Pre-Bid Virtual Site Visit - Pictures of Work Site - Engineering Discussion.pdf

PDF 4 MB Posted

Attached to
Tionesta Dam Gate Operating Machinery Replacement Federal contract opportunity
Solicitation number
W911WN20B8002
Issued by
Department of the Army Corps of Engineers Engineering District Pittsburgh

About this file

This solicitation is for a firm fixed price construction contract to replace gate operating machinery at Tionesta Dam. The U.S. Army Corps of Engineers, Pittsburgh District requires removal of existing gate hoists and installation of new hoists with round wire rope, replacement of power receptacles and grating, and concrete repairs. Bids are due by March 23, 2020 for a contract period of 720 calendar days with a total estimated cost between $1 million to $5 million. This is a 100% small business set-aside for NAICS code 237990. Offerors must be registered in SAM and the winning contractor must submit performance documentation including design submittals, timelines, and paperwork. The link provided gives training to assist new contractors in understanding the Corps of Engineers' contracting process.

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TIONESTA REPLACE GATE OPERATING MACHINERY SYNOPSIS

Work Synopsis

The U.S. Army Corps of Engineers, Pittsburgh District, has a project that involves the replacement of gate operating machinery and concrete repairs at Tionesta Dam, Tionesta, PA. The contract generally includes replacement of the existing gate operating machinery with new ones, and concrete repairs to the work bay floor. The major features of the requirements are identified below:

The contract specifically includes:

a. Removal of existing service gate hoists 1 through 3;

b. Installation of new existing service gate hoists 1 through 3;

c. Removal of emergency gate hoist;

d. Installation of new existing emergency gate hoist;

e. Concrete repairs to the floor of the work bay;

f. Removal of some existing aluminum planking in the work bay;

g. Installation of new aluminum planking in the work bay;

h. Removal of existing power plug and receptacle;

i. Installation of new power plug and receptacle.

Moving the existing and new gate hoists may be done with the Government crane in the control tower by Government personnel. All work will be performed in the control tower of the dam.

Disposal of gate hoists and associated parts, concrete rubble, and electrical equipment will be required. Ferrous and all other construction waste material will be disposed of at commercially permitted facilities licensed to accept waste or recyclable materials as applicable.

Construction work will occur in close proximity to operating dam gates. The dam will not cease regular operations during the work period.

Pittsburgh District

Tionesta Dam

Road to Control Tower Parking area

Tionesta Dam

Looking down Service Bridge to Control Tower Control Tower Entranceway

Operating Floor

Overview of Operating Floor Overhead Crane

Gate Hoist Gate Hoist

Emergency Gate Hoist near Control Tower wall

Back of Gate Hoist

ELECTRICAL

PP-1 PP-1 Existing 8 AWG Feeders

Machinery Receptacle Machinery Control Panel

Plug and Receptacle Located Under Machinery

Machinery Controls Emergency Plug and Receptacle

Work Platform Access

Staircase to Work Platform

Work Platform Access

Staircase to Work Platform Entrance to Work Platform

Gate Connection

Lower Sheave

Lower Sheave

Work Platform

Typical Planking Curb Angle and Concrete Degradation

Concrete Degradation

Typical Emergency Gate Well Typical Service Gate Well

Planking Support Beam