DLA_Generator_Drawings_RTA_Vol_2.pdf

PDF 10 MB Posted

Attached to
FY18 DLA Standby Generator Replacement Federal contract opportunity
Solicitation number
W911XK18R0011
Issued by
Department of the Army Corps of Engineers Engineering District Detroit

About this file

DLA GENERATOR DRAWINGS RTA VOL 2

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M-107

M-107

S O

L

IC

IT

A

T

IO

N N

O

P L

O T

S C

A L E

D R

A W

N B

Y

C K

D B

Y

D E

S

IG

N B

Y

D

2 3

C

4 5

A

B

IS

S

U E

D A

T E

S

IZ

E

S B

M T

B Y

F

IL

E N

A M

E

D E

S C

R

IP

T

IO

N D

A T

E

C O

N T

R A

C T

N O

M A

R K

A P

P R

F

IL

E N

U M

B E

R

"x

J U

N E

Fort Worth District

US Army Corps of Engineers ®

P L

O T

D A

T E

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

F O

R T

W O

R T

H D

IS

T

R

IC

T D

L A

G E

N E

R A

T O

R R

E P

L A

C E

M E

N T

H A

R T

-D O

L E

-I N

O U

Y E

F E

D C

E N

T E

R

SHEET

IDENTIFICATION

N M

IC

H

IG

A

N A

V E

S

U

IT

E

C H

IC

A

G O

IL

T

.6

.7 w w w .e x p fe d e ra l.

c o m

P R

O J N

O

C H

I-

-A

/3

/2

KEY PLAN

N.T.S.

N

PROPERTY OF THE

UNITED STATES GOVERNMENT

FOR OFFICIAL USE ONLY

DO NOT REMOVE THIS NOTICE

PROPERLY DESTROY DOCUMENTS

WHEN NO LONGER NEEDED

A S

N O

T E

D

G G

O R

S L

IN

E

CERTIFIED FINAL

2A

2B 2C

1A

1B

4A

EXTERIOR

VAULT

1C

UPS

B

C O

E S

R E

V

IE

W

IN

T

E R

IM

D

E S

IG

N

R E

V

IE

W

D

E S

IG

N

R E

V

IE

W

/1 /1

/1 /1

/0 /1

B

C O

E S

B A

C K

C H

E C

K

/0

/1

C E

R T

IF

IE

D F

IN

A

L

/3

/1

W

X

K -1

-R

-0

M E

C H

A N

IC

A

L

B U

IL

D

IN

G

A

S U

B B

A S

E M

E N

T

M E

C H

A N

IC

A

L P

L A

N

M-101

S

B A

R R

E T

T

S

B A

R R

E T

T

H D

I_ M

-1 .D

W G

J

R U

T L E

D G

E

M-101

BUILDING 1A SUB BASEMENT MECHANICAL PLAN

SCALE: 1/8"=1'-0"

true north

N 8'0 4' 16'

SCALE:1/8"=1'-0"

LINE ITEM

LINE ITEM

ROOM 1ASB01AROOM 1ASB01A

LINE ITEM

LINE ITEM

ROOM 1ASB13BROOM 1ASB13B

W

1X K

-1 8-

R -0

S O

L

IC

IT

A

T

IO

N N

O

P L

O T

S C

A L E

D R

A W

N B

Y

C K

D B

Y

D E

S

IG

N B

Y

D

2 3

C

4 5

A

B

IS

S

U E

D A

T E

S

IZ

E

S B

M T

B Y

F

IL

E N

A M

E

D E

S C

R

IP

T

IO

N D

A T

E

C O

N T

R A

C T

N O

M A

R K

A P

P R

F

IL

E N

U M

B E

R

"x

J U

N E

Fort Worth District

US Army Corps of Engineers ®

P L

O T

D A

T E

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

F O

R T

W O

R T

H D

IS

T

R

IC

T D

L A

G E

N E

R A

T O

R R

E P

L A

C E

M E

N T

H A

R T

-D O

L E

-I N

O U

Y E

F E

D C

E N

T E

R

SHEET

IDENTIFICATION

N M

IC

H

IG

A

N A

V E

S

U

IT

E

C H

IC

A

G O

IL

T

.6

.7 w w w .e x p fe d e ra l.

c o m

P R

O J N

O

C H

I-

-A

/3

/2

KEY PLAN

N.T.S.

N

PROPERTY OF THE

UNITED STATES GOVERNMENT

FOR OFFICIAL USE ONLY

DO NOT REMOVE THIS NOTICE

PROPERLY DESTROY DOCUMENTS

WHEN NO LONGER NEEDED

A S

N O

T E

D

G G

O R

S L

IN

E

CERTIFIED FINAL

2A

2B 2C

1A

1B

4A

EXTERIOR

VAULT

1C

UPS

B

C O

E S

R E

V

IE

W

IN

T

E R

IM

D

E S

IG

N

R E

V

IE

W

D

E S

IG

N

R E

V

IE

W

/1 /1

/1 /1

/0 /1

B

C O

E S

B A

C K

C H

E C

K

/0

/1

C E

R T

IF

IE

D F

IN

A

L

/3

/1

W

X

K -1

-R

-0

M E

C H

A N

IC

A

L

B U

IL

D

IN

G

B

A S

E M

E N

T

M E

C H

A N

IC

A

L P

L A

N

M-102

S

B A

R R

E T

T

S

B A

R R

E T

T

H D

I_ M

-1 .D

W G

J

R U

T L E

D G

E

M-102

BUILDING 2 BASEMENT MECHANICAL PLAN

SCALE: 1/8"=1'-0" 8'0 4' 16'

SCALE:1/8"=1'-0"

true north N

1. REFER TO SHEET M-001 FOR GENERAL NOTES

AND ABBREVIATIONS.

2. BUILDING 2 SLAB CORING AND DRILLING SHALL

NOT PROCEED UNTIL THE MAIN SLAB

REINFORCING CABLES HAVE BEEN LOCATED BY

MEANS OF RADIOGRAPHIC TECHNIQUE OR OTHER

EFFECTIVE MEANS. THE CABLES CONSIST OF

SEVEN NO. 9 GALVANIZED IRON WIRES, PLACED

APPROXIMATELY 13 INCHES APART, SPANNING IN

THE EAST/WEST DIRECTION. HOLES SHALL

MAINTAIN MINIMUM CLEARANCE OF 1.0 INCH FROM

FACE OF CABLE.

GENERAL NOTES

LINE ITEM

LINE ITEM

LINE ITEM

W

1X K

-1 8-

R -0

W

1X K

-1 8-

R -0

FURNISH AND INSTALL

NEW 1 1/2" CONDENSATE

RETURN PIPE AT 10' AFF

1 1/2" CONDENSATE RETURN

PIPE TO REMAIN 1 1/2" STEAM SUPPLY PIPE

TO REMAIN

1 1/2" CONDENSATE RETURN

RISER TO REMAIN

FURNISH AND INSTALL

NEW 1 1/2" STEAM

SUPPLY PIPE AT 10' AFF

M E

C H

A N

IC

A

L

B U

IL

D

IN

G

B

A S

E M

E N

T

M E

C H

A N

IC

A

L P

L A

N

M-104

S

B A

R R

E T

T

H D

I_ M

-1 .D

W G

J

R U

T L E

D G

E

M-104

BUILDING 5 BASEMENT MECHANICAL PLAN

SCALE: 1/8"=1'-0"

true north

N

8'0 4' 16'

SCALE:1/8"=1'-0"

S O

L

IC

IT

A

T

IO

N N

O

P L

O T

S C

A L E

D R

A W

N B

Y

C K

D B

Y

D E

S

IG

N B

Y

D

2 3

C

4 5

A

B

IS

S

U E

D A

T E

S

IZ

E

S B

M T

B Y

F

IL

E N

A M

E

D E

S C

R

IP

T

IO

N D

A T

E

C O

N T

R A

C T

N O

M A

R K

A P

P R

F

IL

E N

U M

B E

R

"x

J U

N E

Fort Worth District

US Army Corps of Engineers ®

P L

O T

D A

T E

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

F O

R T

W O

R T

H D

IS

T

R

IC

T D

L A

G E

N E

R A

T O

R R

E P

L A

C E

M E

N T

H A

R T

-D O

L E

-I N

O U

Y E

F E

D C

E N

T E

R

SHEET

IDENTIFICATION

N M

IC

H

IG

A

N A

V E

S

U

IT

E

C H

IC

A

G O

IL

T

.6

.7 w w w .e x p fe d e ra l.

c o m

P R

O J N

O

C H

I-

-A

/3

/2

KEY PLAN

N.T.S.

N

PROPERTY OF THE

UNITED STATES GOVERNMENT

FOR OFFICIAL USE ONLY

DO NOT REMOVE THIS NOTICE

PROPERLY DESTROY DOCUMENTS

WHEN NO LONGER NEEDED

A S

N O

T E

D

G G

O R

S L

IN

E

CERTIFIED FINAL

2A

2B 2C

1A

1B

4A

EXTERIOR

VAULT

1C

UPS

B

C O

E S

R E

V

IE

W

IN

T

E R

IM

D

E S

IG

N

R E

V

IE

W

D

E S

IG

N

R E

V

IE

W

/1 /1

/1 /1

/0 /1

B

C O

E S

B A

C K

C H

E C

K

/0

/1

C E

R T

IF

IE

D F

IN

A

L

/3

/1

W

X

K -1

-R

-0

KEY NOTES

1. REFER TO SHEET M-001 FOR GENERAL NOTES

AND ABBREVIATIONS.

2. REFER TO M-600 FOR EQUIPMENT SCHEDULES.

GENERAL NOTES

LOW PRESSURE STEAM SUPPLY PIPING SHALL BE

BLACK SCHEDULE 40 STEEL. PIPE SHALL BE

INSULATED WITH 1" FIBERGLASS INSULATION

AND MARKED "STEAM SUPPLY".

CONDENSATE RETURN PIPING SHALL BE BLACK

SCHEDULE 80 STEEL. PIPE SHALL BE INSULATED

WITH 1" FIBERGLASS INSULATION AND MARKED

"CONDENSATE RETURN".

NEW RISERS SHALL BE SLOPED IN ORDER TO

ROUTE CONDENSATE FROM NEW STEAM SUPPLY

RISER AND NEW CONDENSATE RETURN RISER TO

DRAIN TO EXISTING STEAM TRAP LOCATED NEAR

THE POINT OF CONNECTION TO EXISTING PIPING.

EXISTING 60 HP COOLING TOWER WATER PUMPS.

REPLACE MOTOR CONTROLLERS WITH VARIABLE

FREQUENCY DRIVES. SEQUENCE OF OPERATION

TO MATCH EXISTING START/STOP CONDITIONS

AT BAS WITH SOFT START FROM 0% TO 100%

UPON PUMP RUN SIGNAL. MOTOR COMPATIBILITY

WITH VFD SHALL BE CONFIRMED.

LINE ITEM

ROOM 5B7

LINE ITEM

W

1X K

-1 8-

R -0

FURNISH AND INSTALL

NEW 1" CHILLED WATER

PIPE AT 11'6" AFF

STEAM UNIT HEATER AND ALL

RELATED APPURTENANCES TO

REMAIN

STEAM UNIT HEATER AND ALL

RELATED APPURTENANCES TO

REMAIN

CENTRIFUGAL CHILLER TO

REMAIN (TYPICAL)

CHILLED WATER PUMP TO

REMAIN (TYPICAL)

FURNISH AND INSTALL

NEW 1 1/2" STEAM

SUPPLY PIPE AT 11'6"

AFF

FURNISH AND INSTALL

NEW PIPE AT 11'6" AFF

EXHAUST FAN TO REMAIN

FURNISH AND INSTALL

NEW LOUVER AT 10' AFF

M E

C H

A N

IC

A

L

B U

IL

D

IN

G

F

IR

S

T F

L O

O R

M E

C H

A N

IC

A

L P

L A

N

M-105

S

B A

R R

E T

T

S

B A

R R

E T

T

H D

I_ M

-1 .D

W G

J

R U

T L E

D G

E

M-105

BUILDING 5 FIRST FLOOR MECHANICAL PLAN

SCALE: 1/8"=1'-0"

S O

L

IC

IT

A

T

IO

N N

O

P L

O T

S C

A L E

D R

A W

N B

Y

C K

D B

Y

D E

S

IG

N B

Y

D

2 3

C

4 5

A

B

IS

S

U E

D A

T E

S

IZ

E

S B

M T

B Y

F

IL

E N

A M

E

D E

S C

R

IP

T

IO

N D

A T

E

C O

N T

R A

C T

N O

M A

R K

A P

P R

F

IL

E N

U M

B E

R

"x

J U

N E

Fort Worth District

US Army Corps of Engineers ®

P L

O T

D A

T E

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

F O

R T

W O

R T

H D

IS

T

R

IC

T D

L A

G E

N E

R A

T O

R R

E P

L A

C E

M E

N T

H A

R T

-D O

L E

-I N

O U

Y E

F E

D C

E N

T E

R

SHEET

IDENTIFICATION

N M

IC

H

IG

A

N A

V E

S

U

IT

E

C H

IC

A

G O

IL

T

.6

.7 w w w .e x p fe d e ra l.

c o m

P R

O J N

O

C H

I-

-A

/3

/2

KEY PLAN

N.T.S.

N

PROPERTY OF THE

UNITED STATES GOVERNMENT

FOR OFFICIAL USE ONLY

DO NOT REMOVE THIS NOTICE

PROPERLY DESTROY DOCUMENTS

WHEN NO LONGER NEEDED

A S

N O

T E

D

G G

O R

S L

IN

E

CERTIFIED FINAL

2A

2B 2C

1A

1B

4A

EXTERIOR

VAULT

1C

UPS

B

C O

E S

R E

V

IE

W

IN

T

E R

IM

D

E S

IG

N

R E

V

IE

W

D

E S

IG

N

R E

V

IE

W

/1 /1

/1 /1

/0 /1

B

C O

E S

B A

C K

C H

E C

K

/0

/1

C E

R T

IF

IE

D F

IN

A

L

/3

/1

W

X

K -1

-R

-0

KEY NOTES

1. REFER TO SHEET M-001 FOR GENERAL NOTES

AND ABBREVIATIONS.

GENERAL NOTES

LOW PRESSURE STEAM SUPPLY PIPING SHALL BE

BLACK SCHEDULE 40 STEEL. PIPE SHALL BE

INSULATED WITH 1" FIBERGLASS INSULATION

AND MARKED "STEAM SUPPLY".

CONDENSATE RETURN PIPING SHALL BE BLACK

SCHEDULE 80 STEEL. PIPE SHALL BE INSULATED

WITH 1" FIBERGLASS INSULATION AND MARKED

"CONDENSATE RETURN".

CHILLED WATER LINES SHALL BE SCHEDULE 40

STEEL PIPES. PIPE SHALL BE INSULATED WITH 1

1/2" FIBERGLASS INSULATION AND PAINTED

GREEN TO MATCH EXISTING CONDITIONS.

INSULATION SHALL BE ALUMINUM JACKETED

FROM FLOOR PENETRATION TO 4' AFF. SEE

SHEET M-104 FOR CONTINUATION OF PIPE UNDER

FLOOR

FURNISH AND INSTALL NEW FUEL TANK

MONITORING SYSTEM.

LINE ITEM 0001.

LINE ITEM

ROOM 5221

LINE ITEM

W

1X K

-1 8-

R -0

1X K

-1 8-

R -0

1/2" CONDENSATE RETURN

LINE AT 6'0" AFF TO REMAIN

3" CONDENSATE

RETURN LINE

AT 3'0" AFF TO

REMAIN

1/2" PIPE SHALL BE CONNECTED TO

3" PIPE OUTSIDE NEW ELECTRICAL

ROOM

EXISTING DUCT TO REMAIN

8" EXHAUST DUCT TO BE

FURNISHED AND INSTALLED

AT 11'0" AFF. PROVIDE NEW

ALUMINUM ROOF CAP

12X8

3" BLACK SCHEDULE 40

STEEL PIPE TO BE

REPLACED IN KIND AT 12'6"

AFF

DRIP PAN TO BE

FURNISHED AND

INSTALLED

EF

FD

3/4" PVC DRAIN LINE

L

FD

FCU

1/2" INSULATED COPPER

PIPE TO REMAINFLEXIBLE

DOMESTIC COLD

WATER PIPE TO

REMAIN

FLEXIBLE DOMESTIC HOT

WATER PIPE TO REMAIN

CHILLED WATER/GLYCOL SUPPLY TO

REMAIN

CHILLED WATER/GLYCOL RETURN

TO REMAIN

SANITARY

SEWER PIPE TO

REMAIN

UNIDENTIFIED 2 1/2"

PIPE TO REMAIN

FD

HEATING HOT WATER

SUPPLY TO REMAIN

HEATING HOT WATER

RETURN TO REMAIN

EXISTING FLOOR DRAIN

3/4" PVC DRAIN LINE

EXISTING DUCT TO REMAIN

EXISTING DUCT TO REMAIN

L

FD

S O

L

IC

IT

A

T

IO

N N

O

P L

O T

S C

A L E

D R

A W

N B

Y

C K

D B

Y

D E

S

IG

N B

Y

D

2 3

C

4 5

A

B

IS

S

U E

D A

T E

S

IZ

E

S B

M T

B Y

F

IL

E N

A M

E

D E

S C

R

IP

T

IO

N D

A T

E

C O

N T

R A

C T

N O

M A

R K

A P

P R

F

IL

E N

U M

B E

R

"x

J U

N E

Fort Worth District

US Army Corps of Engineers ®

P L

O T

D A

T E

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

F O

R T

W O

R T

H D

IS

T

R

IC

T D

L A

G E

N E

R A

T O

R R

E P

L A

C E

M E

N T

H A

R T

-D O

L E

-I N

O U

Y E

F E

D C

E N

T E

R

SHEET

IDENTIFICATION

N M

IC

H

IG

A

N A

V E

S

U

IT

E

C H

IC

A

G O

IL

T

.6

.7 w w w .e x p fe d e ra l.

c o m

P R

O J N

O

C H

I-

-A

/3

/2

KEY PLAN

N.T.S.

N

PROPERTY OF THE

UNITED STATES GOVERNMENT

FOR OFFICIAL USE ONLY

DO NOT REMOVE THIS NOTICE

PROPERLY DESTROY DOCUMENTS

WHEN NO LONGER NEEDED

A S

N O

T E

D

G G

O R

S L

IN

E

CERTIFIED FINAL

2A

2B 2C

1A

1B

4A

EXTERIOR

VAULT

1C

UPS

B

C O

E S

R E

V

IE

W

IN

T

E R

IM

D

E S

IG

N

R E

V

IE

W

D

E S

IG

N

R E

V

IE

W

/1 /1

/1 /1

/0 /1

B

C O

E S

B A

C K

C H

E C

K

/0

/1

C E

R T

IF

IE

D F

IN

A

L

/3

/1

W

X

K -1

-R

-0

M E

C H

A N

IC

A

L

B U

IL

D

IN

G

A

S U

B B

A S

E M

E

L A

R G

E D

R O

O M

P L A

N S

M-107

S

B A

R R

E T

T

S

B A

R R

E T

T

H D

I_ M

-1 .D

W G

J

R U

T L E

D G

E true north

N

FURNISH AND INSTALL DRIP PAN LOCATED

BELOW THE 3" STEAM PIPE. SEE SHEET M-502

DETAIL 3 FOR INSTALLATION DETAIL.

ROUTE PVC DRAIN LINE TO EXISTING SINK

LOCATED IN ROOM 1A-SB-14 WITH 1/8" SLOPE PER

FOOT. APPROXIMATELY 30' OF 1" PVC PIPE.

DUCT SHALL BE MARKED AS "ABANDONED IN

PLACE".

INSTALL NEW FAN COIL UNIT NEARLY FLUSH WITH

THE CEILING. CONNECT TO BAS. SEE SHEET

M-502 DETAIL 1 FOR INSTALLATION DETAILS.

INSTALL THERMOSTAT AT 48" AFF.

EXISTING AIR HANDLING UNIT (AHU-9), LOCATED

IN 1A-SB-02, SHALL BE TESTED BEFORE

DEMOLITION TO DETERMINE AIRFLOW TO EACH

SUPPLY DIFFUSER. AFTER DEMOLITION, SYSTEM

SHALL BE RE-BALANCED SO THAT THE SUPPLY

DIFFUSER SHALL ACCOUNT FOR AIRFLOW

ORIGINALLY SUPPLIED BY THE DEMOLISHED

DIFFUSER.

ROUTE 3/4" PVC CONDENSATE DRAIN LINE TO

EXISTING FLOOR DRAIN. APPROXIMATELY 10' OF

3/4" PVC PIPE. SEE SHEET M-502 DETAIL 4 FOR

INSTALLATION DETAILS.

ROUTE DUCTWORK OVER EXISTING CHILLED

WATER LINES AND INTO NEW ELECTRICAL ROOM.

INSTALL LOUVER, 3 HR FIRE DAMPER, AND BIRD

SCREEN IN CMU WALL AT 7' AFF. CONNECT TO

BAS. SEE SHEET M-503 DETAIL 1 FOR

INSTALLATION DETAILS.

FURNISH AND INSTALL 1" FIBERGLASS

INSULATION ON NEW PIPE SECTION AND LABEL

"CONDENSATE RETURN".

FURNISH AND INSTALL 1" FIBERGLASS

INSULATION ON 3" BLACK STEEL PIPE.

FURNISH AND INSTALL 1" FIBERGLASS

INSULATION ON PIPE.

KEY NOTES

1. REFER TO SHEET M-001 FOR GENERAL NOTES

AND ABBREVIATIONS.

2. ALL DUCTWORK SHALL BE CONSTRUCTED TO

SMACNA SEAL CLASS A.

GENERAL NOTES

TYP.

M-107

ROOM 1A-SB-13B ENLARGED MECHANICAL PLAN

SCALE: 1/4"=1'-0"

M-101

M-107

ROOM 1A-SB-01A ENLARGED MECHANICAL PLAN

SCALE: 1/4"=1'-0"

M-101

SCALE: 1/4"=1'-0"

LINE ITEM

LINE ITEM

LINE ITEM

LINE ITEM

LINE ITEM

LINE ITEM

LINE ITEM

LINE ITEM

LINE ITEM

LINE ITEM

LINE ITEM

LINE ITEM

LINE ITEM

LINE ITEM

DETAIL 2DETAIL 2DETAIL 2DETAIL 2DETAIL 2DETAIL 2DETAIL 2DETAIL 2DETAIL 2DETAIL 2DETAIL 2DETAIL 2DETAIL 2DETAIL 2

LINE ITEM

LINE ITEM

LINE ITEM

LINE ITEM

LINE ITEM

LINE ITEM

LINE ITEM

LINE ITEM

LINE ITEM

LINE ITEM

LINE ITEM

LINE ITEM

LINE ITEM

LINE ITEM

DETAIL 1DETAIL 1DETAIL 1DETAIL 1DETAIL 1DETAIL 1DETAIL 1DETAIL 1DETAIL 1DETAIL 1DETAIL 1DETAIL 1DETAIL 1DETAIL 1

W

1X K

-1 8-

R -0

88"X110"

EXHAUST

LOUVER

L

L

L

L

M

M

M

M

C D

-1 ,2

C D

-3 ,4

CD-5,6

M

M

88"X110"

EXHAUST

LOUVER

CD-7,8

VF

VF

M

M

1. REFER TO M-001 FOR SYMBOLS AND ABBREVIATIONS.

2. UNDER NO CIRCUMSTANCES SHALL ANY WELDING BE

DONE ON THE GENERATOR/ENGINE UNLESS THE PATH

TO GROUND IS SITUATED SUCH THAT THERE IS NO

DIRECT ELECTRICAL PATH THROUGH THE CRANKSHAFT

OR ANY ROTATING COMPONENTS.

GENERAL NOTES

M E

C H

A N

IC

A

L

B U

IL

D

IN

G

B

A S

E M

E N

T

E N

L A

R G

E D

M E

C H

A N

IC

A

L P

L A

N

M-401

J

R U

T L E

D G

E

J

M

IL

L E

R

H D

I_ M

-4 .D

W G

J

R U

T L E

D G

E

M-401

BUILDING 5 BASEMENT MECHANICAL PLAN

SCALE: 1/4"=1'-0"

M-104 true north

N

SCALE: 1/4"=1'-0"

S O

L

IC

IT

A

T

IO

N N

O

P L

O T

S C

A L E

D R

A W

N B

Y

C K

D B

Y

D E

S

IG

N B

Y

D

2 3

C

4 5

A

B

IS

S

U E

D A

T E

S

IZ

E

S B

M T

B Y

F

IL

E N

A M

E

D E

S C

R

IP

T

IO

N D

A T

E

C O

N T

R A

C T

N O

M A

R K

A P

P R

F

IL

E N

U M

B E

R

"x

J U

N E

Fort Worth District

US Army Corps of Engineers ®

P L

O T

D A

T E

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

F O

R T

W O

R T

H D

IS

T

R

IC

T D

L A

G E

N E

R A

T O

R R

E P

L A

C E

M E

N T

H A

R T

-D O

L E

-I N

O U

Y E

F E

D C

E N

T E

R

SHEET

IDENTIFICATION

N M

IC

H

IG

A

N A

V E

S

U

IT

E

C H

IC

A

G O

IL

T

.6

.7 w w w .e x p fe d e ra l.

c o m

P R

O J N

O

C H

I-

-A

/3

/2

KEY PLAN

N.T.S.

N

PROPERTY OF THE

UNITED STATES GOVERNMENT

FOR OFFICIAL USE ONLY

DO NOT REMOVE THIS NOTICE

PROPERLY DESTROY DOCUMENTS

WHEN NO LONGER NEEDED

A S

N O

T E

D

G G

O R

S L

IN

E

CERTIFIED FINAL

2A

2B 2C

1A

1B

4A

EXTERIOR

VAULT

1C

UPS

B

C O

E S

R E

V

IE

W

IN

T

E R

IM

D

E S

IG

N

R E

V

IE

W

D

E S

IG

N

R E

V

IE

W

/1 /1

/1 /1

/0 /1

B

C O

E S

B A

C K

C H

E C

K

/0

/1

C E

R T

IF

IE

D F

IN

A

L

/3

/1

W

X

K -1

-R

-0

FURNISH AND INSTALL NEW PARALLEL BLADE

DAMPERS WITH SEALS AND DAMPER ACTUATORS

(CD-5 THROUGH CD-8) FOR NEW LOUVERS.

ACTUATORS TO OPEN WITHIN 15 SECONDS OF A

GENERATOR RUN SIGNAL. PROVIDE ACTUATORS TO

PROVIDE A MINIMUM OF 7.5 IN-LBS OF TORQUE PER

SQUARE FOOT OF DAMPER AREA.

FURNISH AND INSTALL NEW PARALLEL BLADE

DAMPERS WITH SEALS AND DAMPER ACTUATORS

(CD-1 THROUGH CD-4) FOR NEW LOUVERS.

ACTUATORS TO OPEN WITHIN 15 SECONDS OF A

GENERATOR RUN SIGNAL. PROVIDE ACTUATORS TO

PROVIDE A MINIMUM OF 10 IN-LBS OF TORQUE PER

SQUARE FOOT OF DAMPER AREA.

SEAL EXISTING OPENINGS WITH INSULATED SHEET

METAL PANELS. PANELS SHALL MEET ASHRAE 90.1

R VALUES, R-13, FOR CLIMATE ZONE 5.

EXISTING HORIZONTAL UNIT HEATERS TO REMAIN.

SHOWN FOR REFERENCE ONLY.

EXISTING EYE WASH/SAFETY SHOWER TO REMAIN.

SHOWN FOR REFERENCE ONLY.

EXISTING UNIT HEATER TO REMAIN. SHOWN FOR

REFERENCE ONLY.

KEY NOTES

(TYP) 1

3 3

LINE ITEM

LINE ITEM

LINE ITEM

LINE ITEM

LINE ITEM

LINE ITEM

LINE ITEM

LINE ITEM

LINE ITEM

W

1X K

-1 8-

R -0

1X K

-1 8-

R -0

RR

RR

3" CAC COOLING

WATER

5" WATER

JACKET COOLING

3" CAC COOLING

WATER

5" WATER

JACKET COOLING

D

IS

C

IP

L

IN

E

B U

IL

D

IN

G

R O

O F

M E

C H

A N

IC

A

L P

L A

N

M-403

J

R U

T L E

D G

E

J

M

IL

L E

R

H D

I_ M

-4 .D

W G

J

R U

T L E

D G

E1 M-403

BUILDING 5 ROOF MECHANICAL PLAN

SCALE: 1/4"=1'-0"

M-105 true north

N

S O

L

IC

IT

A

T

IO

N N

O

P L

O T

S C

A L E

D R

A W

N B

Y

C K

D B

Y

D E

S

IG

N B

Y

D

2 3

C

4 5

A

B

IS

S

U E

D A

T E

S

IZ

E

S B

M T

B Y

F

IL

E N

A M

E

D E

S C

R

IP

T

IO

N D

A T

E

C O

N T

R A

C T

N O

M A

R K

A P

P R

F

IL

E N

U M

B E

R

"x

J U

N E

Fort Worth District

US Army Corps of Engineers ®

P L

O T

D A

T E

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

F O

R T

W O

R T

H D

IS

T

R

IC

T D

L A

G E

N E

R A

T O

R R

E P

L A

C E

M E

N T

H A

R T

-D O

L E

-I N

O U

Y E

F E

D C

E N

T E

R

SHEET

IDENTIFICATION

N M

IC

H

IG

A

N A

V E

S

U

IT

E

C H

IC

A

G O

IL

T

.6

.7 w w w .e x p fe d e ra l.

c o m

P R

O J N

O

C H

I-

-A

/3

/2

KEY PLAN

N.T.S.

N

PROPERTY OF THE

UNITED STATES GOVERNMENT

FOR OFFICIAL USE ONLY

DO NOT REMOVE THIS NOTICE

PROPERLY DESTROY DOCUMENTS

WHEN NO LONGER NEEDED

A S

N O

T E

D

G G

O R

S L

IN

E

CERTIFIED FINAL

2A

2B 2C

1A

1B

4A

EXTERIOR

VAULT

1C

UPS

B

C O

E S

R E

V

IE

W

IN

T

E R

IM

D

E S

IG

N

R E

V

IE

W

D

E S

IG

N

R E

V

IE

W

/1 /1

/1 /1

/0 /1

B

C O

E S

B A

C K

C H

E C

K

/0

/1

C E

R T

IF

IE

D F

IN

A

L

/3

/1

W

X

K -1

-R

-0

1. REFER TO M-001 FOR SYMBOLS

AND ABBREVIATIONS.

2. REFER TO M-603 FOR FUEL OIL SCHEMATIC.

GENERAL NOTES

FURNISH AND INSTALL NEW REMOTE RADIATORS

TO MATCH NEW GENERATOR HEAT LOAD.

RADIATOR TO REJECT INPUT LOAD OF 28,003

BTU/HR PLUS AMBIENT LOADING.

KEY NOTES

SCALE: 1/4"=1'-0"

1 1

ROUTE EXHAUST PIPE WITH THIMBLE TO AT

LEAST 3' ABOVE FINISHED ROOF SURFACE.

COORDINATE PENETRATION WITH ROOFING

CONTRACTOR TO MAINTAIN WARRANTY. SEE

SHEET M-501 DETAIL 1.

LINE ITEM

W

1X K

-1 8-

R -0

RAINCAP, GT EXHAUST MODEL 22-1200

THIMBLE, GT EXHAUST 20-B-1200

RAINGUARD AND PEST CONTROL SCREEN

(PROVIDED WITH THIMBLE ASSEMBLY)

OUTER SQUARE FLASHING, PROVIDED WITH THIMBLE

INNER SQUARE FLASHING, PROVIDED WITH THIMBLE

CLAMP, INCLUDED WITH THIMBLE

M

IN

12"Ø SPOOL PIECE PROVIDED

BY GENERATOR VENDOR

12 GAUGE GALVANIZED SHEET

METAL INSERTS A HANGERS TO

PROTECT INSULATION, (TYP)

HANGER RODS WITH CHANNEL

SUPPORT AND 18 GA. GALV. SHEET

METAL SADDLE TO PROTECT

INSULATION

PROVIDE OUTLET FLANGE

AND ASSOCIATED HARDWARE

FLEXIBLE CONNECTORS BY

GENSET VENDOR

DO NOT COVER DRAIN WITH

INSULATION

CALCIUM SILICATE INSULATION

TO STOP AT FLANGE. DO NOT

INSULATE FLEX. CONNECTORS

ROOF, REFER TO ARCHITECTURAL FOR CONSTRUCTION

12" SCHEDULE 40 BLACK IRON PIPE

SLOPE 1/8" PER

FOOT TO DRAIN

CLEVIS HANGER (TYP)

THREADED RODS ANCHORED TO

BUILDING STRUCTURE

PROVIDE DRAIN GATE

VALVE WITH PLUG

TO

DIESEL

GENERATOR

SILENCER

FUEL PUMP, RED JACKET

OR APPROVED EQUAL;

1/3 HP 208-230V/1Ø/60 HZ

CONDUIT BY

ELECTRICAL

4" PIPE RISER

FURNISHED W/ PUMP

4" NPT TANK FITTING

1/2" SCH. 40 BLACK

STEEL PIPE TO EQUPMENT

1/2" DIA. X 30" U.L. LISTED

FLEXIBLE CONNECTER/P.T.F.E.

LINER AND STAINLESS STEEL

FLEX BRAID COVER

1/2" 90° ELL

1/2" NIPPLE

1/2" UNION

1/2" NIPPLE

CAST WALL FLANGE

WITH SET SCREW

FIRE STOPPING

MATERIAL

SERVICE PIPE

RATED WALL

CORE DRILLED HOLE

IN EXISTING WALL

CAST WALL FLANGE

WITH SET SCREW

PIPE SLEEVE

PACKING MATERIAL

1/2"

RATED WALL

1/2"

SERVICE PIPE

FIRE STOPPING

MATERIAL

UNINSULATED PIPES

PROVIDE ROD CONNECTIONS TO

STRUCTURE TYPE SHALL BE

PROVIDED BY THE CONTRACTOR

AND VERIFIED WITH BUILDING

CONSTRUCTION MATERIALS/

SYSTEMS. (TYP)

(HOT OR DUAL TEMP)

(4" AND ABOVE)

SPREADER TO BE USED ON

PIPE SIZE 10" AND ABOVE

F.O.S.

F.O.R.

HOT DIPPED GALVANIZED UNISTRUT

PIPE STAND-OFF FROM FLOOR. (5'

O.C.) ANCHOR TO FLOOR.

FINISHED

FLOOR

UNISTRUT PIPE

CLAMP (TYP)

M-501

EXHAUST STACK AND SILENCER SCHEMATIC

SCALE: NTS

M-402

M-501

WALL PIPE SUPPORT

SCALE: NTS

M-501

PIPE SUPPORT AND HANGER DETAIL

SCALE: NTS

M-501

PIPE PENETRATION/EXISITING CONCRETE WALL

SCALE: NTS

M-501

PIPE SLEEVE THROUGH RATED WALL

SCALE: NTS

M-501

UNISTRUT SUPPORT DETAIL FUEL PIPING

SCALE: NTS

M-501

SUBMERGED FUEL PUMP DETAIL

SCALE: NTS

M-402

M-501

FUEL FILL STATION DETAIL

SCALE: NTS

M-402

2" CALCIUM SILICATE

INSULATION COVERED WITH

STAINLESS STEEL JACKET

FUEL OIL PIPING

WALL

HILTI 3/8" KWIK BOLT

EXPANSION ANCHORS

1 3/8" EMBEDMENT MIN. 2

PER BRACKET

UNISTRUT PIPING SUPPORT

"U"-BOLT HANGER ACCEPTABLE AS

ALTERNATE TO UNISTRUT CLAMP

3" PIPE CONNECTION

TO FUEL OIL TANK

3" PIPE CAP

3" GALVANIZED STEEL PIPE

"U"-BOLT TYPE PIPE CLAMP,

3/8" TYP. 2 PLCS

12"Ø POST HOLE

W/CONCRETE FILL

3'-0"

MINIMUM CLEARANCE

IN FRONT OF FILL

STATION

PACKAGED 7 GAL FUEL FILL SYSTEM, W/

2" INLET HOSE COUPLING, 3" NPT THD OUTLET,

HAND PUMP, HOUSING DRAIN, CHECK VALVE,

SHUTOFF VALVE AND GROUND STUD.

PROVIDE TC-9 FILL CONTROLLER - BASIS OF

DESIGN SIMPLEX FUEL PORT

M E

C H

A N

IC

A

L

D E

T A

IL

S

M-501

J

R U

T L E

D G

E

J

R U

T L E

D G

E H D

I_ M

-5 .D

W G

J

R U

T L E

D G

E S

O L

IC

IT

A T

IO

N

N O

P L

O T

S C

A L E

D R

A W

N B

Y

C K

D B

Y

D E

S

IG

N B

Y

D

2 3

C

4 5

A

B

IS

S

U E

D A

T E

S

IZ

E

S B

M T

B Y

F

IL

E N

A M

E

D E

S C

R

IP

T

IO

N D

A T

E

C O

N T

R A

C T

N O

M A

R K

A P

P R

F

IL

E N

U M

B E

R

"x

J U

N E

Fort Worth District

US Army Corps of Engineers ®

P L

O T

D A

T E

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

F O

R T

W O

R T

H D

IS

T

R

IC

T D

L A

G E

N E

R A

T O

R R

E P

L A

C E

M E

N T

H A

R T

-D O

L E

-I N

O U

Y E

F E

D C

E N

T E

R

SHEET

IDENTIFICATION

N M

IC

H

IG

A

N A

V E

S

U

IT

E

C H

IC

A

G O

IL

T

.6

.7 w w w .e x p fe d e ra l.

c o m

P R

O J N

O

C H

I-

-A

/3

/2

PROPERTY OF THE

UNITED STATES GOVERNMENT

FOR OFFICIAL USE ONLY

DO NOT REMOVE THIS NOTICE

PROPERLY DESTROY DOCUMENTS

WHEN NO LONGER NEEDED

A S

N O

T E

D

G G

O R

S L

IN

E

CERTIFIED FINAL

B

C O

E S

R E

V

IE

W

IN

T

E R

IM

D

E S

IG

N

R E

V

IE

W

D

E S

IG

N

R E

V

IE

W

/1 /1

/1 /1

/0 /1

B

C O

E S

B A

C K

C H

E C

K

/0

/1

C E

R T

IF

IE

D F

IN

A

L

/3

/1

W

X

K -1

-R

-0

1. ALL MANUFACTURER SPECIFIC

INFORMATION INCLUDED IN

THESE DIAGRAMS ARE FOR

BASIS OF DESIGN PURPOSES

ONLY. APPROVED EQUAL

EQUIPMENT SHALL ALSO BE

ACCEPTABLE.

GENERAL NOTES

W

1X K

-1 8-

R -0

C H

A N

IC

A

L

D E

T A

IL

S

M-502

J

R U

T L E

D G

E

J

R U

T L E

D G

E H D

I_ M

-5 .D

W G

J

R U

T L E

D G

E S

O L

IC

IT

A T

IO

N

N O

P L

O T

S C

A L E

D R

A W

N B

Y

C K

D B

Y

D E

S

IG

N B

Y

D

2 3

C

4 5

A

B

IS

S

U E

D A

T E

S

IZ

E

S B

M T

B Y

F

IL

E N

A M

E

D E

S C

R

IP

T

IO

N D

A T

E

C O

N T

R A

C T

N O

M A

R K

A P

P R

F

IL

E N

U M

B E

R

"x

J U

N E

Fort Worth District

US Army Corps of Engineers ®

P L

O T

D A

T E

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

F O

R T

W O

R T

H D

IS

T

R

IC

T D

L A

G E

N E

R A

T O

R R

E P

L A

C E

M E

N T

H A

R T

-D O

L E

-I N

O U

Y E

F E

D C

E N

T E

R

SHEET

IDENTIFICATION

N M

IC

H

IG

A

N A

V E

S

U

IT

E

C H

IC

A

G O

IL

T

.6

.7 w w w .e x p fe d e ra l.

c o m

P R

O J N

O

C H

I-

-A

/3

/2

PROPERTY OF THE

UNITED STATES GOVERNMENT

FOR OFFICIAL USE ONLY

DO NOT REMOVE THIS NOTICE

PROPERLY DESTROY DOCUMENTS

WHEN NO LONGER NEEDED

A S

N O

T E

D

G G

O R

S L

IN

E

CERTIFIED FINAL

B

C O

E S

R E

V

IE

W

IN

T

E R

IM

D

E S

IG

N

R E

V

IE

W

D

E S

IG

N

R E

V

IE

W

/1 /1

/1 /1

/0 /1

B

C O

E S

B A

C K

C H

E C

K

/0

/1

C E

R T

IF

IE

D F

IN

A

L

/3

/1

W

X

K -1

-R

-0

CHWR

VIBRATIONAL ISOLATORS (NOTE 1)

3/8" ALL THREAD ROD (NOTE 1)

FACTORY PROVIDED MOUNTING HOLES

FAN

C O

IL

ANCHOR TO CONCRETE SLAB ABOVE

CHWS

DUCT

SHUT OFF VALVE

(TYPICAL)

BALANCING VALVE

2-WAY MODULATING

CONTROL VALVE

MANUAL AIR VENT

(TYPICAL)

STRAINER

FLEXIBLE

CONNECTION

(TYPICAL)

UNION CONNECTION

(TYPICAL)

FLEXIBLE

CONNECTION

HOSE END DRAIN

VALVE (TYPICAL)

HYDRONIC COIL

(INTEGRAL TO FCU)

CONDENSATE DRAIN

AND P-TRAP (NOTE 2)

D

DRIP PAN

(INTEGRAL TO FCU)

PRESSURE GAGE

(TYPICAL)

THERMOMETER

(TYPICAL)

NOTE:

THIS INFORMATION MAY NOT CONTAIN ALL DETAILS REQUIRED FOR

CONSTRUCTION. APPROPRIATE MODIFICATION MAY BE REQUIRED TO ENSURE

SUITABILITY OF THESE DRAWINGS FOR THE SPECIFIC APPLICATION.

NOTES:

1. NUMBER OF HANGAR SUPPORTS AND VIBRATION ISOLATORS TYPE SHALL BE IN

ACCORDANCE WITH THE FAN COIL UNIT MANUFACTURERS RECOMMENDATIONS.

2. CONDENSATE DRAIN SHALL BE SLOPED AT 2%.

3. INSULATE ALL WATER LINES, INCLUDING FLEXIBLE CONNECTIONS.

D

SLOPE AT 2%

2'

1"

WALL WALL

8" WIDE

NOTES:

1. 24 GAGE GALVANIZED STEEL SHALL BE USED TO CONSTRUCT DRIP PAN.

2. 16 GAGE GALVANIZED STEEL WIRE SHALL BE CONNECTED THROUGH PENETRATIONS

IN THE DRIP PAN WALL TO THE CONCRETE CEILING STRUCTURE. SUPPORTS SHALL BE

3'0" ON CENTER.

2"

EXISTING PIPE

TO REMAIN

3/4" DRIP

PAN DRAIN

D

CUT VIEW

3'

HYDRONIC COIL CONNECITON

LOW

PRESSURE

STEAM

UNIT

HEATER

UNION CONNECTION

(TYPICAL) GATE VALVE

(TYPICAL)

STRAINER

F&T TRAP

PITCH AT 2%

SUPPLY

RETURN

M-502

FAN COIL UNIT INSTALLATION DETAIL

SCALE: NTS

M-502

DRIP PAN DETAIL

SCALE: NTS

M-107

M-502

STEAM UNIT HEATER INSTALLATION DETAIL

SCALE: NTS

M-103

ANCHOR TO STRUCTURE ABOVE

3/8" -16 GA THREADED RODS

ANCHOR TO CONCRETE SLAB ABOVE

(TYPICAL)

NOTE:

NUMBER OF HANGAR SUPPORTS AND TYPE SHALL BE IN

ACCORDANCE WITH THE UNIT HEATER MANUFACTURERS

RECOMMENDATIONS.

DRAIN PAN

C.O.

A

B

BA

DRAIN TO INDIRECT RECEPTOR

APPROVED BY AUTHORITIES HAVING

JURISDICTION

PITCH DOWN

TOWARD

DRAIN

CLEAN OUT (TYP.)

DRAIN LINE SHALL BE AT LEAST THE SAME

SIZE AS THE NIPPLE ON THE DRAIN PAN.

COOLING COIL

45° CUT

UNIT TYPE

DRAW THRU

BLOW THRU

WHERE "X" = STATIC PRESS. IN COIL SECTION.

> ("X") > 1/2 ("X")

> 1/2 ("X") > ("X")+1/2"

M-502

COOLING COIL CONDENSATE TRAP DETAIL

SCALE: NTS

16 GAUGE GALVANIZED

STEEL RETAINING ANGLE

(NOTE 2)

MINIMUM 1" ANGLE

OVERLAP WITH CMU

WALL

MINIMUM 1 1/4" ANGLE

OVERLAP WITH SLEEVE

#10 SHEET METAL SCREW

(NOTE 1)

FLANGE MOUNT LOUVER

WITH 1/2" MESH BIRD

SCREEN TO CMU WALL

24 GAUGE GALVANIZED

STEEL SLEEVE

3 HR FIRE DAMPER

NOTES:

1. FIRE DAMPERS SHALL BE ATTACHED TO SLEEVES ON ALL FOUR SIDES USING

MANUFACTURER APPROVED METHODS. FASTENERS SHALL BE SPACED A

MAXIMUM OF 6" ON CENTERS AND A MAXIMUM OF 2" FROM CORNERS. A MINIMUM

OF 4 ATTACHMENTS PER SIDE ARE REQUIRED.

2. RETAINING ANGLES SHALL BE ATTACHED TO SLEEVES IN A SIMILAR MANOR TO

THE ATTACHMENT PROCEDURE AND METHOD DESCRIBED IN NOTE 1.

3. RETAINING ANGLES SHALL NOT BE FASTENED DIRECTLY TO CMU WALL.

4. FIRE DAMPER SHALL BE INSTALLED STRICTLY ACCORDING TO MANUFACTURERS

INSTRUCTIONS. ANY DISCREPANCIES WITH THIS DETAIL SHALL DEFAULT TO

MANUFACTURERS RECOMMENDATION.

MINIMUM 1/2" SLEEVE

TO WALL CLEARANCE

1/2" MESH ALUMINUM BIRD

SCREEN FASTENED FLUSH

WITH CMU WALL

EXTERIOR OF ELECTRICAL ROOMINTERIOR OF ELECTRICAL ROOM

M-502

TRANSFER OPENING FIRE DAMPER INSTALLATION DETAIL

SCALE: NTS

W

1X K

-1 8-

R -0

C H

A N

IC

A

L

D E

T A

IL

S

M-503

J

R U

T L E

D G

E

J

R U

T L E

D G

E H D

I_ M

-5 .D

W G

J

R U

T L E

D G

E S

O L

IC

IT

A T

IO

N

N O

P L

O T

S C

A L E

D R

A W

N B

Y

C K

D B

Y

D E

S

IG

N B

Y

D

2 3

C

4 5

A

B

IS

S

U E

D A

T E

S

IZ

E

S B

M T

B Y

F

IL

E N

A M

E

D E

S C

R

IP

T

IO

N D

A T

E

C O

N T

R A

C T

N O

M A

R K

A P

P R

F

IL

E N

U M

B E

R

"x

J U

N E

Fort Worth District

US Army Corps of Engineers ®

P L

O T

D A

T E

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

F O

R T

W O

R T

H D

IS

T

R

IC

T D

L A

G E

N E

R A

T O

R R

E P

L A

C E

M E

N T

H A

R T

-D O

L E

-I N

O U

Y E

F E

D C

E N

T E

R

SHEET

IDENTIFICATION

N M

IC

H

IG

A

N A

V E

S

U

IT

E

C H

IC

A

G O

IL

T

.6

.7 w w w .e x p fe d e ra l.

c o m

P R

O J N

O

C H

I-

-A

/3

/2

PROPERTY OF THE

UNITED STATES GOVERNMENT

FOR OFFICIAL USE ONLY

DO NOT REMOVE THIS NOTICE

PROPERLY DESTROY DOCUMENTS

WHEN NO LONGER NEEDED

A S

N O

T E

D

G G

O R

S L

IN

E

CERTIFIED FINAL

B

C O

E S

R E

V

IE

W

IN

T

E R

IM

D

E S

IG

N

R E

V

IE

W

D

E S

IG

N

R E

V

IE

W

/1 /1

/1 /1

/0 /1

B

C O

E S

B A

C K

C H

E C

K

/0

/1

C E

R T

IF

IE

D F

IN

A

L

/3

/1

W

X

K -1

-R

-0

16 GAUGE GALVANIZED

STEEL RETAINING ANGLE

(NOTE 2)

MINIMUM 1" ANGLE

OVERLAP WITH CMU

WALL

MINIMUM 1 1/4" ANGLE

OVERLAP WITH SLEEVE

#10 SHEET METAL SCREW

(NOTE 1)

24 GAUGE GALVANIZED

STEEL SLEEVE

3 HR FIRE DAMPER

NOTES:

1. FIRE DAMPERS SHALL BE ATTACHED TO SLEEVES ON ALL FOUR SIDES USING

MANUFACTURER APPROVED METHODS. FASTENERS SHALL BE SPACED A

MAXIMUM OF 6" ON CENTERS AND A MAXIMUM OF 2" FROM CORNERS. A MINIMUM

OF 4 ATTACHMENTS PER SIDE ARE REQUIRED.

2. RETAINING ANGLES SHALL BE ATTACHED TO SLEEVES IN A SIMILAR MANOR TO

THE ATTACHMENT PROCEDURE AND METHOD DESCRIBED IN NOTE 1.

3. RETAINING ANGLES SHALL NOT BE FASTENED DIRECTLY TO CMU WALL.

4. FIRE DAMPER SHALL BE INSTALLED STRICTLY ACCORDING TO MANUFACTURERS

INSTRUCTIONS. ANY DISCREPANCIES WITH THIS DETAIL SHALL DEFAULT TO

MANUFACTURERS RECOMMENDATION.

MINIMUM 1/2" SLEEVE

TO WALL CLEARANCE

1/2" MESH ALUMINUM BIRD

SCREEN FASTENED FLUSH

WITH CMU WALL

EXTERIOR OF ELECTRICAL ROOMINTERIOR OF ELECTRICAL ROOM

M-503

DUCT FIRE DAMPER INSTALLATION DETAIL

SCALE: NTS

6"

MAX

SMACNA APPROVED BREAK AWAY

STYLE TRANSVERSE JOINTS AT

SLEEVE CONNECTION

DUCT

M-503

EXHAUST DUCT CAP CURB INSTALLATION DETAIL

SCALE: NTS

M-107

4" MIN.

3/4" CHAMFER ALL

OPEN EDGES 45°.

EXISTING CONCRETE

FLOOR SLAB

ETCH FLOOR SLAB

FOR BOND

SHEET METAL FLASHING

IN BED OF SEALANT ON

EACH SIDES

NEW EXHAUST

DUCTWORK

CONT. BEAD OF SEALANT

EACH SIDE

NEW CONCRETE

CURB ON ALL

SIDES OF DUCT

W

1X K

-1 8-

R -0

INTERSTITIAL LEAK DETECTOR PORT

TANK LEVEL INDICATOR PORT

LOCAL LEVEL GAUGE

TANK SUCTION WITH FOOT VALVE

FOF

2"

TANK FILL PORT

GENERATOR

BUILDING

EXTERIOR

GENERATOR

BUILDING

INTERIOR 1-1/2"

FT

FOR

FOS

2"

FS

1-1/2"

FOS

PRESSURE GAUGE,

2', 0-100 PSIG

ANTI-SYPHON VALVE AT

HIGH POINT OF PIPING

2"

FOR

1"

1-1/2" FIRE SAFE VALVE

W/ FUSIBLE PLUG

F

F O

S1-1/2"

F O

R

1"

1"

1-1/2"

F

F O

S F

O R

DT

DT

4" EMERGENCY TANK VENT,

TYP. 2 PLCS.

2" TANK VENT,

TYP. 2 PLCS.

2" VENT,

4" EMER. VENTS, 3'

ABOVE ROOF (MIN)

W/OPW 23 VENT CAPS

ANTI-SYPHON VALVE

AT HIGH POINT TO

EACH DAY TANK

KN

1-1/2" FOS

FUEL OIL SUPPLY

FROM FUEL TANK

F O

S

2" FOR

N O

FS

K L

DF

A

E

AC B

TO

FUEL OIL RETURN

TO FUEL TANK

FOR

FOR FROM GENERATOR

FOS TO GENERATOR

1" FOS/FOR

ERES

H

1 J

G

3/4" DAY TANK DRAIN

TF

K PLUG VALVES

M

O

N

CHECK VALVES

FLOW PROVING SWITCH

L

G

J

H

7 2" MANUAL FILL (CAPPED)

FUEL OIL RTD TEMPERATURE ASSEMBLY

DAYTANK LOW LEVEL ALARM

SOLENOID VALVE FROM SUPPLY HEADER -

OPEN, PUMP ENERGIZED

SOLENOID VALVE FROM SUPPLY HEADER -

CLOSED, PUMP DE-ENERGIZED

LIQUID LEVEL SWITCH - COMPATIBLE WITH

VEEDER ROOT CONTROL PANEL.

180 GALLON STEEL FUEL OIL DAY TANK WITH

RUPTURE BASIN, PREFERRED UTILITIES CAT #

11871 OR APPROVED EQUAL

INTERSTITIAL MONITOR AND LEAK DETECTION

SENSOR. LOCAL ALARM TO FACILITY

MANAGEMENT SYSTEM.

OVER PRESSURE RELIEF VALVES

FLEXIBLE STEEL BRAID PIPE CONNECTOR

PACKAGED DUPLEX PUMP SYSTEM, PROVIDED

WITH DAY TANK PACKAGE. DESIGN FLOW RATE

OF 60 GPH (1.0 GPM) @50 PSI.

FLEXIBLE STEEL BRAID PIPE CONNECTOR TO

GENERATOR SET

DUPLEX STRAINER - PREFERRED UTILITIES

MODEL 50, CAT. #13012 WITH 3/64"

PERFORATIONS OR APPROVED EQUAL

COMPOUND GAUGES - 2" DIAL; 15 PSIG/30" HG

PRESSURE GAUGES - 2" DIAL; ANSI GRADE B,

0-100 PSIG

FUEL OIL RECOVERY PUMP - 240 GPH AT 20' WG.

ADJUST AS REQUIRED TO MATCH VENDOR

CUTSHEETS.

CONTROL POWER ON

DAY TANK LEAK

ALARM SILENCE

LAMP TEST

DAY TANK HIGH

DAY TANK LOW

B

D

C

JUNCTION BOX

A 1" GATE VALVES

RESET

F 1" UNION

E 1" GLOBE VALVE

DAY TANK FUEL OIL MANAGEMENT CONTROL

CABINET - NAME PLATE ITEMS INCLUDE:

CONTROL POWER ON/OFF

DAY TANK OIL TEMPERATURE

COMPONENT LEGEND - DAY TANK/PUMP ASSEMBLY

1" SOLENOID VALVE - EMERGENCY SHUTOFF

1" SOLENOID VALVE - DAY TANK FILL OPEN/CLOSE

DAY TANK FLOW CONTROL MANIFOLD:

2"

1-1/2"

FOV

FOV

EOV

EOV

FUEL OIL

FILL

STATION

VEHICLE FILL

STATION

VEHICLE FILL

PUMP -

SUBMERSIBLE

1"

EMERGENCY FUEL

OIL VENT (TYP 2)

FUEL OIL VENT TERMINATE

AT LEAST 12' ABOVE GRADE

W/OPW 23 CAPS (TYP 2)

FUEL LEVEL PROBE

VR SERIES 8373 MAG2

CLOCK TYPE LOCAL LEVEL

GAUGE MORRISON BROS. FIG.

818 OR APPROVED EQUAL

FUEL LEVEL

PROBE RISER

ASSEMBLY

LOCATE ON GENERATOR

ROOM EXTERIOR (REFER

SHEET M-402)

LOCATE IN ROOM 5-1-8,

REFER TO M-105

FUEL

TANK INTERSTITIAL SENSOR

VR SERIES 7943

VEEDER ROOT TLS 350

J-BOX, TYP.

SENSOR WIRING IN CONDUIT

ALARM WIRING IN CONDUIT

POWER WIRING IN CONDUIT

OVERFILL ALARM AND

ACKNOWLEDGMENT SWITCH

DAY TANK ROOM FUEL TANK YARD

DAY TANK ROOM FUEL TANK YARD

DAY TANK ROOM GENERATOR ROOM

FUEL POLISHING

SYSTEM

3/4"

M E

C H

A N

IC

A

L

S C

H E

M A

T

IC

S

M-601

J

R U

T L E

D G

E

J

R U

T L E

D G

E H D

I_ M

-6 .D

W G

J

R U

T L E

D G

E S

O L

IC

IT

A T

IO

N

N O

P L

O T

S C

A L E

D R

A W

N B

Y

C K

D B

Y

D E

S

IG

N B

Y

D

2 3

C

4 5

A

B

IS

S

U E

D A

T E

S

IZ

E

S B

M T

B Y

F

IL

E N

A M

E

D E

S C

R

IP

T

IO

N D

A T

E

C O

N T

R A

C T

N O

M A

R K

A P

P R

F

IL

E N

U M

B E

R

"x

J U

N E

Fort Worth District

US Army Corps of Engineers ®

P L

O T

D A

T E

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

F O

R T

W O

R T

H D

IS

T

R

IC

T D

L A

G E

N E

R A

T O

R R

E P

L A

C E

M E

N T

H A

R T

-D O

L E

-I N

O U

Y E

F E

D C

E N

T E

R

SHEET

IDENTIFICATION

N M

IC

H

IG

A

N A

V E

S

U

IT

E

C H

IC

A

G O

IL

T

.6

.7 w w w .e x p fe d e ra l.

c o m

P R

O J N

O

C H

I-

-A

/3

/2

PROPERTY OF THE

UNITED STATES GOVERNMENT

FOR OFFICIAL USE ONLY

DO NOT REMOVE THIS NOTICE

PROPERLY DESTROY DOCUMENTS

WHEN NO LONGER NEEDED

A S

N O

T E

D

G G

O R

S L

IN

E

CERTIFIED FINAL

B

C O

E S

R E

V

IE

W

IN

T

E R

IM

D

E S

IG

N

R E

V

IE

W

D

E S

IG

N

R E

V

IE

W

/1 /1

/1 /1

/0 /1

B

C O

E S

B A

C K

C H

E C

K

/0

/1

C E

R T

IF

IE

D F

IN

A

L

/3

/1

W

X

K -1

-R

-0

M-601

FUEL OIL SYSTEM TANK AND DAY TANK SCHEMATIC

SCALE: NTS

M-601

FUEL TANK MONITORING SCHEMATIC

SCALE:NTS

M-402

M-601

COMBINATION DAY TANK AND DUPLEX PUMP SCHEMATIC

SCALE: NTS

M-402

1. REFER TO SHEET M-001 FOR GENERAL NOTES

AND ABBREVIATIONS.

2. ALL MANUFACTURER SPECIFIC INFORMATION

INCLUDED IN THESE DIAGRAMS ARE FOR BASIS OF

DESIGN PURPOSES ONLY. APPROVED EQUAL

EQUIPMENT SHALL ALSO BE ACCEPTABLE.

GENERAL NOTES

LINE ITEM

W

1X K

-1 8-

R -0

C H

A N

IC

A

L

S E

Q U

E N

C E

S O

F O

P E

R A

T

IO

N

M-602

J

R U

T L E

D G

E

J

R U

T L E

D G

E H D

I_ M

-6 .D

W G

J

R U

T L E

D G

E S

O L

IC

IT

A T

IO

N

N O

P L

O T

S C

A L E

D R

A W

N B

Y

C K

D B

Y

D E

S

IG

N B

Y

D

2 3

C

4 5

A

B

IS

S

U E

D A

T E

S

IZ

E

S B

M T

B Y

F

IL

E N

A M

E

D E

S C

R

IP

T

IO

N D

A T

E

C O

N T

R A

C T

N O

M A

R K

A P

P R

F

IL

E N

U M

B E

R

"x

J U

N E

Fort Worth District

US Army Corps of Engineers ®

P L

O T

D A

T E

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

F O

R T

W O

R T

H D

IS

T

R

IC

T D

L A

G E

N E

R A

T O

R R

E P

L A

C E

M E

N T

H A

R T

-D O

L E

-I N

O U

Y E

F E

D C

E N

T E

R

SHEET

IDENTIFICATION

N M

IC

H

IG

A

N A

V E

S

U

IT

E

C H

IC

A

G O

IL

T

.6

.7 w w w .e x p fe d e ra l.

c o m

P R

O J N

O

C H

I-

-A

/3

/2

PROPERTY OF THE

UNITED STATES GOVERNMENT

FOR OFFICIAL USE ONLY

DO NOT REMOVE THIS NOTICE

PROPERLY DESTROY DOCUMENTS

WHEN NO LONGER NEEDED

A S

N O

T E

D

G G

O R

S L

IN

E

CERTIFIED FINAL

B

C O

E S

R E

V

IE

W

IN

T

E R

IM

D

E S

IG

N

R E

V

IE

W

D

E S

IG

N

R E

V

IE

W

/1 /1

/1 /1

/0 /1

B

C O

E S

B A

C K

C H

E C

K

/0

/1

C E

R T

IF

IE

D F

IN

A

L

/3

/1

W

X

K -1

-R

-0

STEAM UNIT HEATER

STEAM UNIT HEATER SHALL BE EQUIPPED WITH A REMOTE THERMOSTAT WITH AN

OFF-AUTO SWITCH. WITH THE THERMOSTAT OFF-AUTO SWITCH IN THE OFF POSITION, THE

UNIT HARDWARE SHALL STOP THE FAN AND CLOSE THE HEATING CONTROL VALVE. WITH

THE THERMOSTAT OFF-AUTO SWITCH IN THE AUTO MODE THE UNIT HARDWARE SHALL

MODULATE THE HEATING CONTROL VALVE AND CYCLE THE MULTI-SPEED FAN TO MAINTAIN

SPACE TEMPERATURE AT THE CONFIGURED SETPOINT, 55°F (ADJ.), OR AT THE

OCCUPANT-ADJUSTABLE SET-POINT VIA THE WALL-MOUNTED THERMOSTAT. THE UNIT

SHALL RUN SUBJECT TO THE UNIT MANUFACTURER'S SAFETIES.

HYDRONIC FAN COIL UNIT

FAN COIL UNIT SHALL BE EQUIPPED WITH A REMOTE THERMOSTAT WITH AN OFF-AUTO

SWITCH. WITH THE THERMOSTAT OFF-AUTO SWITCH IN THE OFF POSITION, THE UNIT

HARDWARE SHALL STOP THE FAN AND CLOSE THE COOLING CONTROL VALVE. WITH THE

THERMOSTAT OFF-AUTO SWITCH IN THE AUTO MODE THE UNIT HARDWARE SHALL

MODULATE THE COOLING CONTROL VALVE AND CYCLE THE MULTI-SPEED FAN TO MAINTAIN

SPACE TEMPERATURE AT THE CONFIGURED SETPOINT, 78°F (ADJ.), OR AT THE

OCCUPANT-ADJUSTABLE SET-POINT VIA THE WALL-MOUNTED THERMOSTAT. THE UNIT

SHALL RUN SUBJECT TO THE UNIT MANUFACTURER'S SAFETIES.

M-602

STEAM UNIT HEATER SEQUENCE OF OPERATION

M-602

HYDRONIC FAN COIL UNIT SEQUENCE OF OPERATION

M-602

GENERATOR ROOM FAN SEQUENCE OF OPERATION

POINTS SUMMARY

DDC HARD WIRED

POINTS

EQUIPMENT

INTERFACE

GUI APPLICATION

ALARMING

SCENARIOS

ALARM

PRIORITIES

# CONTROL POINTS TAG D

IG

IT

A

L I

N P

U T

S

D

IG

IT

A

L O

U T

P U

T S

A N

A L O

G I

N P

U T

S

A N

A L

O G

O U

T P

U T

S

R E

A D

D

A T

A P

O

IN

T

R E

A D

/W R

IT

E

D

A T

A P

O

IN

T

T R

E N

D L

O G

G

IN

G

R U

N T

IM

E

A C

C U

M U

L A

T

IO

N

O P

E R

A T

IO

N

S C

H E

D U

L E

S C

R E

E N

D

IS

P L A

Y E

D

U S

E R

O V

E R

R

ID

E

O U

T O

F R

A N

G E

P O

IN

T

S T

A T

U S

C O

M M

A N

D F

A

IL

U R

E

C A

L C

U L A

T E

D E

V E

N T

N O

T

IF

IC

A

T

IO

N

M A

IN

T

E N

A N

C E

M A

J O

R

C R

IT

IC

A L

SUPPLEMENTARY NOTES:

1 LOW COOLANT TEMP X X X X X X TYPICAL FOR GENERATORS 1 & 2

2 LOW OIL PRESSURE X X X X X X TYPICAL FOR GENERATORS 1 & 2

3 UNDER FREQUENCY X X X X X X TYPICAL FOR GENERATORS 1 & 2

4 OVER FREQUENCY X X X X X X TYPICAL FOR GENERATORS 1 & 2

5 UNDER VOLTAGE X X X X X X TYPICAL FOR GENERATORS 1 & 2

6 OVER VOLTAGE X X X X X X TYPICAL FOR GENERATORS 1 & 2

7 CRITICAL LOW FUEL LEVEL SHUTDOWN X X X X X X TYPICAL FOR GENERATORS 1 & 2

8 PHASE TO PHASE VOLTAGE X X X X X X TYPICAL FOR GENERATORS 1 & 2

9 POWER (KW, KVAR) POWER FACTOR X X X X X X TYPICAL FOR GENERATORS 1 & 2

10 FREQUENCY X X X X X X TYPICAL FOR GENERATORS 1 & 2

11 GENERATOR OVERLOAD X X X X X X TYPICAL FOR GENERATORS 1 & 2

12 NUMBER OF ENGINE STARTS X X X X X X TYPICAL FOR GENERATORS 1 & 2

13 HIGH WATER TEMPERATURE X X X X X X TYPICAL FOR GENERATORS 1 & 2

14 LOW OIL PRESSURE X X X X X X TYPICAL FOR GENERATORS 1 & 2

15 HIGH BATTERY VOLTAGE X X X X X X TYPICAL FOR GENERATORS 1 & 2

16 LOW BATTERY VOLTAGE X X X X X X TYPICAL FOR GENERATORS 1 & 2

17 CHARGER FAIL X X X X X X TYPICAL FOR GENERATORS 1 & 2

18 OVERSPEED X X X X X X TYPICAL FOR GENERATORS 1 & 2

19 OVERCRANK X X X X X X TYPICAL FOR GENERATORS 1 & 2

20 CRANK FAIL X X X X X X TYPICAL FOR GENERATORS 1 & 2

21 NOT IN AUTO POSITION X X X X X X TYPICAL FOR GENERATORS 1 & 2

22 LOW COOLANT LEVEL X X X X X X TYPICAL FOR GENERATORS 1 & 2

23 GENERATOR RUN X X X X X X TYPICAL FOR GENERATORS 1 & 2

24 GENERATOR OUTPUT BREAKER OPEN X X X X X X TYPICAL FOR GENERATORS 1 & 2

25 GENERATOR CONTROL FAILURE ALARM X X X X X X TYPICAL FOR GENERATORS 1 & 2

26 GENERATOR FAILURE X X X X X X TYPICAL FOR GENERATORS 1 & 2

27 GENERATOR E-STOP X X X X X X

28 FUEL TANK - LEVEL X X X

29 FUEL TANK - WATER IN TANK X X X X X

30 FUEL TANK - TANK FUEL LEAK X X X X X

31 FUEL TANK - WATER IN INTERSTITIAL SPACE X X X X X

32 FUEL TANK - CRITICAL ALARM X X X X X

33 FUEL TANK - CRITICAL LOW FUEL LEVEL X X X X X

34 FUEL TANK - FUEL TEMPERATURE X X X X X X

35 FUEL TANK - FUEL SPILL X X X X X

M-602

GENERATOR BAS POINTS LIST

NOTES:

GENERATORS AND FUEL MONTORING SHALL BE VIA MODBUS OR BACNET COMMUNICATION CARD. GENERATOR E-STOP SHALL BE

HARD WIRED. PROVIDE THE FOLLOWING POINTS AT A MINIMUM.

GENERATOR ROOM SUPPLY AND EXHAUST FANS

UNITS WILL BE PROVIDED WITH A FACTORY MOUNTED DISCONNECT

SWITCHES AND FACTORY INSTALLED VFD DEVICES. WHEN BAS SIGNALS

GENERATOR OPERATION, ASSOCIATED DAMPERS SHALL OPEN AND

FANS SHALL RUN CONTINUOUSLY SUBJECT TO SAFETIES. FANS SHALL

RUN FOR 30 MINUTES (ADJ.) FOLLOWING THE CONCLUSION OF

GENERATOR OPERATION. VFD SHALL BE USED TO PROVIDE A SOFT

START TO FAN OPERATION.

POINTS SUMMARY

DDC HARD WIRED

POINTS

# CONTROL POINTS D

IG

IT

A

L I

N P

U T

S

D

IG

IT

A

L O

U T

P U

T S

A N

A L O

G I

N P

U T

S

A N

A L

O G

O U

T P

U T

S

1 UNIT HEATER ON/OFF (UH-1)

2 UNIT HEATER ALARMS (UH-1)

4 FAN COIL UNIT ALARMS (FCU-1)

3 FAN COIL UNIT ON/OFF (FCU-1)

5 FAN COIL UNIT ALARMS (FCU-2)

6 FAN COIL UNIT ON/OFF (FCU-2)

X X

X

X X

X

X X

X

5 EXHAUST FAN ALARMS (EF-1)

6 EXHAUST FAN ON/OFF (EF-1)

X X

X

36 VENTILATION FAN ON/OFF X X

37 VENTILATION DAMPER OPEN/CLOSE X X X

38 VENTILATION FAN FAILURE

39 VENTILATION DAMPER FAILURE

X

X X X

X X X

X

X

X

X

X

X

TYPICAL FOR CD 1-8

TYPICAL FOR SF-1 AND SF-2

TYPICAL FOR SF-1 AND SF-2

TYPICAL FOR CD 1-8

M-602

BAS POINTS LIST

1. BUILDING OWNER SHALL BE CONSULTED TO IDENTIFY PREFERRED

CONTROLS CONTRACTOR. ALL WORK DONE TO EXISTING BAS SYSTEM

SHALL BE COMPLETED USING IDENTIFIED CONTRACTOR.

2. THE CURRENT CONTROLS CONTRACTOR FOR HDI FEDERAL CENTER IS

SCHNEIDER ELECTRIC - HAVEL BROTHERS.

GENERAL NOTES

W

1X K

-1 8-

R -0

PRESSURE GAUGE RANGE: 0 TO 200 PSIG

THERMOMETER RANGE: 50°F TO 250°F

1. ALL PIPES AND LINES TO BE DOWNWARD SLOPED FROM

RADIATOR TO ENGINE. NO TRAPS ALLOWED.

2. ALL FLEX CONNECTORS MUST BE CONNECTED DIRECTLY

TO RADIATOR AND ENGINE.

3. DO NOT SUPPORT PIPES FROM BASE OR ENGINE.

4. FLUID SHALL BE A 50/50 MIX OF WATER AND GLYCOL.

SYSTEM FILL SHALL BE ACCESSIBLE THROUGH THE SURGE

TANK ON THE RADIATOR.

DETAIL A

CHARGED AIR COOLER

ROOF

NOTE:

NOTES:

AIR FLOW

1/2" NPT VENT DRAIN VALVE

PROVIDED W/ RADIATOR

1000 kW/1250 kVA

DIESEL GENERATOR SET

5" NPT BUTTERFLY VALVE

USE VITON SEALS FOR

210° F OPERATION (TYP.)

1" BALL DRAIN VALVE

WITH 1' NIPPLE AND CAP

(TYP.)

5" DIA PIPE, SCH. 40

PUMP REFER

TO DETAIL "A"

CHARGED AIR COOLER

REFER TO DETAIL "A"

1" BALL DRAIN VALVE

WITH 1" NIPPLE AND CAP

AT LOW POINTS (TYP.)

VENT FLEX CONNECTORS MUST

BE DIRECTLY CONNECTED TO

ENGINE

THERMOWELL

WITHIN 5 FT OF

RADIATOR

(TYP.)

CONTROL

PANEL

5" X 16 LG FLANGED

FLEX (TYP.)

SIGHT GLASS/LEVEL

SWITCH 1/2" NPT

SURGE TANK

RADIATOR CAP

40,549 BTU/MIN 55 DBA AT 50

FT

DIFFERENTIAL

PRESSURE

SWITCH & GAUGE

COOLING WATER

FROM RADIATOR

COOLING

WATER TO

RADIATOR

PUMP 120

GPM

PRESSURE

GAUGE AND

THERMOMETER

CIRCUIT

SETTER

COLD

INLET

HOT

OUTLET

3/4" BALL DRAIN VALVE WITH

1/2" NIPPLE AND CAP AT LOW

POINTS (TYP.)

CHARGE AIR OUT

CHARGE AIR IN

(3094 SCFM)

461°F

129°F120°F

149°F

INTERCOOLER IN

(120 GPM)

INTERCOOLER OUT

(120 GPM)

JACKET WATER IN (150 GPM)

JACKET WATER OUT (150 GPM)

190°F

210°F

SECOND FLOOR

3" DIA PIPE, SCH. 40

PRESSURE

GAUGE AND

THERMOMETER

3" NPT BUTTERFLY VALVE

USE VITON SEALS FOR

210° F OPERATION (TYP.)

3" X 16 LG FLANGED

FLEX (TYP.)

FURNISH AND INSTALL

METAL SLEEVES AND

RISER CLAMPS AT

FLOOR PENETRATIONS

(TYP.)

M-603

COOLANT PIPING DIAGRAM

N.T.S.

M-402

SURGE TANK AND

APPURTENANCES INTEGRAL TO

RADIATOR.

M E

C H

A N

IC

A

L

S C

H E

M A

T

IC

S

M-603

J

R U

T L E

D G

E

J

R U

T L E

D G

E H D

I_ M

-5 .D

W G

J

R U

T L E

D G

E S

O L

IC

IT

A T

IO

N

N O

P L

O T

S C

A L E

D R

A W

N B

Y

C K

D B

Y

D E

S

IG

N B

Y

D

2 3

C

4 5

A

B

IS

S

U E

D A

T E

S

IZ

E

S B

M T

B Y

F

IL

E N

A M

E

D E

S C

R

IP

T

IO

N D

A T

E

C O

N T

R A

C T

N O

M A

R K

A P

P R

F

IL

E N

U M

B E

R

"x

J U

N E

Fort Worth District

US Army Corps of Engineers ®

P L

O T

D A

T E

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

F O

R T

W O

R T

H D

IS

T

R

IC

T D

L A

G E

N E

R A

T O

R R

E P

L A

C E

M E

N T

H A

R T

-D O

L E

-I N

O U

Y E

F E

D C

E N

T E

R

SHEET

IDENTIFICATION

N M

IC

H

IG

A

N A

V E

S

U

IT

E

C H

IC

A

G O

IL

T

.6

.7 w w w .e x p fe d e ra l.

c o m

P R

O J N

O

C H

I-

-A

/3

/2

PROPERTY OF THE

UNITED STATES GOVERNMENT

FOR OFFICIAL USE ONLY

DO NOT REMOVE THIS NOTICE

PROPERLY DESTROY DOCUMENTS

WHEN NO LONGER NEEDED

A S

N O

T E

D

G G

O R

S L

IN

E

CERTIFIED FINAL

B

C O

E S

R E

V

IE

W

IN

T

E R

IM

D

E S

IG

N

R E

V

IE

W

D

E S

IG

N

R E

V

IE

W

/1 /1

/1 /1

/0 /1

B

C O

E S

B A

C K

C H

E C

K

/0

/1

C E

R T

IF

IE

D F

IN

A

L

/3

/1

W

X

K -1

-R

-0

LINE ITEM

W

1X K

-1 8-

R -0

1X K

-1 8-

R -0

FAN COIL UNIT SCHEDULE

UNIT CAPACITY DESIGN CONDITIONS PERFORMANCE DATA

ELEC. DATA

REMARKS

NO.

BASIS

OF

DESIGN

MODEL #

NOMINAL

COOLING

CAPACITY

(BTU/H)

NOMINAL

HEATING

CAPACITY

(BTU/H)

COOLING

DESIGN

ENTERING

TEMP

DB/WB (F)

COOLING

DIVERSITY

COOLING

TOTAL

CAPACITY

(BTU/H)

COOLING

SENSIBLE

CAPACITY

(BTU/H)

HEATING

CAPACITY

(BTU/H)

EST.

COOLING

COIL LAT

(F) VOLTAGE PHASE

POWER

INPUT

(KW)

MCA/

MOP

WEIGHT

FCU-1 CARRIER 42DF03 9,000 N/A

HEATING

DESIGN

ENTERING

TEMP

DB/WB (F)

80/67 70 FULL DEMAND

HEATING

DIVERSITY

N/A

COIL INLET

/ OUTLET /

DRAIN /

TELL-TALE

(INCH)

5/8 - 5/8 - 7/8

- 5/8

EST.

HEATING

COIL LAT

(F)

9000 6300 NA 61.5 NA

NOMINAL

AIRFLOW

(CFM)

SPL PER

FAN

SPEED

(dBA)

300 46-51-61

FAN DATA

120 1 0.09 0.35/15

TYPE

DUCTED

CEILING

MOUNT

REMARKS:

1. HYDRONIC COOLING ONLY. PROVIDE CONTAINMENT AND LEAK DETECTION ON HYDRONIC PIPING.

2. PROVIDE CONDENSATE PAN, DRAIN, AND LEAK DETECTOR.

3. PROVIDE 2-HOUR RATED FIRESTOP SYSTEMS ON ALL PENETRATIONS.

4. PROVIDE LOCAL THERMOSTAT TO CONTROL FAN COIL UNIT START/STOP. START ON TEMPERATURE ABOVE 75 DEGREES

(ADJ). AUTOMATIC STOP AFTER 15 MINUTES (ADJ).

157 1-6

PIPING

FCU-2 CARRIER 42DF03 9,000 N/A 80/67 70 FULL DEMAND N/A

5/8 - 5/8 - 7/8

- 5/8

9000 6300 NA 61.5 NA 300 46-51-61 120 1 0.09 0.35/15

DUCTED

CEILING

MOUNT

157 1-6

TAG LOCATION BASIS OF DESIGN DRIVE CFM ESP (IN. WG) TSP (IN. WG) FAN RPM BHP V/C/P SONES (INLET) NOTES

EF-1 GREENHECK CSP-A110 DIRECT 90 0.327 950 0.01 115/60/1 1.4 1, 2, 3

NOTES:

1. BACKDRAFT DAMPER, GRAVITY OPERATED

2. SOLID STATE SPEED CONTROL, FACTORY MOUNTED

FAN SCHEDULE

1A-SB-14

TAG LOCATION BASIS OF DESIGN UNIT CAPACITY CFM CONDENSATE (LBS/HR) STEAM TEMP FAN RPM MOTOR HP V/C/P NOTES

UH-1 UHS-042 42 MBH 595 42 250 F 1550 1/40 115/60/1 1, 2, 3, 4

NOTES:

1. VARIABLE SPEED CONTROLLER

2. WALL MOUNTED THERMOSTAT

STEAM UNIT HEATER SCHEDULE

2B-B-1B

FINAL AIR TEMP

124 F

3. PROVIDE ELECTRICAL DISCONNECT SWITCH.

5. PROVIDE ELECTRICAL DISCONNECT SWITCH.

3. PROVIDE ELECTRICAL DISCONNECT SWITCH.

BELT 0.6 0.6 10 480/60/3 55 1, 3, 4BASEMENT GEN RM GREENHECK SBS-3H60

4. PROVIDE WALL HOUSING AND ASSOCIATED WALL SUPPORTS BY MANUFACTURER.

SERVES

EXHAUST

VF-2 BELT 42400 0.6 0.6 603 10 480/60/3 55 1, 3, 4BASEMENT GEN RM SUPPLY

0.10

6. MANUFACTURER PROVIDED UNIT INTEGRAL CONTROLLER WITH BAS CONNECTION.

4. MANUFACTURER PROVIDED UNIT INTEGRAL CONTROLLER WITH BAS CONNECTION.

VF-1 42400SUPPLY

GREENHECK SBS-3H60

S O

L

IC

IT

A

T

IO

N N

O

P L

O T

S C

A L E

D R

A W

N B

Y

C K

D B

Y

D E

S

IG

N B

Y

D

2 3

C

4 5

A

B

IS

S

U E

D A

T E

S

IZ

E

S B

M T

B Y

F

IL

E N

A M

E

D E

S C

R

IP

T

IO

N D

A T

E

C O

N T

R A

C T

N O

M A

R K

A P

P R

F

IL

E N

U M

B E

R

"x

J U

N E

Fort Worth District

US Army Corps of Engineers ®

P L

O T

D A

T E

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

F O

R T

W O

R T

H D

IS

T

R

IC

T D

L A

G E

N E

R A

T O

R R

E P

L A

C E

M E

N T

H A

R T

-D O

L E

-I N

O U

Y E

F E

D C

E N

T E

R

SHEET

IDENTIFICATION

N M

IC

H

IG

A

N A

V E

S

U

IT

E

C H

IC

A

G O

IL

T

.6

.7 w w w .e x p fe d e ra l.

c o m

P R

O J N

O

C H

I-

-A

/3

/2

PROPERTY OF THE

UNITED STATES GOVERNMENT

FOR OFFICIAL USE ONLY

DO NOT REMOVE THIS NOTICE

PROPERLY DESTROY DOCUMENTS

WHEN NO LONGER NEEDED

A S

N O

T E

D

G G

O R

S L

IN

E

CERTIFIED FINAL

B

C O

E S

R E

V

IE

W

IN

T

E R

IM

D

E S

IG

N

R E

V

IE

W

D

E S

IG

N

R E

V

IE

W

/1 /1

/1 /1

/0 /1

B

C O

E S

B A

C K

C H

E C

K

/0

/1

C E

R T

IF

IE

D F

IN

A

L

/3

/1

W

X

K -1

-R

-0

M E

C H

A N

IC

A

L

S C

H E

D U

L E

S

M-702

S

B A

R R

E T

T

S

B A

R R

E T

T

H D

I_ M

-7 .D

W G

J

R U

T L E

D G

E

GENERATOR COOLING

SERVICE

BUILDING 5 ROOFRR-1

LOCATIONTAG

REMOTE RADIATOR

REMARKS

REMARKS:

1. PROVIDE WITH DISCONNECT BY MANUFACTURER.

2. PROVIDE WITH MOTOR STARTER BY MANUFACTURER.

3. PROVIDE UNIT CLEARANCES AS RECOMMENDED BY

MANUFACTURER.

4. INTERLOCK WITH GENERATOR OPERATION.

1-410

FAN

HP

GENERATOR COOLINGBUILDING 5 ROOFRR-2 1-410

RADIATORS SHALL BE SIZED AND

SUPPLIED BY THE GENERATOR

MANUFACTURER

RR

480/3/60

V/C/P

480/3/60

W

1X K

-1 8-

R -0

F1

CB

T

SPD

C

LCP

M

K

VFD

3a

F1 3a

F1 3a

F1 3a

OS

ab

OHP

PB

OR

S1 3a

J

J

J

J b

3W

PC

D b ab

TC

VS

OS

F1 3a

J

S O

L

IC

IT

A

T

IO

N N

O

P L

O T

S C

A L E

D R

A W

N B

Y

C K

D B

Y

D E

S

IG

N B

Y

D

2 3

C

4 5

A

B

IS

S

U E

D A

T E

S

IZ

E

S B

M T

B Y

F

IL

E N

A M

E

D E

S C

R

IP

T

IO

N D

A T

E

C O

N T

R A

C T

N O

M A

R K

A P

P R

F

IL

E N

U M

B E

R

"x

J U

N E

Fort Worth District

US Army Corps of Engineers ®

P L

O T

D A

T E

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

F O

R T

W O

R T

H D

IS

T

R

IC

T D

L A

G E

N E

R A

T O

R R

E P

L A

C E

M E

N T

H A

R T

-D O

L E

-I N

O U

Y E

F E

D C

E N

T E

R

SHEET

IDENTIFICATION

N M

IC

H

IG

A

N A

V E

S

U

IT

E

C H

IC

A

G O

IL

T

.6

.7 w w w .e x p fe d e ra l.

c o m

P R

O J N

O

C H

I-

-A

/3

/2

PROPERTY OF THE

UNITED STATES GOVERNMENT

FOR OFFICIAL USE ONLY

DO NOT REMOVE THIS NOTICE

PROPERLY DESTROY DOCUMENTS

WHEN NO LONGER NEEDED

A S

N O

T E

D

G G

O R

S L

IN

E

CERTIFIED FINAL

B

C O

E S

R E

V

IE

W

IN

T

E R

IM

D

E S

IG

N

R E

V

IE

W

D

E S

IG

N

R E

V

IE

W

/1 /1

/1 /1

/0 /1

B

C O

E S

B A

C K

C H

E C

K

/0

/1

C E

R T

IF

IE

D F

IN

A

L

/3

/1

W

X

K -1

-R

-0

E L E

C T

R

IC

A L

S Y

M B

O L S

E-001

G

G O

R S

L

IN

E

J H

U E

R T

A

H D

I_ E

-0 .D

W G

B

B R

E U

N

IG

ELECTRICAL

SLIDE DIMMER

FLEXIBLE CONDUIT, 6FT MAXIMUM, UNO

NONFUSED DISCONNECT SWITCH WITH LIQUID TIGHT

FLEXIBLE CONDUIT AND FINAL CONNECTION

CIRCUIT BREAKER THERMAL MAGNETIC TRIP

UNLESS NOTED OTHERWISE

THREE WAY TOGGLE SWITCH

WHERE SHOWN, ARROWHEAD DENOTES HOME RUN TO

PANEL BOARD; SLASH LINES INDICATE QUANTITY OF

WIRES, NEUTRAL WIRE SHOWN AS A LONG LINE PHASE

WIRE AND SWITCH LEGS SHOWN AS SHORT LINES, AND

GROUND WIRE SHOWN AS A LONG LINE WITH A DOT.

REFER TO E002 NOTES FOR BRANCH CIRCUIT WIRING.

POLE MOUNTED SITE LIGHT

GFCI

JUNCTION BOX WITH BLANK COVER

DUPLEX RECEPTACLE MOUNTED IN FLUSH FLOOR BOX

DUPLEX RECEPTACLE FOR WORLD CLOCK

WALL MOUNTED JUNCTION BOX WITH BLANK

COVER

120V, 20A CIRCUIT FOR OVERHEAD PROJECTOR

WEATHER PROOF WHILE IN USE ENCLOSURE WITH

GROUND FAULT CIRCUIT INTERRUPTER DUPLEX

RECEPTACLE

FUSED DISCONNECT SWITCH WITH LIQUID TIGHT

FLEXIBLE CONDUIT AND FINAL CONNECTION

LIGHTING CONTACTOR

SURGE PROTECTIVE DEVICE

LIGHTING CONTROL PANEL

DOUBLE DUPLEX RECEPTACLE WITH COMMON COVER

PLATE, WHERE TWO (2) CIRCUITS SHOWN, EACH

DUPLEX ON A SEPARATE CIRCUIT

DOUBLE DUPLEX RECEPTACLE MOUNTED IN FLUSH FLOOR

BOX

GROUND FAULT CIRCUIT INTERRUPTER DUPLEX

RECEPTACLE

SPECIAL RECEPTACLE, NEMA RATING AS INDICATED ON

DRAWING

BRANCH CIRCUIT PANELBOARD

RP

MP MECHANICAL POWER PANELBOARD

POWER PANELBOARD

RECEPTACLE PANELBOARD

LIGHTING PANELBOARDLP

UP

PP

UPS RECEPTACLE PANELBOARD

DP DISTRIBUTION PANELBOARD

UP/DOWN/STOP PUSHBUTTON CONTROL

STATION

VARIABLE FREQUENCY DRIVE

COMBINATION MAGNETIC MOTOR STARTER AND

DISCONNECTING MEANS WITH OVERCURRENT DEVICE

MOTOR (REFER TO MECH DRAWINGS FOR REQUIREMENTS)

PROVIDE LIQUIDTIGHT FLEX CONNECTION AND JUNCTION

BOX

SINGLE POLE TOGGLE SWITCH, 20A, 120277V, WALL

MOUNTED

"b" INDICATES SWITCH LEG

LOW VOLTAGE LIGHTING CONTROL WALLSTATION

DUPLEX RECEPTACLE, NEMA 520R, WALL MOUNTED

EMERGENCY POWER OFF SWITCH, RED MUSHROOM

TYPE WITH CLEAR PROTECTIVE COVER

120V, 20A CIRCUIT FOR MOTORIZED PROJECTION SCREEN

EXOTHERMIC WELD CONNECTION OR LISTED IRREVERSIBLE

HIGH COMPRESSION FITTING

RECEPTACLE ON UPS PANEL

POKETHROUGH COMBINATION DUPLEX RECEPTACLE AND

TELECOMMUNICATION OUTLET (REFER TO TELECOM

DRAWINGS FOR TELE/DATA DEVICE REQUIREMENTS)

POKETHROUGH COMBINATION DOUBLE DUPLEX

RECEPTACLE AND TELECOMMUNICATION OUTLET (REFER

TO TELECOM DRAWINGS FOR TELE/DATA DEVICE

REQUIREMENTS)

F1

F1E

2x4 NORMAL POWER

REFER TO LIGHTING FIXTURE SCHEDULE

FIXTURE TAGS:

"F1" INDICATES FIXTURE TYPE, "3" INDICATES CIRCUIT

NUMBER, "a" INDICATES SWITCH LEG

EXIT SIGNS: SHADING INDICATES ILLUMINATED FACE,

ARROW INDICATES CHEVRON DIRECTION,

"5" INDICATES CIRCUIT NUMBER

LOW VOLTAGE LIGHTING CONTROL WALLSTATION

"D" INDICATES DIMMING CONTROL

ab

HB

NO TEXT INDICATES DUAL TYPE,

"HB" INDICATES HIGH BAY INFRARED

TYPE,

"IR" INDICATES INFRARED ONLY TYPE

MPS

ST

DUPLEX RECEPTACLE FOR TELEVISION, 54" AFF

UNO

J FLUSH FLOOR BOX WITH COVERJ

LIGHTING SYMBOLS

WIRING AND RACEWAY SYMBOLS

LIGHTING CONTROL SYMBOLS

D

TOGGLE SWITCH WITH WEATHERPROOF NEMA 3R COVER

WP

THREE POSITION MOMENTARY CONTACT SWITCH

MC

TOGGLE SWITCH WITH PILOT LIGHT

P

SINGLE PHASE MANUAL MOTOR STARTER SWITCH WITH

THERMAL OVERLOAD ELEMENT, "TP" INDICATES PILOT

LIGHT

T

FAN CONTROL STATION

F

DIGITAL PUSHBUTTON TIME SWITCH WITH MAXIMUM

DURATION OF 30 MINUTES

TM

ASTRONOMIC TIME CLOCK

VACANCY SENSOR, CEILING MOUNTED COMPLETE WITH

RELAY(S) AND CONNECTIONS

RECEPTACLE SYMBOLS

WP

U

DUPLEX RECEPTACLE MOUNTED ABOVE COUNTER TOP

3" ON CENTER ABOVE TOP OF BACKSPLASH

TV

CL

PANELBOARD SYMBOLS EQUIPMENT SYMBOLS MOTORS AND CONTROL SYMBOLS

ONE LINE SYMBOLS

MISCELLANEOUS SYMBOLSGROUNDING SYMBOLS

1x4 NORMAL POWER

DOWNLIGHT NORMAL POWER

STRIP LIGHT NORMAL POWER

NIGHT LIGHTS: SHADING INDICATES CONNECTION AHEAD

OF CONTROL SWITCHES, "E" INDICATES FIXTURE

INCLUDES EMERGENCY BACKUP

2x4 EMERGENCY POWER NIGHT LIGHT

1x4 NORMAL POWER NIGHT LIGHT

STRIP LIGHT NORMAL POWER NIGHT LIGHT

F1

DOWNLIGHT NORMAL POWER NIGHT LIGHT

EXIT SIGN CEILING MOUNTED

EXIT SIGN WALL MOUNTED, 6" ABOVE DOOR LEVEL,

UNO

OCCUPANCY SENSOR, CEILING MOUNTED

COMPLETE WITH RELAY(S) AND CONNECTIONS

MDP MAIN DISTRIBUTION PANELBOARD

SWBD SWITCHBOARD

MONUMENT FLOOR BOX WITH FLEX

MONUMENT FLOOR BOX WITH DUPLEX

120V, 20A CIRCUIT FOR MOTORIZED BLINDS

MB

SHUNT TRIP

KEY INTERLOCK

METER

POTENTIAL TRANSFORMER, RATING AS INDICATED

NORMALLY OPEN CONTACT

NORMALLY CLOSED CONTACT

PUSH BUTTON NORMALLY CLOSED

PUSH BUTTON NORMALLY OPEN

SELECTOR SWITCH N.O./N.C.

THERMAL OVERLOAD

SEPARABLE CONNECTORS

TRANSFORMER

CURRENT TRANSFORMER, RATING AS INDICATED

GROUND

FUSE

MAGNETIC MOTOR STARTER

TRANSFORMER

ENCLOSED CIRCUIT BREAKER

KEYED NOTE DESIGNATION

FEEDER TAG

EQUIPMENT TAG

LIGHTNING PROTECTION AIR TERMINAL

GROUND ROD

GROUND BAR

MISCELLANEOUS PANELS AND CABINETS

POWER DISTRIBUTION PANELBOARD

LETTERS INDICATE SWITCH LEGS

CONTROLLED. PROVIDE 13 POLE

RELAYS AS NECESSARY.

WALL MOUNTED WHEN INDICATED

CONDUIT STUBBED UP

CONDUIT STUBBED DOWN

CONDUIT STUBBED OUT WITH CAP

BUS DUCT FEEDER OR PLUGIN

PULL BOX

PHOTOCELL

SINGLE RECEPTACLE

REFER TO SHEET ED600 FOR ADDITIONAL

ONELINE SYMBOLS

EQUIPMENT FRONT

POINT OF CONNECTION BETWEEN

EXISTING AND NEW SYSTEMS

DUPLEX RECEPTACLE MOUNTED ON CEILING

W

1X K

-1 8-

R -0

1X K

-1 8-

R -0

L

IC

IT

A

T

IO

N N

O

P L

O T

S C

A L E

D R

A W

N B

Y

C K

D B

Y

D E

S

IG

N B

Y

D

2 3

C

4 5

A

B

IS

S

U E

D A

T E

S

IZ

E

S B

M T

B Y

F

IL

E N

A M

E

D E

S C

R

IP

T

IO

N D

A T

E

C O

N T

R A

C T

N O

M A

R K

A P

P R

F

IL

E N

U M

B E

R

"x

J U

N E

Fort Worth District

US Army Corps of Engineers ®

P L

O T

D A

T E

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

F O

R T

W O

R T

H D

IS

T

R

IC

T D

L A

G E

N E

R A

T O

R R

E P

L A

C E

M E

N T

H A

R T

-D O

L E

-I N

O U

Y E

F E

D C

E N

T E

R

SHEET

IDENTIFICATION

N M

IC

H

IG

A

N A

V E

S

U

IT

E

C H

IC

A

G O

IL

T

.6

.7 w w w .e x p fe d e ra l.

c o m

P R

O J N

O

C H

I-

-A

/3

/2

PROPERTY OF THE

UNITED STATES GOVERNMENT

FOR OFFICIAL USE ONLY

DO NOT REMOVE THIS NOTICE

PROPERLY DESTROY DOCUMENTS

WHEN NO LONGER NEEDED

A S

N O

T E

D

G G

O R

S L

IN

E

CERTIFIED FINAL

B

C O

E S

R E

V

IE

W

IN

T

E R

IM

D

E S

IG

N

R E

V

IE

W

D

E S

IG

N

R E

V

IE

W

/1 /1

/1 /1

/0 /1

B

C O

E S

B A

C K

C H

E C

K

/0

/1

C E

R T

IF

IE

D F

IN

A

L

/3

/1

W

X

K -1

-R

-0

E L E

C T

R

IC

A L

P H

A S

IN

G

N O

T E

S

E-003

G

G O

R S

L

IN

E

J H

U E

R T

A

H D

I_ E

-0 .D

W G

B

B R

E U

N

IG

ELECTRICAL

PROJECT PHASING NOTES

PROJECT IMPLEMENTATION WILL REQUIRE PHASING TO MAINTAIN THE

ELECTRICAL SYSTEM IN AN OPERATIONAL/FULLY READY STATE DURING

CONSTRUCTION ACTIVITIES PER NFPA 1014.6.10. THE CONTRACTOR IS

RESPONSIBLE FOR DETERMINING AND SUBMITTING FOR APPROVAL A

DETAILED PHASING PLAN THAT ALLOWS FOR THE PROJECT SCOPE WHILE

SUPPORTING THE NEED OF THE FEDERAL CENTER TO REMAIN FULLY

OPERATIONAL. THE PHASING NOTES INCLUDED HERE ARE FOR

REFERENCE DURING PRICING AND OFFER A POSSIBLE SOLUTION FOR

PHASING THE WORK OF THIS PROJECT.

STEP 1

IDENTIFY AND TRACE ALL LOADS FED FROM THE LOAD SIDE OF THE

EXISTING AUTOMATIC TRANSFER SWITCH, LOCATED IN THE PARALLELING

SWITCHGEAR ROOM. THOSE LOADS THAT SUPPORT THE EXISTING

GENERATOR PLANT SHALL REMAIN ASIS, INCLUDING FUEL PUMPS,

CRANKCASE HEATERS, BATTERY CHARGERS, AND LOADS IN THE EXISTING

GENERATOR, SWITCHGEAR, AND FUELING ROOMS INCLUDING HVAC,

LIGHTING, AND RECEPTACLES. LOADS THAT FEED DEVICES OUTSIDE OF

THE GENERATOR PLANT STRUCTURE THAT NEED TO REMAIN CONTINUOUS

DURING CONSTRUCTION SHALL BE TRANSFERRED TO OTHER DISTRIBUTION

PANELS.

STEP 2

THE EXISTING MAIN UPS SYSTEM WILL BE TESTED BY OTHERS.

COORDINATE WITH THE TESTING TEAM AND PROVIDE SUPPORT AS IT

RELATES TO THE GENERATOR REPLACEMENT PROJECT. UTILIZE

NECESSARY OUTAGES TO ACCOMPLISH WORK UNDER THIS CONTRACT AS

POSSIBLE.

STEP 3

PROVIDE TEMPORARY GENERATORS AND TEMPORARY PARALLELING

SWITCHGEAR TO FEED THE BUILDING LOAD, SIZED COMPARABLY TO THE

EXISTING GENERATOR PLANT. THE TEMPORARY GENERATORS SHALL BE

CONFIGURED IN A N+1 CONFIGURATION TO MATCH THE EXISTING

GENERATOR PLANT REDUNDANCY. PRIOR TO CONNECTION TO BUILDING

LOADS, PROVIDE LOAD BANK TESTING OF THE FULL SERVICE LOAD OF

THE TEMPORARY GENERATOR PLANT IN ACCORDANCE WITH NFPA 110.

STEP 4

THE TEMPORARY GENERATOR PLANT SHALL BE INTERCONNECTED WITH

THE EXISTING SYSTEM INCREMENTALLY TO MINIMIZE DISRUPTION TO

EXISTING GOVERNMENT OPERATIONS. GOVERNMENT REQUIREMENTS

NECESSITATE THE WEEKLY TESTING OF THE STANDBY POWER SYSTEM FOR

A USER INSIDE THE FACILITY. CONTRACTOR SHALL PROVIDE SUPPORT

FOR THIS TESTING WHILE THE TEMPORARY GENERATOR SYSTEM IS

OPERATIONAL, AND DURING THE TESTING PHASE OF THE NEW GENERATOR

PLANT. CONTRACTOR SHALL INCLUDE FUELING AND MAINTENANCE FOR

THE TEMPORARY GENERATOR PLANT TO SUPPORT GOVERNMENT ACTIVITIES.

STEP 5

PROVIDE TEMPORARY FEEDERS TO THE DEVICES THAT ARE FED BY THE

EXISTING PARALLELING SWITCHGEAR. INTERCEPT EXISTING FEEDERS AT

LOCATIONS OUTSIDE OF THE EXISTING GENERATOR ROOM AND

PARALLELING SWITCHGEAR ROOM WHERE POSSIBLE. THE FEEDERS TO

THE TWO STEPUP TRANSFORMERS IN THE PARALLELING SWITCHGEAR

ROOM WILL NEED TO ROUTE DIRECTLY TO THE TWO TRANSFORMERS.

SALVAGE AS MUCH LENGTH FROM THE MI CONDUCTORS FOR THE FIRE

PUMP EMERGENCY FEEDER AS POSSIBLE FOR REUSE, WITHOUT CUTTING

EXISTING FEEDER. MIGRATE FEEDERS TO THE TEMPORARY GENERATOR

P…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.