W56MES90962392
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
ARRA - Sturgeon Bay South Revetment Repair, Section N, Sturgeon Bay, Wisconsin
This amendment is issued to:
1. update the project specif ications as identified on the follow ing page and the attached document.
2. DELETE line item number 0006, Scour Stone, and all associated sub-line items.
3. incorporate FAR provision 52.228-1, Bid Guarantee, into the solicitation.
4. change the bid opening date to 16 June 2009 at 2:00 PM Eastern time.
No other changes are made to the solicitation.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 22-May-2009
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911XK-09-B-0006
X 9B. DATED (SEE ITEM 11)
12-May-2009
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
19-May-2009
CODE
CONTRACTING DIVISION
DETROIT DISTRICT, USAED
477 MICHIGAN AVE.
DETROIT MI 48226
W911XK 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911XK-09-B-0006
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMEND 0001 - SPEC CHANGES
CHANGES TO THE SPECIFICATIONS
SECTION 01 35 13.10 SPECIAL PROJECT PROCEDURES
DELETE PARAGRAPH 1.4.3 GROUND AND OVER-WATER TRANSPORT
“All required on-land and over-water transport shall be provided by the Contractor. Contractor must be aware of and abide by all road restrictions imposed by Local, State or Federal Authorities. Over-land access to the required work area from the mainland is available only via walking along the concrete capped cribs as shown in the project drawings. The Contractor shall not use breakwater structure for storage or moving any equipment or supplies.”
ADD PARAGRAPH 1.4.3 GROUND AND OVER-WATER TRANSPORT
“All required on-land and over-water transport shall be provided by the Contractor. Contractor must be aware that Lake Lane road leading toward project site is a class B road and must be used to get to Barge road which provides the only land vehicle access to the site. Contractor must abide by all road restrictions imposed by Local, State or Federal Authorities.”
DELETE PARAGRAPH 1.8 AMERICAN RECOVERY AND REINVESTMENT ACT
DELETE AMERICAN RECOVERY AND REINVESTMENT ACT ATTACHMENT AT END
OF SECTION 01 35 13.10
DELETE SECTION 01 58 00 CONSTRUCTION PROJECTS AND SAFETY
PERFORMANCE SIGNS
ADD SECTION 01 58 01 PROJECT SIGN AND SAFETY SIGN
SECTION 01 22 00.00 10 MEASUREMENT AND PAYMENT
DELETE: Paragraph 1.2.4
(1) “e. Scour Stone (Item No. 0006): First 6,500 Short ton (Item No. 0006AA) and Over 6,500 Short ton (Item No. 0006AB).”
SECTION 01 35 13.10 SPECIAL PROJECT PROCEDURES
DELETE: Paragraph 1.7 VIBRATION MONITORING AND CONTROL
DELETE: All submittals referencing vibration monitoring.
SECTIONS 35 31 19.45 03 STONE MATERIALS AND 35 31 19 STONE PLACEMENT
AND CONSTRUCTION
DELETE: All references to “Scour Stone”.
CHANGES TO THE DRAWINGS
DRAWING NO. 9 OF 16, STRUCTURE PLAN, SECTION
DELETE: Original drawing 9 of 16, STRUCTURE PLAN, SECTION ADD: Revised drawing 9 of 16, STRUCTURE PLAN, SECTION
END OF AMENDMENT
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 11-Jun-2009 02:00 PM to 16-Jun-2009 02:00 PM.
CLIN 0006
The CLIN description has changed from Scour Stone to DELETED.
SUBCLIN 0006AA
The CLIN description has changed from First 6,500 Tons to DELETED.
The pricing detail quantity has decreased by 6,500.00 from 6,500.00 to 0.00.
The unit of issue Short Ton has been deleted.
SUBCLIN 0006AB
The CLIN description has changed from Over 6,500 Tons to DELETED.
The pricing detail quantity has decreased by 2,600.00 from 2,600.00 to 0.00.
The unit of issue Short Ton has been deleted.
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
The following have been added by full text:
52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.
The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-
(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3 million, whichever is less.-
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
(End of clause)
(End of Summary of Changes)