W911XK-09-B-0006 Questions & Answers 29 May.pdf

PDF 11 KB Posted

Attached to
RECOVERY--Z--Sturgeon Bay South Revetment Repair, Section N, Sturgeon Bay, Wisconsin
Solicitation number
W911XK-09-B-0006
Issued by

About this file

Questions & Answers 29 May

View the file

Other files

File Type Posted
W911XK-09-B-0006 Sturgeon Bay Repair - Bid Abstract.pdf PDF
W911XK-09-B-0006 Amendment 0005 conform.pdf PDF
W911XK-09-B-0006 Amendment 0005 SF30.pdf PDF
W911XK-09-B-0006 Questions & Answers 12 June.pdf PDF
W911XK-09-B-0006 Amendment 0005 SF30.pdf PDF
W911XK-09-B-0006 Amendment 0005 conform.pdf PDF
14stbay_AMEND_5JUN09.pdf PDF
03stbay_AMEND_5JUN09.pdf PDF
09stbayAMEND_5JUN09.pdf PDF
16STBAY_AMEND_5JUN09.pdf PDF
W911XK-09-B-0006 Questions & Answers 9 June.pdf PDF
W911XK-09-B-0006 Amendment 0004 SF 30.pdf PDF
W911XK-09-B-0006 Amendment 0004 Conform.pdf PDF
W911XK-09-B-0006 Questions & Answers 2 June.pdf PDF
W911XK-09-B-0006 Amendment 0003 SF30.pdf PDF
W911XK-09-B-0006 Amendment 0003 conform.pdf PDF
W911XK-09-B-0006 Questions & Answers 27 May.pdf PDF
W911XK-09-B-0006 Amendment 0002.pdf PDF
W911XK-09-B-0006 Questions & Answers 22 May.pdf PDF
AMEND0001.maxFR —
W911XK-09-B-0006 Amendment 0001.pdf PDF
W911XK-09-B-0006 Amendment 0001 - Project Sign & Safety Sign.pdf PDF
09stbayAMEND0001.cal —
09stbayAMEND0001.maxTK —
12stbay.cal —
W911XK-09-B-0006 Solicitation.pdf PDF
14stbay.cal —
09stbay.cal —
02stbay.cal —
16STBAY.cal —
13stbay.cal —
01stbay.cal —
05stbay.cal —
11stbay.cal —
08stbay.cal —
10stbay.cal —
07stbay.cal —
SVDTITLE.CAL —
W911XK-09-B-0006 Specifications.pdf PDF
06stbay.cal —
04stbay.cal —
entry.maxFR —
plans.maxfr.maxFR —
03stbay.cal —
15STBAY.cal —
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W911XK-09-B-0006 Updated 29 May 2009 FY09 Sturgeon Bay South Revetment Repair, Sturgeon Bay, Wisconsin

Questions and Answers

Added 22 May 2009

1. QUESTION: Bid Bond: Are you requiring a bid bond? If so how much? Are you requiring a particular bid bond form?

ANSWER: The bid bond requirements are added to the solicitation via Amendment 0001 in FAR clause 52.228-1, Bid Guarantee. Bid bonds are required to be submitted on Standard Form 24.

2. QUESTION: Cap Channel: I do not see a cap channel on the plans.

ANSWER: There is no channel cap required in the plans.

3. QUESTION: Tie Rod Spacing: The plans call for tie rods every 9' but the specs say 11'.

ANSWER: Tie rod spacing to be 9 feet on center as required by the plans and no greater than

11 feet as stated in the specifications.

4. QUESTION: Scour Stone: The specs say scour stone should come from an "on-site source". Is that correct?

ANSWER: The scour stone requirements have been eliminated from the repair work in

Amendment 0001 and modified plans have been issued to reflect this. The specs are modified to eliminate scour stone requirements.

5. QUESTION: Request the following soil boring information:

a. Field logs of Boring

b. N Value, Blows.ft

c. TERZAGHI Classification

d. Laboratory Analysis

e. Moisture Content

f. Type of Sample, Slit Spoon, Auger

g. Unconfirmed Compressive Strengths

ANSWER: Item a. The field logs of boring are included in Sec 01 99 90 of the specifications, which includes the Soil Boring logs location map and soil classifications.

As far as for the items b to g, we do not have that information and we normally do not provide that, other than the soil boring logs.

6. QUESTION: Request information about the structures that require vibration monitoring and control per Section 01 35 13.10 Paragraph 1.7 of the Specifications.

W911XK-09-B-0006 Updated 29 May 2009 FY09 Sturgeon Bay South Revetment Repair, Sturgeon Bay, Wisconsin

ANSWER: Paragraph 1.7, Section 01 35 13.10 of the specification is deleted via Amendment

0001. It is not required for this project location.

Added 27 May 2009

7. QUESTION: PVC Conduit: The plans call out a 2-1/2" PVC conduit to encase the tie rods.

The specifications call out a 6" material for encasing the tie rods. Which one governs?

ANSWER: The required PVC diameter for tie-rod encasement is as shown on the plans (2.5" dia) except at turnbuckle locations where no PVC encasement is required. The specs are changed via Amendment 0002 to exclude the PVC diameter requirement. Plans should be referenced for the required diameter.

Added 29 May 2009

8. QUESTION: We would like to inquire about possible access to the south portion of the project via Lake Lane and Barge Rd. During our site visit it was noted that there is a 6 ton weight limit on Lake Lane. Is it possible that those restrictions will be lifted to accommodate the project?

Also, it was noted on Sheet 1 of the drawings (Note #7) that there is a 150 psf surface/surcharge load limit on the existing revetment sections. Is there a setback distance that needs to be maintained for equipment and materials from the existing section? Our initial assessment of the project would be to perform a majority of the work from land based operations. Is it the Corps of Engineers intent to construct this project from marine plant?

ANSWER: No changes will be made in this regard to the plans and specifications. Methods of construction are left to the discretion of the offerors.