W911WN21B8002 - Amendment 0002.pdf

PDF 367 KB Posted

Attached to
Crooked Creek Lake Boat Ramp Road Erosion Repair Project 2021
Solicitation number
W911WN21B8002
Issued by

About this file

This amendment to a federal solicitation provides clarification regarding the acceptability of CIPP repair methods for addressing erosion issues along Crooked Creek Lake Boat Ramp Road in Armstrong County, Pennsylvania. The scope of work for the base contract and seven options includes improvements to surface drainage, embankment buttressing, and pavement replacement/rehabilitation. Submittal of detailed information on alternative lining systems is required for review and approval. Acceptance of CIPP will be evaluated during this process if the method meets specification requirements.

The related federal contract opportunity is a solicitation from the U.S. Army Corps of Engineers Pittsburgh District for the Crooked Creek Lake Boat Ramp Road Erosion Repair Project. The estimated cost range for repairs to drainage, culverts, pavement, and other infrastructure is between $1 million and $5 million. The contractor must maintain at least one travel lane at all times and dispose of excess materials appropriately. The period of performance is 365 calendar days from notice to proceed.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81ET410776453

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

BOAT RAMP ROAD EROSION REPAIR, CROOKED CREEK LAKE, FORD CITY, ARMSTRONG COUNTY, PENNSYLVANIA

The purpose of this Amendment is to answ er a question arising from the Solicitation and/or Site Visit.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 07-Jul-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W911WN21B8002

X 9B. DATED (SEE ITEM 11)

11-Jun-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

07-Jul-2021

CODE

U.S. ARMY ENGINEER DISTRICT, PITTSBURGH

ATTN CELRP-CT

W S MOORHEAD FEDERAL BUILDING

1000 LIBERTY AVENUE ROOM 2203

PITTSBURGH PA 15222-4186

W911WN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911WN21B8002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The following have been added by full text:

QUESTION AND ANSWER

Q1: In reference to the addendum, can we get a firm answer on whether ASTM 1216 F would be acceptable?

This is a CIPP repair method. The current ASTM for the project states to not go greater than 18”.

A1: Acceptance of the CIPP repair method cannot be provided prior to review of the Contractor submitted information. As noted in Technical Specification Section 33 01 99 Amendment 1, for all other in-place pipe repair systems or multi-component products, the Contractor shall submit the detailed information and anticipated installation work plan for the Contractor's proposed alternative lining system, which is subject to the review and approval by the Contracting Officer or their designated representative.

CIPP methods in accordance with ASTM F1216 may be acceptable if the proposed method meets the requirements of Technical Specification section 33 01 99 upon review and approval by the contracting officer or designated representative during the administration of the contract. As such, there is not enough information provided at this time to make a determination, and acceptance will be evaluated during the submittal process.

(End of Summary of Changes)