BID RESULTS.pdf
PDF 119 KB Posted
- Solicitation number
- W911WN21B8002
About this file
This document contains bid results for the Crooked Creek Lake Boat Ramp Road Erosion Repair Project 2021 opportunity with the U.S. Army Corps of Engineers Pittsburgh District. Brentzel Excavation LLC submitted the lowest bid of $1,032,986.76 for the base scope of work, which includes drainage improvements, embankment buttressing, and pavement replacement along Boat Ramp Road adjacent to Crooked Creek Lake. The government estimate was $1,494,234.12. There are also seven awardable options that involve culvert cleaning, parking lot resurfacing, and additional road work. The selected contractor must complete all work within 365 calendar days of the notice to proceed and have traffic control measures in place to maintain at least one travel lane at all times. The project cost is estimated between $1,000,000.00 and $5,000,000.00.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID RESULTS
W911WN21B8002
Boat Ramp Road Erosion Repair, Crooked Creek Lake, Ford City, Armstrong County, Pennsylvania
Bid Opening: 13 July 2021
Contractor's Name & Address Total Bid Amount
Brentzel Excavation LLC DBA Brex Enterprises 2 Main Street STE A Irwin PA 15642
$ 1,032,986.76
Gregori Construction Inc.
P.O. Box 121 Sarver, PA 16055
$1,203,302.00
A. Merante Contracting, Inc.
4740 Streets Run Road Pittsburgh, PA 15236
$1,378,791.26
Kovilic Construction Co., Inc.
3721 N. Carnation Street Franklin Park, IL 60131
$1,768,340.00
Government Estimate w/o Profit $1,494,234.12