Text version

W56MES00855897

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Fox River Removal & Replacement of Spillw ays Piers and Walkw ays Amendment 0006

This amendment is issued to make the follow ing changes to the plans and specif ications. See attached. The bid opening date has been extended to 10 Aug 2010 at 2:00 p.m. local time. This acquisition is being solicited as unrestricted.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 27-Jul-2010

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911XK-10-B-0004

X 9B. DATED (SEE ITEM 11)

22-Jun-2010

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

27-Jul-2010

CODE

CONTRACTING DIVISION

DETROIT DISTRICT

477 MICHIGAN AVE

RM 700

DETROIT MI 48226-2550

W911XK 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911XK-10-B-0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0006

Solicitation Amendment No. 0006 For Solicitation No. W911XK-10-B-0004 FY10 Fox River Removal and Replacement of Spillway Piers and Walkways

CHANGES TO PLANS

SHEETS 1 Through 20 DELETE : All sheets ADD: SHEETS 1 through 20, Revised Plans

CHANGES TO THE SPECIFICATIONS

DELETE: All SECTIONS

ADD:

DIVISION 01 - GENERAL REQUIREMENTS

01 10 10 REAL ESTATE

01 22 00.00 10 MEASUREMENT AND PAYMENT

01 33 00 SUBMITTAL PROCEDURES

01 35 13.10 SPECIAL PROJECT PROCEDURES

01 35 29 SAFETY AND OCCUPATIONAL HEALTH REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 01.10 USACE QUALITY CONTROL SYSTEM (QCS)

01 45 04.00 10 CONTRACTOR QUALITY CONTROL

01 57 20.00 20 ENVIRONMENTAL PROTECTION

01 58 01 PROJECT SIGN AND SAFETY SIGN

DIVISION 02 - EXISTING CONDITIONS

02 13 90 SITE PREPARATION

02 41 00 DEMOLITION

DIVISION 03 - CONCRETE

03 11 14.00 10 STRUCTURAL CONCRETE FORMWORK

03 16 00 GROUTED DOWELS

03 20 01.00 10 CONCRETE REINFORCEMENT

03 31 01.00 10 CAST-IN-PLACE STRUCTURAL CONCRETE FOR CIVIL WORKS

DIVISION 05 - METALS

05 12 00 STRUCTURAL STEEL

05 50 04.00 10 METALS: MISCELLANEOUS, STANDARD ARTICLES, SHOP

FABRICATED ITEMS FOR CIVIL WORKS STRUCTURES

W911XK-10-B-0004

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 03-Aug-2010 02:00 PM to 10-Aug-2010 02:00 PM.

The Issued By organization has changed from

U S ARMY ENGINEER DISTRICT, DETROIT

ATTN: CELRE-CT 477 MICHIGAN AVE., ROOM 6

DETROIT MI 48226

to

CONTRACTING DIVISION

DETROIT DISTRICT, USAED

477 MICHIGAN AVENUE, RM 700

DETROIT MI 48226

The required performance has changed from FY10 Fox River Removal and Replacement of Spillway Piers and WalkwaysFSC- Y291NAICS Code- 238110Small Business Size Standard- $14 MillionEstimated Cost of Construction- Between $1,000,000 and $5,000,000.THIS SOLICITATION IS BEING SET ASIDE TO SMALL BUSINESS CONCERNS.A BID BOND IS REQUIRED. to FY10 Fox River Removal and Replacement of Spillway Piers and WalkwaysFSC- Y291NAICS Code- 238110Small Business Size Standard- $14 MillionEstimated Cost of Construction- Between $1,000,000 and $5,000,000.A BID BOND IS REQUIRED..