W56MES00855897
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
FY10 Fox River Removal and Replacement of Spillw ay Piers and Walkw ays
This amendment is issued to update the plans and specifications. The due date for receipt of bids remains unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 15-Jul-2010
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911XK-10-B-0004
X 9B. DATED (SEE ITEM 11)
22-Jun-2010
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
15-Jul-2010
CODE
CONTRACTING DIVISION
DETROIT DISTRICT
477 MICHIGAN AVE
RM 700
DETROIT MI 48226-2550
W911XK 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911XK-10-B-0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0004
CHANGES TO PLANS
SHEET 4
DELETE SHEET 4
ADD REVISED SHEET 4: Changes include updating “Existing Spillway Pier Demolition” Section B, 3, 4 and “Req’d Pier Section” Section E, 4, 4. This includes adding the flat shelf with the WT8x25 sea lamprey barrier.
SHEETS 4
ADD NOTE: 6. WT8x25 sea lamprey barriers to left and right of each pier shall remain undisturbed during construction
SHEETS 3, 6, 13, 16 AND 19
ADD NOTE: 13. Life saving rings, pier number signs and security fencing shall be salvaged and reinstalled. Contractor shall submit plan on how these items will be secured to the new walkway per contract specifications.
SHEET 9
ADD NOTE: 14. Life saving rings, pier number signs and security fencing shall be salvaged and reinstalled. Contractor shall submit plan on how these items will be secured to the new walkway per contract specifications.
SHEET 16
ADD NOTE: 14. The Kaukauna lighted sign is owned and operated by the City of Kaukauna and shall be removed and reinstalled by others.
SHEET 4, 7, 10, 14, 17 and 20 DELETE: Live Load Point Load of 10,000 lbs @ mid span from Load Table ADD: Live Load Point Load of 3,000 lbs @ mid span to Load Table
CHANGES TO THE SPECIFICATIONS
SECTION 02 13 90 SITE PREPARATION
ADD PARAGRAPH: Under 1.2 SUBMITTALS
W911XK-10-B-0004
Reinstallation of Security Fence, Life Saving Rings and Pier Number Signs; G-AOF
At least ten (10) calendar days prior to proceeding with the work at the site, submit a work plan for the work required under this Section. The plan shall include a description of the materials used, methods, procedures and sequence in which the required work will be performed. Shop drawings and materials list shall be provided to the Contracting Officer’s Representative.
(End of Summary of Changes)