Drawings (Attachment 2).pdf
PDF 11 MB Posted
- Attached to
- Tionesta Dam Gate Operating Machinery Replacement Federal contract opportunity
- Solicitation number
- W911WN20B8002
About this file
This solicitation is for the replacement of gate operating machinery at Tionesta Dam in Pennsylvania. The U.S. Army Corps of Engineers, Pittsburgh District is seeking to replace the existing vertical lift gate machinery with new round wire rope machinery through a firm fixed price contract. The contract includes removing the existing machinery and installing new 115-ton capacity machinery, replacing associated grating and power receptacles, and repairing concrete. The base contract entails one new machine with options to replace up to three additional machines. Interested vendors must register on beta.sam.gov to receive solicitation amendments with bids due by March 23, 2020. The period of performance is 720 days from notice to proceed. The estimated cost range is $1,000,000 to $5,000,000. This procurement is a 100% small business set-aside.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Results 5-19-20 W911WN20B8002.pdf | ||
| Atendance Register Virtual Bid Opening 5-19-20.pdf | ||
| W911WN20B8002 Amendment 0001.pdf | ||
| Technical Specification Section 35 01 41.00 08 (REV) Amendment 0001.pdf | ||
| Drawing G-011-A (REV) Amendment 0001.pdf | ||
| Drawing C-122-A (REV) Amendment 0001.pdf | ||
| Drawing CD521-A (REV) Amendment 0001.pdf | ||
| Pre-Bid Virtual Site Visit - Pictures of Work Site - Engineering Discussion.pdf | ||
| Pre-Bid Virtual Site Visit - Contracting Solicitation Discussion.pdf | ||
| Pre-Bid Virtual Site Visit - List of Contractors in Attendance.pdf | ||
| Solicitation W911WN20B8002.pdf | ||
| Reference Drawings (Attachment 3).pdf | ||
| Davis Bacon Wage Determination PA20200002 04-10-2002.pdf | ||
| Drawings (Attachment 2).pdf | ||
| Technical Specifications (Attachment 1).pdf | ||
| Bid Schedule.xlsx | XLSX spreadsheet |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E L E
IS
U R
E
G-010
C O
V E
R S
H E
T
SOLICITATION NO.:
CONTRACT NO.:
ISSUE DATE:
of Engineers
US Army Corps
AND APPROVAL OF ALL DRAWINGS LISTED ON THE INDEX SHEET.
SIGNATURES AFFIXED BELOW INDICATE OFFICIAL RECOMMENDATION
SUBMITTED BY:
SECTION CHIEF
APPROVAL RECOMMENDED BY:
BRANCH CHIEF
APPROVED BY:
CONSTRUCTION DIVISION
CHIEF, ENGINEERING AND
DATE
DATE
DATE
THEIR EMPLOYMENT AS REQUIRED BY ER 1110-1-8152.
APPEAR ON THESE PROJECT DOCUMENTS WITHIN THE SCOPE OF
DESIGNATIONS OF U.S. ARMY CORPS OF ENGINEERS INDIVIDUALS
THIS SHEET. THE INITIALS OR SIGNATURES AND REGISTRATION
U.S. ARMY CORPS OF ENGINEERS AND THE A/E FIRMS IDENTIFIED ON
THIS PROJECT WAS DESIGNED BY THE PITTSBURGH DISTRICT OF THE
PITTSBURGH DISTRICT
ALLEGHENY RIVER BASIN
TIONESTA CREEK LAKE
REPLACE GATE OPERATING MACHINERY
A
F
R E
G O
S O
LAKE
CREEK
TIONESTA
/s/ JOHN E. NITES, P.E.
FEBRUARY 2020
M
M A
R C
U S
W911WN20B8002
CERTIFIED FINAL DOCUMENTS
/S J
O H
N E
N
IT
E S P .E
F
E B
/S/ STEPHEN R. STOLTZ, P.E.
/S/ STEPHEN R. STOLTZ, P.E. 14 FEB 2020
14 FEB 2020
14 FEB 2020
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T E
D B
Y
S
IZ
E
IS
S
U E D
A T
E
S O
L
IC
IT
A T
IO
N N
O
C O
N T
R A
C T N
O
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
-F
E B -2
:5
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S I
D
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
W
W N
B
P L
O T D
A T
E
A L L E
G H
E N
Y R
IV
E R B
A S
IN
R E
P L
A C
E G
A T
E O
P E
R A
T
IN
G M
A C
H
IN
E R
Y
IO
N E
S T
A C
R E
E K L
A K
CERTIFIED FINAL DOCUMENTS
L E
IS
U R
E
G-011
C O
N T
R A
C T A
N D R
E F
E R
E N
C E D
R A
W
IN
G I
N D
E X
F
R E
G O
S O
M
M A
R C
U
GENERAL NOTES
EXERCISED.
STARTING WORK ON THE NEXT GATE IF MULTIPLE AWARDABLE OPTIONS ARE
CONTRACTOR MUST COMPLETE ALL WORK ON THE SPECIFIC GATE BEFORE4.
SEE SPECIFICATIONS FOR DETAILS.
GATE/BULKHEAD PLACEMENT WITH CONTRACTING OFFICER AND PROJECT STAFF
PLACEMENT OPERATIONS. THE CONTRACTOR SHALL COORDINATE NEEDED
OPERATE THE EXISTING OPERATING MACHINERY FOR GATE AND BULKHEAD
GOVERNMENT PERSONNEL ARE THE ONLY PERSONNEL AUTHORIZED TO3.
SEE SPECIFICATION FOR DETAILS.
LIFTING OPERATIONS WITH THE CONTRACTING OFFICER AND PROJECT STAFF.
TO USE THE OVERHEAD HOIST. THE CONTRACTOR SHALL COORDINATE ALL
GOVERNMENT PERSONNEL ARE THE ONLY PERSONNEL AUTHORIZED PERSONNEL2.
LEGACY 822.33-3.54=818.79 NAVD88).
3.54 FEET FROM THE LEGACY ELEVATION TO EQUAL CURRENT NAVD88 (I.E.
LEGACY/PROJECT ELEVATION TO CURRENT NAVD88 ONE SHOULD SUBTRACT
CONSIDERED A "LEGACY" OR "PROJECT DATUM". TO CONVERT A
ELEVATIONS ON REFERENCE DRAWINGS WITHOUT A NOTED DATUM SHOULD BE1.
CONTRACT DRAWINGS INDEX
NUMBER
DWG
DRAWING TITLE
GENERAL
G-010 COVER SHEET
G-011 CONTRACT AND REFERENCE DRAWING INDEXES
G-012 STANDARD ABBREVIATIONS
G-113 GENERAL SITE PLAN WITH CONTRACTOR ACCESS AND NOTES
G-114 CONTRACTOR WORK LIMITS PLAN AND NOTES
CIVIL
CD420 GATE OPERATING MACHINERY - WORK PLATFORM CONCRETE FLOOR AND EMBEDDED STEEL DEMOLITION PLAN
CD521 GATE OPERATING MACHINERY - WORK PLATFORM CONCRETE FLOOR AND EMBEDDED STEEL DEMOLITION DETAILS
C-122 GATE OPERATING MACHINERY - WORK PLATFORM ALUMINUM PLANKING PLAN
C-523 GATE OPERATING MACHINERY - ALUMINUM PLANKING DETAILS SHEET 1 OF 2
C-524 GATE OPERATING MACHINERY - ALUMINUM PLANKING DETAILS SHEET 2 OF 2
C-425 GATE OPERATING MACHINERY - WORK PLATFORM CONCRETE FLOOR AND EMBEDDED STEEL CONCRETE REPLACEMENT PLAN
C-526 GATE OPERATING MACHINERY - WORK PLATFORM CONCRETE FLOOR AND EMBEDDED STEEL CONCRETE REPLACEMENT DETAILS
MECHANICAL
MD105 GATE OPERATING MACHINERY - OPERATING HOUSE FLOOR DEMOLITION PLAN
M-106 GATE OPERATING MACHINERY - OPERATING HOUSE FLOOR PLAN AND DETAIL
M-307 GATE OPERATING MACHINERY - INTAKE TOWER SECTION
M-608 GATE OPERATING MACHINERY - GATE MACHINERY LAYOUT
ELECTRICAL
E-105 GATE OPERATING MACHINERY - OPERATING HOUSE FLOOR ELECTRICAL PLAN
E-606 GATE OPERATING MACHINERY - POWER ONE-LINE DIAGRAM
REFERENCE DRAWINGS INDEX
FILE NAME DRAWING TITLE
038e-U1-4_6.2 BOAT LAUNCH RAMP AND ACCESS ROADS
038e-U1-_4_7 BITUMINOUS PAVING PLAN VIEW
038e-U1-4_9 INTAKE FLOOR COVERING PLANS AND EXSITING OPENINGS
038e-U1-4_10 INTAKE FLOOR COVERINGS ALUMINUM PLANK DETAILS
038e-U1-12_25 ACCESS ROAD TO DAM STA 18+00 TO STA 38+10 PLAN AND SECTIONS
038e-U1-40_8.9 INTAKE SECTION NO. 1 SHEET
038e-U1-40_10.12 INTAKE SECTION NO. 3 SHEET
038e-U1-40_13.7 INTAKE SECTIONAL PLAN NO. 3 SHEET
038e-U1-40_16.4 INTAKE STEEL REINFORCEMENT NO. 1
038e-U1-40_20.3 INTAKE STEEL REINFORCEMENT NO. 5
038e-U1-50_1 SLUICE GATES GENERAL PLAN
038e-U1-50_2.1 SERVICE SLUICE GATE ASSEMBLY
038e-U1-50_5.1 SERVICE SLUICE GATE DOGGING DEVICE AND THRUST ROLLER
038e-U1-50_6.2 SERVICE SLUICE GATE SEAL AND PICK UP
038e-U1-50_8.1 EMERGENCY SLUICE GATE ASSEMBLY
038e-U1-50_11.1 EMERGENCY SLUICE GATE DOGGING DEVICE ASSEMBLY AND DETAILS
038e-U1-50_12.2 EMERGENCY SLUICE GATE SEAL AND PICK UP
038e-U1-53_1.3 SERVICE BRIDGE SUPERSTRUCTURE NO. 1
038e-U1-55_1A.2 SLUICE GATE HOISTING MACHINERY GENERAL PLAN
038e-U1-56_1A.2 ELECTRIC LIGHTING AND POWER SYSTEM NO. 1
038e-U1-56_3.3 ELECTRIC LIGHTING AND POWER SYSTEM NO. 3
038e-U1-57_1.1 OPERATING HOUSE CRANE GENERAL PLAN
038e-U1-65_4.5 MISCELLANEOUS METALS DETAILS NO. 1
61039 D. B. ELECTRIC CRANE (ONE MOTOR) 20 TON WIRING DIAGRAM
/S J
O H
N E
N
IT
E S P .E
F
E B
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T E
D B
Y
S
IZ
E
IS
S
U E D
A T
E
S O
L
IC
IT
A T
IO
N N
O
C O
N T
R A
C T N
O
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
-F
E B -2
:5
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S I
D
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
W
W N
B
P L
O T D
A T
E
A L L E
G H
E N
Y R
IV
E R B
A S
IN
R E
P L
A C
E G
A T
E O
P E
R A
T
IN
G M
A C
H
IN
E
N E
S T
A C
R E
E K L
A K
L E
IS
U
G-012
A N
D A
R D A
B B
R E
V
IA
T
IO
N S
A F
R E
G O
S O
M
M A
R C
U S
ABBREVIATIONS
COURSE(S)CRS
CROSS GRAINCRG
CORROSIVE RESISTANT STEELCRES
CIRCUMFERENCECRCMF
CARPETCPT
COMPRESSIBLECPRS
COVERCOV
CORRIDORCORR
CONTRACTORCONTR
CONTINUE CONT
CONSTRUCTIONCONSTR
CONNECTCONN
CONCRETECONC
COMPARTMENTCOMPT
COMBUSTIONCOMB
COMMONCOM
COLUMNCOL
CARBON DIOXIDECO2
CLEANOUTCO
COUNTERCNTR
CORNERCNR
CONDUCTIVE NEOPRENE LATEXCNL
CONDUITCND
CONCRETE MASONRY UNITCMU
COMPOSITECMPST
CORRUGATED METAL PIPECMP
CENTIMETER(S)cm
CLEAR WIRED GLASSCLWG
CLEAR(ANCE)CLR
CLOSURECLOS
CLOSETCLO
CONTRACT LIMIT LINECLL
CLEAR GLASSCLGL
CEILING HEIGHTCLG HT
CEILINGCLG
CENTER LINECL
CIRCUIT BREAKERCKT BRKR
CIRCUITCKT
CONSTRUCTION JOINTCJ
CONTROL JOINTCJ
CIRCULARCIRC
CAST-IN-PLACECIP
CURB INLETCI
CAST IRONCI
CHROME PLATEDCHR PL
CHECKCHK
CHIMNEYCHIM
CHAMFERCHFR
CHALKBOARDCH BD
CORNER GUARDCG
CUBIC FEET PER MINUTECFM
COUNTERFLASHINGCFLG
CONDUCTIVE FLOORINGCFI
CERAMICCER
CEMENT PLASTERCEM PLAS
CEMENTCEM
COVER ELEVATIONCE
CLOSED CIRCUIT TELEVISIONCCTV
CUBICLE CURTAIN TRACKCCT
CATCH BASINCB
CAPACITYCAP
CABINETCAB
BOTH WAYSBW
BUILT-UP ROOFINGBUR
BETWEENBTWN
BTU PER HOURBtuH
BRITISH THERMAL UNITBtu
BASEMENTBSMT
BOTH SIDESBS
BRONZEBRZ
BRACKETBRKT
BRICKBRK
BEARING PLATEBRG PL
BEARINGBRG
BRIDGINGBRDG
BRACINGBRCG
BACK PLASTER(ED)BP
BOTTOMBOT
BOTTOM OFBO
BENCHMARKBM
BELOWBLW
BUILDINGBLDG
BUILDING LINEBL
BED JOINTBJT
BITUMINOUSBITUM
BEVELBEV
BRICK EXPANSION JOINTBEJ
BOUNDARYBDRY
BOARDBD
BOOKCASEBC
BULLETIN BOARDBB
ACOUSTICAL WALL TREATMENTAWT
AMERICAN WIRE GAUGEAWG
AVERAGEAVG
AUTOMATICAUTO
ACOUSTICAL TILE CEILINGATC
ASPHALTASPH
ABOVE SUSPENDED CEILINGASC
ASBESTOSASB
AMERICAN REFRIGERATION INSTITUTEARI
ARCHITECTARCH
APPROXIMATEAPPROX
APPROVEDAPPD
AMERICAN NATIONAL STANDARDS INSTITUTEANSI
ANODIZEANOD
AMPEREAMP
AMBIENTAMB
ALUMINUMALUM
ALTERNATEALT
ACTIVE LEAFA.L.
AMERICAN INSTITUTE OF STEEL CONSTRUCTIONAISC
AMPERE INTERRUPTING CAPACITYAIC
AREA INLETAI
AIR HANDLING UNITAHU
ANCHOR AHR
AGGREGATEAGGR
ABOVE FINISHED FLOORAFF
AUTOMATIC DOOR OPERATORADO
ADJACENT, ADJOINING, ADJUSTABLEADJ
ADHESIVEADH
ADDENDUMADDM
ACOUSTICAL CEILING TILEACT
ACOUSTICACST
ALUMINUM CABLE STEEL REINFORCEDACSR
ACCESS PANELACS PNL
ACCESS DOORACS DR
ACRYLIC PLASTICACR
AMERICAN CONCRETE INSTITUTEACI
ACCESSIBLEACC
ALTERNATING CURRENTAC
ABOVEABV
ANCHOR BOLTAB
AIR CONDITIONING UNITA/C UNIT
AIR CONDITIONINGA/C
ANGLEL
FRAMINGFRMG
FORGEDFRG
FRAMEFR
FIRE RESISTANT FR
FEET PER MINUTEFPM
FIREPROOFFP
FIRE PARTITIONFP
FACE OF STUDFOS
FACE OF MASONRYFOM
FACE OF FINISHFOF
FACE OF CONCRETEFOC
FENCEFN
FLUORESCENTFLUOR
FLOOR PLATEFLR PL
FLOORINGFLG
FLEXIBLEFLEX
FLOORFLR
FLASHINGFLASH
FLUSH JOINTFJT
FIXTUREFIXT
FINISH FLOORFIN FLR
FINISHFIN
FIGUREFIG
FLAT HEAD WOOD SCREWFHWS
FIRE HOSE STATIONFHS
FIRE HOSE RACKFHR
FLAT HEAD MACHINE SCREWFHMS
FIRE HOSE CABINETFHC
FLAT HEADFH
FIRE HYDRANTFH
FIBERGLASSFGL
FACTORY FINISHFF
FIRE EXTINGUISHER CABINETFEC
FIRE EXTINGUISHER BRACKETFEB
FIRE EXTINGUISHERFE
FOUNDATIONFDTN
FIRE DAMPERFDMPR
FLOOR DRAINFD
FAN COIL UNITFCU
FLOOR CLEANOUTFCO
FLOOR CONSTRUCTION JOINTFCJ
FACINGFCG
FACE BRICKFC BRK
FOOT CANDLEFC
FIRE BRICKF BRK
FRESH AIR INTAKEFAI
FIRE APPARATUS CLOSETFAC
FRESH AIRFA
FIRE ALARMFA
FAHRENHEITF
EXTERIOREXT
EXPANSION BOLTEXP BT
EXPOSEDEXP
EXPANSIONEXP
EXISTINGEXST
EXHAUST AIREXH A
EXHAUSTEXH
EXCAVATEEXC
ENTERING WATER TEMPERATUREEWT
ELECTRIC WATER COOLEREWC
ESTIMATE(D)EST
ESCALATORESCAL
EQUIPMENTEQUIP
EQUALEQ
EPOXY COATINGEPY
EXPLOSION PROOFEPRF
ELECTRICAL PANELBOARDEP
ENTRANCE, ENTERINGENTR
ENCLOSE(URE)ENCL
EMERGENCYEMER
ESTIMATED MAXIMUM DEMANDEMD
EXPANDED METAL EM
ELECTRICELEC
ELEVATION - GRADE OR BUILDINGEL
EXPANSION JOINTEJ
EACH FACEEF
ENTERING AIR TEMPERATUREEAT
EACHEA
EASTE
DIRECT EXPANSIONDX
DUMBWAITERDWTR
DRAWERDWR
DOWELSDWLS
DRAWINGDWG
DOVETAIL DVTL
DRAIN TILEDT
DOWNSPOUTDS
DOUBLE STRENGTH (GLASS)DS
DOOR CLOSERDR CL
DRAINBOARDDRB
DRAINDR
DOORDR
DOWNDN
DEMOUNTABLEDMT
DAMPERDMPR
DAMPPROOFINGDMPF
DEAD LOADDL
DIVISIONDIV
DISTRIBUTION PANELDISTR PNL
DISPENSERDISP
DISCONNECTDISC
DIMENSIONDIM
DIAGONALDIAG
DIAMETERDIA
DUCT HEATERDH
DOUBLE HUNGDH
DRINKING FOUNTAINDF
DETAILDET
DEPARTMENTDEPT
DEPRESSIONDEPR
DEMOLITIONDEMO
DEGREEDEG
DUMMY CONTROL JOINTDCJT
DOWELED CONTROL JOINTDCJ
DOUBLE ACTING DOORDBL ACT DR
DOUBLEDBL
DRY BULBDB
DATUMDAT
PENNY (AS IN NAIL - 10D)d
CYLINDERCYL
COLD WATERCW
CONDUCTIVE VINYL HOMOGENEOUS (SHEET TYPE)CVH
CEILING VENTCV
CUBIC YARDSCU YD
CABINET UNIT HEATERCUH
CUBIC FEETCU FT
COPPERCu
CONDENSING UNITCU
CENTERCTR
CENTER TO CENTERC TO C
CURRENT TRANSFORMERCT
CERAMIC TILECT
CASEMENTCSMT
COUNTERSUNKCSK
CAST STONECS
YARD DRAINYD
YARDYD
TRANSFORMERXFMR
WELDED WIRE REINFORCEMENTWWR
WELDED WIRE MESHWWM
WELDED WIRE FABRICWWF
WALL TO WALLW/W
WIDTHWTH
WEIGHTWT
WAINSCOTWSCT
WASTE STACKW.S.
WATERSTOPWS
WARDROBEWRB
WASTE RECEPTACLEWR
WORKING POINTWP
WEATHERPROOFWP
WATERPROOF(ING)WP
WITHOUTW/O
WIRE MESHWM
WORK SHOPWKSH
WROUGHT IRONWI
WATT-HOUR METERWHM
WHEEL BUMPERWHB
WATER HEATERWH
WALL HUNGWH
WIRED GLASSWGL
WIDE FLANGEWF
WINDOWWDW
WASTE DISPOSERWDSP
WOOD DOORWD
WOODWD
WOOD-CASED OPENINGWCO
WHEELCHAIRW/C
WATER CLOSETWC
WOOD BLOCKINGWBL
WET BULBWB
WITHW/
WESTW
VINYL WALL COVERINGVWC
VENT THRU ROOFVTR
VOLTAGE TRANSFORMERV.T.
VENT STACKVS
VERMICULITEVRM
VAPOR RETARDERVR
VOLUMEVOL
VENEERVNR
V-JOINT(ED)VJ
VINYL HOMOGENEOUSVH
VERTICAL GRAINVG
VINYL FABRICVF
VESTIBULEVEST
VERTICALVERT
VENTILATOR(TION)VENT
VAULT DOORVD
VITRIFIED CLAY TILEVCT
VINYL COMPOSITION TILEVCT
VINYL BASEVB
VARNISHVAR
VOLTV
UNIT VENTILATORUV
UTILITYUTIL
URINALUR
UNINTERRUPTABLE POWER SUPPLYUPS
UNFINISHEDUNFIN
UNEXCAVATEDUNEX
UNDERWRITERS LABORATORIESUL
UNIT HEATERUH
UNDERGROUNDUGND
UNIT COOLERUC
TYPICALTYP
TELEVISIONTV
THERMOSTATTSTAT
TRANSVERSETRANS
TRANSOMTRANS
TOILET PARTITIONTPTN
TOILET PAPER DISPENSERTPD
TOP OF WALLTOW
TOP OF STEELTOS
TOP OF SLABTOS
TOPOGRAPHYTOPO
TOLERANCETOL
TOP OFTO
TACKSTRIPTKS
TACKBOARDTK BD
THRESHOLDTHRES
THICK(NESS)THK
TRUSS HEADTH
TOGGLETGL
TONGUE AND GROOVET&G
TERMINALTERM
TERRAZZOTER
TEMPORARYTEMP
TEMPERATURETEMP
TELEPHONETEL
TERRA COTTATC
TOWEL BARTB
TANGENTTAN
TREADT
SYSTEMSYS
SYNTHETICSYNTH
SYMMETRICALSYMM
SWITCHBOARDSWBD
SWITCHSW
SHEET VINYL SV
SUSPENDEDSUSP
SUBFLOORSUB FL
STAIRWAYSTWY
STRUCTURALSTRUCT
STRINGERSTR
STATIC PRESSUREST PR
STORAGESTOR
STEELSTL
SEATINGSTG
STANDARDSTD
STATIONSTA
STAINLESS STEELSST
STANDING SEAM (ROOF)SS
SERVICE SINKSS
SHELF AND RODS&R
SQUARE HEADSQHD
SQUARESQ
SPEAKERSPKR
SPACE HEATERSPH
SPECIAL FINISHSP FIN
SOUNDPROOFSPF
SPECIFICATIONSPEC
SOUNDPROOF DOORSPD
SPECIALSPCL
SPACERSPC
SHUT OFF VALVESOV
SHEET METAL SCREWSSMS
SHEET METALSM
SLEEVESLV
SEALANTSLNT
SKYLIGHTSKLT
STEEL JOIST INSTITUTESJI
SIMILARSIM
SHELVINGSHV
SHEATHINGSHTHG
SHEETSHT
SHOULDERSHLDR
SHEET GLASSSG
STRUCTURAL FACING UNITSFU
STRUCTURAL FACING TILE UNITSFTU
SAFETY GLASSSFGL
SEQUENCESEQ
SECTIONSECT
STEEL DOOR INSTITUTESDI
STORM DRAINSD
STRUCTURAL CLAY TILESCT
SCREENSCRN
SCHEDULESCHED
SOLID CORESC
SECURITY BARSS.B.
SPLASH BLOCKSB
SUPPLY AIRSA
SOUTHS
RAINWATER CONDUCTORRWC
RIVETRVT
REVERSERVS
RUBBER TILE FLOORRTF
RAISED PATTERN RUBBER TILERPRT
REVOLUTIONS PER MINUTERPM
RETRACTABLE PARTITIONRP
RIGHT OF WAYROW
ROUGH OPENINGRO
ROUNDRND
ROOMRM
RAILINGRLG
RACKRK
ROOF HATCHRH
RIGHT HANDRH
RELATIVE HUMIDITYRH
ROOFINGRFG
REVISIONREV
RETURNRET
RESILIENTRESIL
REQUIREDREQD
REMOVE(ABLE)REM
REINFORCEREINF
REGLETREG
REGISTERREG
REFRIGERATIONREFR
REFLECTREFL
REFERENCEREF
RECTIFIERRECT
RECREATION ROOMREC ROOM
RECEPTACLERECPT
RIGID INSULATIONRDG INS
ROOF DRAINRD
RECEIVERRCVR
REINFORCED CONCRETE PIPERCP
REMOTE CONTROLRC
RUBBERRBR
RUBBLE STONERBL
RUBBER BASE, RESILIENT BASERB
RETURN AIR REGISTERRAR
RETURN AIR GRILLERA GR
RABBETEDRAB
RETURN AIRRA
RISERR
RANGER
RADIUSR
QUANTITYQTY
QUARTER ROUND1/4 RND
QUARTERQTR
QUARTQT.
QUARRY TILEQT
PASS WINDOWPW
PAVINGPVG
POLYVINYL CHLORIDEPVC
PAVEDPV
PAPER TOWEL RECEPTACLEPTR
PARTITIONPTN
PAPER TOWEL DISPENSERPTD
POST-TENSIONED CONCRETEPT CONC
POINTPT.
PNEUMATIC TUBEPT
POUNDS PER SQUARE INCHPSI
POUNDS PER SQUARE FOOTPSF
PRESTRESSED CONCRETEPS CONC
PRESSED STEELP.S.
PIPE SPACEPS
PRESSURE-REGULATING VALVEPRV
PROJECTPROJ
PARKINGPRKG
PREFORMEDPREFMD
PREFINISHEDPREFIN
PREFABRICATE(D)PREFAB
PAIRPR
PARTS PER MILLIONPPM
POLISHED PLATE GLASSPPGL
PORTABLEPORT
PORCELAINPORC
POLISHEDPOL
PAINT(ED)PT
PANELPNL
PLYWOODPLYWD
PLATE GLASSPL GL
PILINGPLG
POUNDS PER LINEAR FOOTPLF
PLUMBINGPLBG
PLATFORMPLAT
PLASTERPLAS
PLASTIC LAMINATEPLAM
PROPERTY LINEPL
PLATEPL
POST INDICATING VALVEPIV
PREFAB ISOLATION POWER UNITPIPU
POINT OF INTERSECTIONPI
PHARMACYPHAR
PHASEPH
PERIMETERPERIM
PERFORATE(D)PERF
PEDESTALPED
PAVEMENT DRAINPD
CEMENT PLASTER (PORTLAND)PCP
POUNDS PER CUBIC FOOTPCF
PRECAST CONCRETEPCC
PIECEPC
PUSH BUTTON STATIONPBS
PARTICLE BOARDPBD
PANIC BARPB
PARALLELPAR
PUBLIC ADDRESSPA
POLEP
OBSCURE WIRED GLASSOWGL
OUTSIDE SCREW AND YOKEOS & Y
OPERATIONSOPS
OPAQUEOPQ
OPPOSITEOPP
OPENINGOPNG
OPPOSITE HANDOPH
OVALHEAD WOOD SCREWOHWS
OVALHEAD MACHINE SCREWOHMS
OVERHEADOH
OBSCURE GLASSOGL
OFFICEOFC
OUTSIDE DIAMETEROD
ON CENTER EACH WAYOCEW
ON CENTEROC
OBSERVATION WINDOWOBW
OBSCUREOBSC
OUTSIDE AIROA
NOT TO SCALENTS
NOT REQUIREDN’’REQD
NOISE REDUCTION COEFFICIENTNRC
NOISE REDUCTIONNR
NOMINALNOM
NUMBERNO
NORMALLY OPENNO
NONMETALLICNM
NEOPRENE LATEXN.L.
NAILABLENL
NOT IN CONTRACTNIC
NICKELNi
NATIONAL FIRE PROTECTION ASSOCIATIONNFPA
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATIONNEMA
NATIONAL ELECTRICAL CODENEC
NORMALLY CLOSEDNC
NATURALNAT
NORTHN
MULLIONMULL
MOVABLEMVBL
METALMTL
METAL FURRINGMTFR
MOUNTEDMTD
MOUNTMT
METAL THRESHOLDMT
MACHINE SCREWSMS
METAL ROOF DECKINGMRD
MARBLE BASEMRB
MOP RECEPTORMR
MOVABLE PARTITIONMP
MOTORMOT
MODIFIEDMOD.
MODULARMOD
MASONRY OPENINGMO
MATERIAL NOT IN CONTRACT (INSTALLATION BY CONTRACTOR)MNIC
MILLIMETER(S)mm
MILLWORKMLWK
MOULDINGMLDG
MONOLITHICML
METAL LATHML
MISCELLANEOUSMISC
MIRRORMIRR
MINIMUMMIN
MALLEABLE IRONMI
MANHOLEMH
MATTE-GLAZED TILEMGT
MOTOR GENERATORMG
MANUFACTURERMFR
MANUFACTURINGMFG
METAL FLOOR DECKINGMFD
METAL EDGE STRIPMES
MEMBRANEMEMB
MEDIUMMED
MECHANICAL ROOMMECH RM
MECHANICALMECH
METAL DIVIDER STRIPMDS
METAL-CASED OPENINGMCO
MASONRY CONTROL JOINTMCJ
MEDICINE CABINETMC
MEMBERMBR
MACHINE BOLTSMB
MAXIMUMMAX
MATERIAL(S)MATL
MASONRYMAS
MACHINEMACH
MATCHED AND BEADEDM&B
METER(S)m
LEAVING WATER TEMPERATURELWT
LIGHTWEIGHT CONCRETELWC
LOUVERLVR
LIGHTNINGLTNG
LIGHTINGLTG
LIGHTWEIGHTLT WT
LIGHTLT
LAWN SPRINKLERLS
LIVING ROOMLR
LOW POINTLPT
LIGHTPROOF LOUVERLPL
LIGHTPROOF DOORLPD
LIGHTPROOFLP
LONGITUDINALLONG
LINTELLNTL
LIMESTONELMST
LUMENLM
LEAD-LINED DOORLLD
LIVE LOADLL
LOCKERLKR
LINEARLIN
LEFT HAND(ED)LH
LENGTHLG
LOADINGLDG
LOADLD
LIGHT CONTROLLC
LUMBERLBR
LABELLBL
POUNDLB
LAG BOLTLB
LAVATORYLAV
LAUNDRYLAU
LEAVING AIR TEMPERATURELAT
LAMINATELAM
LADDERLAD
LABORATORYLAB
KEYWAYKWY
KILOWATTkW
KILOVOLT AMPERES REACTIVEkVAR
KILOVOLT AMPERESkVA
KILOVOLTSkV
KILOMETERkm
KICKPLATEKPL
KNOCKOUT PANELKOP
KITCHENKIT
KILOPOUND (1000 POUNDS)KIP
JOINTJT
JOISTJST
JUNCTIONJCT
JUNCTION BOXJ-BOX
JANITOR’S CLOSETJAN CLO
INSIDE PIPE SIZEI.P.S.
IRON PIPE SIZEIPS
IRON PIPEIP
INVERTINV
INTERMEDIATEINTM
INTERIORINT
INSULATIONINSUL
INSULATING FILLINSF
INCLUDEDINCL
INCINERATORINCIN
INCHIN
INTERLOCKILK
ILLUMINATING ENGINEERING SOCIETY OF NORTH AMERICAIESNA
INSIDE DIAMETERID
INTERCOMIC
HERTZHz
HYDRAULICHYDR
HEATING, VENTILATING AND AIR CONDITIONINGHVAC
HEATERHTR
HEATINGHTG
HEIGHTHT
HOUSEKEEPINGHSKPG
HIGH-STRENGTH GYPSUM PLASTERHSGYP
HIGH STRENGTHHS
HOURHR
HIGH POINTHPT
HORSEPOWERHP
HIGH PRESSUREHP
HORIZONTALHORIZ
HANDRAILHNDRL
HOLLOW METALHM
HOOK(S)HK
HANDHOLEHH
HEXAGONHEX
HIGH EARLY-STRENGTH CEMENTHES
HARDWOODHDWD
HARDWAREHDW
HEADERHDR
HEAD JOINTHD JT
HARDBOARDHDBD
HEAVY DUTYHD
HEADHD
HANDICAPPEDHCP
HALON CONTAINMENT DAMPERHCD
HOLLOW COREHC
HOSE BIBBHB
GYPSUM PLASTERGYP PLAS
GYPSUM BOARDGYP BD
GYPSUMGYP
GLAZED WALL TILEGWT
GROUTGT
GLAZED STRUCTURAL UNITSGSU
GLAZED STRUCTURAL TILEGST
GRATINGGRTG
GRADE LINEGR LN
GRANITEGRAN
GYPSUM TILEGPT
GALLONS PER MINUTEGPM
GOVERNMENTGOVT
GROUNDG
GLAZED CONCRETE MASONRY UNITSGLZ CMU
GLAZINGGLZ
GLASS FIBERGLF
GLASS BLOCKGL BLK
GLASSGL
GASKET(ED)GKT
GALVANIZED IRON PIPEGIP
GALVANIZED IRONGI
GOVERNMENT-FURNISHED EQUIPMENT CONTRACTOR INSTALLEDGFE/CI
GOVERNMENT-FURNISHED EQUIPMENTGFE
GROUND FAULT CIRCUIT INTERRUPTERGFCI
GROUND FACEGF
GENERALGEN
GENERAL CONTRACTORGC
GRAB BARGB
GALVANIZED STEELGALV STL
GALVANIZEDGALV
GALLON(S)GAL
GAGEGA
NATURAL GASG
FABRIC WALL COVERINGFWC
FIRE WATERFW
FUTUREFUT
FURRINGFURG
FOOTINGFTG
FEETFT
FASTEN(ER)FSTNR
FULL SIZEFS
FIRE-RETARDANTFRT
OTHER ABBREVIATIONS
VOLT ALTERNATING CURRENTVAC
UNITED STATESU.S.
TOP OFT/
STATE ROADS.R.
POWER PANELPP
MARKMK
LIGHTING PANELLP
GROUNDGRD
GENERATORGEN
CENTER TO CENTERC TO C
CONDUITC
AMPA
/S J
O H
N E
N
IT
E S P .E
F
E B
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T E
D B
Y
S
IZ
E
IS
S
U E D
A T
E
S O
L
IC
IT
A T
IO
N N
O
C O
N T
R A
C T N
O
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
-F
E B -2
:5
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S I
D
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
W
W N
B
P L
O T D
A T
E
A L L E
G H
E N
Y R
IV
E R B
A S
IN
R E
P L
A C
E G
A T
E O
P E
R A
T
IN
G M
A C
H
IN
E
N E
S T
A C
R E
E K L
A K
DAM
TIONESTA
LAUNCH RAMP
PUBLIC BOAT
S .R
C O
L O
N E
L D
R A
K E H
IG
H W
A Y
DAM ACCESS ROAD
S P
IL
L W
A Y R
O A
D
B O
A T L
A U
N C
H A
C C
E S S R
O A
D
TO
W
ER ACCESS RO
AD
PARKING LOT
BOAT LAUNCH
INTAKE TOWER
STRUCTURE
OUTFLOW
DAM
T
IO
N E S T A C
R E E
K
WOODS
WOODS
WOODS
WOODS
WOODS
WOODS
CAMPGROUND
RECREATION AREA
TIONESTA
WOODS
PUBLIC SANITARY BUILDING
PARKINGPARKING
AREA
MAINTENANCE
PROJECT
STORAGE BUILDING
DWELLING, AND
DAMKEEPER'S
PROJECT OFFICE,
SERVICE BRIDGE
INTAKE TOWER
WOODS
C R E E
K L
A K E
T
IO
N E S T A
RECREATION AREA
RIGHT BANK OUTFLOW
INFORMATION CENTER
LAWN
LAWN
LAWN
AREA
PARKING
CAMPGROUND
RECREATION AREA
TIONESTA
WOODS
D A
M A
C C
E S
S R
O A
D
FLAGPOLE
SPILLWAY ROAD
WOODS
DOCKS
BOAT
EMERGENCY SPILLWAY
OVERFLOW WEIR
SPILLWAY
EMERGENCY
OVERFLOW WEIR
SPILLWAY
EMERGENCY
AREA
UNPAVED
AREA
UNPAVED
F L O
W
F L
O W
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T E
D B
Y
S
IZ
E
IS
S
U E D
A T
E
S O
L
IC
IT
A T
IO
N N
O
C O
N T
R A
C T N
O
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps a u to s y ti m e
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S I
D
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
W
W N
B
P L
O T D
A T
E
A L L E
G H
E N
Y R
IV
E R B
A S
IN
R E
P L
A C
E G
A T
E O
P E
R A
T
IN
G M
A C
H
IN
E
N E
S T
A C
R E
E K L
A K
G-113
B S
A K
M A
R
J
R U
S N
A K
B
C R
A T
T Y
G E
N E
R A
L S
IT
E P
L A
N W
IT
H
A1
SCALE: 1" = 200'
NORTH
PLAN
400'0 200'
C O
N T
R A
C T
O R A
C C
E S
S
GENERAL SITE PLAN WITH CONTRACTOR ACCESS
A N
D N
O T
E S
CONTRACTOR WORK SITE PRIMARY ACCESS
CONTRACTOR WORK SITE SECONDARY ACCESS
EDGE OF WATER
TREELINE
LEGEND
SHEET KEYNOTES
(COLONEL DRAKE HIGHWAY).
CONTRACTOR SHALL ACCESS TIONESTA CREEK LAKE AND DAM VIA S.R. 0036
(TIONESTA CREEK LAKE INTAKE TOWER).
AS "PRIMARY ACCESS" ON THIS SHEET TO REACH THE PROJECT WORK SITE
CONTRACTOR SHALL USE EXISTING DAM SITE ACCESS ROADS DESIGNATED
NOTES
CHAIN-LINK SECURITY FENCE
TREE (INDIVIDUAL, NON-SPECIFIC SPECIES)
ABBREVIATIONS
STATE ROUTES.R.
(ONE-WAY TRAFFIC)
NORMAL CONDITIONS TRAVEL DIRECTION INDICATOR
(TWO-WAY TRAFFIC)
NORMAL CONDITIONS TRAVEL DIRECTION INDICATOR
MATERIALS OR EQUIPMENT.
PARKING, AS A STAGING AREA FOR CONSTRUCTION, OR FOR STORAGE OF
SHALL NOT USE ANY OF THE EXISTING DAM SITE ACCESS ROADS FOR VEHICLE
BE LIMITED TO INGRESS AND EGRESS THE WORK SITE. THE CONTRACTOR
USE OF THE EXISTING DAM SITE ACCESS ROADS BY THE CONTRACTOR SHALL
6. FOR STANDARD LIST OF ABBREVIATIONS, SEE SHEET G-012.
EXISTING FEATURES.
5. ITEMS CALLED OUT IN ITALICS AND/OR DISPLAYED IN GRAYSCALE REPRESENT
4. REFER TO SHEET G-114 FOR CONTRACTOR WORK LIMITS AND LAYDOWN AREAS.
FLOW CONDITIONS.
3. TRAVEL DIRECTION INDICATORS ON THIS SHEET REPRESENT NORMAL TRAFFIC
EM 385-1-1.
ENTRY AND EXIT TO AND FROM THE BOAT LAUNCH AREA IN ACCORDANCE WITH
2. TEMPORARY TRAFFIC CONTROLS SHALL BE PLACED TO ALLOW SAFE PUBLIC
TO A MINIMUM.
1. CONTRACTOR SHALL ENSURE OBSTRUCTIONS TO ACCESS WAYS WILL BE KEPT
NAVIGATE PORTIONS OF THE "PRIMARY ACCESS" ROADWAYS.
USING AN OVERSIZED VEHICLE (ANY VEHICLE THAT MAY BE TOO LARGE TO
"SECONDARY ACCESS" FOR DELIVERY OF EQUIPMENT, MATERIALS, ETC.,
ONE-WAY TRAVEL DIRECTIVES ALONG ACCESS ROADS DESIGNATED AS
COORDINATE WITH THE CONTRACTING OFFICER TO TEMPORARILY REVERSE
NECESSARY, THE CONTRACTOR SHALL NOTIFY, GET APPROVAL FROM, AND
AT LEAST 24 HOURS PRIOR TO ANY TIME THAT THE CONTRACTOR DEEMS IT
TURN FROM THE SPILLWAY ROAD ONTO THE BOAT LAUNCH ACCESS ROAD.
OVERSIZED VEHICLE TO SAFELY NAVIGATE THE 90-DEGREE RIGHT-HAND
THAT TIME PERIOD IN ORDER TO PROVIDE ENOUGH SPACE FOR THE
"SECONDARY ACCESS" ROUTE OF TRAVEL, AS SHOWN ON THIS SHEET, FOR
TO THE PUBLIC FOR PARKING TO THE AREA OUTSIDE OF THE OUTLINED
OFFICER TO LIMIT THE AREA OF THE BOAT LAUNCH PARKING LOT AVAILABLE
NOTIFY, GET APPROVAL FROM, AND COORDINATE WITH THE CONTRACTING
THE "SECONDARY ACCESS" ROUTE OF TRAVEL, THE CONTRACTOR SHALL
NECESSARY TO HAVE AN OVERSIZED VEHICLE ACCESS THE WORK SITE VIA
AT LEAST 24 HOURS PRIOR TO ANY TIME THAT THE CONTRACTOR DEEMS IT
/S
M A
T T
H E
W P
R O
T H
E R P .E
F
E B
G-114
INTAKE TOWER
PAR
KI
N G L
O T
W
ALK
SERVICE BRIDGE APPROACH ROAD
T O P
R O J E
C T O
F F
IC
E
)SSECCA YRADNOCES( 6300 .R.S DNA HCNUAL TAOB YAWLLIPS OT
S E
R V
IC
E B
R
ID
G E T
O
IN
T A
K E T
O W
E R
BOAT
LAUNCH
ACCES
S
ROAD
SECURITY GATE
)SSECCA YRAMIRP(6300 .R.S OT
WOODS
WOODS
WOODS
LAWN
LAWN
LAWN
LAWN
LAWN
RAIL
GUIDE
GUIDE RAIL
GUIDE RAIL
GUIDE RAIL
C R E E K L
A K E
TI
O
N E S
TA
GUIDE RAIL
FL
O
W
WORK LIMITS
CONTRACTOR
0'
WORK LIMITS
CONTRACTOR
WORK LIMITS
CONTRACTOR
PARKING AREA
LAYDOWN/
CONTRACTOR
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T E
D B
Y
S
IZ
E
IS
S
U E D
A T
E
S O
L
IC
IT
A T
IO
N N
O
C O
N T
R A
C T N
O
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps a u to s y ti m e
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S I
D
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
W
W N
B
P L
O T D
A T
E
A L L E
G H
E N
Y R
IV
E R B
A S
IN
R E
P L
A C
E G
A T
E O
P E
R A
T
IN
G M
A C
H
IN
E
N E
S T
A C
R E
E K L
A K
G-114
S
A K
M A
R
J
R U
S N
A K
B
C R
A T
T Y
A1
SCALE: 1" = 30'
NORTH
PLAN
30' 60'0
LEGEND
CONTRACTOR WORK LIMITS
CONTRACTOR LAYDOWN/PARKING AREA
C O
N T
R A
C T
O R W
O R
K L
IM
IT
S
P L
A N A
N D N
O T
E S
G-113
C5 CONTRACTOR WORK LIMITS PLAN
NOTES
GUIDE RAIL
SHEET KEYNOTES
AND DELIVERIES.
PARKING LOT TO THE INTAKE TOWER FOR OPERATIONS PERSONNEL ACCESS
THE CONTRACTOR SHALL KEEP CLEAR THE SERVICE BRIDGE FROM THE
OPERATIONS PERSONNEL AND THE PUBLIC.
PARKING LOT AND LAND-SIDE PARKING SPACES SHALL REMAIN OPEN TO
SPACES OF THE INTAKE TOWER PARKING LOT. THE ROADWAY THROUGH THE
CONTRACTOR LAYDOWN/PARKING AREA IS LIMITED TO THE LAKE-SIDE PARKING
WORK SITE, INCLUDING PERMANENT AND TEMPORARY TRAFFIC DIRECTIVES.
REFER TO SHEET G-113 FOR CONTRACTOR ACCESS ROUTE TO THE PROJECT
4. FOR ADDITIONAL LEGEND SYMBOLS AND ABBREVIATIONS, SEE SHEET G-113.
3. FOR STANDARD LIST OF ABBREVIATIONS, SEE SHEET G-012.
EXISTING FEATURES.
2. ITEMS CALLED OUT IN ITALICS AND/OR DISPLAYED IN GRAYSCALE REPRESENT
TO A MINIMUM.
1. CONTRACTOR SHALL ENSURE OBSTRUCTIONS TO ACCESS WAYS WILL BE KEPT
/S
M A
T T
H E
W P
R O
T H
E R P .E
F
E B
"5
"5
"5
"5
"5
SERVICE BRIDGE
SLUICE GATE
1 1 1
6 6
1 1
5 5 5
5 5 5
INTAKE TOWER
D O
W N
LC
F L
O W
C R
E E
K L
A K
E
T
IO
N E
S T
A
EL 1195.0
OPERATING FLOOR
WELL NO. 3
EMERGENCY GATE
WELL NO. 2
EMERGENCY GATE
WELL NO. 1
EMERGENCY GATE
WELL NO. 3
SERVICE GATE
WELL NO. 2
SERVICE GATE
WELL NO. 1
SERVICE GATE
WELL
ACCESS
WELL
ACCESS
WELL
ACCESS
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T E
D B
Y
S
IZ
E
IS
S
U E D
A T
E
S O
L
IC
IT
A T
IO
N N
O
C O
N T
R A
C T N
O
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
-M
A R -2
:2
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S I
D
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
W
W N
B
P L
O T D
A T
E
A L L E
G H
E N
Y R
IV
E R B
A S
IN
R E
P L
A C
E G
A T
E O
P E
R A
T
IN
G M
A C
H
IN
E
N E
S T
A C
R E
E K L
A K
S
A K
M A
R
J
R U
S N
A K
KEY ELEVATION
B
C R
A T
T Y
G A
T E O
P E
R A
T
IN
G M
A C
H
IN
E R
Y W
O R
K P
L A
T F
O
M
PLAN
SCALE: 1/2"=1'
T R
U E N
SHEET KEYNOTES
INTAKE TOWER CONCRETE WALLS
EL 1173.0
WORK PLATFORM
D E
M O
L
IT
IO
N P
L A
N
C O
N C
R E
T E F
L O
O R A
N D E
M B
E D
D E
D S
T E
E L
NOTES
LEGEND
WORK PLATFORM CONCRETE FLOOR DEMOLITION PLAN
0 2' 4'1'
DEPTH OF 1 1/2 INCHES.
SAWCUT EXISTING CONCRETE AROUND PERIMETER OF REMOVAL AREA TO A
PAINTED IN ACCORDANCE WITH CONTRACT SPECIFICATIONS.
SHALL REMAIN IN PLACE. CURB ANGLE SHALL BE CLEANED, PREPARED AND
EXISTING CURB ANGLE ASSEMBLY EMBEDDED INTO OR BELOW EXISITNG WALL
DETAILS ON SHEET CD521.
REMOVE EXISTING SUPPORT BEAM AND ANGLE ASSEMBLY FROM GATE WELL PER
DRAWING O38e-U1-50/11.1 FOR EMERGENCY GATE DOGGING DEVICE DETAILS.
DOGGING DEVICE WILL OCCUR DURING THIS CONTRACT. SEE REFERENCE
EMBEDDED PIPE, LEVER, OR ANY OTHER PORTION OF THE EMERGENCY GATE
CONTRACTOR SHALL TAKE MEASURES TO ENSURE THAT NO DAMAGE TO THE
EXISTING DOOR IN THIS LOCATION NOT SHOWN FOR CLARITY.
CONCRETE DEMOLITION
CONTRACT SPECIFICATIONS.
6. FOR INSTRUCTIONS REGARDING THE DISPOSAL OF DEMOLITION DEBRIS, SEE
SAWCUT LINES.
5. DO NOT REMOVE CONCRETE BEYOND THE EDGE OF EXISTING WALLS AND/OR
BASE CONTRACT.
4. ALL WORK DESCRIBED ON THIS SHEET TO BE PERFORMED AS PART OF THE
THIS SHEET.
TOWER, SEE THE INTAKE TOWER KEY ELEVATION AT THE BOTTOM RIGHT OF
3. FOR GENERAL LOCATION OF THE WORK PLATFORM WITHIN THE INTAKE
CURB ANGLE REMOVAL.
2. ALL DIMENSIONS SHALL BE FIELD VERIFIED PRIOR TO STARTING CONCRETE AND
TOWER AND FLOOR OPENINGS.
COMPLETE DIMENSIONING OF THE WORK PLATFORM LEVEL OF THE CONTROL
CLARITY. SEE REFERENCE DRAWINGS 038e-U1-40/13.7 AND O38eU1-65/4.5 FOR
OF CONCRETE AND FLOOR OPENINGS. NOT ALL DIMENSIONS ARE INCLUDED FOR
1. PLAN VIEWS ON THIS SHEET SHOW THE GENERAL FLOOR LAYOUT AND LOCATIONS
2 2
2 2 2
AND/OR ACCESS WELLS AS SHOWN ON SHEET CD521.
REMOVE EXISTING CURB ANGLE ASSEMBLY AND CONCRETE AROUND THE GATE
DEVICE DETAILS.
SEE REFERENCE DRAWING 038e-U150/5.1 FOR SERVICE GATE DOGGING
SERVICE GATE DOGGING DEVICE WILL OCCUR DURING THIS CONTRACT,
CONTRACTOR SHALL ENSURE THAT NO DAMAGE TO ANY PORTION OF THE
AT THE SAME LOCATION ONCE THE NEW CONCRETE HAS BEEN PLACED.
SERVICE GATE DOGGING DEVICE LEVER LATCH PLATE FOR RE-INSTALLATION
PRIOR TO REMOVING CONCRETE, CONTRACTOR SHALL REMOVE AND SAVE
DETAILS.
OR TO SOUND CONCRETE (WHICHEVER IS GREATER). SEE SHEET CD521 FOR
REMOVE EXISTING CONCRETE TO 3 INCHES BELOW AS BUILT FINISHED SURFACE
CD420
CD521
A6
CD521
F1
CD521
F1
WELL
ACCESS
EMERGENCY GATE WELL (SIMILAR)
SERVICE GATE WELL (AS SHOWN)METAL
RECESS FIXED
EXISTING GATE
RECESS FIXED METAL
EXISTING GATE
RUNG(S)
LADDER
EXISTING
GATE WELL OPENINGS
TYP ALL AROUND ALL
EXISTING CURB ANGLE,
ACCESS WELL OPENINGS
TYP ALL AROUND ALL
EXISTING CURB ANGLE,
WELD TO TOP FLANGE
WITH PL 1 3/4" X 1/4"
SUPPORT BEAM
EXISTING S6X12.5
DOGGING DEVICE ASSEMBLY OPENING (BELOW)
WALL
EXISTING
WALL
EXISTING
EL 1173.0 (NVGD29)
T/WORK PLATFORM
VARIES
REINFORCING STEEL
EXISTING FLOOR 4
IN-PLACE
FIXED METAL TO REMAIN
EXISTING GATE RECESS
TO REMAIN IN-PLACE
RECESS FIXED METAL
EXISTING GATE
EXISTING PL 1 3/4" X 1/4"
SUPPORT BEAM
EXISTING S6X12.5
TO 3" BELOW FINISHED FLOOR ELEVATION.
DEMOLISH AND REMOVE CONCRETE
5"
EL 1173.0 (NVGD29)
T/WORK PLATFORM
EXISTING WALL
ANCHOR STRAP
ANGLE AND
EXISTING CURB AND CURB ANGLE ASSEMBLY
EXISTING CONCRETE
DEMOLISH AND REMOVE
ANCHOR STRAP
ANGLE AND
EXISTING CURB
REMAIN IN-PLACE
METAL TO
RECESS FIXED
EXISTING GATE
5"
EL 1173.0 (NVGD29)
T/WORK PLATFORM
AND CURB ANGLE ASSEMBLY
EXISTING CONCRETE
DEMOLISH AND REMOVE
TYP EACH END
THIS SHEET,
SEE DETAIL F4,
INFORMATION,
REMOVAL
FOR CONCRETE
CUT EXISTING WELDS
CUT EXISTING WELDS
CUT EXISTING WELDS CUT EXISTING WELDS
1 1/4" PLATE ASSEMBLY
SUPPORT BEAM WITH
REMOVE EXISTING S6X12.5
5"
EL 1173.0 (NVGD29)
T/WORK PLATFORM
ANCHOR STRAP
ANGLE AND
EXISTING CURB
CONCRETE
TOWER
INTAKE
EXISTING
ASSEMBLY
CURB ANGLE
CONCRETE AND
REMOVE EXISTING
DEMOLISH AND
(MIN)
1 1/2"
MIN
1 1/2"
(EXPOSED)
REINFORCING
EXISTING
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T E
D B
Y
S
IZ
E
IS
S
U E D
A T
E
S O
L
IC
IT
A T
IO
N N
O
C O
N T
R A
C T N
O
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps a u to s y ti m e
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S I
D
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
W
W N
B
P L
O T D
A T
E
A L L E
G H
E N
Y R
IV
E R B
A S
IN
R E
P L
A C
E G
A T
E O
P E
R A
T
IN
G M
A C
H
IN
E
N E
S T
A C
R E
E K L
A K
E
CERTIFIED FINAL DOCUMENTS
1 1/2" (MIN)
EXISTING SOUND CONCRETE
CONCRETE REMOVAL)
(IF EXPOSED DURING
REINFORCING BARS
AROUND EXISTING
AREA OF CONCRETE
REMOVE ADDITIONAL
CONCRETE
REMOVED
EXTENT OF
S
A K
M A
R
J
R U
S N
A K
B
C R
A T
T Y
G A
T E O
P E
R A
T
IN
G M
A C
H
IN
E R
Y W
O R
K P
L A
T F
O
SHEET KEYNOTES
C O
N C
R E
T E F
L O
O R A
N D E
M B
E D
D E
D S
T E
E L
D E
M O
L
IT
IO
N D
E T
A
IL
SCALE: 1" = 1'
DEMOLITION PLAN - EMERGENCY AND SERVICE GATE WELLS
0 1' 2'6"CD420
C3
A6
SCALE: 1" = 1' 0 1' 2'6"CD420
C3
SIMILAR AT EMERGENCY GATE WELLS
TYPICAL AT SERVICE GATE WELLS
DEMOLITION PLAN - ACCESS WELLS
SIMILAR 1 LOCATION
TYPICAL 2 LOCATIONS
D1
SCALE: 1" = 1' 0 1' 2'6"
SIMILAR AT EMERGENCY GATE WELLS
TYPICAL AT SERVICE GATE WELLS
SECTION
D6
SCALE: 1 1/2" = 1' 1' 2'0 6"
F4
F6
SAWCUT LINES.
DO NOT REMOVE CONCRETE BEYOND THE EDGE OF EXISTING WALLS AND/OR
NOTES
LEGEND
INTAKE TOWER EXISTING CONCRETE (TO REMAIN)
CONCRETE AND EMBEDDED METAL DEMOLITION AREA
CUT EXISTING CURB ANGLE FLUSH WITH EXISTING WALL.
TO CONTRACT SPECIFICATIONS.
REMAIN IN PLACE. CLEAN, PREPARE AND PAINT CURB ANGLE, ACCORDING
EXISTING CURB ANGLE EMBEDDED INTO OR BELOW EXISTING WALLS SHALL
CUT EXISTING ANCHOR STRAP AND ABANDON IN PLACE.
CD420 FOR SPECIAL INSTRUCTIONS.
DOGGING DEVICE ASSEMBLY OPENING, SEE KEYNOTES 6 AND 7 ON SHEET
EXISTING REINFORCING BARS.
REMOVE SOUND CONCRETE A MINIMUM OF 1 1/2 INCHES FROM ALL SIDES OF THE
IF EXISITNG REINFORCING BARS ARE EXPOSED DURING REMOVAL OPERATIONS,
B8
NTS
SECTION - ADDITIONAL CONCRETE REMOVAL
CONTRACT SPECIFICATIONS.
6. FOR INSTRUCTIONS REGARDING THE DISPOSAL OF DEMOLITION DEBRIS, SEE
BASE CONTRACT.
5. ALL WORK DESCRIBED ON THIS SHEET TO BE PERFORMED AS PART OF THE
THIS SHEET OR TO SOUND CONCRETE, WHICHEVER IS GREATER.
4. CONCRETE SHALL BE REMOVED IN ALL DIRECTIONS TO DEPTH SHOWN ON
3. NEW AND EXPOSED REINFORCING BAR SHALL REMAIN UNCOATED.
BARS.
FOR CLARITY. SEE REFERENCE DRAWINGS FOR LOCATION OF REINFORCING
2. EXISTING REINFORCING BARS ARE GENERALLY NOT SHOWN IN THE DETAILS
AND CURB ANGLE REMOVAL.
1. ALL DIMENSIONS SHALL BE FIELD VERIFIED PRIOR TO STARTING CONCRETE
NTSCD420
D3
D1
CD521
D1
CD521
F6
CD521
F6
CD521
F4
CD521
F6
CD521
D6
CD521
D6
CD521
B8
PIPING WELL
LOW DISCHARGE
PIPING WELL
LOW DISCHARGE
INTAKE TOWER
BOILER ROOM
WELL NO. 1
EMERGENCY GATE
WELL NO. 2
EMERGENCY GATE
WELL NO. 3
EMERGENCY GATE
DRAIN (TYP)
ACCESS WELL
WELL NO. 2
SERVICE GATE
WELL NO. 3
SERVICE GATE
D O
W N
SERVICE BRIDGE
SLUICE GATE
OPENING
HOIST
GATE
OPENING
HOIST
GATE
WELL
ACCESS
WELL
ACCESS
OPENING
HOIST
GATE
OPENING
HOIST
GATE
TOWER
INTAKE
WELL NO. 1
SERVICE GATE
U P
C R
E E
K L
A K
E
T
IO
N E
S T
A
EL 1195.0
OPERATING FLOOR
LC
F L
O W
X
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T E
D B
Y
S
IZ
E
IS
S
U E D
A T
E
S O
L
IC
IT
A T
IO
N N
O
C O
N T
R A
C T N
O
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps a u to s y ti m e
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S I
D
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
W
W N
B
P L
O T D
A T
E
A L L E
G H
E N
Y R
IV
E R B
A S
IN
R E
P L
A C
E G
A T
E O
P E
R A
T
IN
G M
A C
H
IN
E
N E
S T
A C
R E
E K L
A K
C-122
S
A K
M A
R
J
R U
S N
A K
KEY ELEVATION
3 3 22
1 1
44 5511
B
C R
A T
T Y
G A
T E O
P E
R A
T
IN
G M
A C
H
IN
E R
Y W
O R
K P
L A
T F
O
L
U M
IN
U M P
L A
N K
IN
G P
L A
N
A1
WORK PLATFORM ALUMINUM PLANKING PLAN
0 4' 8'2'
NORTH
PLAN
SCALE: 1/4"=1'
1 1
T R
U E N
NOTES
SHEET KEYNOTES
OPTION NO. 1.
REPLACE PLANKING PANELS WITH GATE HOIST OPENING AS PART OF
OPTION NO. 2.
REPLACE PLANKING PANELS WITH GATE HOIST OPENING AS PART OF
OPTION NO. 3.
REPLACE PLANKING PANELS WITH GATE HOIST OPENING AS PART OF
BASE CONTRACT.
REPLACE PLANKING PANELS WITH GATE HOIST OPENING AS PART OF
CONTRACT. SEE NOTE 2, SHEET C-521 FOR ADDITIONAL INFORMATION.
WITH PLANKING PANELS WITHOUT OPENING AS PART OF BASE
EXISTING PLANKING PANELS (WITH HOIST OPENING) TO BE REPLACED
DRAWINGS O38e-U1-4/9 AND O38e-U1-4/10.
FOR EXISTING WORK PLATFORM PLANKING PLAN, REFER TO REFERENCE5.
OF THIS SHEET.
TOWER, SEE THE INTAKE TOWER KEY ELEVATION AT THE BOTTOM RIGHT
FOR GENERAL LOCATION OF THE WORK PLATFORM WITHIN THE INTAKE4.
WORK PLATFORM ALUMINUM GRATING BY THE CONTRACTOR.
INSTALLATION), EQUIPMENT, ETC., SHALL BE STORED ON THE EXISTING
NO MATERIALS (INCLUDING NEW ALUMINUM PLANKING PANELS PRIOR TO3.
PANELS (TYPICAL FOR ALL BOLD PANELS).
REMOVE EXISTING PLANKING PANELS AND REPLACE WITH NEW PLANKING2.
ARRANGEMENT PLAN AND DETAILS, SEE SHEETS C-521 AND C-522.
ALUMINUM PLANKING PANELS. FOR GATE WELL PLANKING PANEL
PLANKING OVER EACH GATE WELL IS COMPRISED OF SIX (6) INDIVIDUAL1.
LEGEND
X
ASSOCIATED SHEET KEYNOTE
NEW SLOTTED ALUMINUM PLANKING PANEL WITH
INTAKE TOWER CONCRETE WALLS
EL 1173.0
WORK PLATFORM
/S
M A
T T
H E
W P
R O
T H
E R P .E
F
E B
C-521
PL 1 3/4" X 1/4"
EXISTING
WELL OPENING
10'-6"
W E
L L O
P E
N
IN
G
S6X12.5
EXISTING
(TYPICAL ALL AROUND)
EXISTING CURB ANGLE
(EXISTING)
S6X12.5
EXISTING ALUMINUM PLANKING
EXISTING PLATE 1/4" X 1 3/4"
5'-0" WELL OPENING
FLOOR - EL 1773.0
T/WORK PLATFORM
CURB ANGLE
EXISTING
EXISTING CURB ANGLE
1/4" PL (EXISTING)
PLANKING
ALUMINUM
EXISTING
/4
/4
MK C-523-3
TOE PLATE
ON BEARING BARS
WITH RAISED RIDGES
ALUMINUM PLANKING
OPENING OUT TO OUT
1'-8"
1'-10 11/16 " 1'-10 11/16 "
CLR
3/16 "
O P
E N
IN
G O
U T T
O O
U T
/1
CLR
3/16 "
CLR
3/16 "
1/4 " TOE PL 1/4 " TOE PL
/1
/1
/4 T
O E P
L /4 T
O E P
L
T Y
P
/1
C
L R
T Y
P
/1
C
L R
DETAIL G6, THIS SHEET
TOE PLATE MK C-523-2, SEE
DETAIL G4, THIS SHEET
TOE PLATE MK C-523-3, SEE
3" 3"
6"
/2
/2
"STEEL U-BOLT
STAINLESS
1/2" DIA
SURFACE WHEN NOT IN USE
FLUSH WITH PLANKING
TO ALLOW HANDLE TO SIT
NOTCH ALUMINUM PLANKING
/2
(TYPICAL EACH SIDE)
9/16" DIA HOLE
STAINLESS STEEL WITH
BAR 3/8" X 3" X 3" LONG
3/16 " CLR (MIN)
/1
C
L R
1/4" ALUMINUM TOE PLATE
BANDING BAR
3/16" ALUMINUM
3'-4 13/16 "
/4
/1
/1
1/4" ALUMINUM PLATE
EMBEDDED ANGLE SIDE
2 5/16 "
EXISTING S6 SIDE
1 3/16 "
3/16" BANDING BAR
MK C-523-2
TOE PLATE
B A
N D
IN
G B
A R
/1
A
L U
M
IN
U M
B A
N D
IN
G B
A R
/1
A
L U
M
IN
U M
SLOTTED ALUMINUM PLANKING
1'-10 11/16 "
3/16" ALUMINUM BANDING BAR
2'-8 13/16 "
MK C-523-2
TOE PLATE
1/4" ALUMINUM
MK C-523-3
TOE PLATE
1/4" ALUMINUM
MK C-523-2
TOE PLATE
1/4" ALUMINUM
BEARING BARS
WITH RAISED RIDGES ON
1 1/2" ALUMINUM PLANKING
S L
O T
T E
D A
L U
M
IN
U M P
L A
N K
IN
G
/1
PER PLANKING PANEL
LIFTING HANDLE, 2
9 7/8 "
/1
1/4" ALUMINUM PLATE
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T E
D B
Y
S
IZ
E
IS
S
U E D
A T
E
S O
L
IC
IT
A T
IO
N N
O
C O
N T
R A
C T N
O
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps a u to s y ti m e
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S I
D
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
W
W N
B
P L
O T D
A T
E
A L L E
G H
E N
Y R
IV
E R B
A S
IN
R E
P L
A C
E G
A T
E O
P E
R A
T
IN
G M
A C
H
IN
E
N E
S T
A C
R E
E K L
A K
E
CERTIFIED FINAL DOCUMENTS
3/16 3-12
(SEE NOTE 5)
(S E
E N
O T
E
3/16
TYP
1-3 3/16
1/8 60°
G
E6
S P
A N
F6
C-523
C8
F4
C8
C-523
S
A K
M
J
R U
S N
A K
G A
T E O
P E
R A
T
IN
G M
A C
H
IN
E R
Y A
L U
M
IN
P
A N
K
IN
G D
E T
A
IL
S
B
C R
A T
T
A1 0 1' 2'6" A6
SCALE: 1 1/2"=1'
F4
SECTION
E6
SCALE: 6"=1' 3"0 6"1-1/2"
6"0 3" 1'
3"0 6"1-1/2"
E1
1' 2'0 6"
G4 1' 2'0 6"
NOTES
G6 1' 2'0 6"
SERVICE AND EMERGENCY GATE WELL PLANKING PANEL PLAN
C6
DETAIL
SCALE: 6"=1' 3"0 6"1-1/2" C8
SCALE: 6"=1' 3"0 6"1-1/2"
SECTION
S H
E E
T O
F
O38e-U1-4/9 AND O38e-U1-4/10.
FOR EXISTING PLANKING DETAILS, REFER TO REFERENCE DRAWINGS10.
IN PLACE.
ALL EXISTING AND EMBEDDED STEEL FRAMING MEMBERS ARE TO REMAIN 9.
FOR ALL OPTIONS, PROVIDE PLANKING PANELS WITH OPENING. 8.
FINAL APPROVED HOIST DESIGN.
ACTUAL OPENING DIMENSIONS IN PLANKING PANELS TO BE DETERMINED FROM 7.
INSTALLATION OF ANY ALUMINUM PLANKING PANELS.
ALL DIMENSIONS SHALL BE FIELD VERIFIED PRIOR TO FABRICATION AND 6.
PLANKING PANELS SHALL BE INTERCHANGEABLE AMONG SIMILAR OPENINGS. 5.
IDENTIFIED LOCATIONS.
NEW 1 1/2" SLOTTED ALUMINUM TYPE PLANKING IS TO BE INSTALLED AT ALL 4.
ORIENTATION AS EXISTING HANDLES.
ALL NEW LIFTING HANDLES SHALL BE PLACED IN THE SAME LOCATION ANDG.
FRAMING.
PROVIDE 3/16" CLEARANCE BETWEEN EACH PANEL AND EXISTING GATEF.
PROVIDE 4 FASTENER CLIPS FOR EACH PANEL.E.
ALL PANELS ARE TO BE END BANDED ALL AROUND.D.
MAXIMUM WEIGHT OF EACH PANEL SHALL NOT EXCEED 60LBS.C.
BEARING BARS ARE TO BE 1 1/2" X 3/16" AT 1 1/2" C TO C.B.
BARS.
MATERIAL - ALUMINUM, ASTM B221-ALLOY 6063-T6 TEMPER FOR BEARINGA.
ALL ALUMINUM PLANKING IS TO BE AS FOLLOWS, UNLESS OTHERWISE NOTED: 3.
NO. 1 AND NO. 2.
REPLACE EXISTING PANELS WITH AN OPENING IN EMERGENCY GATE WELLS
OPENING (EACH PLANKING PANEL SHALL BE SIZED 2'-5 3/16" X 3'-5 3/4") TO
PROVIDE TWO SETS OF TWO PLANKING PANELS WITHOUT A GATE HOIST 2.
GATE HOIST OPENING (SEE NOTE 2).
EMERGENCY GATE WELLS NO. 1 AND NO. 2 SHALL NOT BE PROVIDED WITH A
NO. 3. OPENING IN PLANKING PANELS TO ACCOMODATE GATE HOIST.
THIS SHEET, FOR ALL SERVICE GATES WELLS AND EMERGENCY GATE WELL
THE SERVICE AND EMERGENCY GATE WELL PLANKING PANEL PLAN "A1" ON
PROVIDE ONE SET OF TWO PLANKING PANELS WITH OPENING, AS SHOWN IN 1.
SCALE: 1 1/2" = 1'
SCALE: 1 1/2" = 1'
SCALE: 1 1/2" = 1'
SCALE: 1" = 1'
DETAIL
SECTION
16 REQUIRED
MK C-523-2
ALUMINUM TOE PLATE
DETAIL
8 REQUIRED
MK C-523-3
ALUMINUM TOE PLATE
DETAIL
SCALE: 3" = 1'
8 REQUIRED
MK C-523-1
SLOTTED ALUMINUM PLANKING PANEL
C-122
E3
LEGEND
ALUMINUM PLANKING PANEL BEARING BARS ORIENTATIONSPAN
/S
M A
T T
H E
W P
R O
T H
E R P .E
F
E B
E1
C6
A6
A6
/2
(TYP)
3/16 "
/1
/1
(TYP)
1 3/16 "
ON BEARING BARS
WITH RAISED RIDGES
ALUMINUM PLANKING
ALUMINUM BANDING BAR
/1
/1
3/16 "
BANDING BAR
3/16" ALUMINUM
ALUMINUM PLANKING
1 1/2" SLOTTED
BANDING BAR
3/16" ALUMINUM
RIDGES
WITH RAISED
BEARING BARS
19/32" X 3", TYP
OPENINGS (SLOTS)
RECTANGULAR
C-524
S
A K
M
J
R U
S N
A K
G A
T E O
P E
R A
T
IN
G M
A C
H
IN
E R
Y A
L U
M
IN
P
A N
K
IN
G D
E T
A
IL
S
B
C R
A T
T Y
F6
D6
SECTION
SCALE: 6"=1'
B6
SCALE: 6"=1'
3"0 6"1-1/2"
3"0 6"1-1/2"
1' 2'0 6"
NOTES
S H
E E
T O
F
SEE SHEET C-523 FOR NOTES PERTAINING TO DETAILS SHOWN ON THIS SHEET.1.
C-523
G2 DETAIL
SCALE: 3" = 1'
/S
M A
T T
H E
W P
R O
T H
E R P .E
F
E B
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T E
D B
Y
S
IZ
E
IS
S
U E D
A T
E
S O
L
IC
IT
A T
IO
N N
O
C O
N T
R A
C T N
O
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps a u to s y ti m e
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S I
D
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
W
W N
B
P L
O T D
A T
E
A L L E
G H
E N
Y R
IV
E R B
A S
IN
R E
P L
A C
E G
A T
E O
P E
R A
T
IN
G M
A C
H
IN
E
N E
S T
A C
R E
E K L
A K
E
CERTIFIED FINAL DOCUMENTS
D6
B6
(PLACED 1 1/2" BELOW FINISHED FLOOR ELEVATION)
W4x4-W2.9xW2.9 WELDED WIRE FABRIC
INTAKE TOWER
D O
W N
EL 1195.0
OPERATING FLOOR
WELL NO. 3
EMERGENCY GATE
WELL NO. 2
EMERGENCY GATE
WELL NO. 1
EMERGENCY GATE
WELL NO. 3
SERVICE GATE
WELL NO. 2
SERVICE GATE
WELL NO. 1
SERVICE GATE
WELL
ACCESS
WELL
ACCESS
WELL
ACCESS
SERVICE BRIDGE
SLUICE GATE
WALL
EXISTING
WALL
EXISTING
EL 1173.0 (NVGD29)
T/WORK PLATFORM
VARIES
REINFORCING STEEL
EXISTING FLOOR 4
LC
CONCRETE PLACEMENT
NEW MINIMUM 3" THICK
EXPOSED CONCRETE
TO TOP SURFACE OF
APPLY BONDING AGENT
1 1
2 2 2 2 2 3
2 2 2 2 2 2
5 5
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T E
D B
Y
S
IZ
E
IS
S
U E D
A T
E
S O
L
IC
IT
A T
IO
N N
O
C O
N T
R A
C T N
O
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps a u to s y ti m e
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S I
D
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
W
W N
B
P L
O T D
A T
E
A L L E
G H
E N
Y R
IV
E R B
A S
IN
R E
P L
A C
E G
A T
E O
P E
R A
T
IN
G M
A C
H
IN
E
N E
S T
A C
R E
E K L
A K
E
CERTIFIED FINAL DOCUMENTS
S
A K
M A
R
J
R U
S N
A K
KEY ELEVATION
B
C R
A T
T Y
G A
T E O
P E
R A
T
IN
G M
A C
H
IN
E R
Y W
O R
K P
L A
T F
O
PLAN
SCALE: 1/2"=1'
T R
U E N
SHEET KEYNOTES
INTAKE TOWER CONCRETE WALLS
EL 1173.0
WORK PLATFORM
C O
N C
R E
T E F
L O
O R A
N D E
M B
E D
D E
D S
T E
E L
NOTES
LEGEND
0 2' 4'1'
WORK PLATFORM CONCRETE FLOOR REPAIRS PLAN
BASE CONTRACT.
ALL WORK DESCRIBED ON THIS SHEET TO BE PERFORMED AS PART OF THE2.
THIS SHEET.
TOWER, SEE THE INTAKE TOWER KEY ELEVATION AT THE BOTTOM RIGHT OF
FOR GENERAL LOCATION OF THE WORK PLATFORM WITHIN THE INTAKE1.
C O
N C
R E
T E R
E P
L A
C E
M E
N T P
L A
N
CONCRETE REPLACEMENT
SEE REFERENCE DRAWINGS O38e-U1-50/1, O38e-U1-50/5.1, AND O38e-U1-50/11.1.
DEVICES ARE OPERABLE AND IN THE SAME CONDITION AS BEFORE REMOVAL.
SERVICE GATE AND EMERGENCY GATE DOGGING DEVICES, ENSURE ALL
AFTER PLACEMENT OF NEW CONCRETE, CONTRACTOR SHALL REINSTALL ALL
INTERFERE WITH OPERATION OF THE SERVICE OR EMERGENCY GATES.
ENSURE THAT THE FLANGES OF THE NEW W6X16 SUPPORT BEAMS DO NOT
CONCRETE REPAIR.
LEAVE 3" MINIMUM SPACE BETWEEN WELDED WIRE FABRIC AND EDGE OF
C-425
FINISHING
REFER TO THE SPECIFICATIONS FOR COMPLETED CONCRETE SURFACE
GATE WELLS
SAWCUT CONSTRUCTION JOINT TO A DEPTH OF 3/4" EQUIDISTANT BETWEEN
NTS
F1
C-425
F1
C-425
A1
C-526
A1
C-526
A7
C-526
A7
C-526
A7
C-526
1'-10"
3"1'-3" 1'-3"3"
(TYPICAL ON LONG SIDE OF FRAME)
9 STUD ANCHORS SPACED ON 1'-0" C/C
(T Y
P
IC
A L O
N S
H O
R T S
ID
E O
F F
R A
M E
S
T U
D A
N C
H O
R S S
P A
C E
D O
N
C /C
4 ANCHORS @ 1'-6" C/C
A
N C
H O
R S
C /C
A
N C
H O
R S
C /C
6 ANCHORS @ 1'-6" C/C
3" 3"
3'-3" 3'-3"
1'-9" 1'-9"
6"
A
N C
H O
R S
6" x x x
2'-8"
7"1'-6"
7"
4"1'-0"1'-0"4"
3" 3"
4"1'-0"1'-0"4"
7" 7"1'-6"
2'-8"
3" 3" x
WELDED WIRE FABRIC)
ELEVATION TIED TO
FINISHED FLOOR
(PLACED 1 1/2" BELOW
#4 BAR, 1'-6" LG
WELDED WIRE FABRIC)
ELEVATION TIED TO
FINISHED FLOOR
(PLACED 1 1/2" BELOW
#4 BAR, 1'-6" LG
E M
B E
D D
M E
N T
/2
BONDING AGENT
#4 BARS
5"
3 1/2 "
E M
B E
D D
M E
N T
/2
BONDING AGENT
#4 BARS
1'-10"
3"1'-3" 1'-3"3"
(TYPICAL ON LONG SIDE OF FRAME)
9 STUD ANCHORS SPACED ON 1'-0" C/C
(T Y
P
IC
A L O
N S
H O
R T S
ID
E O
F F
R A
M E
S
T U
D A
N C
H O
R S S
P A
C E
D O
N
C /C
4 ANCHORS @ 1'-6" C/C
A
N C
H O
R S
C /C
A
N C
H O
R S
C /C
6 ANCHORS @ 1'-6" C/C
E1
C-526
E6
C-526
F1
C-526
F1
C-526
6"
A
N C
H O
R S
6" x x x
2'-8"
7"1'-6"
7"
4"1'-0"1'-0"4"
3" 3"
4"1'-0"1'-0"4"
7" 7"1'-6"
2'-8"
3" 3" x
WELDED WIRE FABRIC)
ELEVATION TIED TO
FINISHED FLOOR
(PLACED 1 1/2" BELOW
#4 BAR, 1'-6" LG
WELDED WIRE FABRIC)
ELEVATION TIED TO
FINISHED FLOOR
(PLACED 1 1/2" BELOW
#4 BAR, 1'-6" LG
E3
C-526
E8
C-526
E M
B E
D D
M E
N T
/2
BONDING AGENT
#4 BARS
5"
3 1/2 "
E M
B E
D D
M E
N T
/2
BONDING AGENT
#4 BARS
1'-10"1'-10"
3"1'-3" 1'-3"3"
(TYPICAL ON LONG SIDE OF FRAME)
9 STUD ANCHORS SPACED ON 1'-0" C/C
(T Y
P
IC
A L O
N S
H O
R T S
ID
E O
F F
R A
M E
S
T U
D A
N C
H O
R S S
P A
C E
D O
N
C /C
4 ANCHORS @ 1'-6" C/C
A
N C
H O
R S
C /C
A
N C
H O
R S
C /C
6 ANCHORS @ 1'-6" C/C
3"1'-3" 1'-3"3"
(TYPICAL ON LONG SIDE OF FRAME)
9 STUD ANCHORS SPACED ON 1'-0" C/C
(T Y
P
IC
A L O
N S
H O
R T S
ID
E O
F F
R A
M E
S
T U
D A
N C
H O
R S S
P A
C E
D O
N
C /C
4 ANCHORS @ 1'-6" C/C
A
N C
H O
R S
C /C
A
N C
H O
R S
C /C
6 ANCHORS @ 1'-6" C/C
E1
C-526
E6
C-526
F1
C-526
F1
C-526
OR BELOW WALL
EMBEDDED IN
CURB ANGLE
L 2X1 1/2X5/16
EXISTING
6"
A
N C
H O
R S
6" x x x
S
Q O
P E
N
IN
G
2'-8"
7"1'-6"
7"
4"1'-0"1'-0"4"
3" 3"
4"1'-0"1'-0"4"
7" 7"1'-6"
2'-8"
3" 3" x
WELDED WIRE FABRIC)
ELEVATION TIED TO
FINISHED FLOOR
(PLACED 1 1/2" BELOW
#4 BAR, 1'-6" LG
WELDED WIRE FABRIC)
ELEVATION TIED TO
FINISHED FLOOR
(PLACED 1 1/2" BELOW
#4 BAR, 1'-6" LG
6"
A
N C
H O
R S
6" x x x
2'-8"
7"1'-6"
7"
4"1'-0"1'-0"4"
3" 3"
4"1'-0"1'-0"4"
7" 7"1'-6"
2'-8"
3" 3" x
WELDED WIRE FABRIC)
ELEVATION TIED TO
FINISHED FLOOR
(PLACED 1 1/2" BELOW
#4 BAR, 1'-6" LG
WELDED WIRE FABRIC)
ELEVATION TIED TO
FINISHED FLOOR
(PLACED 1 1/2" BELOW
#4 BAR, 1'-6" LG
E3
C-526
E8
C-526
RECESS FIXED METAL
EXISTING GATE
RECESS FIXED METAL
EXISTING GATE
E M
B E
D D
M E
N T
/2
BONDING AGENT
#4 BARS
5"
3 1/2 "
E M
B E
D D
M E
N T
/2
BONDING AGENT
#4 BARS
5"
3 1/2 "
E M
B E
D D
M E
N T
/2
BONDING AGENT
#4 BARS
E M
B E
D D
M E
N T
/2
BONDING AGENT
#4 BARS
ANCHOR
STUD
PL 1 3/4"X1/4"
CORNERS, TYPICAL
MITRE AND WELD
TYPICAL
ANCHOR,
STUD
W6X16 SUPPORT BEAM
TYPICAL
L 3X2X5/16, CURB ANGLE
TYPICAL
L 3X2X5/16, CURB ANGLE
3"1'-3" 1'-3"3"
ANCHOR
STUD
2 LOCATIONS
TO EXISTING,
CURB ANGLE
WELD NEW
TYPICAL
L 2X1 1/2X1/4, CURB ANGLE
TYPICAL
ANCHOR,
STUD
2'-8"
7"1'-6"
7"
4"1'-0"1'-0"4"
3" 3"
4"1'-0"1'-0"4"
7" 7"1'-6"
2'-8"
3" 3"
C /C
C /C
WELDED WIRE FABRIC)
ELEVATION TIED TO
FINISHED FLOOR
(PLACED 1 1/2" BELOW
#4 BAR, 1'-6" LG
WELDED WIRE FABRIC)
ELEVATION TIED TO
FINISHED FLOOR
(PLACED 1 1/2" BELOW
#4 BAR, 1'-6" LG
PL 1 3/4"X1/4"
TO NEW CURB ANGLE
SIDES OF 1 3/4" PL
TACK WELD BOTH
TO NEW CURB ANGLE
SIDES OF 1 3/4" PL
TACK WELD BOTH
1'-2 1/4 "
10'-5 1/2 "
1'-2 1/4 "
/1
/1
BEAM
SUPPORT
W6X16
WORK PLATFORM
TO MATCH EXISTING
T/NEW CONCRETE
SIDES OF W6 WEB
FIXED METAL, BOTH
EXISTING GATE RECESS
1/4" FIELD WELD W6 TO
BOTH SIDES OF W6 WEB
RECESS FIXED METAL,
TO EXISTING GATE
1/4" FIELD WELD W6
PL 1 3/4" X 1/4"
BEAM
SUPPORT
W6X16
CURB ANGLE
L 3X2X5/16
1/2" DIA X 6" LG
STUD ANCHOR,
1/2" DIA X 6" LG
STUD ANCHOR,
CURB ANGLE
L 2X1 1/2X1/4
/2
5"
3 1/2 "
SEE SECTION E-1
STUD ANCHOR.
ANGLE AND
NEW CURB
/2
4"
3 1/2 "
SEE SECTION E-3
STUD ANCHOR.
ANGLE AND
NEW CURB
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T E
D B
Y
S
IZ
E
IS
S
U E D
A T
E
S O
L
IC
IT
A T
IO
N N
O
C O
N T
R A
C T N
O
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps a u to s y ti m e
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S I
D
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
W
W N
B
P L
O T D
A T
E
A L L E
G H
E N
Y R
IV
E R B
A S
IN
R E
P L
A C
E G
A T
E O
P E
R A
T
IN
G M
A C
H
IN
E
N E
S T
A C
R E
E K L
A K
E
CERTIFIED FINAL DOCUMENTS
1'-10"
LC
W
(TYPICAL ON LONG SIDE OF FRAME)
9 STUD ANCHORS SPACED ON 1'-0" C/C
(T Y
P
IC
A L O
N S
H O
R T S
ID
E O
F F
R A
M E
S
T U
D A
N C
H O
R S S
P A
C E
D O
N
C /C
4 ANCHORS @ 1'-6" C/C
A
N C
H O
R S
C /C
A
N C
H O
R S
C /C
6 ANCHORS @ 1'-6" C/C
F6
C-526
E1
C-526
E6
C-526
F1
C-526
F1
C-526
TYPICAL
CORNERS,
AND WELD
MITRE
C/C C/C
#4 ANCHORS
C/C C/C
#4 ANCHORS
6"
A
N C
H O
R S
6" x x x x
E3
C-526
E8
C-526
3-12
1/4
3/16
E M
B E
D D
M E
N T
BONDING AGENT
#4 BARS
E M
B E
D D
M E
N T
BONDING AGENT
#4 BARS
S
A K
M A
R
J
R U
S N
A K
B
C R
A T
T Y
G A
T E O
P E
R A
T
IN
G M
A C
H
IN
E R
Y W
O R
K P
L A
T F
O
SHEET KEYNOTES
C O
N C
R E
T E F
L O
O R A
N D E
M B
E D
D E
D S
T E
E L
C O
N C
R E
T E R
E P
L A
C E
M E
N T D
E T
A
IL
S
A1
SCALE: 1" = 1' 0 1' 2'6"C-425
C3 SERVICE AND EMERGENCY GATES - NEW PLANKING SUPPORT FRAMING PLAN A7
SCALE: 1" = 1' 0 1' 2'6"C-425
C3
F1
SCALE: 1" = 1' 0 1' 2'6"
SCALE: 3" = 1' 6"0 3" 1'
E1
SCALE: 3" = 1' 6"0 3" 1'
NO. 1 AND NO. 2.
OMIT THIS STUD ANCHOR ON SERVICE GATE AND EMERGENCY GATE WELL
NO. 2 AND NO. 3.
OMIT THIS STUD ANCHOR ON SERVICE GATE AND EMERGENCY GATE WELL
NOTES
BASE CONTRACT.
ALL WORK DESCRIBED ON THIS SHEET TO BE PERFORMED AS PART OF THE1.
KEYNOTE NO. 3 ON SHEET C-425.
COPE ENDS OF SUPPORT BEAM TO FIT WITHIN GATE RECESS. REFER TO
THE PLANKING PANEL.
AS THE EXISTING CURB ANGLE TO PROVIDE FLAT RESTING SURFACE FOR
ENSURE BOTTOM FLANGE OF NEW CURB ANGLE IS AT THE SAME ELEVATION
SCALE: 3" = 1'
E3 6"0 3" 1'
E6
SCALE: 1 1/2" = 1'
(TYP CONCRETE PLACEMENT REINFORCING AROUND GATE WELL)
E8
SCALE: 1 1/2" = 1'
(TYP CONCRETE PLACEMENT REINFORCING AROUND ACCESS WELL)
LEGEND
NEW CONCRETE
EXISTING CONCRETE
(TYP CURB AND ASSEMBLY AROUND GATE WELL) (TYP CURB AND ASSEMBLY AROUND ACCESS WELL)
GATE WELLS
DIMENSIONS SHALL BE 2'-8" FOR SUC GATE AND 1'-10" FOR EMBEDDED
ACCESS WELLS NO. 1, 2 & 3 - NEW PLANKING SUPPORT FRAMING PLAN
CONCRETE TO THE SIZE RECOMMENDED BY ADHESIVE MANUFATURER.
ADHESIVE, REFER TO SPECIFICATIONS FOR DETAILS. DRILL HOLES INTO SOUND
ANCHORS TO BE SECURED INTO SOUND CONCRETE USING EPOXY INJECTABLE
MACHINERY
APPROX AREA OF EXISTING
SERVICE BRIDGE
SLUICE GATE
REPLACE IN BASE CONTRACT
SERVICE GATE HOIST NO. 2
REPLACE IN OPTION NO. 2
SERVICE GATE HOIST NO. 3
REPLACE IN OPTION NO. 3
SERVICE GATE HOIST NO. 1
REPLACE IN OPTION NO. 1
EMERGENCY GATE HOIST NO. 3
L E
IS
U R
MD105
F
R E
G O
S O
PIPING WELL
LOW DISCHARGE
PIPING WELL
LOW DISCHARGE
BRIDGE
SERVICE
D O
W N
UP
OPERATING FLOOR
WORK PLATFORM
KEY ELEVATION
G A
T E O
P E
R A
T
IN
G M
A C
H
IN
E R
Y O
P E
R A
T
IN
G H
O U
F
O O
R D
E M
O L
IT
IO
N P
L A
N
M
M A
R C
U S
A1 0 4' 8'2'
MECHANICAL SEQUENCING NOTES
F L
O W
L C
SCALE: 1/4" = 1'
THE NEW HOIST WILL BE CONNECTED TO GATE NO.1 AND TESTED.J.
THE BULKHEAD WILL BE REMOVED.I.
GATE NO. 2.
HOIST NO. 2 WILL BE SET IN SERVICE GATE WELL NO. 2 AND CONNECTE TOH.
THE TRUCK WILL EXIT THE CONTROL TOWER.G.
THE EXISTING HOIST WILL BE PLACED ON THE TRUCK.F.
MACHINERY MOVED TO SERVICE GATE WELL NO. 1.
THE DELIVERY TRUCK WILL ENTER THE CONTROL TOWER AND THE NEWE.
WELL NO. 2.
HOIST NO. 1 WILL BE DISCONNECTED AND MOVED TO EMERGENCY GATED.
WELL NO. 3.
HOIST NO. 2 WILL BE DISCONNECTED AND MOVED TO EMERGENCY GATEC.
THE BULKHEAD WILL BE SET IN SLUICE NO. 2.B.
THE EMERGENCY GATE AND MACHINERY WILL BE SET IN SLUICE NO. 1.A.
FOR OPTION 3, MACHINERY WILL BE SET AS FOLLOWS:4.
THE NEW HOIST WILL BE CONNECTED TO GATE NO. 3 AND TESTED.J.
THE BULKHEAD WILL BE REMOVED.I.
GATE NO. 2.
HOIST NO. 2 WILL BE SET IN SERVICE GATE WELL NO. 2 AND CONNECTED TOH.
THE TRUCK WILL EXIT THE CONTROL TOWER.G.
THE EXISTING HOIST WILL BE PLACED ON THE TRUCK.F.
MACHINERY MOVED TO SERVICE GATE WELL NO. 3.
THE DELIVERY TRUCK WILL ENTER THE CONTROL TOWER AND THE NEWE.
WELL NO. 2.
HOIST NO. 3 WILL BE DISCONNECTED AND MOVED TO EMERGENCY GATED.
WELL NO. 1.
HOIST NO. 2 WILL BE DISCONNECTED AND MOVED TO EMERGENCY GATEC.
THE BULKHEAD WILL BE SET IN SLUICE NO. 2.B.
THE EMERGENCY GATE AND MACHINERY WILL BE SET IN SLUICE NO. 3.A.
FOR OPTION 2, MACHINERY WILL BE SET AS FOLLOWS:3.
TESTED.
THE NEW HOIST WILL BE CONNECTED TO THE EMERGENCY GATE ANDI.
THE BULKHEAD WILL BE REMOVED.H.
GATE NO. 2.
HOIST NO. 2 WILL BE SET IN SERVICE GATE WELL NO. 2 AND CONNECTED TOG.
THE TRUCK WILL EXIT THE CONTROL TOWER.F.
DISPOSAL.
THE EXISTING EMERGENCY HOIST WILL BE PLACED ON THE TRUCK FORE.
MACHINERY MOVED TO EMERGENCY GATE WELL NO. 2.
THE DELIVERY TRUCK WILL ENTER THE CONTROL TOWER AND THE NEWD.
WELL NO. 3.
HOIST NO. 2 WILL BE DISCONNECTED AND MOVED TO EMERGENCY GATEC.
THE BULKHEAD WILL BE SET IN SLUICE NO. 2.B.
WELL NO. 1, WITH THE EMERGENCY GATE IN SLUICE NO. 2.
THE EMERGENCY GATE MACHINERY WILL BE SET IN EMERGENCY GATEA.
FOR OPTION 1, MACHINERY WILL BE SET AS FOLLOWS:2.
THE HOIST WILL BE CONNECTED TO GATE NO. 2 AND TESTED.G.
THE NEW HOIST WILL BE SET IN SERVICE GATE WELL NO. 2.F.
THE TRUCK WILL EXIT THE CONTROL TOWER.E.
THE EXISTING HOIST NO. 2 WILL BE PLACED ON THE TRUCK FOR DISPOSAL.D.
MACHINERY MOVED TO EMERGENCY GATE WELL NO. 1.
THE DELIVERY TRUCK WILL ENTER THE CONTROL TOWER AND THE NEWC.
GATE WELL NO. 3.
EXISTING HOIST NO. 2 WILL BE DISCONNECTED AND MOVED TO EMERGENCYB.
THE EMERGENCY GATE AND MACHINERY WILL BE SET IN SLUICE NO. 2.A.
FOR THE BASE CONTRACT, MACHINERY WILL BE SET AS FOLLOWS:1.
EMERGENCY GATE WELL NO. 3 EMERGENCY GATE WELL NO. 2 EMERGENCY GATE WELL NO. 1
SERVICE GATE WELL NO. 3 SERVICE GATE WELL NO. 2 SERVICE GATE WELL NO. 1
INTAKE TOWER
NORTH
PLAN
T R
U E N
OPERATING HOUSE FLOOR DEMOLITION PLAN
/S J
O H
N E
N
IT
E S P .E
F
E B
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T E
D B
Y
S
IZ
E
IS
S
U E D
A T
E
S O
L
IC
IT
A T
IO
N N
O
C O
N T
R A
C T N
O
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
-F
E B -2
:5
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S I
D
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
W
W N
B
P L
O T D
A T
E
A L L E
G H
E N
Y R
IV
E R B
A S
IN
R E
P L
A C
E G
A T
E O
P E
R A
T
IN
G M
A C
H
IN
E
N E
S T
A C
R E
E K L
A K
FOOT AREAS
ALLOWABLE MACHINERY
DOWEL PIN
1-3/4" DIA TAPER
CONNECTION
10" DIA ELECTRICAL
SERVICE BRIDGE
SLUICE GATE
/1
A
P P
R O
X /1
2'-9" 4'-7"
2'-7 15/32 "
7'-4"
/3
/3
HOIST NO. 3
EMERGENCY GATE
HOIST NO. 3
SERVICE GATE
HOIST NO. 2
SERVICE GATE
HOIST NO. 1
SERVICE GATE
L E
IS
U R
M-106
GATE PICKUP CENTERLINE
F
R E
G O
S O
G A
T E W
E L L C
E N
T E
R L
IN
E
PIPING WELL
LOW DISCHARGE PIPING WELL
LOW DISCHARGE
OPERATING FLOOR
WORK…
This is the start of the file's text. The full file is on GovTribe.