Drawing C-122-A (REV) Amendment 0001.pdf
PDF 563 KB Posted
- Attached to
- Tionesta Dam Gate Operating Machinery Replacement Federal contract opportunity
- Solicitation number
- W911WN20B8002
About this file
This document provides details for a federal solicitation seeking replacement of gate operating machinery. The U.S. Army Corps of Engineers, Pittsburgh District is soliciting proposals to replace existing vertical lift gate machinery with new round wire rope machinery at Tionesta Dam in Pennsylvania under solicitation number W911WN20B8002. The work includes removing the current machinery and installing new 115-ton capacity machinery that weighs less than 20 tons, replacing associated grating and power receptacles, and repairing concrete. The base contract includes one new machine plus options to replace up to three additional machines. The performance period is 720 days from notice to proceed and cost is estimated between $1 million to $5 million. The procurement is a 100% small business set-aside for a firm fixed price contract. The NAICS code is 237990. The IFB will be issued on March 23, 2020 via beta.sam.gov and proposals are due by the specified date.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Results 5-19-20 W911WN20B8002.pdf | ||
| Atendance Register Virtual Bid Opening 5-19-20.pdf | ||
| W911WN20B8002 Amendment 0001.pdf | ||
| Technical Specification Section 35 01 41.00 08 (REV) Amendment 0001.pdf | ||
| Drawing G-011-A (REV) Amendment 0001.pdf | ||
| Drawing CD521-A (REV) Amendment 0001.pdf | ||
| Pre-Bid Virtual Site Visit - Pictures of Work Site - Engineering Discussion.pdf | ||
| Pre-Bid Virtual Site Visit - Contracting Solicitation Discussion.pdf | ||
| Pre-Bid Virtual Site Visit - List of Contractors in Attendance.pdf | ||
| Drawings (Attachment 2).pdf | ||
| Solicitation W911WN20B8002.pdf | ||
| Reference Drawings (Attachment 3).pdf | ||
| Davis Bacon Wage Determination PA20200002 04-10-2002.pdf | ||
| Drawings (Attachment 2).pdf | ||
| Technical Specifications (Attachment 1).pdf | ||
| Bid Schedule.xlsx | XLSX spreadsheet |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WELL NO. 1
EMERGENCY GATE
WELL NO. 2
EMERGENCY GATE
WELL NO. 3
EMERGENCY GATE
DRAIN (TYP)
ACCESS WELL
WELL NO. 2
SERVICE GATE
WELL NO. 3
SERVICE GATE
SERVICE BRIDGE
SLUICE GATE
OPENING
HOIST
GATE
OPENING
HOIST
GATE
WELL
ACCESS
WELL
ACCESS
OPENING
HOIST
GATE
OPENING
HOIST
GATE
TOWER
INTAKE
WELL NO. 1
SERVICE GATE
PIPING WELL
LOW DISCHARGE
PIPING WELL
LOW DISCHARGE
INTAKE TOWER
BOILER ROOM
D O
W N
LC
U P
F L
O W
C R
E E
K L
A K
E
T
IO
N E
S T
A
X
EL 1195.0
OPERATING FLOOR
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T E
D B
Y
S
IZ
E
IS
S
U E D
A T
E
S O
L
IC
IT
A T
IO
N N
O
C O
N T
R A
C T N
O
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
-M
A Y -2
:3
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S I
D
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
W
W N
B
P L
O T D
A T
E
A L L E
G H
E N
Y R
IV
E R B
A S
IN
R E
P L
A C
E G
A T
E O
P E
R A
T
IN
G M
A C
H
IN
E R
Y
T
IO
N E
S T
A C
R E
E K L
A K
E
CERTIFIED FINAL DOCUMENTS
A
B S
A K
M A
R
J
R U
S N
A K
KEY ELEVATION
3 3 22
1 1
44 5511
B
C R
A T
T Y
G A
T E O
P E
R A
T
IN
G M
A C
H
IN
E R
Y W
O R
K P
L A
T F
O R
M
L
U M
IN
U M P
L A
N K
IN
G P
L A
N
A1
WORK PLATFORM ALUMINUM PLANKING PLAN
0 4' 8'2'
NORTH
PLAN
SCALE: 1/4"=1'
1 1
T R
U E N
NOTES
SHEET KEYNOTES
OPTION NO. 1.
REPLACE PLANKING PANELS WITH GATE HOIST OPENING AS PART OF
OPTION NO. 2.
REPLACE PLANKING PANELS WITH GATE HOIST OPENING AS PART OF
OPTION NO. 3.
REPLACE PLANKING PANELS WITH GATE HOIST OPENING AS PART OF
BASE CONTRACT.
REPLACE PLANKING PANELS WITH GATE HOIST OPENING AS PART OF
CONTRACT. SEE NOTE 2, SHEET C-523 FOR ADDITIONAL INFORMATION.
WITH PLANKING PANELS WITHOUT OPENING AS PART OF BASE
EXISTING PLANKING PANELS (WITH HOIST OPENING) TO BE REPLACED
DRAWINGS O38e-U1-4/9 AND O38e-U1-4/10.
FOR EXISTING WORK PLATFORM PLANKING PLAN, REFER TO REFERENCE5.
OF THIS SHEET.
TOWER, SEE THE INTAKE TOWER KEY ELEVATION AT THE BOTTOM RIGHT
FOR GENERAL LOCATION OF THE WORK PLATFORM WITHIN THE INTAKE4.
WORK PLATFORM ALUMINUM GRATING BY THE CONTRACTOR.
INSTALLATION), EQUIPMENT, ETC., SHALL BE STORED ON THE EXISTING
NO MATERIALS (INCLUDING NEW ALUMINUM PLANKING PANELS PRIOR TO3.
PANELS (TYPICAL FOR ALL BOLD PANELS).
REMOVE EXISTING PLANKING PANELS AND REPLACE WITH NEW PLANKING2.
ARRANGEMENT PLAN AND DETAILS, SEE SHEETS C-523 AND C-524.
ALUMINUM PLANKING PANELS. FOR GATE WELL PLANKING PANEL
PLANKING OVER EACH GATE WELL IS COMPRISED OF SIX (6) INDIVIDUAL1.
LEGEND
X
ASSOCIATED SHEET KEYNOTE
NEW SLOTTED ALUMINUM PLANKING PANEL WITH
INTAKE TOWER CONCRETE WALLS
EL 1173.0
WORK PLATFORM
/S
M A
T T
H E
W P
R O
T H
E R P .E
F
E B
C-122-A
-0
-2
R E
V
IS
E D P
E R A
M E
N D
M E
N T
A1
C-523
A
| AO38e_C-122-A |
| References |
| PW_WORKDIR:d0110017 |
| _LRP_TitleBlock_FY18.dgn |
| LHTCH, PW_WORKDIR:d0110015 |
| AO38e_NewPlnkngPln_C-PL01.dgn |
| XKEL1-SCRN30, PW_WORKDIR:d0110015 |
| AO38e-SCTOWE.dgn |
| LHTCH-SCRN20, PW_WORKDIR:d0110017 |
| AO38e_C-122-A.dgn |
| XKEL4-SCRN30, PW_WORKDIR:d0110015 |
| AO38E_Gate Machinery_MY-3.dgn |
File details come from the government source that posted it. Updated .