W911WN21B8002 Amendment 0001.pdf
PDF 378 KB Posted
- Solicitation number
- W911WN21B8002
About this file
This document provides details regarding a federal contract solicitation for the Crooked Creek Lake Boat Ramp Road Erosion Repair Project 2021. The solicitation involves erosion repairs and preventative measures at Crooked Creek Lake Boat Ramp Road in Ford City, Armstrong County, Pennsylvania to be performed by the U.S. Army Corps of Engineers Pittsburgh District. The base contract and seven awardable options include improvements to surface drainage, buttressing an eroded road embankment, and pavement replacement/rehabilitation. The base contract scope of work consists of drainage feature repairs and modifications, earthwork, excavation and disposal, toe bench excavation and riprap installation, culvert cleaning and lining, full depth pavement replacement and subdrainage, asphalt milling and overlay, and guiderail removal and replacement. The seven awardable options involve culvert cleaning, lining, and repairs, camp area grading, additional asphalt milling and overlay, and parking lot resurfacing. The solicitation number is W911WN21B8002 and the estimated cost ranges from $1,000,000 to $5,000,000. The completion period is 365 calendar days from notice to proceed.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81ET410776453
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
BOAT RAMP ROAD EROSION REPAIR, CROOKED CREEK LAKE, FORD CITY, ARMSTRONG COUNTY, PENNSYLVANIA
The purpose of this Amendment is to:
1) Answ er questions arising from the Solicitation and/or Site Visit
2) Provide revised Specifications Sections 01 22 00.00 08; 01 35 00.00 08; and 33 01 99 and;
3) Provide Specification Attachment - Short-term Repair Construction Photos July 2020
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 30-Jun-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W911WN21B8002
X 9B. DATED (SEE ITEM 11)
11-Jun-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
30-Jun-2021
CODE
U.S. ARMY ENGINEER DISTRICT, PITTSBURGH
ATTN CELRP-CT
W S MOORHEAD FEDERAL BUILDING
1000 LIBERTY AVENUE ROOM 2203
PITTSBURGH PA 15222-4186
W911WN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911WN21B8002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The following have been added by full text:
QUESTIONS AND ANSWERS
Q1: How is the pavement base drain paid for in the full depth areas?
A1: Pavement base drain is included in CLIN 0029 - REMOVAL OF EXISTING PAVEMENT, OVEREXCAVATION, AND SUBGRADE REHABILITATION (STA 14+00 TO STA 18+25). See the amended Specification Section 01 22 00.00 08 paragraph 1.2.8.1.
Q2: How does the placement of the millings get paid? I see they get placed onsite. Should the placement number be rolled into the milling SY price? Also, can we assume that all millings stay onsite? If we run out of space, the unit price won’t have any offsite trucking included.
A2: See the amended Specification Section 01 22 00.00.08 paragraph 1.3.4.1 for placement of the asphalt millings.
Per Sheet CG-101, Recommended Construction Note no. 10, asphalt millings shall be stockpiled at Parking Lot No.
2 and reused for parking lot resurfacing in accordance with Awardable Option No. 4. As noted in Recommended Construction Note no. 7 on Sheet CG-103, awardable Option 4 includes resurfacing and regrading parking lot nos. 2, 3, and 4. Salvaged and stockpiled asphalt millings shall be used for resurfacing/regrading of parking lot nos. 2, 3 and 4 until millings are exhausted before any aggregate is purchased for resurfacing. See also detail A3 on Sheet C- 503.
Q3: Is the swale work on northern portion CG103 part of the swale items on the base bid or part of the stormwater ramp LS item?
A3: If you are referring to channel C-5 excavation and lining, that area is part of the base contract, CLIN 0008 - RIPRAP CHANNEL: EXCAVATE, FURNISH, AND INSTALL UNGROUTED RIPRAP. See Specification Section 01 22 00.00 08 paragraph 1.3.2.1.
Q4: Will the Corps consider changing the culvert lining spec? The current spec for FFPVC, Section 33 01 99, is no longer done in PA. This is based on phone calls with the area’s top liners. The only place contractors do FFPVC is in Florida where they have sandy soil. The current and most practicable solution is a CIPP. Also, the FFPVC requires all of the pointing, requiring a person to slide through a 24” pipe. The CIPP can be done without the pointing. This is a considerable savings overall.
A4: Please refer to Specification Section 33 01 99 paragraph 1.2 that states “All other in-place pipe repair systems or multi-component products will be required to meet the submittal requirements as contained herein.”
As such, any other Contractor proposed lining system must meet all submittal requirements contained in Specification Section 33 01 99. Therefore, alternate lining systems may be acceptable, but the burden of proof, as required by paragraph 1.2 excerpted above, will be borne by the Contractor. The Contractor shall submit the detailed information and anticipated installation workplan for the Contractor’s proposed alternative lining system, which is subject to the review and approval by the Contracting Officer or their designated representative during the administration of the contract.
Prior to specification of the FFPVC lining system, Government design personnel performed a search and confirmed that there are contractors with capability to perform FFPVC lining within the Pittsburgh District limits.
Point repair grouting prior to FFPVC liner installation does not require a person to slide through the pipe. Refer to paragraph 3.1.4 (final paragraph). Grout is to be delivered to the point repairs via a tremie tube/pipe and pumping methods.
If the presence of voids is confirmed by post-cleaning CCTV inspection, point repair grouting will be required to fill the voids regardless of the pipe lining method. Therefore, the use of CIPP does not preclude the need for point repair grouting.
Q5: Can the details of the Rock Buttress be clarified as to what gets done? B-102 shows 2 details. One, J-3, shows full depth up through the guiderail, where the existing rip-rap is. The second, A1, shows the rip-rap just daylighting to the top surface. B-103 only show the toe-bench portion and nothing above the pipe. With this item being LS, it would be nice to calculate the rough volume. Can this be adjusted to a TN price?
A5: Sheet B-103 is intended to show an intermediate construction condition where the toe bench is partially backfilled creating a working area for removal of the 18-inch diameter CPEP culvert and installation of the 24-inch diameter culvert pipe extension. The finished grade of the proposed riprap buttress shall be constructed to an overall approximate slope of 1.75Horizontal to 1Vertical as shown on Section A1 on Sheet B-102 and to the finished lines and grades shown in plan view on sheet CG-101B.
The cross section for detail A1 is cut through the deepest part of the existing riprap buttress nearest to the 24-inch diameter culvert. As described in Recommended Construction Note 3 on Sheet B-102, Option 1 includes removal of the existing 18-inch CPEP extension thus requiring excavation of the existing buttress. How much of the existing buttress that is deconstructed will be dictated by the means and methods of the contractor. For portions of the buttress to be constructed on subgrade soils, details J3 and K9 are included to show that geotextile must be placed on subgrade soils and also give provisions for installation of guide rail posts where applicable. The riprap buttress is intended to be tied into the existing left and right flanks for the slope as shown on Sheet B-102; as such, the subgrade slope and thickness of riprap will vary as noted by the “1:VARIES” slope called out on details J3 and K9.
The riprap composing the existing buttress is to be salvaged; therefore, the required riprap volume can be determined by the Contractor with the provided existing and proposed grading contours. Sheet CG-101A clearly shows the existing ground contours and the proposed toe bench contours and Sheet CG-101B clearly shows the proposed buttress finished grade contours.
This work item will not be adjusted to a TN unit price. For additional clarity, photographs of this region taken during the previous temporary repair are included within the amendment to Section 01 35 00.00 08 paragraph 1.5.3.
(End of Questions)
SUMMARY OF CHANGES 0001
CERTIFIED FINAL DOCUMENTS – W911WNB218002 TECHNICAL SPECIFICATIONS
The following Sections have been revised:
01 22 00.00 08 PRICE AND PAYMENT PROCEDURES
Paragraph 1.2.8.1 Payment Edited paragraph.
Paragraph 1.3.4.1 Payment
Edited paragraph.
01 35 00.00 08 SPECIAL PROCEDURES
Paragraph 1.5.3 Existing Condition Photographs Added paragraph. (Photographs added as attachment)
33 01 99 IN-PLACE CULVERT PIPE REHABILITATION
Section 1.2 System Description Edited fourth paragraph.
(End of Summary of Changes)