
P R
O J N
O
C H
I-
-A
/3
/2
KEY PLAN
N.T.S.
N
PROPERTY OF THE
UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
DO NOT REMOVE THIS NOTICE
PROPERLY DESTROY DOCUMENTS
WHEN NO LONGER NEEDED
A S
N O
T E
D
G G
O R
S L
IN
E
CERTIFIED FINAL
2A
2B 2C
1A
1B
4A
EXTERIOR
VAULT
1C
UPS
B
C O
E S
R E
V
IE
W
IN
T
E R
IM
D
E S
IG
N
R E
V
IE
W
D
E S
IG
N
R E
V
IE
W
/1 /1
/1 /1
/0 /1
B
C O
E S
B A
C K
C H
E C
K
/0
/1
C E
R T
IF
IE
D F
IN
A
L
/3
/1
W
X
K -1
-R
-0
FURNISH AND INSTALL NEW PARALLEL BLADE
DAMPERS WITH SEALS AND DAMPER ACTUATORS
(CD-5 THROUGH CD-8) FOR NEW LOUVERS.
ACTUATORS TO OPEN WITHIN 15 SECONDS OF A
GENERATOR RUN SIGNAL. PROVIDE ACTUATORS TO
PROVIDE A MINIMUM OF 7.5 IN-LBS OF TORQUE PER
SQUARE FOOT OF DAMPER AREA.
FURNISH AND INSTALL NEW PARALLEL BLADE
DAMPERS WITH SEALS AND DAMPER ACTUATORS
(CD-1 THROUGH CD-4) FOR NEW LOUVERS.
ACTUATORS TO OPEN WITHIN 15 SECONDS OF A
GENERATOR RUN SIGNAL. PROVIDE ACTUATORS TO
PROVIDE A MINIMUM OF 10 IN-LBS OF TORQUE PER
SQUARE FOOT OF DAMPER AREA.
SEAL EXISTING OPENINGS WITH INSULATED SHEET
METAL PANELS. PANELS SHALL MEET ASHRAE 90.1
R VALUES, R-13, FOR CLIMATE ZONE 5.
EXISTING HORIZONTAL UNIT HEATERS TO REMAIN.
SHOWN FOR REFERENCE ONLY.
EXISTING EYE WASH/SAFETY SHOWER TO REMAIN.
SHOWN FOR REFERENCE ONLY.
EXISTING UNIT HEATER TO REMAIN. SHOWN FOR
REFERENCE ONLY.
KEY NOTES
(TYP) 1
3 3
LINE ITEM
LINE ITEM
LINE ITEM
LINE ITEM
LINE ITEM
LINE ITEM
LINE ITEM
LINE ITEM
LINE ITEM
W
1X K
-1 8-
R -0
1X K
-1 8-
R -0
RR
RR
3" CAC COOLING
WATER
5" WATER
JACKET COOLING
3" CAC COOLING
WATER
5" WATER
JACKET COOLING
D
IS
C
IP
L
IN
E
B U
IL
D
IN
G
R O
O F
M E
C H
A N
IC
A
L P
L A
N
M-403
J
R U
T L E
D G
E
J
M
IL
L E
R
H D
I_ M
-4 .D
W G
J
R U
T L E
D G
E1 M-403
BUILDING 5 ROOF MECHANICAL PLAN
SCALE: 1/4"=1'-0"
M-105 true north
N
S O
L
IC
IT
A
T
IO
N N
O
P L
O T
S C
A L E
D R
A W
N B
Y
C K
D B
Y
D E
S
IG
N B
Y
D
2 3
C
4 5
A
B
IS
S
U E
D A
T E
S
IZ
E
S B
M T
B Y
F
IL
E N
A M
E
D E
S C
R
IP
T
IO
N D
A T
E
C O
N T
R A
C T
N O
M A
R K
A P
P R
F
IL
E N
U M
B E
R
"x
J U
N E
Fort Worth District
US Army Corps of Engineers ®
P L
O T
D A
T E
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
F O
R T
W O
R T
H D
IS
T
R
IC
T D
L A
G E
N E
R A
T O
R R
E P
L A
C E
M E
N T
H A
R T
-D O
L E
-I N
O U
Y E
F E
D C
E N
T E
R
SHEET
IDENTIFICATION
N M
IC
H
IG
A
N A
V E
S
U
IT
E
C H
IC
A
G O
IL
T
.6
.7 w w w .e x p fe d e ra l.
c o m
P R
O J N
O
C H
I-
-A
/3
/2
KEY PLAN
N.T.S.
N
PROPERTY OF THE
UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
DO NOT REMOVE THIS NOTICE
PROPERLY DESTROY DOCUMENTS
WHEN NO LONGER NEEDED
A S
N O
T E
D
G G
O R
S L
IN
E
CERTIFIED FINAL
2A
2B 2C
1A
1B
4A
EXTERIOR
VAULT
1C
UPS
B
C O
E S
R E
V
IE
W
IN
T
E R
IM
D
E S
IG
N
R E
V
IE
W
D
E S
IG
N
R E
V
IE
W
/1 /1
/1 /1
/0 /1
B
C O
E S
B A
C K
C H
E C
K
/0
/1
C E
R T
IF
IE
D F
IN
A
L
/3
/1
W
X
K -1
-R
-0
1. REFER TO M-001 FOR SYMBOLS
AND ABBREVIATIONS.
2. REFER TO M-603 FOR FUEL OIL SCHEMATIC.
GENERAL NOTES
FURNISH AND INSTALL NEW REMOTE RADIATORS
TO MATCH NEW GENERATOR HEAT LOAD.
RADIATOR TO REJECT INPUT LOAD OF 28,003
BTU/HR PLUS AMBIENT LOADING.
KEY NOTES
SCALE: 1/4"=1'-0"
1 1
ROUTE EXHAUST PIPE WITH THIMBLE TO AT
LEAST 3' ABOVE FINISHED ROOF SURFACE.
COORDINATE PENETRATION WITH ROOFING
CONTRACTOR TO MAINTAIN WARRANTY. SEE
SHEET M-501 DETAIL 1.
LINE ITEM
W
1X K
-1 8-
R -0
RAINCAP, GT EXHAUST MODEL 22-1200
THIMBLE, GT EXHAUST 20-B-1200
RAINGUARD AND PEST CONTROL SCREEN
(PROVIDED WITH THIMBLE ASSEMBLY)
OUTER SQUARE FLASHING, PROVIDED WITH THIMBLE
INNER SQUARE FLASHING, PROVIDED WITH THIMBLE
CLAMP, INCLUDED WITH THIMBLE
M
IN
12"Ø SPOOL PIECE PROVIDED
BY GENERATOR VENDOR
12 GAUGE GALVANIZED SHEET
METAL INSERTS A HANGERS TO
PROTECT INSULATION, (TYP)
HANGER RODS WITH CHANNEL
SUPPORT AND 18 GA. GALV. SHEET
METAL SADDLE TO PROTECT
INSULATION
PROVIDE OUTLET FLANGE
AND ASSOCIATED HARDWARE
FLEXIBLE CONNECTORS BY
GENSET VENDOR
DO NOT COVER DRAIN WITH
INSULATION
CALCIUM SILICATE INSULATION
TO STOP AT FLANGE. DO NOT
INSULATE FLEX. CONNECTORS
ROOF, REFER TO ARCHITECTURAL FOR CONSTRUCTION
12" SCHEDULE 40 BLACK IRON PIPE
SLOPE 1/8" PER
FOOT TO DRAIN
CLEVIS HANGER (TYP)
THREADED RODS ANCHORED TO
BUILDING STRUCTURE
PROVIDE DRAIN GATE
VALVE WITH PLUG
TO
DIESEL
GENERATOR
SILENCER
FUEL PUMP, RED JACKET
OR APPROVED EQUAL;
1/3 HP 208-230V/1Ø/60 HZ
CONDUIT BY
ELECTRICAL
4" PIPE RISER
FURNISHED W/ PUMP
4" NPT TANK FITTING
1/2" SCH. 40 BLACK
STEEL PIPE TO EQUPMENT
1/2" DIA. X 30" U.L. LISTED
FLEXIBLE CONNECTER/P.T.F.E.
LINER AND STAINLESS STEEL
FLEX BRAID COVER
1/2" 90° ELL
1/2" NIPPLE
1/2" UNION
1/2" NIPPLE
CAST WALL FLANGE
WITH SET SCREW
FIRE STOPPING
MATERIAL
SERVICE PIPE
RATED WALL
CORE DRILLED HOLE
IN EXISTING WALL
CAST WALL FLANGE
WITH SET SCREW
PIPE SLEEVE
PACKING MATERIAL
1/2"
RATED WALL
1/2"
SERVICE PIPE
FIRE STOPPING
MATERIAL
UNINSULATED PIPES
PROVIDE ROD CONNECTIONS TO
STRUCTURE TYPE SHALL BE
PROVIDED BY THE CONTRACTOR
AND VERIFIED WITH BUILDING
CONSTRUCTION MATERIALS/
SYSTEMS. (TYP)
(HOT OR DUAL TEMP)
(4" AND ABOVE)
SPREADER TO BE USED ON
PIPE SIZE 10" AND ABOVE
F.O.S.
F.O.R.
HOT DIPPED GALVANIZED UNISTRUT
PIPE STAND-OFF FROM FLOOR. (5'
O.C.) ANCHOR TO FLOOR.
FINISHED
FLOOR
UNISTRUT PIPE
CLAMP (TYP)
M-501
EXHAUST STACK AND SILENCER SCHEMATIC
SCALE: NTS
M-402
M-501
WALL PIPE SUPPORT
SCALE: NTS
M-501
PIPE SUPPORT AND HANGER DETAIL
SCALE: NTS
M-501
PIPE PENETRATION/EXISITING CONCRETE WALL
SCALE: NTS
M-501
PIPE SLEEVE THROUGH RATED WALL
SCALE: NTS
M-501
UNISTRUT SUPPORT DETAIL FUEL PIPING
SCALE: NTS
M-501
SUBMERGED FUEL PUMP DETAIL
SCALE: NTS
M-402
M-501
FUEL FILL STATION DETAIL
SCALE: NTS
M-402
2" CALCIUM SILICATE
INSULATION COVERED WITH
STAINLESS STEEL JACKET
FUEL OIL PIPING
WALL
HILTI 3/8" KWIK BOLT
EXPANSION ANCHORS
1 3/8" EMBEDMENT MIN. 2
PER BRACKET
UNISTRUT PIPING SUPPORT
"U"-BOLT HANGER ACCEPTABLE AS
ALTERNATE TO UNISTRUT CLAMP
3" PIPE CONNECTION
TO FUEL OIL TANK
3" PIPE CAP
3" GALVANIZED STEEL PIPE
"U"-BOLT TYPE PIPE CLAMP,
3/8" TYP. 2 PLCS
12"Ø POST HOLE
W/CONCRETE FILL
3'-0"
MINIMUM CLEARANCE
IN FRONT OF FILL
STATION
PACKAGED 7 GAL FUEL FILL SYSTEM, W/
2" INLET HOSE COUPLING, 3" NPT THD OUTLET,
HAND PUMP, HOUSING DRAIN, CHECK VALVE,
SHUTOFF VALVE AND GROUND STUD.
PROVIDE TC-9 FILL CONTROLLER - BASIS OF
DESIGN SIMPLEX FUEL PORT
M E
C H
A N
IC
A
L
D E
T A
IL
S
M-501
J
R U
T L E
D G
E
J
R U
T L E
D G
E H D
I_ M
-5 .D
W G
J
R U
T L E
D G
E S
O L
IC
IT
A T
IO
N
N O
P L
O T
S C
A L E
D R
A W
N B
Y
C K
D B
Y
D E
S
IG
N B
Y
D
2 3
C
4 5
A
B
IS
S
U E
D A
T E
S
IZ
E
S B
M T
B Y
F
IL
E N
A M
E
D E
S C
R
IP
T
IO
N D
A T
E
C O
N T
R A
C T
N O
M A
R K
A P
P R
F
IL
E N
U M
B E
R
"x
J U
N E
Fort Worth District
US Army Corps of Engineers ®
P L
O T
D A
T E
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
F O
R T
W O
R T
H D
IS
T
R
IC
T D
L A
G E
N E
R A
T O
R R
E P
L A
C E
M E
N T
H A
R T
-D O
L E
-I N
O U
Y E
F E
D C
E N
T E
R
SHEET
IDENTIFICATION
N M
IC
H
IG
A
N A
V E
S
U
IT
E
C H
IC
A
G O
IL
T
.6
.7 w w w .e x p fe d e ra l.
c o m
P R
O J N
O
C H
I-
-A
/3
/2
PROPERTY OF THE
UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
DO NOT REMOVE THIS NOTICE
PROPERLY DESTROY DOCUMENTS
WHEN NO LONGER NEEDED
A S
N O
T E
D
G G
O R
S L
IN
E
CERTIFIED FINAL
B
C O
E S
R E
V
IE
W
IN
T
E R
IM
D
E S
IG
N
R E
V
IE
W
D
E S
IG
N
R E
V
IE
W
/1 /1
/1 /1
/0 /1
B
C O
E S
B A
C K
C H
E C
K
/0
/1
C E
R T
IF
IE
D F
IN
A
L
/3
/1
W
X
K -1
-R
-0
1. ALL MANUFACTURER SPECIFIC
INFORMATION INCLUDED IN
THESE DIAGRAMS ARE FOR
BASIS OF DESIGN PURPOSES
ONLY. APPROVED EQUAL
EQUIPMENT SHALL ALSO BE
ACCEPTABLE.
GENERAL NOTES
W
1X K
-1 8-
R -0
C H
A N
IC
A
L
D E
T A
IL
S
M-502
J
R U
T L E
D G
E
J
R U
T L E
D G
E H D
I_ M
-5 .D
W G
J
R U
T L E
D G
E S
O L
IC
IT
A T
IO
N
N O
P L
O T
S C
A L E
D R
A W
N B
Y
C K
D B
Y
D E
S
IG
N B
Y
D
2 3
C
4 5
A
B
IS
S
U E
D A
T E
S
IZ
E
S B
M T
B Y
F
IL
E N
A M
E
D E
S C
R
IP
T
IO
N D
A T
E
C O
N T
R A
C T
N O
M A
R K
A P
P R
F
IL
E N
U M
B E
R
"x
J U
N E
Fort Worth District
US Army Corps of Engineers ®
P L
O T
D A
T E
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
F O
R T
W O
R T
H D
IS
T
R
IC
T D
L A
G E
N E
R A
T O
R R
E P
L A
C E
M E
N T
H A
R T
-D O
L E
-I N
O U
Y E
F E
D C
E N
T E
R
SHEET
IDENTIFICATION
N M
IC
H
IG
A
N A
V E
S
U
IT
E
C H
IC
A
G O
IL
T
.6
.7 w w w .e x p fe d e ra l.
c o m
P R
O J N
O
C H
I-
-A
/3
/2
PROPERTY OF THE
UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
DO NOT REMOVE THIS NOTICE
PROPERLY DESTROY DOCUMENTS
WHEN NO LONGER NEEDED
A S
N O
T E
D
G G
O R
S L
IN
E
CERTIFIED FINAL
B
C O
E S
R E
V
IE
W
IN
T
E R
IM
D
E S
IG
N
R E
V
IE
W
D
E S
IG
N
R E
V
IE
W
/1 /1
/1 /1
/0 /1
B
C O
E S
B A
C K
C H
E C
K
/0
/1
C E
R T
IF
IE
D F
IN
A
L
/3
/1
W
X
K -1
-R
-0
CHWR
VIBRATIONAL ISOLATORS (NOTE 1)
3/8" ALL THREAD ROD (NOTE 1)
FACTORY PROVIDED MOUNTING HOLES
FAN
C O
IL
ANCHOR TO CONCRETE SLAB ABOVE
CHWS
DUCT
SHUT OFF VALVE
(TYPICAL)
BALANCING VALVE
2-WAY MODULATING
CONTROL VALVE
MANUAL AIR VENT
(TYPICAL)
STRAINER
FLEXIBLE
CONNECTION
(TYPICAL)
UNION CONNECTION
(TYPICAL)
FLEXIBLE
CONNECTION
HOSE END DRAIN
VALVE (TYPICAL)
HYDRONIC COIL
(INTEGRAL TO FCU)
CONDENSATE DRAIN
AND P-TRAP (NOTE 2)
D
DRIP PAN
(INTEGRAL TO FCU)
PRESSURE GAGE
(TYPICAL)
THERMOMETER
(TYPICAL)
NOTE:
THIS INFORMATION MAY NOT CONTAIN ALL DETAILS REQUIRED FOR
CONSTRUCTION. APPROPRIATE MODIFICATION MAY BE REQUIRED TO ENSURE
SUITABILITY OF THESE DRAWINGS FOR THE SPECIFIC APPLICATION.
NOTES:
1. NUMBER OF HANGAR SUPPORTS AND VIBRATION ISOLATORS TYPE SHALL BE IN
ACCORDANCE WITH THE FAN COIL UNIT MANUFACTURERS RECOMMENDATIONS.
2. CONDENSATE DRAIN SHALL BE SLOPED AT 2%.
3. INSULATE ALL WATER LINES, INCLUDING FLEXIBLE CONNECTIONS.
D
SLOPE AT 2%
2'
1"
WALL WALL
8" WIDE
NOTES:
1. 24 GAGE GALVANIZED STEEL SHALL BE USED TO CONSTRUCT DRIP PAN.
2. 16 GAGE GALVANIZED STEEL WIRE SHALL BE CONNECTED THROUGH PENETRATIONS
IN THE DRIP PAN WALL TO THE CONCRETE CEILING STRUCTURE. SUPPORTS SHALL BE
3'0" ON CENTER.
2"
EXISTING PIPE
TO REMAIN
3/4" DRIP
PAN DRAIN
D
CUT VIEW
3'
HYDRONIC COIL CONNECITON
LOW
PRESSURE
STEAM
UNIT
HEATER
UNION CONNECTION
(TYPICAL) GATE VALVE
(TYPICAL)
STRAINER
F&T TRAP
PITCH AT 2%
SUPPLY
RETURN
M-502
FAN COIL UNIT INSTALLATION DETAIL
SCALE: NTS
M-502
DRIP PAN DETAIL
SCALE: NTS
M-107
M-502
STEAM UNIT HEATER INSTALLATION DETAIL
SCALE: NTS
M-103
ANCHOR TO STRUCTURE ABOVE
3/8" -16 GA THREADED RODS
ANCHOR TO CONCRETE SLAB ABOVE
(TYPICAL)
NOTE:
NUMBER OF HANGAR SUPPORTS AND TYPE SHALL BE IN
ACCORDANCE WITH THE UNIT HEATER MANUFACTURERS
RECOMMENDATIONS.
DRAIN PAN
C.O.
A
B
BA
DRAIN TO INDIRECT RECEPTOR
APPROVED BY AUTHORITIES HAVING
JURISDICTION
PITCH DOWN
TOWARD
DRAIN
CLEAN OUT (TYP.)
DRAIN LINE SHALL BE AT LEAST THE SAME
SIZE AS THE NIPPLE ON THE DRAIN PAN.
COOLING COIL
45° CUT
UNIT TYPE
DRAW THRU
BLOW THRU
WHERE "X" = STATIC PRESS. IN COIL SECTION.
> ("X") > 1/2 ("X")
> 1/2 ("X") > ("X")+1/2"
M-502
COOLING COIL CONDENSATE TRAP DETAIL
SCALE: NTS
16 GAUGE GALVANIZED
STEEL RETAINING ANGLE
(NOTE 2)
MINIMUM 1" ANGLE
OVERLAP WITH CMU
WALL
MINIMUM 1 1/4" ANGLE
OVERLAP WITH SLEEVE
#10 SHEET METAL SCREW
(NOTE 1)
FLANGE MOUNT LOUVER
WITH 1/2" MESH BIRD
SCREEN TO CMU WALL
24 GAUGE GALVANIZED
STEEL SLEEVE
3 HR FIRE DAMPER
NOTES:
1. FIRE DAMPERS SHALL BE ATTACHED TO SLEEVES ON ALL FOUR SIDES USING
MANUFACTURER APPROVED METHODS. FASTENERS SHALL BE SPACED A
MAXIMUM OF 6" ON CENTERS AND A MAXIMUM OF 2" FROM CORNERS. A MINIMUM
OF 4 ATTACHMENTS PER SIDE ARE REQUIRED.
2. RETAINING ANGLES SHALL BE ATTACHED TO SLEEVES IN A SIMILAR MANOR TO
THE ATTACHMENT PROCEDURE AND METHOD DESCRIBED IN NOTE 1.
3. RETAINING ANGLES SHALL NOT BE FASTENED DIRECTLY TO CMU WALL.
4. FIRE DAMPER SHALL BE INSTALLED STRICTLY ACCORDING TO MANUFACTURERS
INSTRUCTIONS. ANY DISCREPANCIES WITH THIS DETAIL SHALL DEFAULT TO
MANUFACTURERS RECOMMENDATION.
MINIMUM 1/2" SLEEVE
TO WALL CLEARANCE
1/2" MESH ALUMINUM BIRD
SCREEN FASTENED FLUSH
WITH CMU WALL
EXTERIOR OF ELECTRICAL ROOMINTERIOR OF ELECTRICAL ROOM
M-502
TRANSFER OPENING FIRE DAMPER INSTALLATION DETAIL
SCALE: NTS
W
1X K
-1 8-
R -0
C H
A N
IC
A
L
D E
T A
IL
S
M-503
J
R U
T L E
D G
E
J
R U
T L E
D G
E H D
I_ M
-5 .D
W G
J
R U
T L E
D G
E S
O L
IC
IT
A T
IO
N
N O
P L
O T
S C
A L E
D R
A W
N B
Y
C K
D B
Y
D E
S
IG
N B
Y
D
2 3
C
4 5
A
B
IS
S
U E
D A
T E
S
IZ
E
S B
M T
B Y
F
IL
E N
A M
E
D E
S C
R
IP
T
IO
N D
A T
E
C O
N T
R A
C T
N O
M A
R K
A P
P R
F
IL
E N
U M
B E
R
"x
J U
N E
Fort Worth District
US Army Corps of Engineers ®
P L
O T
D A
T E
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
F O
R T
W O
R T
H D
IS
T
R
IC
T D
L A
G E
N E
R A
T O
R R
E P
L A
C E
M E
N T
H A
R T
-D O
L E
-I N
O U
Y E
F E
D C
E N
T E
R
SHEET
IDENTIFICATION
N M
IC
H
IG
A
N A
V E
S
U
IT
E
C H
IC
A
G O
IL
T
.6
.7 w w w .e x p fe d e ra l.
c o m
P R
O J N
O
C H
I-
-A
/3
/2
PROPERTY OF THE
UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
DO NOT REMOVE THIS NOTICE
PROPERLY DESTROY DOCUMENTS
WHEN NO LONGER NEEDED
A S
N O
T E
D
G G
O R
S L
IN
E
CERTIFIED FINAL
B
C O
E S
R E
V
IE
W
IN
T
E R
IM
D
E S
IG
N
R E
V
IE
W
D
E S
IG
N
R E
V
IE
W
/1 /1
/1 /1
/0 /1
B
C O
E S
B A
C K
C H
E C
K
/0
/1
C E
R T
IF
IE
D F
IN
A
L
/3
/1
W
X
K -1
-R
-0
16 GAUGE GALVANIZED
STEEL RETAINING ANGLE
(NOTE 2)
MINIMUM 1" ANGLE
OVERLAP WITH CMU
WALL
MINIMUM 1 1/4" ANGLE
OVERLAP WITH SLEEVE
#10 SHEET METAL SCREW
(NOTE 1)
24 GAUGE GALVANIZED
STEEL SLEEVE
3 HR FIRE DAMPER
NOTES:
1. FIRE DAMPERS SHALL BE ATTACHED TO SLEEVES ON ALL FOUR SIDES USING
MANUFACTURER APPROVED METHODS. FASTENERS SHALL BE SPACED A
MAXIMUM OF 6" ON CENTERS AND A MAXIMUM OF 2" FROM CORNERS. A MINIMUM
OF 4 ATTACHMENTS PER SIDE ARE REQUIRED.
2. RETAINING ANGLES SHALL BE ATTACHED TO SLEEVES IN A SIMILAR MANOR TO
THE ATTACHMENT PROCEDURE AND METHOD DESCRIBED IN NOTE 1.
3. RETAINING ANGLES SHALL NOT BE FASTENED DIRECTLY TO CMU WALL.
4. FIRE DAMPER SHALL BE INSTALLED STRICTLY ACCORDING TO MANUFACTURERS
INSTRUCTIONS. ANY DISCREPANCIES WITH THIS DETAIL SHALL DEFAULT TO
MANUFACTURERS RECOMMENDATION.
MINIMUM 1/2" SLEEVE
TO WALL CLEARANCE
1/2" MESH ALUMINUM BIRD
SCREEN FASTENED FLUSH
WITH CMU WALL
EXTERIOR OF ELECTRICAL ROOMINTERIOR OF ELECTRICAL ROOM
M-503
DUCT FIRE DAMPER INSTALLATION DETAIL
SCALE: NTS
6"
MAX
SMACNA APPROVED BREAK AWAY
STYLE TRANSVERSE JOINTS AT
SLEEVE CONNECTION
DUCT
M-503
EXHAUST DUCT CAP CURB INSTALLATION DETAIL
SCALE: NTS
M-107
4" MIN.
3/4" CHAMFER ALL
OPEN EDGES 45°.
EXISTING CONCRETE
FLOOR SLAB
ETCH FLOOR SLAB
FOR BOND
SHEET METAL FLASHING
IN BED OF SEALANT ON
EACH SIDES
NEW EXHAUST
DUCTWORK
CONT. BEAD OF SEALANT
EACH SIDE
NEW CONCRETE
CURB ON ALL
SIDES OF DUCT
W
1X K
-1 8-
R -0
INTERSTITIAL LEAK DETECTOR PORT
TANK LEVEL INDICATOR PORT
LOCAL LEVEL GAUGE
TANK SUCTION WITH FOOT VALVE
FOF
2"
TANK FILL PORT
GENERATOR
BUILDING
EXTERIOR
GENERATOR
BUILDING
INTERIOR 1-1/2"
FT
FOR
FOS
2"
FS
1-1/2"
FOS
PRESSURE GAUGE,
2', 0-100 PSIG
ANTI-SYPHON VALVE AT
HIGH POINT OF PIPING
2"
FOR
1"
1-1/2" FIRE SAFE VALVE
W/ FUSIBLE PLUG
F
F O
S1-1/2"
F O
R
1"
1"
1-1/2"
F
F O
S F
O R
DT
DT
4" EMERGENCY TANK VENT,
TYP. 2 PLCS.
2" TANK VENT,
TYP. 2 PLCS.
2" VENT,
4" EMER. VENTS, 3'
ABOVE ROOF (MIN)
W/OPW 23 VENT CAPS
ANTI-SYPHON VALVE
AT HIGH POINT TO
EACH DAY TANK
KN
1-1/2" FOS
FUEL OIL SUPPLY
FROM FUEL TANK
F O
S
2" FOR
N O
FS
K L
DF
A
E
AC B
TO
FUEL OIL RETURN
TO FUEL TANK
FOR
FOR FROM GENERATOR
FOS TO GENERATOR
1" FOS/FOR
ERES
H
1 J
G
3/4" DAY TANK DRAIN
TF
K PLUG VALVES
M
O
N
CHECK VALVES
FLOW PROVING SWITCH
L
G
J
H
7 2" MANUAL FILL (CAPPED)
FUEL OIL RTD TEMPERATURE ASSEMBLY
DAYTANK LOW LEVEL ALARM
SOLENOID VALVE FROM SUPPLY HEADER -
OPEN, PUMP ENERGIZED
SOLENOID VALVE FROM SUPPLY HEADER -
CLOSED, PUMP DE-ENERGIZED
LIQUID LEVEL SWITCH - COMPATIBLE WITH
VEEDER ROOT CONTROL PANEL.
180 GALLON STEEL FUEL OIL DAY TANK WITH
RUPTURE BASIN, PREFERRED UTILITIES CAT #
11871 OR APPROVED EQUAL
INTERSTITIAL MONITOR AND LEAK DETECTION
SENSOR. LOCAL ALARM TO FACILITY
MANAGEMENT SYSTEM.
OVER PRESSURE RELIEF VALVES
FLEXIBLE STEEL BRAID PIPE CONNECTOR
PACKAGED DUPLEX PUMP SYSTEM, PROVIDED
WITH DAY TANK PACKAGE. DESIGN FLOW RATE
OF 60 GPH (1.0 GPM) @50 PSI.
FLEXIBLE STEEL BRAID PIPE CONNECTOR TO
GENERATOR SET
DUPLEX STRAINER - PREFERRED UTILITIES
MODEL 50, CAT. #13012 WITH 3/64"
PERFORATIONS OR APPROVED EQUAL
COMPOUND GAUGES - 2" DIAL; 15 PSIG/30" HG
PRESSURE GAUGES - 2" DIAL; ANSI GRADE B,
0-100 PSIG
FUEL OIL RECOVERY PUMP - 240 GPH AT 20' WG.
ADJUST AS REQUIRED TO MATCH VENDOR
CUTSHEETS.
CONTROL POWER ON
DAY TANK LEAK
ALARM SILENCE
LAMP TEST
DAY TANK HIGH
DAY TANK LOW
B
D
C
JUNCTION BOX
A 1" GATE VALVES
RESET
F 1" UNION
E 1" GLOBE VALVE
DAY TANK FUEL OIL MANAGEMENT CONTROL
CABINET - NAME PLATE ITEMS INCLUDE:
CONTROL POWER ON/OFF
DAY TANK OIL TEMPERATURE
COMPONENT LEGEND - DAY TANK/PUMP ASSEMBLY
1" SOLENOID VALVE - EMERGENCY SHUTOFF
1" SOLENOID VALVE - DAY TANK FILL OPEN/CLOSE
DAY TANK FLOW CONTROL MANIFOLD:
2"
1-1/2"
FOV
FOV
EOV
EOV
FUEL OIL
FILL
STATION
VEHICLE FILL
STATION
VEHICLE FILL
PUMP -
SUBMERSIBLE
1"
EMERGENCY FUEL
OIL VENT (TYP 2)
FUEL OIL VENT TERMINATE
AT LEAST 12' ABOVE GRADE
W/OPW 23 CAPS (TYP 2)
FUEL LEVEL PROBE
VR SERIES 8373 MAG2
CLOCK TYPE LOCAL LEVEL
GAUGE MORRISON BROS. FIG.
818 OR APPROVED EQUAL
FUEL LEVEL
PROBE RISER
ASSEMBLY
LOCATE ON GENERATOR
ROOM EXTERIOR (REFER
SHEET M-402)
LOCATE IN ROOM 5-1-8,
REFER TO M-105
FUEL
TANK INTERSTITIAL SENSOR
VR SERIES 7943
VEEDER ROOT TLS 350
J-BOX, TYP.
SENSOR WIRING IN CONDUIT
ALARM WIRING IN CONDUIT
POWER WIRING IN CONDUIT
OVERFILL ALARM AND
ACKNOWLEDGMENT SWITCH
DAY TANK ROOM FUEL TANK YARD
DAY TANK ROOM FUEL TANK YARD
DAY TANK ROOM GENERATOR ROOM
FUEL POLISHING
SYSTEM
3/4"
M E
C H
A N
IC
A
L
S C
H E
M A
T
IC
S
M-601
J
R U
T L E
D G
E
J
R U
T L E
D G
E H D
I_ M
-6 .D
W G
J
R U
T L E
D G
E S
O L
IC
IT
A T
IO
N
N O
P L
O T
S C
A L E
D R
A W
N B
Y
C K
D B
Y
D E
S
IG
N B
Y
D
2 3
C
4 5
A
B
IS
S
U E
D A
T E
S
IZ
E
S B
M T
B Y
F
IL
E N
A M
E
D E
S C
R
IP
T
IO
N D
A T
E
C O
N T
R A
C T
N O
M A
R K
A P
P R
F
IL
E N
U M
B E
R
"x
J U
N E
Fort Worth District
US Army Corps of Engineers ®
P L
O T
D A
T E
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
F O
R T
W O
R T
H D
IS
T
R
IC
T D
L A
G E
N E
R A
T O
R R
E P
L A
C E
M E
N T
H A
R T
-D O
L E
-I N
O U
Y E
F E
D C
E N
T E
R
SHEET
IDENTIFICATION
N M
IC
H
IG
A
N A
V E
S
U
IT
E
C H
IC
A
G O
IL
T
.6
.7 w w w .e x p fe d e ra l.
c o m
P R
O J N
O
C H
I-
-A
/3
/2
PROPERTY OF THE
UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
DO NOT REMOVE THIS NOTICE
PROPERLY DESTROY DOCUMENTS
WHEN NO LONGER NEEDED
A S
N O
T E
D
G G
O R
S L
IN
E
CERTIFIED FINAL
B
C O
E S
R E
V
IE
W
IN
T
E R
IM
D
E S
IG
N
R E
V
IE
W
D
E S
IG
N
R E
V
IE
W
/1 /1
/1 /1
/0 /1
B
C O
E S
B A
C K
C H
E C
K
/0
/1
C E
R T
IF
IE
D F
IN
A
L
/3
/1
W
X
K -1
-R
-0
M-601
FUEL OIL SYSTEM TANK AND DAY TANK SCHEMATIC
SCALE: NTS
M-601
FUEL TANK MONITORING SCHEMATIC
SCALE:NTS
M-402
M-601
COMBINATION DAY TANK AND DUPLEX PUMP SCHEMATIC
SCALE: NTS
M-402
1. REFER TO SHEET M-001 FOR GENERAL NOTES
AND ABBREVIATIONS.
2. ALL MANUFACTURER SPECIFIC INFORMATION
INCLUDED IN THESE DIAGRAMS ARE FOR BASIS OF
DESIGN PURPOSES ONLY. APPROVED EQUAL
EQUIPMENT SHALL ALSO BE ACCEPTABLE.
GENERAL NOTES
LINE ITEM
W
1X K
-1 8-
R -0
C H
A N
IC
A
L
S E
Q U
E N
C E
S O
F O
P E
R A
T
IO
N
M-602
J
R U
T L E
D G
E
J
R U
T L E
D G
E H D
I_ M
-6 .D
W G
J
R U
T L E
D G
E S
O L
IC
IT
A T
IO
N
N O
P L
O T
S C
A L E
D R
A W
N B
Y
C K
D B
Y
D E
S
IG
N B
Y
D
2 3
C
4 5
A
B
IS
S
U E
D A
T E
S
IZ
E
S B
M T
B Y
F
IL
E N
A M
E
D E
S C
R
IP
T
IO
N D
A T
E
C O
N T
R A
C T
N O
M A
R K
A P
P R
F
IL
E N
U M
B E
R
"x
J U
N E
Fort Worth District
US Army Corps of Engineers ®
P L
O T
D A
T E
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
F O
R T
W O
R T
H D
IS
T
R
IC
T D
L A
G E
N E
R A
T O
R R
E P
L A
C E
M E
N T
H A
R T
-D O
L E
-I N
O U
Y E
F E
D C
E N
T E
R
SHEET
IDENTIFICATION
N M
IC
H
IG
A
N A
V E
S
U
IT
E
C H
IC
A
G O
IL
T
.6
.7 w w w .e x p fe d e ra l.
c o m
P R
O J N
O
C H
I-
-A
/3
/2
PROPERTY OF THE
UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
DO NOT REMOVE THIS NOTICE
PROPERLY DESTROY DOCUMENTS
WHEN NO LONGER NEEDED
A S
N O
T E
D
G G
O R
S L
IN
E
CERTIFIED FINAL
B
C O
E S
R E
V
IE
W
IN
T
E R
IM
D
E S
IG
N
R E
V
IE
W
D
E S
IG
N
R E
V
IE
W
/1 /1
/1 /1
/0 /1
B
C O
E S
B A
C K
C H
E C
K
/0
/1
C E
R T
IF
IE
D F
IN
A
L
/3
/1
W
X
K -1
-R
-0
STEAM UNIT HEATER
STEAM UNIT HEATER SHALL BE EQUIPPED WITH A REMOTE THERMOSTAT WITH AN
OFF-AUTO SWITCH. WITH THE THERMOSTAT OFF-AUTO SWITCH IN THE OFF POSITION, THE
UNIT HARDWARE SHALL STOP THE FAN AND CLOSE THE HEATING CONTROL VALVE. WITH
THE THERMOSTAT OFF-AUTO SWITCH IN THE AUTO MODE THE UNIT HARDWARE SHALL
MODULATE THE HEATING CONTROL VALVE AND CYCLE THE MULTI-SPEED FAN TO MAINTAIN
SPACE TEMPERATURE AT THE CONFIGURED SETPOINT, 55°F (ADJ.), OR AT THE
OCCUPANT-ADJUSTABLE SET-POINT VIA THE WALL-MOUNTED THERMOSTAT. THE UNIT
SHALL RUN SUBJECT TO THE UNIT MANUFACTURER'S SAFETIES.
HYDRONIC FAN COIL UNIT
FAN COIL UNIT SHALL BE EQUIPPED WITH A REMOTE THERMOSTAT WITH AN OFF-AUTO
SWITCH. WITH THE THERMOSTAT OFF-AUTO SWITCH IN THE OFF POSITION, THE UNIT
HARDWARE SHALL STOP THE FAN AND CLOSE THE COOLING CONTROL VALVE. WITH THE
THERMOSTAT OFF-AUTO SWITCH IN THE AUTO MODE THE UNIT HARDWARE SHALL
MODULATE THE COOLING CONTROL VALVE AND CYCLE THE MULTI-SPEED FAN TO MAINTAIN
SPACE TEMPERATURE AT THE CONFIGURED SETPOINT, 78°F (ADJ.), OR AT THE
OCCUPANT-ADJUSTABLE SET-POINT VIA THE WALL-MOUNTED THERMOSTAT. THE UNIT
SHALL RUN SUBJECT TO THE UNIT MANUFACTURER'S SAFETIES.
M-602
STEAM UNIT HEATER SEQUENCE OF OPERATION
M-602
HYDRONIC FAN COIL UNIT SEQUENCE OF OPERATION
M-602
GENERATOR ROOM FAN SEQUENCE OF OPERATION
POINTS SUMMARY
DDC HARD WIRED
POINTS
EQUIPMENT
INTERFACE
GUI APPLICATION
ALARMING
SCENARIOS
ALARM
PRIORITIES
# CONTROL POINTS TAG D
IG
IT
A
L I
N P
U T
S
D
IG
IT
A
L O
U T
P U
T S
A N
A L O
G I
N P
U T
S
A N
A L
O G
O U
T P
U T
S
R E
A D
D
A T
A P
O
IN
T
R E
A D
/W R
IT
E
D
A T
A P
O
IN
T
T R
E N
D L
O G
G
IN
G
R U
N T
IM
E
A C
C U
M U
L A
T
IO
N
O P
E R
A T
IO
N
S C
H E
D U
L E
S C
R E
E N
D
IS
P L A
Y E
D
U S
E R
O V
E R
R
ID
E
O U
T O
F R
A N
G E
P O
IN
T
S T
A T
U S
C O
M M
A N
D F
A
IL
U R
E
C A
L C
U L A
T E
D E
V E
N T
N O
T
IF
IC
A
T
IO
N
M A
IN
T
E N
A N
C E
M A
J O
R
C R
IT
IC
A L
SUPPLEMENTARY NOTES:
1 LOW COOLANT TEMP X X X X X X TYPICAL FOR GENERATORS 1 & 2
2 LOW OIL PRESSURE X X X X X X TYPICAL FOR GENERATORS 1 & 2
3 UNDER FREQUENCY X X X X X X TYPICAL FOR GENERATORS 1 & 2
4 OVER FREQUENCY X X X X X X TYPICAL FOR GENERATORS 1 & 2
5 UNDER VOLTAGE X X X X X X TYPICAL FOR GENERATORS 1 & 2
6 OVER VOLTAGE X X X X X X TYPICAL FOR GENERATORS 1 & 2
7 CRITICAL LOW FUEL LEVEL SHUTDOWN X X X X X X TYPICAL FOR GENERATORS 1 & 2
8 PHASE TO PHASE VOLTAGE X X X X X X TYPICAL FOR GENERATORS 1 & 2
9 POWER (KW, KVAR) POWER FACTOR X X X X X X TYPICAL FOR GENERATORS 1 & 2
10 FREQUENCY X X X X X X TYPICAL FOR GENERATORS 1 & 2
11 GENERATOR OVERLOAD X X X X X X TYPICAL FOR GENERATORS 1 & 2
12 NUMBER OF ENGINE STARTS X X X X X X TYPICAL FOR GENERATORS 1 & 2
13 HIGH WATER TEMPERATURE X X X X X X TYPICAL FOR GENERATORS 1 & 2
14 LOW OIL PRESSURE X X X X X X TYPICAL FOR GENERATORS 1 & 2
15 HIGH BATTERY VOLTAGE X X X X X X TYPICAL FOR GENERATORS 1 & 2
16 LOW BATTERY VOLTAGE X X X X X X TYPICAL FOR GENERATORS 1 & 2
17 CHARGER FAIL X X X X X X TYPICAL FOR GENERATORS 1 & 2
18 OVERSPEED X X X X X X TYPICAL FOR GENERATORS 1 & 2
19 OVERCRANK X X X X X X TYPICAL FOR GENERATORS 1 & 2
20 CRANK FAIL X X X X X X TYPICAL FOR GENERATORS 1 & 2
21 NOT IN AUTO POSITION X X X X X X TYPICAL FOR GENERATORS 1 & 2
22 LOW COOLANT LEVEL X X X X X X TYPICAL FOR GENERATORS 1 & 2
23 GENERATOR RUN X X X X X X TYPICAL FOR GENERATORS 1 & 2
24 GENERATOR OUTPUT BREAKER OPEN X X X X X X TYPICAL FOR GENERATORS 1 & 2
25 GENERATOR CONTROL FAILURE ALARM X X X X X X TYPICAL FOR GENERATORS 1 & 2
26 GENERATOR FAILURE X X X X X X TYPICAL FOR GENERATORS 1 & 2
27 GENERATOR E-STOP X X X X X X
28 FUEL TANK - LEVEL X X X
29 FUEL TANK - WATER IN TANK X X X X X
30 FUEL TANK - TANK FUEL LEAK X X X X X
31 FUEL TANK - WATER IN INTERSTITIAL SPACE X X X X X
32 FUEL TANK - CRITICAL ALARM X X X X X
33 FUEL TANK - CRITICAL LOW FUEL LEVEL X X X X X
34 FUEL TANK - FUEL TEMPERATURE X X X X X X
35 FUEL TANK - FUEL SPILL X X X X X
M-602
GENERATOR BAS POINTS LIST
NOTES:
GENERATORS AND FUEL MONTORING SHALL BE VIA MODBUS OR BACNET COMMUNICATION CARD. GENERATOR E-STOP SHALL BE
HARD WIRED. PROVIDE THE FOLLOWING POINTS AT A MINIMUM.
GENERATOR ROOM SUPPLY AND EXHAUST FANS
UNITS WILL BE PROVIDED WITH A FACTORY MOUNTED DISCONNECT
SWITCHES AND FACTORY INSTALLED VFD DEVICES. WHEN BAS SIGNALS
GENERATOR OPERATION, ASSOCIATED DAMPERS SHALL OPEN AND
FANS SHALL RUN CONTINUOUSLY SUBJECT TO SAFETIES. FANS SHALL
RUN FOR 30 MINUTES (ADJ.) FOLLOWING THE CONCLUSION OF
GENERATOR OPERATION. VFD SHALL BE USED TO PROVIDE A SOFT
START TO FAN OPERATION.
POINTS SUMMARY
DDC HARD WIRED
POINTS
# CONTROL POINTS D
IG
IT
A
L I
N P
U T
S
D
IG
IT
A
L O
U T
P U
T S
A N
A L O
G I
N P
U T
S
A N
A L
O G
O U
T P
U T
S
1 UNIT HEATER ON/OFF (UH-1)
2 UNIT HEATER ALARMS (UH-1)
4 FAN COIL UNIT ALARMS (FCU-1)
3 FAN COIL UNIT ON/OFF (FCU-1)
5 FAN COIL UNIT ALARMS (FCU-2)
6 FAN COIL UNIT ON/OFF (FCU-2)
X X
X
X X
X
X X
X
5 EXHAUST FAN ALARMS (EF-1)
6 EXHAUST FAN ON/OFF (EF-1)
X X
X
36 VENTILATION FAN ON/OFF X X
37 VENTILATION DAMPER OPEN/CLOSE X X X
38 VENTILATION FAN FAILURE
39 VENTILATION DAMPER FAILURE
X
X X X
X X X
X
X
X
X
X
X
TYPICAL FOR CD 1-8
TYPICAL FOR SF-1 AND SF-2
TYPICAL FOR SF-1 AND SF-2
TYPICAL FOR CD 1-8
M-602
BAS POINTS LIST
1. BUILDING OWNER SHALL BE CONSULTED TO IDENTIFY PREFERRED
CONTROLS CONTRACTOR. ALL WORK DONE TO EXISTING BAS SYSTEM
SHALL BE COMPLETED USING IDENTIFIED CONTRACTOR.
2. THE CURRENT CONTROLS CONTRACTOR FOR HDI FEDERAL CENTER IS
SCHNEIDER ELECTRIC - HAVEL BROTHERS.
GENERAL NOTES
W
1X K
-1 8-
R -0
PRESSURE GAUGE RANGE: 0 TO 200 PSIG
THERMOMETER RANGE: 50°F TO 250°F
1. ALL PIPES AND LINES TO BE DOWNWARD SLOPED FROM
RADIATOR TO ENGINE. NO TRAPS ALLOWED.
2. ALL FLEX CONNECTORS MUST BE CONNECTED DIRECTLY
TO RADIATOR AND ENGINE.
3. DO NOT SUPPORT PIPES FROM BASE OR ENGINE.
4. FLUID SHALL BE A 50/50 MIX OF WATER AND GLYCOL.
SYSTEM FILL SHALL BE ACCESSIBLE THROUGH THE SURGE
TANK ON THE RADIATOR.
DETAIL A
CHARGED AIR COOLER
ROOF
NOTE:
NOTES:
AIR FLOW
1/2" NPT VENT DRAIN VALVE
PROVIDED W/ RADIATOR
1000 kW/1250 kVA
DIESEL GENERATOR SET
5" NPT BUTTERFLY VALVE
USE VITON SEALS FOR
210° F OPERATION (TYP.)
1" BALL DRAIN VALVE
WITH 1' NIPPLE AND CAP
(TYP.)
5" DIA PIPE, SCH. 40
PUMP REFER
TO DETAIL "A"
CHARGED AIR COOLER
REFER TO DETAIL "A"
1" BALL DRAIN VALVE
WITH 1" NIPPLE AND CAP
AT LOW POINTS (TYP.)
VENT FLEX CONNECTORS MUST
BE DIRECTLY CONNECTED TO
ENGINE
THERMOWELL
WITHIN 5 FT OF
RADIATOR
(TYP.)
CONTROL
PANEL
5" X 16 LG FLANGED
FLEX (TYP.)
SIGHT GLASS/LEVEL
SWITCH 1/2" NPT
SURGE TANK
RADIATOR CAP
40,549 BTU/MIN 55 DBA AT 50
FT
DIFFERENTIAL
PRESSURE
SWITCH & GAUGE
COOLING WATER
FROM RADIATOR
COOLING
WATER TO
RADIATOR
PUMP 120
GPM
PRESSURE
GAUGE AND
THERMOMETER
CIRCUIT
SETTER
COLD
INLET
HOT
OUTLET
3/4" BALL DRAIN VALVE WITH
1/2" NIPPLE AND CAP AT LOW
POINTS (TYP.)
CHARGE AIR OUT
CHARGE AIR IN
(3094 SCFM)
461°F
129°F120°F
149°F
INTERCOOLER IN
(120 GPM)
INTERCOOLER OUT
(120 GPM)
JACKET WATER IN (150 GPM)
JACKET WATER OUT (150 GPM)
190°F
210°F
SECOND FLOOR
3" DIA PIPE, SCH. 40
PRESSURE
GAUGE AND
THERMOMETER
3" NPT BUTTERFLY VALVE
USE VITON SEALS FOR
210° F OPERATION (TYP.)
3" X 16 LG FLANGED
FLEX (TYP.)
FURNISH AND INSTALL
METAL SLEEVES AND
RISER CLAMPS AT
FLOOR PENETRATIONS
(TYP.)
M-603
COOLANT PIPING DIAGRAM
N.T.S.
M-402
SURGE TANK AND
APPURTENANCES INTEGRAL TO
RADIATOR.
M E
C H
A N
IC
A
L
S C
H E
M A
T
IC
S
M-603
J
R U
T L E
D G
E
J
R U
T L E
D G
E H D
I_ M
-5 .D
W G
J
R U
T L E
D G
E S
O L
IC
IT
A T
IO
N
N O
P L
O T
S C
A L E
D R
A W
N B
Y
C K
D B
Y
D E
S
IG
N B
Y
D
2 3
C
4 5
A
B
IS
S
U E
D A
T E
S
IZ
E
S B
M T
B Y
F
IL
E N
A M
E
D E
S C
R
IP
T
IO
N D
A T
E
C O
N T
R A
C T
N O
M A
R K
A P
P R
F
IL
E N
U M
B E
R
"x
J U
N E
Fort Worth District
US Army Corps of Engineers ®
P L
O T
D A
T E
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
F O
R T
W O
R T
H D
IS
T
R
IC
T D
L A
G E
N E
R A
T O
R R
E P
L A
C E
M E
N T
H A
R T
-D O
L E
-I N
O U
Y E
F E
D C
E N
T E
R
SHEET
IDENTIFICATION
N M
IC
H
IG
A
N A
V E
S
U
IT
E
C H
IC
A
G O
IL
T
.6
.7 w w w .e x p fe d e ra l.
c o m
P R
O J N
O
C H
I-
-A
/3
/2
PROPERTY OF THE
UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
DO NOT REMOVE THIS NOTICE
PROPERLY DESTROY DOCUMENTS
WHEN NO LONGER NEEDED
A S
N O
T E
D
G G
O R
S L
IN
E
CERTIFIED FINAL
B
C O
E S
R E
V
IE
W
IN
T
E R
IM
D
E S
IG
N
R E
V
IE
W
D
E S
IG
N
R E
V
IE
W
/1 /1
/1 /1
/0 /1
B
C O
E S
B A
C K
C H
E C
K
/0
/1
C E
R T
IF
IE
D F
IN
A
L
/3
/1
W
X
K -1
-R
-0
LINE ITEM
W
1X K
-1 8-
R -0
1X K
-1 8-
R -0
FAN COIL UNIT SCHEDULE
UNIT CAPACITY DESIGN CONDITIONS PERFORMANCE DATA
ELEC. DATA
REMARKS
NO.
BASIS
OF
DESIGN
MODEL #
NOMINAL
COOLING
CAPACITY
(BTU/H)
NOMINAL
HEATING
CAPACITY
(BTU/H)
COOLING
DESIGN
ENTERING
TEMP
DB/WB (F)
COOLING
DIVERSITY
COOLING
TOTAL
CAPACITY
(BTU/H)
COOLING
SENSIBLE
CAPACITY
(BTU/H)
HEATING
CAPACITY
(BTU/H)
EST.
COOLING
COIL LAT
(F) VOLTAGE PHASE
POWER
INPUT
(KW)
MCA/
MOP
WEIGHT
FCU-1 CARRIER 42DF03 9,000 N/A
HEATING
DESIGN
ENTERING
TEMP
DB/WB (F)
80/67 70 FULL DEMAND
HEATING
DIVERSITY
N/A
COIL INLET
/ OUTLET /
DRAIN /
TELL-TALE
(INCH)
5/8 - 5/8 - 7/8
- 5/8
EST.
HEATING
COIL LAT
(F)
9000 6300 NA 61.5 NA
NOMINAL
AIRFLOW
(CFM)
SPL PER
FAN
SPEED
(dBA)
300 46-51-61
FAN DATA
120 1 0.09 0.35/15
TYPE
DUCTED
CEILING
MOUNT
REMARKS:
1. HYDRONIC COOLING ONLY. PROVIDE CONTAINMENT AND LEAK DETECTION ON HYDRONIC PIPING.
2. PROVIDE CONDENSATE PAN, DRAIN, AND LEAK DETECTOR.
3. PROVIDE 2-HOUR RATED FIRESTOP SYSTEMS ON ALL PENETRATIONS.
4. PROVIDE LOCAL THERMOSTAT TO CONTROL FAN COIL UNIT START/STOP. START ON TEMPERATURE ABOVE 75 DEGREES
(ADJ). AUTOMATIC STOP AFTER 15 MINUTES (ADJ).
157 1-6
PIPING
FCU-2 CARRIER 42DF03 9,000 N/A 80/67 70 FULL DEMAND N/A
5/8 - 5/8 - 7/8
- 5/8
9000 6300 NA 61.5 NA 300 46-51-61 120 1 0.09 0.35/15
DUCTED
CEILING
MOUNT
157 1-6
TAG LOCATION BASIS OF DESIGN DRIVE CFM ESP (IN. WG) TSP (IN. WG) FAN RPM BHP V/C/P SONES (INLET) NOTES
EF-1 GREENHECK CSP-A110 DIRECT 90 0.327 950 0.01 115/60/1 1.4 1, 2, 3
NOTES:
1. BACKDRAFT DAMPER, GRAVITY OPERATED
2. SOLID STATE SPEED CONTROL, FACTORY MOUNTED
FAN SCHEDULE
1A-SB-14
TAG LOCATION BASIS OF DESIGN UNIT CAPACITY CFM CONDENSATE (LBS/HR) STEAM TEMP FAN RPM MOTOR HP V/C/P NOTES
UH-1 UHS-042 42 MBH 595 42 250 F 1550 1/40 115/60/1 1, 2, 3, 4
NOTES:
1. VARIABLE SPEED CONTROLLER
2. WALL MOUNTED THERMOSTAT
STEAM UNIT HEATER SCHEDULE
2B-B-1B
FINAL AIR TEMP
124 F
3. PROVIDE ELECTRICAL DISCONNECT SWITCH.
5. PROVIDE ELECTRICAL DISCONNECT SWITCH.
3. PROVIDE ELECTRICAL DISCONNECT SWITCH.
BELT 0.6 0.6 10 480/60/3 55 1, 3, 4BASEMENT GEN RM GREENHECK SBS-3H60
4. PROVIDE WALL HOUSING AND ASSOCIATED WALL SUPPORTS BY MANUFACTURER.
SERVES
EXHAUST
VF-2 BELT 42400 0.6 0.6 603 10 480/60/3 55 1, 3, 4BASEMENT GEN RM SUPPLY
0.10
6. MANUFACTURER PROVIDED UNIT INTEGRAL CONTROLLER WITH BAS CONNECTION.
4. MANUFACTURER PROVIDED UNIT INTEGRAL CONTROLLER WITH BAS CONNECTION.
VF-1 42400SUPPLY
GREENHECK SBS-3H60
S O
L
IC
IT
A
T
IO
N N
O
P L
O T
S C
A L E
D R
A W
N B
Y
C K
D B
Y
D E
S
IG
N B
Y
D
2 3
C
4 5
A
B
IS
S
U E
D A
T E
S
IZ
E
S B
M T
B Y
F
IL
E N
A M
E
D E
S C
R
IP
T
IO
N D
A T
E
C O
N T
R A
C T
N O
M A
R K
A P
P R
F
IL
E N
U M
B E
R
"x
J U
N E
Fort Worth District
US Army Corps of Engineers ®
P L
O T
D A
T E
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
F O
R T
W O
R T
H D
IS
T
R
IC
T D
L A
G E
N E
R A
T O
R R
E P
L A
C E
M E
N T
H A
R T
-D O
L E
-I N
O U
Y E
F E
D C
E N
T E
R
SHEET
IDENTIFICATION
N M
IC
H
IG
A
N A
V E
S
U
IT
E
C H
IC
A
G O
IL
T
.6
.7 w w w .e x p fe d e ra l.
c o m
P R
O J N
O
C H
I-
-A
/3
/2
PROPERTY OF THE
UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
DO NOT REMOVE THIS NOTICE
PROPERLY DESTROY DOCUMENTS
WHEN NO LONGER NEEDED
A S
N O
T E
D
G G
O R
S L
IN
E
CERTIFIED FINAL
B
C O
E S
R E
V
IE
W
IN
T
E R
IM
D
E S
IG
N
R E
V
IE
W
D
E S
IG
N
R E
V
IE
W
/1 /1
/1 /1
/0 /1
B
C O
E S
B A
C K
C H
E C
K
/0
/1
C E
R T
IF
IE
D F
IN
A
L
/3
/1
W
X
K -1
-R
-0
M E
C H
A N
IC
A
L
S C
H E
D U
L E
S
M-702
S
B A
R R
E T
T
S
B A
R R
E T
T
H D
I_ M
-7 .D
W G
J
R U
T L E
D G
E
GENERATOR COOLING
SERVICE
BUILDING 5 ROOFRR-1
LOCATIONTAG
REMOTE RADIATOR
REMARKS
REMARKS:
1. PROVIDE WITH DISCONNECT BY MANUFACTURER.
2. PROVIDE WITH MOTOR STARTER BY MANUFACTURER.
3. PROVIDE UNIT CLEARANCES AS RECOMMENDED BY
MANUFACTURER.
4. INTERLOCK WITH GENERATOR OPERATION.
1-410
FAN
HP
GENERATOR COOLINGBUILDING 5 ROOFRR-2 1-410
RADIATORS SHALL BE SIZED AND
SUPPLIED BY THE GENERATOR
MANUFACTURER
RR
480/3/60
V/C/P
480/3/60
W
1X K
-1 8-
R -0
F1
CB
T
SPD
C
LCP
M
K
VFD
3a
F1 3a
F1 3a
F1 3a
OS
ab
OHP
PB
OR
S1 3a
J
J
J
J b
3W
PC
D b ab
TC
VS
OS
F1 3a
J
S O
L
IC
IT
A
T
IO
N N
O
P L
O T
S C
A L E
D R
A W
N B
Y
C K
D B
Y
D E
S
IG
N B
Y
D
2 3
C
4 5
A
B
IS
S
U E
D A
T E
S
IZ
E
S B
M T
B Y
F
IL
E N
A M
E
D E
S C
R
IP
T
IO
N D
A T
E
C O
N T
R A
C T
N O
M A
R K
A P
P R
F
IL
E N
U M
B E
R
"x
J U
N E
Fort Worth District
US Army Corps of Engineers ®
P L
O T
D A
T E
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
F O
R T
W O
R T
H D
IS
T
R
IC
T D
L A
G E
N E
R A
T O
R R
E P
L A
C E
M E
N T
H A
R T
-D O
L E
-I N
O U
Y E
F E
D C
E N
T E
R
SHEET
IDENTIFICATION
N M
IC
H
IG
A
N A
V E
S
U
IT
E
C H
IC
A
G O
IL
T
.6
.7 w w w .e x p fe d e ra l.
c o m
P R
O J N
O
C H
I-
-A
/3
/2
PROPERTY OF THE
UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
DO NOT REMOVE THIS NOTICE
PROPERLY DESTROY DOCUMENTS
WHEN NO LONGER NEEDED
A S
N O
T E
D
G G
O R
S L
IN
E
CERTIFIED FINAL
B
C O
E S
R E
V
IE
W
IN
T
E R
IM
D
E S
IG
N
R E
V
IE
W
D
E S
IG
N
R E
V
IE
W
/1 /1
/1 /1
/0 /1
B
C O
E S
B A
C K
C H
E C
K
/0
/1
C E
R T
IF
IE
D F
IN
A
L
/3
/1
W
X
K -1
-R
-0
E L E
C T
R
IC
A L
S Y
M B
O L S
E-001
G
G O
R S
L
IN
E
J H
U E
R T
A
H D
I_ E
-0 .D
W G
B
B R
E U
N
IG
ELECTRICAL
SLIDE DIMMER
FLEXIBLE CONDUIT, 6FT MAXIMUM, UNO
NONFUSED DISCONNECT SWITCH WITH LIQUID TIGHT
FLEXIBLE CONDUIT AND FINAL CONNECTION
CIRCUIT BREAKER THERMAL MAGNETIC TRIP
UNLESS NOTED OTHERWISE
THREE WAY TOGGLE SWITCH
WHERE SHOWN, ARROWHEAD DENOTES HOME RUN TO
PANEL BOARD; SLASH LINES INDICATE QUANTITY OF
WIRES, NEUTRAL WIRE SHOWN AS A LONG LINE PHASE
WIRE AND SWITCH LEGS SHOWN AS SHORT LINES, AND
GROUND WIRE SHOWN AS A LONG LINE WITH A DOT.
REFER TO E002 NOTES FOR BRANCH CIRCUIT WIRING.
POLE MOUNTED SITE LIGHT
GFCI
JUNCTION BOX WITH BLANK COVER
DUPLEX RECEPTACLE MOUNTED IN FLUSH FLOOR BOX
DUPLEX RECEPTACLE FOR WORLD CLOCK
WALL MOUNTED JUNCTION BOX WITH BLANK
COVER
120V, 20A CIRCUIT FOR OVERHEAD PROJECTOR
WEATHER PROOF WHILE IN USE ENCLOSURE WITH
GROUND FAULT CIRCUIT INTERRUPTER DUPLEX
RECEPTACLE
FUSED DISCONNECT SWITCH WITH LIQUID TIGHT
FLEXIBLE CONDUIT AND FINAL CONNECTION
LIGHTING CONTACTOR
SURGE PROTECTIVE DEVICE
LIGHTING CONTROL PANEL
DOUBLE DUPLEX RECEPTACLE WITH COMMON COVER
PLATE, WHERE TWO (2) CIRCUITS SHOWN, EACH
DUPLEX ON A SEPARATE CIRCUIT
DOUBLE DUPLEX RECEPTACLE MOUNTED IN FLUSH FLOOR
BOX
GROUND FAULT CIRCUIT INTERRUPTER DUPLEX
RECEPTACLE
SPECIAL RECEPTACLE, NEMA RATING AS INDICATED ON
DRAWING
BRANCH CIRCUIT PANELBOARD
RP
MP MECHANICAL POWER PANELBOARD
POWER PANELBOARD
RECEPTACLE PANELBOARD
LIGHTING PANELBOARDLP
UP
PP
UPS RECEPTACLE PANELBOARD
DP DISTRIBUTION PANELBOARD
UP/DOWN/STOP PUSHBUTTON CONTROL
STATION
VARIABLE FREQUENCY DRIVE
COMBINATION MAGNETIC MOTOR STARTER AND
DISCONNECTING MEANS WITH OVERCURRENT DEVICE
MOTOR (REFER TO MECH DRAWINGS FOR REQUIREMENTS)
PROVIDE LIQUIDTIGHT FLEX CONNECTION AND JUNCTION
BOX
SINGLE POLE TOGGLE SWITCH, 20A, 120277V, WALL
MOUNTED
"b" INDICATES SWITCH LEG
LOW VOLTAGE LIGHTING CONTROL WALLSTATION
DUPLEX RECEPTACLE, NEMA 520R, WALL MOUNTED
EMERGENCY POWER OFF SWITCH, RED MUSHROOM
TYPE WITH CLEAR PROTECTIVE COVER
120V, 20A CIRCUIT FOR MOTORIZED PROJECTION SCREEN
EXOTHERMIC WELD CONNECTION OR LISTED IRREVERSIBLE
HIGH COMPRESSION FITTING
RECEPTACLE ON UPS PANEL
POKETHROUGH COMBINATION DUPLEX RECEPTACLE AND
TELECOMMUNICATION OUTLET (REFER TO TELECOM
DRAWINGS FOR TELE/DATA DEVICE REQUIREMENTS)
POKETHROUGH COMBINATION DOUBLE DUPLEX
RECEPTACLE AND TELECOMMUNICATION OUTLET (REFER
TO TELECOM DRAWINGS FOR TELE/DATA DEVICE
REQUIREMENTS)
F1
F1E
2x4 NORMAL POWER
REFER TO LIGHTING FIXTURE SCHEDULE
FIXTURE TAGS:
"F1" INDICATES FIXTURE TYPE, "3" INDICATES CIRCUIT
NUMBER, "a" INDICATES SWITCH LEG
EXIT SIGNS: SHADING INDICATES ILLUMINATED FACE,
ARROW INDICATES CHEVRON DIRECTION,
"5" INDICATES CIRCUIT NUMBER
LOW VOLTAGE LIGHTING CONTROL WALLSTATION
"D" INDICATES DIMMING CONTROL
ab
HB
NO TEXT INDICATES DUAL TYPE,
"HB" INDICATES HIGH BAY INFRARED
TYPE,
"IR" INDICATES INFRARED ONLY TYPE
MPS
ST
DUPLEX RECEPTACLE FOR TELEVISION, 54" AFF
UNO
J FLUSH FLOOR BOX WITH COVERJ
LIGHTING SYMBOLS
WIRING AND RACEWAY SYMBOLS
LIGHTING CONTROL SYMBOLS
D
TOGGLE SWITCH WITH WEATHERPROOF NEMA 3R COVER
WP
THREE POSITION MOMENTARY CONTACT SWITCH
MC
TOGGLE SWITCH WITH PILOT LIGHT
P
SINGLE PHASE MANUAL MOTOR STARTER SWITCH WITH
THERMAL OVERLOAD ELEMENT, "TP" INDICATES PILOT
LIGHT
T
FAN CONTROL STATION
F
DIGITAL PUSHBUTTON TIME SWITCH WITH MAXIMUM
DURATION OF 30 MINUTES
TM
ASTRONOMIC TIME CLOCK
VACANCY SENSOR, CEILING MOUNTED COMPLETE WITH
RELAY(S) AND CONNECTIONS
RECEPTACLE SYMBOLS
WP
U
DUPLEX RECEPTACLE MOUNTED ABOVE COUNTER TOP
3" ON CENTER ABOVE TOP OF BACKSPLASH
TV
CL
PANELBOARD SYMBOLS EQUIPMENT SYMBOLS MOTORS AND CONTROL SYMBOLS
ONE LINE SYMBOLS
MISCELLANEOUS SYMBOLSGROUNDING SYMBOLS
1x4 NORMAL POWER
DOWNLIGHT NORMAL POWER
STRIP LIGHT NORMAL POWER
NIGHT LIGHTS: SHADING INDICATES CONNECTION AHEAD
OF CONTROL SWITCHES, "E" INDICATES FIXTURE
INCLUDES EMERGENCY BACKUP
2x4 EMERGENCY POWER NIGHT LIGHT
1x4 NORMAL POWER NIGHT LIGHT
STRIP LIGHT NORMAL POWER NIGHT LIGHT
F1
DOWNLIGHT NORMAL POWER NIGHT LIGHT
EXIT SIGN CEILING MOUNTED
EXIT SIGN WALL MOUNTED, 6" ABOVE DOOR LEVEL,
UNO
OCCUPANCY SENSOR, CEILING MOUNTED
COMPLETE WITH RELAY(S) AND CONNECTIONS
MDP MAIN DISTRIBUTION PANELBOARD
SWBD SWITCHBOARD
MONUMENT FLOOR BOX WITH FLEX
MONUMENT FLOOR BOX WITH DUPLEX
120V, 20A CIRCUIT FOR MOTORIZED BLINDS
MB
SHUNT TRIP
KEY INTERLOCK
METER
POTENTIAL TRANSFORMER, RATING AS INDICATED
NORMALLY OPEN CONTACT
NORMALLY CLOSED CONTACT
PUSH BUTTON NORMALLY CLOSED
PUSH BUTTON NORMALLY OPEN
SELECTOR SWITCH N.O./N.C.
THERMAL OVERLOAD
SEPARABLE CONNECTORS
TRANSFORMER
CURRENT TRANSFORMER, RATING AS INDICATED
GROUND
FUSE
MAGNETIC MOTOR STARTER
TRANSFORMER
ENCLOSED CIRCUIT BREAKER
KEYED NOTE DESIGNATION
FEEDER TAG
EQUIPMENT TAG
LIGHTNING PROTECTION AIR TERMINAL
GROUND ROD
GROUND BAR
MISCELLANEOUS PANELS AND CABINETS
POWER DISTRIBUTION PANELBOARD
LETTERS INDICATE SWITCH LEGS
CONTROLLED. PROVIDE 13 POLE
RELAYS AS NECESSARY.
WALL MOUNTED WHEN INDICATED
CONDUIT STUBBED UP
CONDUIT STUBBED DOWN
CONDUIT STUBBED OUT WITH CAP
BUS DUCT FEEDER OR PLUGIN
PULL BOX
PHOTOCELL
SINGLE RECEPTACLE
REFER TO SHEET ED600 FOR ADDITIONAL
ONELINE SYMBOLS
EQUIPMENT FRONT
POINT OF CONNECTION BETWEEN
EXISTING AND NEW SYSTEMS
DUPLEX RECEPTACLE MOUNTED ON CEILING
W
1X K
-1 8-
R -0
1X K
-1 8-
R -0
L
IC
IT
A
T
IO
N N
O
P L
O T
S C
A L E
D R
A W
N B
Y
C K
D B
Y
D E
S
IG
N B
Y
D
2 3
C
4 5
A
B
IS
S
U E
D A
T E
S
IZ
E
S B
M T
B Y
F
IL
E N
A M
E
D E
S C
R
IP
T
IO
N D
A T
E
C O
N T
R A
C T
N O
M A
R K
A P
P R
F
IL
E N
U M
B E
R
"x
J U
N E
Fort Worth District
US Army Corps of Engineers ®
P L
O T
D A
T E
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
F O
R T
W O
R T
H D
IS
T
R
IC
T D
L A
G E
N E
R A
T O
R R
E P
L A
C E
M E
N T
H A
R T
-D O
L E
-I N
O U
Y E
F E
D C
E N
T E
R
SHEET
IDENTIFICATION
N M
IC
H
IG
A
N A
V E
S
U
IT
E
C H
IC
A
G O
IL
T
.6
.7 w w w .e x p fe d e ra l.
c o m
P R
O J N
O
C H
I-
-A
/3
/2
PROPERTY OF THE
UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
DO NOT REMOVE THIS NOTICE
PROPERLY DESTROY DOCUMENTS
WHEN NO LONGER NEEDED
A S
N O
T E
D
G G
O R
S L
IN
E
CERTIFIED FINAL
B
C O
E S
R E
V
IE
W
IN
T
E R
IM
D
E S
IG
N
R E
V
IE
W
D
E S
IG
N
R E
V
IE
W
/1 /1
/1 /1
/0 /1
B
C O
E S
B A
C K
C H
E C
K
/0
/1
C E
R T
IF
IE
D F
IN
A
L
/3
/1
W
X
K -1
-R
-0
E L E
C T
R
IC
A L
P H
A S
IN
G
N O
T E
S
E-003
G
G O
R S
L
IN
E
J H
U E
R T
A
H D
I_ E
-0 .D
W G
B
B R
E U
N
IG
ELECTRICAL
PROJECT PHASING NOTES
PROJECT IMPLEMENTATION WILL REQUIRE PHASING TO MAINTAIN THE
ELECTRICAL SYSTEM IN AN OPERATIONAL/FULLY READY STATE DURING
CONSTRUCTION ACTIVITIES PER NFPA 1014.6.10. THE CONTRACTOR IS
RESPONSIBLE FOR DETERMINING AND SUBMITTING FOR APPROVAL A
DETAILED PHASING PLAN THAT ALLOWS FOR THE PROJECT SCOPE WHILE
SUPPORTING THE NEED OF THE FEDERAL CENTER TO REMAIN FULLY
OPERATIONAL. THE PHASING NOTES INCLUDED HERE ARE FOR
REFERENCE DURING PRICING AND OFFER A POSSIBLE SOLUTION FOR
PHASING THE WORK OF THIS PROJECT.
STEP 1
IDENTIFY AND TRACE ALL LOADS FED FROM THE LOAD SIDE OF THE
EXISTING AUTOMATIC TRANSFER SWITCH, LOCATED IN THE PARALLELING
SWITCHGEAR ROOM. THOSE LOADS THAT SUPPORT THE EXISTING
GENERATOR PLANT SHALL REMAIN ASIS, INCLUDING FUEL PUMPS,
CRANKCASE HEATERS, BATTERY CHARGERS, AND LOADS IN THE EXISTING
GENERATOR, SWITCHGEAR, AND FUELING ROOMS INCLUDING HVAC,
LIGHTING, AND RECEPTACLES. LOADS THAT FEED DEVICES OUTSIDE OF
THE GENERATOR PLANT STRUCTURE THAT NEED TO REMAIN CONTINUOUS
DURING CONSTRUCTION SHALL BE TRANSFERRED TO OTHER DISTRIBUTION
PANELS.
STEP 2
THE EXISTING MAIN UPS SYSTEM WILL BE TESTED BY OTHERS.
COORDINATE WITH THE TESTING TEAM AND PROVIDE SUPPORT AS IT
RELATES TO THE GENERATOR REPLACEMENT PROJECT. UTILIZE
NECESSARY OUTAGES TO ACCOMPLISH WORK UNDER THIS CONTRACT AS
POSSIBLE.
STEP 3
PROVIDE TEMPORARY GENERATORS AND TEMPORARY PARALLELING
SWITCHGEAR TO FEED THE BUILDING LOAD, SIZED COMPARABLY TO THE
EXISTING GENERATOR PLANT. THE TEMPORARY GENERATORS SHALL BE
CONFIGURED IN A N+1 CONFIGURATION TO MATCH THE EXISTING
GENERATOR PLANT REDUNDANCY. PRIOR TO CONNECTION TO BUILDING
LOADS, PROVIDE LOAD BANK TESTING OF THE FULL SERVICE LOAD OF
THE TEMPORARY GENERATOR PLANT IN ACCORDANCE WITH NFPA 110.
STEP 4
THE TEMPORARY GENERATOR PLANT SHALL BE INTERCONNECTED WITH
THE EXISTING SYSTEM INCREMENTALLY TO MINIMIZE DISRUPTION TO
EXISTING GOVERNMENT OPERATIONS. GOVERNMENT REQUIREMENTS
NECESSITATE THE WEEKLY TESTING OF THE STANDBY POWER SYSTEM FOR
A USER INSIDE THE FACILITY. CONTRACTOR SHALL PROVIDE SUPPORT
FOR THIS TESTING WHILE THE TEMPORARY GENERATOR SYSTEM IS
OPERATIONAL, AND DURING THE TESTING PHASE OF THE NEW GENERATOR
PLANT. CONTRACTOR SHALL INCLUDE FUELING AND MAINTENANCE FOR
THE TEMPORARY GENERATOR PLANT TO SUPPORT GOVERNMENT ACTIVITIES.
STEP 5
PROVIDE TEMPORARY FEEDERS TO THE DEVICES THAT ARE FED BY THE
EXISTING PARALLELING SWITCHGEAR. INTERCEPT EXISTING FEEDERS AT
LOCATIONS OUTSIDE OF THE EXISTING GENERATOR ROOM AND
PARALLELING SWITCHGEAR ROOM WHERE POSSIBLE. THE FEEDERS TO
THE TWO STEPUP TRANSFORMERS IN THE PARALLELING SWITCHGEAR
ROOM WILL NEED TO ROUTE DIRECTLY TO THE TWO TRANSFORMERS.
SALVAGE AS MUCH LENGTH FROM THE MI CONDUCTORS FOR THE FIRE
PUMP EMERGENCY FEEDER AS POSSIBLE FOR REUSE, WITHOUT CUTTING
EXISTING FEEDER. MIGRATE FEEDERS TO THE TEMPORARY GENERATOR
P…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.