W56MES00855897
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
FY10 Fox River Removal and Replacement of Spillw ays and Walkw ays
This amendment is being issued to update the estimated cost of construction, update contract clause FAR 52.211-10, update the specifications, DELETE Wage Determination WI 19 dated 6/4/2010 and and ADD Wage Determination WI 19 dated 7/2/2010. The due date for receipt of bids remains unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 25
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 09-Jul-2010
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911XK-10-B-0004
X 9B. DATED (SEE ITEM 11)
22-Jun-2010
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
09-Jul-2010
CODE
CONTRACTING DIVISION
DETROIT DISTRICT, USAED
477 MICHIGAN AVENUE, RM 700
DETROIT MI 48226
W911XK 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911XK-10-B-0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0002
CHANGES TO SPECIFICATIONS
DIVISION 01 GENERAL REQUIREMENTS
DELETE SECTION 01 22 00.00 10 MEASUREMENT AND PAYMENT
ADD REVISED SECTION 01 22 00.00 10 MEASUREMENT AND PAYMENT
SECTION 01 22 00.00 10
MEASUREMENT AND PAYMENT
7 July 2010
PART 1 GENERAL
1.1 LUMP SUM PAYMENT ITEMS
Payment items for the work of this contract for which contract lump sum payments will be made are listed in the BIDDING SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular lump sum or unit price payment item, shall be included in the listed lump sum item most closely associated with the work involved. The lump sum price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
1.1.1 Base & Options
a. "Mobilization & Demobilization"
Payment Item No's. 0001AA, 0002AA, 0003AA, 0004AA and 0005AA
(1) Payment will be made for costs associated with mobilizing and demobilizing all materials and equipment necessary for construction of all dam rehabilitation specified in this contract.
(2) Unit of Measure: Lump Sum.
b. "Dam Rehabilitation"
Payment Item No's:
0001AB Rapid Croche Dam Rehabilitation 0001AC Cedars Dam Rehabilitation 0002AB Depere Dam Rehabilitation 0003AB Little Chute Dam Rehabilitation 0004AB Kaukauna Dam Rehabilitation 0005AB Little Kaukauna Dam Rehabilitation
(1) Payment will be made for costs associated with materials and operations necessary for replacement of dam spillway walkway and piers as specified in Division 01 General Requirements and in SECTIONS 02 13 90 "SITE PREPARATION", 02 41 00 "DEMOLITION", 03 11 14.00 10 "STRUCTURAL CONCRETE FORMWORK", 03
16 00 "GROUTED DOWELS", 03 20 01.00 10 "CONCRETE REINFORCEMENT", 03 31 01.00 10
"CAST-IN-PLACE STRUCTURAL CONCRETE FOR CIVIL WORKS", 05 12 00 "STRUCTURAL STEEL" and 05 50 04.00 10 "METALS: MISCELLANEOUS, STANDARD ARTICLES, SHOP FABRICATED ITEMS FOR
CIVIL WORKS STRUCTURES".
(2) Unit of Measure: Lump Sum.
1.1.2 Unit Price Items (Not Applicable)
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION (Not Applicable)
-- End of Section --
SECTION 00010 - SOLICITATION CONTRACT FORM
The description of performance FAR 52.211-10 has been added.
The contractor period of performance end date has decreased by 125 days from 365 days to 240 days.
The required performance has changed from FY10 Fox River Removal and Replacement of Spillways and WalkwaysFSC- Y291NAICS Code- 238110Small Business Size Standard- $14 MillionEstimated Cost of Construction- Between $500,000 and $1,000,000.THIS SOLICITATION IS BEING SET ASIDE TO SMALL BUSINESS CONCERNS.A BID BOND IS REQUIRED. to FY10 Fox River Removal and Replacement of Spillways and WalkwaysFSC- Y291NAICS Code- 238110Small Business Size Standard- $14 MillionEstimated Cost of Construction- Between $1,000,000 and $5,000,000.THIS SOLICITATION IS BEING SET ASIDE TO
SMALL BUSINESS CONCERNS.A BID BOND IS REQUIRED..
SECTION 00700 - CONTRACT CLAUSES
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 240 calendar days after receipt of the notice to proceed for the base and an additional 90 calendar days for each additional exercised option. The time stated for completion shall include final cleanup of the premises.
(End of clause)
The following have been deleted:
52.211-10 Commencement, Prosecution, and Completion of Work APR 1984
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
WAGE DETERMINATION WI-19
General Decision Number: WI100019 07/02/2010 WI19
Superseded General Decision Number: WI20080019
State: Wisconsin
Construction Type: Heavy
Counties: Wisconsin Statewide.
HEAVY CONSTRUCTION PROJECTS (Excluding Tunnel, Sewer, and Water Lines), AND HOPPER DREDGE PROJECTS
Modification Number Publication Date 0 03/12/2010 1 03/19/2010 2 06/04/2010 3 07/02/2010
BOIL0107-001 07/01/2009
Rates Fringes
BOILERMAKER
Boilermaker.................$ 33.64 19.27 Small Boiler Repair (under 25,000 lbs/hr)..............$ 26.91 16.00
BRWI0001-002 06/01/2009
CRAWFORD, JACKSON, JUNEAU, LA CROSSE, MONROE, TREMPEALEAU, AND
VERNON COUNTIES
Rates Fringes
BRICKLAYER.......................$ 29.40 15.54
BRWI0002-002 06/01/2008
ASHLAND, BAYFIELD, DOUGLAS, AND IRON COUNTIES
BRICKLAYER.......................$ 35.24 13.35
BRWI0002-005 06/01/2009
ADAMS, ASHLAND, BARRON, BROWN, BURNETT, CALUMET, CHIPPEWA,
CLARK, COLUMBIA, DODGE, DOOR, DUNN, FLORENCE, FOND DU LAC,
FOREST, GREEN LAKE, IRON, JEFFERSON, KEWAUNEE, LANGLADE,
LINCOLN, MANITOWOC, MARATHON, MARINETTE, MARQUETTE, MENOMINEE,
OCONTO, ONEIDA, OUTAGAMIE, POLK, PORTAGE, RUSK, ST CROIX, SAUK,
SHAWANO, SHEBOYGAN, TAYLOR, VILAS, WALWORTH, WAUPACA, WAUSHARA,
WINNEBAGO, AND WOOD COUNTIES
CEMENT MASON/CONCRETE FINISHER...$ 28.75 13.80
BRWI0003-002 06/01/2009
BROWN, DOOR, FLORENCE, KEWAUNEE, MARINETTE, AND OCONTO COUNTIES
Rates Fringes
BRICKLAYER.......................$ 30.06 14.87
BRWI0004-002 06/01/2008
KENOSHA, RACINE, AND WALWORTH COUNTIES
Rates Fringes
BRICKLAYER.......................$ 32.88 14.50
BRWI0006-002 06/01/2009
ADAMS, CLARK, FOREST, LANGLADE, LINCOLN, MARATHON, MENOMINEE,
ONEIDA, PORTAGE, PRICE, TAYLOR, VILAS AND WOOD COUNTIES
BRICKLAYER.......................$ 30.54 14.40
BRWI0007-002 06/01/2009
GREEN, LAFAYETTE, AND ROCK COUNTIES
Rates Fringes
BRICKLAYER.......................$ 31.26 15.35
BRWI0008-002 06/01/2008
MILWAUKEE, OZAUKEE, WASHINGTON, AND WAUKESHA COUNTIES
BRICKLAYER.......................$ 32.71 14.54
BRWI0009-001 06/01/2009
GREEN LAKE, MARQUETTE, OUTAGAMIE, SHAWANO, WAUPACA, WASHARA,
AND WINNEBAGO COUNTIES
BRICKLAYER.......................$ 30.06 14.87
BRWI0011-002 06/01/2009
CALUMET, FOND DU LAC, MANITOWOC, AND SHEBOYGAN COUNTIES
Rates Fringes
BRICKLAYER.......................$ 30.06 14.87
BRWI0013-002 06/01/2009
DANE, GRANT, IOWA, AND RICHLAND COUNTIES
Rates Fringes
BRICKLAYER.......................$ 31.46 15.15
BRWI0019-002 06/01/2009
BARRON, BUFFALO, BURNETT, CHIPPEWA, DUNN, EAU CLAIRE, PEPIN,
PIERCE, POLK, RUSK, ST. CROIX, SAWYER AND WASHBURN COUNTIES
BRICKLAYER.......................$ 29.82 15.12
BRWI0021-002 06/01/2009
DODGE AND JEFFERSON COUNTIES
Rates Fringes
BRICKLAYER.......................$ 31.76 14.87
BRWI0034-002 06/04/2009
COLUMBIA AND SAUK COUNTIES
BRICKLAYER.......................$ 31.51 15.10
CARP0087-001 05/01/2007
BURNETT (W. of Hwy 48), PIERCE (W. of Hwy 29), POLK (W. of Hwys 35, 48 & 65), AND ST. CROIX (W. of Hwy 65) COUNTIES
Carpenter & Piledrivermen........$ 26.76 11.61
CARP0252-002 06/01/2010
ADAMS, BARRON, BAYFIELD (Eastern 2/3), BROWN, BUFFALO, BURNETT (E. of Hwy 48), CALUMET, CHIPPEWA, CLARK, COLUMBIA, CRAWFORD, DANE, DODGE, DOOR, DUNN, EAU CLAIRE, FLORENCE (except area bordering Michigan State Line), FOND DU LAC, FOREST, GRANT, GREEN, GREEN LAKE, IOWA, IRON, JACKSON, JEFFERSON, JUNEAU, KEWAUNEE, LA CROSSE, LAFAYETTE, LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE (except N.E. corner), MARQUETTE, MENOMINEE, MONROE, OCONTO, ONEIDA, OUTAGAMIE, PEPIN, PIERCE (E.
of Hwys 29 & 65), POLK (E. of Hwys 35, 48 & 65), PORTAGE, PRICE, RICHLAND, ROCK, RUSK, SAUK, SAWYER, SHAWANO, SHEBOYGAN, ST CROIX (E. of Hwy 65), TAYLOR, TREMPEALEAU, VERNON, VILAS, WALWORTH, WASHBURN, WAUPACA, WAUSHARA, WINNEBAGO, AND WOOD
COUNTIES
CARPENTER
CARPENTER...................$ 30.56 13.36
MILLWRIGHT..................$ 32.16 13.36
PILEDRIVER..................$ 31.06 13.36
CARP0252-010 05/27/2007
ASHLAND COUNTY
Rates Fringes
Carpenters Carpenter...................$ 23.82 11.26 Millwright..................$ 27.71 11.26 Pile Driver.................$ 24.81 10.43
CARP0264-003 06/01/2008
KENOSHA, MILWAUKEE, OZAUKEE, RACINE, WAUKESHA, AND WASHINGTON
CARPENTER........................$ 30.52 14.41
CARP0361-004 05/01/2009
BAYFIELD (Western 1/3) AND DOUGLAS COUNTIES
Rates Fringes
CARPENTER........................$ 30.12 14.65
CARP2337-001 06/01/2008
ZONE A: MILWAUKEE, OZAUKEE, WAUKESHA AND WASHINGTON
ZONE B: KENOSHA & RACINE
PILEDRIVERMAN
Zone A......................$ 27.25 19.46 Zone B......................$ 24.47 19.46
CARP2337-003 06/02/2008
Rates Fringes
MILLWRIGHT
Zone A......................$ 27.92 19.08 Zone B......................$ 26.82 19.08
ZONE DEFINITIONS
ZONE A: MILWAUKEE, OZAUKEE, WAUKESHA AND WASHINGTON COUNTIES
ZONE B: KENOSHA & RACINE COUNTIES
ELEC0014-002 06/01/2009
ASHLAND, BARRON, BAYFIELD, BUFFALO, BURNETT, CHIPPEWA, CLARK
(except Maryville, Colby, Unity, Sherman, Fremont, Lynn & Sherwood), CRAWFORD, DUNN, EAU CLAIRE, GRANT, IRON, JACKSON, LA
CROSSE, MONROE, PEPIN, PIERCE, POLK, PRICE, RICHLAND, RUSK, ST
CROIX, SAWYER, TAYLOR, TREMPEALEAU, VERNON, AND WASHBURN
Electricians:....................$ 28.74 35.25%+8.82
ELEC0127-002 06/01/2009
KENOSHA COUNTY
Electricians:....................$ 33.75 18.52
ELEC0158-002 06/02/2008
BROWN, DOOR, KEWAUNEE, MANITOWOC (except Schleswig), MARINETTE(Wausuakee and area South thereof), OCONTO, MENOMINEE (East of a ine 6 miles West of the West boundary of Oconto County), SHAWANO (Except Area North of Townships of Aniwa and Hutchins) COUNTIES
Electricians:....................$ 27.27 26.75%+7.62
ELEC0159-003 06/01/2009
COLUMBIA, DANE, DODGE (Area West of Hwy 26, except Chester and Emmet Townships), GREEN, LAKE (except Townships of Berlin, Seneca, and St. Marie), IOWA, MARQUETTE (except Townships of Neshkoka, Crystal Lake, Newton, and Springfield), and SAUK
Electricians:....................$ 31.61 28%+8.95
ELEC0219-004 06/01/2009
FLORENCE COUNTY (Townships of Aurora, Commonwealth, Fern, Florence and Homestead) AND MARINETTE COUNTY (Township of Niagara)
Electricians:
Electrical contracts over $90,000.....................$ 28.39 3.75%+14.95 Electrical contracts under $90,000.....................$ 26.19 3.75%+14.95
* ELEC0242-005 05/30/2010
DOUGLAS COUNTY
Rates Fringes
Electricians:....................$ 31.24 66.55%
ELEC0388-002 03/01/2007
ADAMS, CLARK (Colby, Freemont, Lynn, Mayville, Sherman, Sherwood, Unity), FOREST, JUNEAU, LANGLADE, LINCOLN, MARATHON, MARINETTE (Area North of the town of Wausaukee), MENOMINEE (Area West of a line 6 miles West of the West boundary of Oconto County), ONEIDA, PORTAGE, SHAWANO (Area North of the townships of Aniwa and Hutchins), VILAS AND WOOD COUNTIES
Electricians:....................$ 27.68 15.23
ELEC0430-002 06/01/2009
RACINE COUNTY (Except Burlington Township)
Rates Fringes
Electricians:....................$ 32.53 3%+17.59
* ELEC0494-005 06/01/2010
MILWAUKEE, OZAUKEE, WASHINGTON, AND WAUKESHA COUNTIES
Rates Fringes
Electricians:....................$ 31.10 20.32
* ELEC0494-006 06/01/2010
CALUMET (Township of New Holstein), DODGE (East of Hwy 26 including Chester Township), FOND DU LAC, MANITOWOC (Schleswig), and SHEBOYGAN COUNTIES
Electricians:....................$ 29.02 18.41
ELEC0577-003 06/01/2009
CALUMET (except Township of New Holstein), GREEN LAKE (N. part including Townships of Berlin, St Marie, and Seneca), MARQUETTE (N. part including Townships of Crystal Lake, Neshkoro, Newton, and Springfield), OUTAGAMIE, WAUPACA, WAUSHARA, AND WINNEBAGO
Electricians:....................$ 27.40 26.5%+8.90
ELEC0890-003 06/01/2009
DODGE (Emmet Township only), GREEN, JEFFERSON, LAFAYETTE, RACINE (Burlington Township), ROCK AND WALWORTH COUNTIES
Electricians:....................$ 29.10 27.95%+8.92
ELEC0953-001 05/31/2010
Rates Fringes
Line Construction:
(1) Lineman.................$ 35.97 16.62
(2) Heavy Equipment Operator....................$ 32.37 15.43
(3) Equipment Operator......$ 28.78 14.25
(4) Heavy Groundman Driver..$ 25.18 13.07
(5) Light Groundman Driver..$ 23.38 12.46
(6) Groundsman..............$ 19.78 11.28
ENGI0139-001 06/01/2010
KENOSHA, MILWAUKEE, OZAUKEE, RACINE, WASHINGTON, AND WAUKESHA
Power Equipment Operator Group 1.....................$ 38.06 17.90 Group 2.....................$ 37.56 17.90 Group 3.....................$ 37.06 17.90 Group 4.....................$ 36.47 17.90 Group 5.....................$ 34.59 17.90 Group 6.....................$ 29.44 17.90
EPA PREMIUMS:
Level "A" Protection: $3.00 per hour Level "B" Protection: $2.00 per hour Level "C" Protection: $1.00 per hour
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Cranes, Tower Cranes, Pedestal Tower Cranes and Derricks with or w/o attachments with a lifting capacity of over 100 tons; or Cranes, Tower Cranes, Pedestal Tower Cranes and Derricks with boom, leads, and/or jib lengths measuring 176 feet or longer; Self-Erecting Tower Cranes over 4000 lbs lifting capacity; All Cranes with Boom Dollies; Boring Machines (directional); Master Mechanic.
$0.50 additional per hour per 100 tons or 100 ft of boom over 200 ft or lifting capacity of crane over 200 tons to a maximum of 300 tons or 300 ft. Thereafter an increase of $0.01 per ft or ton, whichever is greater.
GROUP 2: Cranes, Tower Cranes, Pedestal Tower Cranes and
Derricks with or without attachments with a lifting capacity of 100 tons or less; or Cranes, Tower Cranes Portable Tower Cranes, Pedestal Tower Cranes and Derricks with boom, leadsand/or jib lengths measuring 175 feet or less; Backhoes (excavators) 130,000 lbs and over; Caisson Rigs; Pile Drivers; Boring Machines (vertical or horizontal), Versi-Lift, Tri-Lift, Gantry 20,000 lbs & over.
GROUP 3: Backhoe (excavator) under 130,000 lbs;Self-erecting Tower Crane 4000 lbs & under lifting capacity;Traveling Crane (bridge type); Skid Rigs; Dredge Operator; Mechanic;
Concrete Paver (over 27E); Concrete Spreader and Distributor; Forklift/ Telehandler (machinery- moving / steel erection); Hydro Blaster, 10,000 psi and over
GROUP 4: Material Hoists; Stack Hoists; Hydraulic Backhoe (tractor or truck mounted); Hydraulic Crane, 5 tons or under (tractor or truck mounted); Hoist (tuggers 5 tons & over); Hydro-Excavators/Daylighters; Concrete Pumps Rotec type Conveyors; Tractor/Bulldozer/End Loader (over 40 hp);
Motor Patrol; Scraper Operator; Sideboom; Straddle Carrier;
Welder; Bituminous Plant and Paver Operator; Roller over 5 tons; Rail Leveling Machine (Railroad); Tie Placer; Tie Extractor; Tie Tamper; Stone Leveler; Rotary Drill Operator and Blaster; Percussion Drill Operator; Air Track Drill and/or Hammers; Gantrys (under 20,000 lbs); Tencher (wheel type or chain type having 8 inch or larger bucket); Milling Machine; Off-Road Material Haulers.
GROUP 5: Backfiller; Concrete Auto Breaker (large); Concrete Finishing Machines (road type); Rubber Tired Roller;
Concrete Batch Hopper; Concrete Conveyor Systems; Grout Pumps; Concrete Mixers (14S or over); Screw Type Pumps and Gypsum Pumps; Tractor, Bulldozer, End Loader (under 40 hp);
Trencher (chain type, bucket under 8 inch); Industrial Locomotives; Rollers under 5 tons; Stump Grinder/Chipper (Large); Timber Equipment; Firemen (pile drivers and derricks); Personnel Hoist, Telehandler over 8000 lbs;
Robotic Tool Carrier with or without attachments
GROUP 6: Tampers - Compactors (riding type); Assistant Engineer; A-Frames and Winch Trucks; Concrete Auto Breaker;
Hydrohammers (small); Brooms and Sweepers; Hoist (tuggers under 5 tons); Boats (Tug, Safety, Work Barges, Launch);
Shouldering Machine Operator; Prestress Machines; Screed Operator; Stone Crushers and Screening Plants; Screed Operators (milling machine), Farm or Industrial Tractor Mounted Equipment; Post Hole Digger; Fireman (asphalt plants); Air Compressors over 400 CFM; Generators, over 150 KW; Augers (vertical and horizontal); Air, Electric, Hydraulic Jacks (slipform); Skid Steer Loaders (with or without attachments); Boiler Operators (temporary heat);
Refrigeration Plant/Freeze Machines; Power Pack Vibratory/Ultra Sound Drivers and Extractors; Welding Machines; Heaters (mechanical); Pumps; Winches (small electric); Oiler and Greaser; Rotary Drill Tender;
Conveyor; Forklifts/Telehandler 8000 lbs & under;
Elevators: Automatic Hoists; Pumps (well points);
Combination Small Equipment Operators
ENGI0139-003 06/01/2010
REMAINING COUNTIES
Rates Fringes
Power Equipment Operator Group 1.....................$ 34.62 17.75 Group 2.....................$ 33.62 17.75 Group 3.....................$ 32.42 17.75 Group 4.....................$ 31.89 17.75 Group 5.....................$ 29.82 17.75 Group 6.....................$ 29.19 17.75
EPA PREMIUMS:
Level "A" Protection: $3.00 per hour Level "B" Protection: $2.00 per hour Level "C" Protection: $1.00 per hour
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Cranes, Tower Cranes and Derricks with or without attachments with a lifting capacity of over 100 tons;
Cranes, Tower Cranes, and Derricks with boom, leads and/or jib lengths 176 ft or longer.
GROUP 2: Backhoes (Excavators) weighing 130,00 lbs and over;
Cranes, Tower Cranes and Derricks with or without attachments with a lifting capacity of 100 tons or less;
Cranes, Tower Cranes, and Derricks with boom, leads, and/or jib lengths 175 ft or less; Caisson Rigs; Pile Driver
GROUP 3: Backhoes (Excavators) weighing under 130,000 lbs;
Travelling Crane (bridge type); Milling Machine; Concrete Paver over 27 E; Concrete Spreader and Distributor;
Concrete Laser Screed; Concrete Grinder and Planing Machine; Slipform Curb and Gutter Machine; Boring Machine (Directional); Dredge Operator; Skid Rigs; over 46 meter Concrete Pump.
GROUP 4: Hydraulic Backhoe (tractor or truck mounted);
Hydraulic Crane, 10 tons or less; Tractor, Bulldozer, or End Loader (over 40 hp); Motor Patrol; Scraper Operator;
Bituminous Plant and Paver Operator; Screed-Milling Machine; Roller over 5 tons; Concrete pumps 46 meter and under; Grout Pumps; Rotec type machine; Hydro Blaster, 10,000 psi and over; Rotary Drill Operator; Percussion Drilling Machine; Air Track Drill with or without integral hammer; Blaster; Boring Machine (vertical or horizontal);
Side Boom; Trencher, wheel type or chain type having 8 inch or larger bucket; Rail Leveling Machine (Railroad); Tie
Placer; Tie Extractor; Tie Tamper; Stone Leveler; Straddle Carrier; Material Hoists; Stack Hoist; Man Hoists; Mechanic and Welder; Off Road Material Haulers.
GROUP 5: Tractor, Bulldozer, or Endloader (under 40 hp);
Tampers -Compactors, riding type; Stump Chipper, large;
Roller, Rubber Tire; Backfiller; Trencher, chain type (bucket under 8 inch); Concrete Auto Breaker, large;
Concrete Finishing Machine (road type); Concrete Batch Hopper; Concrete Conveyor Systems; Concrete Mixers, 14S or over; Pumps, Screw Type and Gypsum); Hydrohammers, small;
Brooms and Sweeeprs; Lift Slab Machine; Roller under 5 tons; Industrial Locomotives; Fireman (Pile Drivers and Derricks); Pumps (well points); Hoists, automatic; A-Frames and Winch Trucks; Hoists (tuggers); Boats (Tug, Safety, Work Barges and Launches); Assistant Engineer
GROUP 6: Shouldering Machine Operator; Farm or Industrial Tractor mounted equipment; Post Hole Digger; Auger (vertical and horizontal); Skid Steer Loader with or without attachments; Robotic Tool Carrier with or without attachments; Power Pack Vibratory/Ultra Sound Driver and Extractor; Fireman (Asphalt Plants); Screed Operator; Stone Crushers and Screening Plants; Air, Electric, Hydraulic Jacks (Slip Form); Prestress Machines; Air Compressor, 400 CFM or over; Refrigeration Plant/Freese Machine; Boiler Operators (temporary heat); Forklifts; Welding Machines;
Generators; Pumps over 3"; Heaters, Mechanical; Combination small equipment operator; Winches, small electric; Oiler;
Greaser; Rotary Drill Tender; Conveyor; Elevator Operator
IRON0008-002 06/01/2009
BROWN, CALUMET, DOOR, FOND DU LAC, KEWAUNEE, MANITOWOC,
MARINETTE, OCONTO, OUTAGAMI, SHAWANO, SHEBOYGAN, AND WINNEBAGO
COUNTIES:
IRONWORKER.......................$ 27.93 20.59
* IRON0008-003 06/01/2010
KENOSHA, MILWAUKEE, OZAUKEE, RACINE, WALWORTH (N.E. 2/3),
WASHINGTON, AND WAUKESHA COUNTIES
IRONWORKER.......................$ 31.31 21.79
* IRON0383-001 06/01/2010
ADAMS, COLUMBIA, CRAWFORD, DANE, DODGE, FLORENCE, FOREST,
GRANT, GREENE, (Excluding S.E. tip), GREEN LAKE, IOWA, JEFFERSON, JUNEAU, LA CROSSE, LAFAYETTE, LANGLADE, MARATHON, MARQUETTE, MENOMINEE, MONROE, PORTAGE, RICHLAND, ROCK (Northern area, vicinity of Edgerton and Milton), SAUK, VERNON, WAUPACA, WAUSHARA, AND WOOD COUNTIES
IRONWORKER.......................$ 30.90 19.13
IRON0512-008 05/01/2009
BARRON, BUFFALO, CHIPPEWA, CLARK, DUNN, EAU CLAIRE, JACKSON,
PEPIN, PIERCE, POLK, RUSK, ST CROIX, TAYLOR, AND TREMPEALEAU
IRONWORKER.......................$ 33.80 20.44
IRON0512-021 05/01/2009
ASHLAND, BAYFIELD, BURNETT, DOUGLAS, IRON, LINCOLN, ONEIDA,
PRICE, SAWYER, VILAS AND WASHBURN COUNTIES
IRONWORKER.......................$ 29.76 19.50
LABO0113-002 06/01/2008
MILWAUKEE AND WAUKESHA COUNTIES
Rates Fringes
Laborers:
Group 1.....................$ 23.26 14.18 Group 2.....................$ 23.41 14.18 Group 3.....................$ 23.61 14.18 Group 4.....................$ 23.76 14.18 Group 5.....................$ 23.91 14.18 Group 6.....................$ 19.75 14.18
LABORERS CLASSIFICATIONS
GROUP 1: General Laborer; Tree Trimmer; Conduit Layer;
Demolition and Wrecking Laborer; Guard Rail, Fence, and Bridge Builder; Landscaper; Multiplate Culvert Assembler;
Stone Handler; Bituminous Worker (Shoveler, Loader, and Utility Man); Batch Truck Dumper or Cement Handler;
Bituminous Worker (Dumper, Ironer, Smoother, and Tamper);
Concrete Handler
GROUP 2: Air Tool Operator; Joint Sawer and Filler (Pavement); Vibrator or Tamper Operator (Mechanical Hand Operated); Chain Saw Operator; Demolition Burning TOrch Laborer
GROUP 3: Bituminous Worker (Raker and Luteman); Formsetter (Curb, Sidewalk, and Pavement); Strike Off Man
GROUP 4: Line and Grade Specialist
GROUP 5: Blaster and Powderman
GROUP 6: Flagperson; traffic control person
LABO0113-003 06/01/2008
OZAUKEE AND WASHINGTON COUNTIES
Rates Fringes
Laborers:
Group 1.....................$ 22.51 14.18 Group 2.....................$ 22.61 14.18 Group 3.....................$ 22.66 14.18 Group 4.....................$ 22.86 14.18 Group 5.....................$ 22.71 14.18 Group 6.....................$ 19.60 14.18
LABORERS CLASSIFICATIONS
GROUP 1: General Laborer; Tree Trimmer; Conduit Layer;
Demolition and Wrecking Laborer; Guard Rail, Fence, and Bridge Builder; Landscaper; Multiplate Culvert Assembler;
Stone Handler; Bituminous Worker (Shoveler, Loader, and Utility Man); Batch Truck Dumper or Cement Handler;
Bituminous Worker (Dumper, Ironer, Smoother, and Tamper);
Concrete Handler
GROUP 2: Air Tool Operator; Joint Sawer and Filler (Pavement); Vibrator or Tamper Operator (Mechanical Hand Operated);
GROUP 3: Bituminous Worker (Raker and Luteman); Formsetter (Curb, Sidewalk, and Pavement); Strike Off Man
GROUP 4: Line and Grade Specialist
GROUP 5: Blaster; powderman
GROUP 6: Flagperson and Traffic Control Person
LABO0113-011 06/01/2008
KENOSHA AND RACINE COUNTIES
LABORERS
Group 1.....................$ 21.52 14.98 Group 2.....................$ 21.67 14.98 Group 3.....................$ 21.87 14.98 Group 4.....................$ 21.84 14.98 Group 5.....................$ 22.17 14.98 Group 6.....................$ 18.66 14.98
LABORERS CLASSIFICATIONS:
GROUP 1: General laborer; Tree Trimmer; Conduit Layer;
Demolition and Wrecking Laborer; Guard Rail, Fence, and Bridge Builder; Landscaper; Multiplate Culvert Assembler;
Stone Handler; Bituminous Worker (Shoveler, Loader, and Utility Man); Batch Truck Dumper or Cement Handler;
Bituminous worker (Dumper, Ironer, Smoother, and Tamper);
Concrete Handler
GROUP 2: Air Tool Operator; Joint Sawer and Filler (Pavement); Vibrator or Tamper Operator (Mechanical Hand Operated); Chain Saw Operator; Demolition Burning Torch Laborer
GROUP 3: Bituminous Worker (Raker and Luteman); Formsetter (Curb, Sidewalk, and Pavement); Strike Off Man
GROUP 4: Line and Grade Specialist
GROUP 5: Blaster and Powderman
GROUP 6: Flagman; traffic control person
LABO0140-002 06/01/2008
ADAMS, ASHLAND, BARRON, BAYFIELD, BROWN, BUFFALO, BURNETT,
CALUMET, CHIPPEWA, CLARK, COLUMBIA, CRAWFORD, DODGE, DOOR,
DOUGLAS, DUNN, EAU CLAIRE, FLORENCE, FOND DU LAC, FOREST,
GRANT, GREEN, GREEN LAKE, IRON, JACKSON, JUNEAU, IOWA,
JEFFERSON, KEWAUNEE, LA CROSSE, LAFAYETTE, LANGLADE, LINCOLN,
MANITOWOC, MARATHON, MARINETTE, MARQUETTE, MENOMINEE, MONROE,
OCONTO, ONEIDA, OUTAGAMIE, PEPIN, PIERCE, POLK, PORTAGE, PRICE,
RICHLAND, ROCK, RUSK, SAUK, SAWYER, SHAWANO, SHEBOYGAN, ST.
CROIX, TAYLOR, TREMPEALEAU, VERNON, VILLAS, WALWORTH, WASHBURN,
WAUPACA, WAUSHARA, WINNEBAGO, AND WOOD COUNTIES
Laborers:
Group 1.....................$ 23.87 11.75 Group 2.....................$ 23.97 11.75 Group 3.....................$ 24.02 11.75
Group 4.....................$ 24.22 11.75 Group 5.....................$ 24.07 11.75 Group 6.....................$ 20.50 11.75
LABORERS CLASSIFICATIONS
GROUP 1: General Laborer; Tree Trimmer; Conduit Layer;
Demolition and Wrecking Laborer; Guard Rail, Fence, and Bridge Builder; Landscaper; Multiplate Culvert Assembler;
Stone Handler; Bitminous Worker (Shoveler, Loader, and Utility Man); Batch Truck Dumper or Cement Handler;
Bituminous Worker (Dumper, Ironer, Smoother and Tamper);
Concrete Handler
GROUP 2: Air Tool Operator; Joint Sawer and Filler (Pavement); Vibrator or Tamper Operator (Mechanical Hand Operated)
GROUP 3: Bituminous Worker (Raker and Luteman); Formsetter (Curb, Sidewalk and Pavement); Strike Off Man
GROUP 4: Line and Grade Secialist
GROUP 5: Blaster; powderman
GROUP 6: Flagperson; Traffic Control
LABO0464-003 06/01/2008
DANE COUNTY
Rates Fringes
Laborers:
Group 1.....................$ 24.15 11.75 Group 2.....................$ 24.25 11.75 Group 3.....................$ 24.30 11.75 Group 4.....................$ 24.50 11.75 Group 5.....................$ 24.35 11.75 Group 6.....................$ 20.50 11.75
LABORERS CLASSIFICATIONS:
GROUP 1: General Laborer; Tree Trimmer; Conduit Layer;
Demolition and Wrecking Laborer; Guard Rail, Fence, and Bridge Builder; Landscaper; Multiplate Culvert Assembler;
Stone Handler; Bituminous Worker (Shoveler, Loader, and Utility Man); Batch Truck Dumper or Cement Handler;
Bituminious Worker (Dumper, Ironer, Smoother, and Tamper);
Concrete Handler
GROUP 2: Air Tool Operator; Joint Sawer and Filler (Pavement); Vibrator or Tamper Operator (Mechanical Hand Operated); Chain Saw Operator; Demolition Burning Torch Laborer
GROUP 3: Bituminous Worker (Raker and Luteman); Formsetter (Curb, Sidewalk, and Pavement); Strike Off Man
GROUP 4: Line and Grade Specialist
GROUP 5: Blaster; Powderman
GROUP 6: Flagperson and Traffic Control Person
PAIN0106-008 05/01/2010
ASHLAND, BAYFIELD, BURNETT, AND DOUGLAS COUNTIES
Rates Fringes
Painters:
New:
Brush, Roller..............$ 27.30 14.08 Spray, Sandblast, Steel....$ 27.90 14.08 Repaint:
Brush, Roller..............$ 25.80 14.08 Spray, Sandblast, Steel....$ 26.40 14.08
* PAIN0108-002 06/01/2010
RACINE COUNTY
Rates Fringes
Painters:
Brush, Roller...............$ 29.10 16.09 Spray & Sandblast...........$ 30.10 16.09
PAIN0259-002 05/01/2008
BARRON, CHIPPEWA, DUNN, EAU CLAIRE, PEPIN, PIERCE, POLK, RUSK,
SAWYER, ST. CROIX, AND WASHBURN COUNTIES
PAINTER..........................$ 24.11 12.15
PAIN0259-004 05/01/2008
BUFFALO, CRAWFORD, JACKSON, LA CROSSE, MONROE, TREMPEALEAU, AND
PAINTER..........................$ 20.43 8.40
* PAIN0781-002 06/01/2010
JEFFERSON, MILWAUKEE, OZAUKEE, WASHINGTON, AND WAUKESHA COUNTIES
Painters:
Bridge......................$ 28.82 16.69 Brush.......................$ 28.47 16.69 Spray & Sandblast...........$ 29.22 16.69
PAIN0802-002 06/01/2009
COLUMBIA, DANE, DODGE, GRANT, GREEN, IOWA, LAFAYETTE, RICHLAND,
ROCK, AND SAUK COUNTIES
PAINTER
Brush.......................$ 25.65 13.10
PREMIUM PAY:
Structural Steel, Spray, Bridges = $1.00 additional per hour.
PAIN0802-003 06/01/2009
ADAMS, BROWN, CALUMET, CLARK, DOOR, FOND DU LAC, FOREST, GREEN
LAKE, IRON, JUNEAU, KEWAUNEE, LANGLADE, LINCOLN, MANITOWOC,
MARATHON, MARINETTE, MARQUETTE, MENOMINEE, OCONTO, ONEIDA,
OUTAGAMIE, PORTAGE, PRICE, SHAWANO, SHEBOYGAN, TAYLOR, VILAS,
WAUSHARA, WAUPACA, WINNEBAGO, AND WOOD COUNTIES
PAINTER..........................$ 21.87 10.07
* PAIN0934-001 06/01/2010
KENOSHA AND WALWORTH COUNTIES
Rates Fringes
Painters:
Brush.......................$ 29.10 16.09 Spray.......................$ 30.10 16.09 Structural Steel............$ 29.25 16.09
PAIN1011-002 06/01/2009
FLORENCE COUNTY
Painters:........................$ 23.40 8.57
PLAS0599-010 06/01/2009
Rates Fringes
CEMENT MASON/CONCRETE FINISHER
Area 1......................$ 28.27 12.73 Area 2 (BAC)................$ 28.75 13.80 Area 3......................$ 27.85 15.10 Area 4......................$ 26.82 12.93 Area 5......................$ 26.97 12.78 Area 6......................$ 24.08 15.67
AREA DESCRIPTIONS
AREA 1: BAYFIELD, DOUGLAS, PRICE, SAWYER, AND WASHBURN
COUNTIES
AREA 2: ADAMS, ASHLAND, BARRON, BROWN, BURNETT, CALUMET,
CHIPPEWA, CLARK, COLUMBIA, DODGE, DOOR, DUNN, FLORENCE,
FOND DU LAC, FOREST, GREEN LAKE, IRON, JEFFERSON, KEWAUNEE,
LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE,
MARQUETTE, MENOMINEE, OCONTO, ONEIDA, OUTAGAMIE, POLK,
PORTAGE, RUSK, ST CROIX, SAUK, SHAWANO, SHEBOYGAN, TAYLOR,
VILAS, WALWORTH, WAUPACA, WAUSHARA, WINNEBAGO, AND WOOD
COUNTIES
AREA 3: BUFFALO, CRAWFORD, EAU CLAIRE, JACKSON, JUNEAU, LA
CROSSE MONROE, PEPIN, PIERCE, RICHLAND, TREMPEALEAU, AND
AREA 4: MILWAUKEE, OZAUKEE, WASHINGTON, AND WAUKESHA COUNTIES
AREA 5: DANE, GRANT, GREEN, IOWA, LAFAYETTE, AND ROCK
AREA 6: KENOSHA AND RACINE COUNTIES
* PLUM0011-003 05/03/2010
ASHLAND, BAYFIELD, BURNETT, DOUGLAS, IRON, SAWYER, AND WASHBURN
PLUMBER..........................$ 35.60 16.25
PLUM0075-002 11/29/2009
MILWAUKEE, OZAUKEE, WASHINGTON, AND WAUKESHA COUNTIES
PLUMBER..........................$ 35.93 15.66
PLUM0075-004 06/01/2009
DODGE (Watertown), GREEN, JEFFERSON, LAFAYETTE, AND ROCK
PLUMBER/PIPEFITTER...............$ 35.53 14.96
PLUM0075-009 06/01/2009
COLUMBIA, DANE, IOWA, MARQUETTE, RICHLAND AND SAUK COUNTIES
Rates Fringes
PLUMBER..........................$ 34.88 13.76
PLUM0111-007 07/06/2009
MARINETTE COUNTY (Niagara only)
Rates Fringes
PLUMBER/PIPEFITTER...............$ 29.61 18.00
PLUM0118-002 06/01/2009
KENOSHA, RACINE, AND WALWORTH COUNTIES
Rates Fringes
Plumber and Steamfitter..........$ 35.26 16.44
PLUM0400-003 06/01/2009
ADAMS,BROWN, CALUMET, DODGE (except Watertown), DOOR, FOND DU LAC, GREEN LAKE,KEWAUNEE, MANITOWOC, MARINETTE (except Niagara), MENOMINEE, OCONTO, OUTAGAMIE, SHAWANO, SHEBOYGAN, WAUPACA, WAUSHARA, AND WINNEBAGO COUNTIES
PLUMBER/PIPEFITTER...............$ 31.43 14.46
PLUM0434-002 06/01/2009
BARON, BUFFALO, CHIPPEWA, CLARK, CRAWFORD, DUNN, EAU CLAIRE,
FLORENCE, FOREST, GRANT, JACKSON, JUNEAU, LA CROSSE, LANGLADE,
LINCOLN, MARATHON, MONROE, ONEIDA, PEPIN, PIERCE, POLK,
PORTAGE, PRICE, RUSK, ST. CROIX, TAYLOR, TREMPEALEAU, VERNON,
VILAS, AND WOOD COUNTIES
PIPEFITTER.......................$ 32.59 13.78
TEAM0039-002 05/01/2009
Rates Fringes
TRUCK DRIVER
1 & 2 Axle Trucks...........$ 23.84 14.70 3 or more axles; Euclids or Dumptor, Articulated Truck, Mechanic.............$ 23.99 14.70
SELF-PROPELLED HOPPER DREDGE:
Drag Tender $ 8.78 $4.23+A
FOOTNOTE:
A. Paid Holidays: New years Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Paul Hall's Birthday (August 20), Veteran,s Day, Thanksgiving Day, and Christmas Day
WELL DRILLER $16.52 $3.70
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
The following have been deleted:
WAGE DETERMINATION
(End of Summary of Changes)