W911XK-09-B-0006 Amendment 0002.pdf
PDF 23 KB Posted
- Solicitation number
- W911XK-09-B-0006
About this file
W911XK-09-B-0006 Amendment 0002
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W56MES90962392
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
American Recovery and Reinvestment Act - Sturgeon Bay South Revetment Repair, Sturgeon Bay, Wisconsin
This amendment is issued to:
1. amend the project specif ications as identified on the follow ing pages.
2. add the required Treasury Account Symbol to each line item due to ARRA funding requirements.
No other changes are made. The bid opening date/time remains 16 June 2009 at 2:00 PM Eastern.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 27-May-2009
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911XK-09-B-0006
X 9B. DATED (SEE ITEM 11)
12-May-2009
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
27-May-2009
CODE
CONTRACTING DIVISION
DETROIT DISTRICT, USAED
477 MICHIGAN AVE.
DETROIT MI 48226
W911XK 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911XK-09-B-0006
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMEND 0002 - SPEC CHANGES
CHANGES TO THE SPECIFICATIONS
SECTION 05 50 14 MISCELLANEOUS METAL
DELETE: Paragraph 3.4
“TIE ROD PROTECTION”
ADD: New Paragraph 3.4
”TIE ROD PROTECTION
The Contractor shall protect each tie rod during placement of stone and backfill. Each tie rod shall be encased in solid walled SDR Schedule 26 or 40 PVC pipe as specified in the plan drawings. Pipe shall be continuous between wales. PVC pipe shall not be cut along its longitudinal axis for placement over the tie rod. Stone and/or backfill shall be placed such that the bottom of the pipe is fully supported and the tie rod is positioned in at the invert of the pipe as shown on the drawings. The invert of the PVC pipe shall be perforated.”
END OF AMENDMENT
SECTION 00010 - SOLICITATION CONTRACT FORM
CLIN 0001
The CLIN description has changed from Site Preparation to TAS::96 3135::TAS.
The CLIN extended description Site Preparation has been added.
CLIN 0002
The CLIN description has changed from Steel Sheet Piling to TAS::96 3135::TAS.
The CLIN extended description Steel Sheet Piling has been added.
SUBCLIN 0002AA
The CLIN description has changed from First 1,375 Tons to TAS::96 3135::TAS.
The CLIN extended description First 1,375 Tons has been added.
SUBCLIN 0002AB
The CLIN description has changed from Over 1,375 Tons to TAS::96 3135::TAS.
The CLIN extended description Over 1,375 Tons has been added.
CLIN 0003
The CLIN description has changed from Miscellaneous Metals to TAS::96 3135::TAS.
The CLIN extended description Miscellaneous Metals has been added.
SUBCLIN 0003AA
The CLIN description has changed from First 120 Tons to TAS::96 3135::TAS.
The CLIN extended description First 120 Tons has been added.
SUBCLIN 0003AB
The CLIN description has changed from Over 120 Tons to TAS::96 3135::TAS.
The CLIN extended description Over 120 Tons has been added.
CLIN 0004
The CLIN description has changed from Splash Stone to TAS::96 3135::TAS.
The CLIN extended description Splash Stone has been added.
SUBCLIN 0004AA
The CLIN description has changed from First 2,620 Tons to TAS::96 3135::TAS.
The CLIN extended description First 2,620 Tons has been added.
SUBCLIN 0004AB
The CLIN description has changed from Over 2,620 Tons to TAS::96 3135::TAS.
The CLIN extended description Over 2,620 Tons has been added.
CLIN 0005
The CLIN description has changed from Excavated Rock to TAS::96 3135::TAS.
The CLIN extended description Excavated Rock has been added.
SUBCLIN 0005AA
The CLIN description has changed from First 50 Cubic Yards to TAS::96 3135::TAS.
The CLIN extended description First 50 Cubic Yards has been added.
SUBCLIN 0005AB
The CLIN description has changed from Over 50 Cubic Yards to TAS::96 3135::TAS.
The CLIN extended description Over 50 Cubic Yards has been added.
(End of Summary of Changes)