W911WN-14-T-0021-0002.pdf
PDF 216 KB Posted
- Solicitation number
- W911WN14T0021
About this file
W911WN-14-T-0021 AMENDMENT 02
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W911WN-14-T-0021-Conformed.pdf | ||
| Amend_0002_Exhibits.pdf | ||
| Amend_0002_Price_Schedule.xls | XLS spreadsheet | |
| Amend_0002_Attachments_1_-_7.pdf | ||
| Attachments_1_-_7.pdf | ||
| Exhibit_K.pdf | ||
| W911WN-14-T-0021-0001.pdf | ||
| W911WN-14-T-0021.pdf | ||
| Revised_Price_Schedule.xls | XLS spreadsheet | |
| Sign_in_Sheet.pdf | ||
| Price_Schedule.xls | XLS spreadsheet | |
| Exhibits.pdf | ||
| MasterEXHpbsc_2014.docx | DOCX document | |
| OSHA_300.pdf | ||
| ATCH_6_QUALITY_ASSURANCE_SURVEILLANC_PLAN.pdf | ||
| ATCH_4_ENG_Form3394.pdf | ||
| CELRH_FORM_2800_Contractor_Equipment_and_Supply_Inspection_MAY_2010.pdf | ||
| ATCH_3_Hazards_Analysis_Form.xls | XLS spreadsheet | |
| ATCH_1_Qual_Ctrl_Plan.pdf | ||
| ATCH_7_Pesticide_applic_method.pdf | ||
| ATCH_2_Accident_Prevention_Plan.docx | DOCX document | |
| ATCH_5_DD2772.pdf |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81ET432100852
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
East Branch Building & Grounds Maintenance
This amendment is issued to include a revised Price Schedule, changes to the quantities and description of the line items, revise the Performance Work Statement, revise the Exhibits, revise the Attachments, update Clause 52.212-4 to the most recent version and change the period of performance.
Please see Summary of Changes
1. CONTRACT ID CODE PAGE OF PAGES
J 1 63
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 21-Jun-2014
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911WN-14-T-0021
X 9B. DATED (SEE ITEM 11)
03-Jun-2014
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
21-Jun-2014
CODE
U.S. ARMY ENGINEER DISTRICT, PITTSBURGH
ATTN CELRP-RC-P
W S MOORHEAD FEDERAL BUILDING
1000 LIBERTY AVENUE ROOM 2203
PITTSBURGH PA 15222-4186
W911WN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911WN-14-T-0021
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 23-Jun-2014 11:00 AM to 24-Jun-
2014 11:00 AM.
SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The CLIN extended description has changed from Admin/Maintenance Buildings to Admin/Maintenance Buildings - July through September, three (3) times per month.
The pricing detail quantity has decreased by 7.00 from 16.00 to 9.00.
CLIN 0002
The CLIN extended description has changed from Overlook Picnic Area to Overlook Picnic Area - July and August, two (2) times per month.
The pricing detail quantity has decreased by 4.00 from 8.00 to 4.00.
CLIN 0003
The CLIN extended description has changed from East Branch Campground to East Branch Campground -July and August, two (2) times per month.
The pricing detail quantity has decreased by 4.00 from 8.00 to 4.00.
CLIN 0004
The CLIN extended description has changed from Boat Launch to Boat Launch - July through September, three (3) times per month.
The pricing detail quantity has decreased by 7.00 from 16.00 to 9.00.
CLIN 0005
The CLIN extended description has changed from Miscellaneous Areas to Miscellaneous Areas - July through September, one (1) time per month.
The pricing detail quantity has decreased by 3.00 from 6.00 to 3.00.
CLIN 0006
The CLIN extended description has changed from Dam and Communication Area to Dam and
Communication Area - July through September, one (1) time per month.
The pricing detail quantity has decreased by 3.00 from 6.00 to 3.00.
CLIN 0008
The CLIN extended description One (1) time each week, from July through 31 Dec 2014. has been added.
The pricing detail quantity has decreased by 25.00 from 52.00 to 27.00.
CLIN 0009
The CLIN extended description One (1) time each week from July through 31 Dec 2014. has been added.
The pricing detail quantity has decreased by 25.00 from 52.00 to 27.00.
CLIN 0010
The CLIN extended description has changed from Overlook Picnic Area to Overlook Picnic Area *The East Branch Cutoff Wall Construction project will impact the quantity of work ordered under this CLIN as well as the scheduling of these efforts. The quantity may (1) increase due to delay of the Cutoff Wall construction project or
(2) decrease during the East Branch Cutoff Wall construction period when this area will be closed. Similarly, the scheduling of the efforts will depend on whether construction is ongoing..
CLIN 0011
*The East Branch Cutoff Wall Construction project will impact the quantity of work ordered under this CLIN as well as the scheduling of these efforts. The quantity may (1) increase due to delay of the Cutoff Wall construction project or (2) decrease during the East Branch Cutoff Wall construction period when this area will be closed.
Similarly, the scheduling of the efforts will depend on whether construction is ongoing..
CLIN 0012
The CLIN extended description has changed from Boat Launch to Boat Launch - Four (4) times per week from July through September 30, 2014.
The pricing detail quantity has decreased by 83.00 from 135.00 to 52.00.
CLIN 0013
The CLIN extended description has changed from Shampooing/Steamcleaning of carpeted floors, Project Office to Shampooing/Steamcleaning of carpeted floors, Project Office - One (1) time in October 2014.
The pricing detail quantity has decreased by 1.00 from 2.00 to 1.00.
CLIN 0014
This CLIN has been renumbered to CLIN 0015.
The CLIN extended description has changed from Site 1 and 4 (Two Dumpsters) to Site 1 (One Dumpsters) - One (1) time per week, for 52 weeks in a year.
The pricing detail quantity has decreased by 26.00 from 52.00 to 26.00.
CLIN 0015
This CLIN has been renumbered to CLIN 0016.
The CLIN extended description has changed from Site 3 (One Dumpster) to Site 3 (One Dumpster) *The East Branch Cutoff Wall Construction project will impact the quantity of work ordered under this CLIN as well as the scheduling of these efforts. The quantity may (1) increase due to delay of the Cutoff Wall construction project or
(2) decrease during the East Branch Cutoff Wall construction period when this area will be closed. Similarly, the
CLIN 0016
This CLIN has been renumbered to CLIN 0017.
The CLIN extended description has changed from Site 4 (One Dumpster) to Site 4 (One Dumpster) - One
(1) time per week during July through September.
The pricing detail quantity has decreased by 13.00 from 26.00 to 13.00.
CLIN 0017
This CLIN has been renumbered to CLIN 0018.
CLIN 0018
This CLIN has been renumbered to CLIN 0019.
CLIN 1001
Buildings - April through September, three (3) times per month.
The pricing detail quantity has increased by 2.00 from 16.00 to 18.00.
The option status has changed from No Status to Option.
CLIN 1002
The CLIN extended description has changed from Overlook Picnic Area to Overlook Picnic Area - May through August, two (2) times per month.
CLIN 1003
-May through August, two (2) times per month.
The unit of issue Each has been added.
CLIN 1004
The CLIN extended description has changed from Boat Launch to Boat Launch - April through
September, three (3) times per month. The East Branch Cutoff Wall Construction project will impact the quantity ofwork ordered under this CLIN as well as the scheduling of these efforts. The quantity may (1) increase due to delay of the Cutoff Wall constructionproject or (2) decrease during the East Branch Cutoff Wall constructionperiod when this area will be closed. Similarly, the scheduling of theefforts will depend on whether construction is ongoing..
CLIN 1005
The CLIN extended description has changed from Miscellaneous Areas to Miscellaneous Areas - April
CLIN 1006
Communication Area - April through September, one (1) time per month.
CLIN 1007
CLIN 1008
The CLIN extended description One (1) time each week, from January through December has been added.
CLIN 1009
The CLIN extended description One (1) time each week from January through December has been added.
CLIN 1010
East Branch Cutoff Wall Construction project will impact the quantity of work ordered under this CLIN as well as the scheduling of these efforts. The quantity may (1) increase due to delay of the Cutoff Wall construction project or
(2) decrease during the East Branch Cutoff Wall construction period when this area will be closed. Similarly, the
CLIN 1011
*The East Branch Cutoff Wall Construction project will impact the quantity of work ordered under this CLIN as well as the scheduling of these efforts. The quantity may (1) increase due to delay of the Cutoff Wall construction project or (2) decrease during the East Branch Cutoff Wall construction period when this area will be closed.
CLIN 1012
from April through September.
The pricing detail quantity has decreased by 31.00 from 135.00 to 104.00.
CLIN 1013
The CLIN extended description has changed from Shampooing/Steamcleaning of Carpeted Floors, Project Office. to Shampooing/Steamcleaning of Carpeted Floors, Project Office - Two (2) times a year, Spring and Fall..
CLIN 1014
This CLIN has been renumbered to CLIN 1015.
The CLIN description has changed from Solid Waste Removal, Site 1 and 4, to Solid Waste Removal, Site 1.
The CLIN extended description has changed from (Two Dumpsters) to (Two Dumpsters) - One (1) time per week, for 52 weeks in a year.
CLIN 1015
This CLIN has been renumbered to CLIN 1016.
The CLIN extended description has changed from (One Dumpster) to (One Dumpster) *The East Branch Cutoff Wall Construction project will impact the quantity of work ordered under this CLIN as well as the scheduling of these efforts. The quantity may (1) increase due to delay of the Cutoff Wall construction project or (2) decrease during the East Branch Cutoff Wall construction period when this area will be closed. Similarly, the scheduling of the efforts will depend on whether construction is ongoing..
CLIN 1016
This CLIN has been renumbered to CLIN 1017.
The CLIN extended description has changed from (One Dumpster) to (One Dumpster) - One (1) time per week during April through September.
CLIN 1017
This CLIN has been renumbered to CLIN 1018.
The CLIN description has changed from Raw Sewage Ramoval, to Raw Sewage Removal,.
CLIN 1018
This CLIN has been renumbered to CLIN 1019.
CLIN 2001
Buildings - April through September, three (3) times per month.
CLIN 2002
The CLIN extended description has changed from Overlook Picnic Area to Overlook Picnic Area - May through August, two (2) times per month.
CLIN 2003
-May through August, two (2) times per month.
CLIN 2004
The CLIN extended description has changed from Boat Launch to Boat Launch April through September, three (3) times per month..
CLIN 2005
The CLIN extended description has changed from Miscellaneous Areas to Miscellaneous Areas - April
CLIN 2006
Communication Area - April through September, one (1) time per month.
CLIN 2007
CLIN 2008
The CLIN extended description One (1) time each week, from January through December has been added.
CLIN 2009
The CLIN extended description One (1) time each week from January through December has been added.
CLIN 2010
East Branch Cutoff Wall Construction project will impact the quantity of work ordered under this CLIN as well as the scheduling of these efforts. The quantity may (1) increase due to delay of the Cutoff Wall construction project or
(2) decrease during the East Branch Cutoff Wall construction period when this area will be closed. Similarly, the
CLIN 2011
*The East Branch Cutoff Wall Construction project will impact the quantity of work ordered under this CLIN as well as the scheduling of these efforts. The quantity may (1) increase due to delay of the Cutoff Wall construction project or (2) decrease during the East Branch Cutoff Wall construction period when this area will be closed.
CLIN 2012
from April through September.
The pricing detail quantity has decreased by 31.00 from 135.00 to 104.00.
CLIN 2013
The CLIN extended description has changed from Shampooing/Steamcleaning of Carpeted Floors, Project Office to Shampooing/Steamcleaning of Carpeted Floors, Project Office - Two (2) times a year, Spring and Fall..
CLIN 2014
This CLIN has been renumbered to CLIN 2015.
The CLIN extended description has changed from (Two Dumpters) to (Two Dumpters) - One (1) time per week, for 52 weeks in a year.
CLIN 2015
This CLIN has been renumbered to CLIN 2016.
The CLIN extended description has changed from (One Dumpster) to Site 3 (One Dumpster) *The East Branch Cutoff Wall Construction project will impact the quantity of work ordered under this CLIN as well as the scheduling of these efforts. The quantity may (1) increase due to delay of the Cutoff Wall construction project or (2) decrease during the East Branch Cutoff Wall construction period when this area will be closed. Similarly, the
CLIN 2016
This CLIN has been renumbered to CLIN 2017.
The CLIN extended description has changed from (One Dumpster) to Site 4 (One Dumpster) - One (1) time per week during April through September.
CLIN 2017
This CLIN has been renumbered to CLIN 2018.
CLIN 2018
This CLIN has been renumbered to CLIN 2019.
CLIN 0014 is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0014 Each Pressure Washing, Restrooms
FFP
Sites 2, 3 and 4, one (1) time per year - Not used during the base year FOB: Destination
NET AMT
CLIN 1014 is added as follows:
1014 1 Each OPTION Pressure Washing Restrooms, FFP
Sites 2, 3 and 4, one (1) time per year
CLIN 2014 is added as follows:
2014 1 Each OPTION Pressure Washing Restrooms
FFP
Sites 2, 3 and 4, one (1) time per year
DELIVERIES AND PERFORMANCE
The following Delivery Schedule item for CLIN 0001 has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 01-JUL-2014 TO
30-JUN-2015
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
9624BA
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 01-JUL-2014 TO
31-DEC-2014
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
The following Delivery Schedule item for CLIN 0002 has been changed from:
POP 01-JUL-2014 TO
30-JUN-2015
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
POP 01-JUL-2014 TO
31-DEC-2014
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
The following Delivery Schedule item for CLIN 0003 has been changed from:
POP 01-JUL-2014 TO
30-JUN-2015
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
POP 01-JUL-2014 TO
31-DEC-2014
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
The following Delivery Schedule item for CLIN 0004 has been changed from:
POP 01-JUL-2014 TO
30-JUN-2015
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
POP 01-JUL-2014 TO
31-DEC-2014
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
The following Delivery Schedule item for CLIN 0005 has been changed from:
POP 01-JUL-2014 TO
30-JUN-2015
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
POP 01-JUL-2014 TO
31-DEC-2014
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
The following Delivery Schedule item for CLIN 0006 has been changed from:
30-JUN-2015
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
POP 01-JUL-2014 TO
31-DEC-2014
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
The following Delivery Schedule item for CLIN 0007 has been changed from:
POP 01-JUL-2014 TO
30-JUN-2015
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
POP 01-JUL-2014 TO
31-DEC-2014
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
The following Delivery Schedule item for CLIN 0008 has been changed from:
POP 01-JUL-2014 TO
30-JUN-2015
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
POP 01-JUL-2014 TO
31-DEC-2014
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
The following Delivery Schedule item for CLIN 0009 has been changed from:
POP 01-JUL-2014 TO
30-JUN-2015
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
POP 01-JUL-2014 TO
31-DEC-2014
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
The following Delivery Schedule item for CLIN 0010 has been changed from:
POP 01-JUL-2014 TO
30-JUN-2015
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
31-DEC-2014
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
The following Delivery Schedule item for CLIN 0011 has been changed from:
POP 01-JUL-2014 TO
30-JUN-2015
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
POP 01-JUL-2014 TO
31-DEC-2014
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
The following Delivery Schedule item for CLIN 0012 has been changed from:
POP 01-JUL-2014 TO
30-JUN-2015
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
POP 01-JUL-2014 TO
31-DEC-2014
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
The following Delivery Schedule item for CLIN 0013 has been changed from:
POP 01-JUL-2014 TO
30-JUN-2015
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
POP 01-JUL-2014 TO
31-DEC-2014
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
The following Delivery Schedule Item has been deleted from CLIN 0014:
POP 01-JUL-2014 TO
30-JUN-2015
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
The following Delivery Schedule item has been added to CLIN 0014:
POP 01-JUL-2014 TO
31-DEC-2014
N/A EAST BRANCH RESIDENT OFFICE
KIMBERLY M WARNER
US ARMY CORPS OF ENGINEER 631C
EAST BRANC
WILCOX PA 15870
270-343-6067
963634
The following Delivery Schedule Item has been deleted from CLIN 0015:
30-JUN-2015
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
The following Delivery Schedule Item has been deleted from CLIN 0016:
POP 01-JUL-2014 TO
30-JUN-2015
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
The following Delivery Schedule Item has been deleted from CLIN 0017:
POP 01-JUL-2014 TO
30-JUN-2015
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
The following Delivery Schedule Item has been deleted from CLIN 0018:
POP 01-JUL-2014 TO
30-JUN-2015
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
The following Delivery Schedule item for CLIN 1001 has been changed from:
POP 01-JUL-2015 TO
30-JUN-2016
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
POP 01-JAN-2015 TO
31-DEC-2015
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
The following Delivery Schedule item for CLIN 1002 has been changed from:
POP 01-JUL-2015 TO
30-JUN-2016
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
POP 01-JAN-2015 TO
31-DEC-2015
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
The following Delivery Schedule item for CLIN 1003 has been changed from:
POP 01-JUL-2015 TO
30-JUN-2016
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
POP 01-JAN-2015 TO
31-DEC-2015
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
The following Delivery Schedule item for CLIN 1004 has been changed from:
POP 01-JUL-2015 TO
30-JUN-2016
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
POP 01-JAN-2015 TO
31-DEC-2015
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
The following Delivery Schedule item for CLIN 1005 has been changed from:
POP 01-JUL-2015 TO
30-JUN-2016
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
POP 01-JAN-2015 TO
31-DEC-2015
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
The following Delivery Schedule item for CLIN 1006 has been changed from:
POP 01-JUL-2015 TO
30-JUN-2016
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
POP 01-JAN-2015 TO
31-DEC-2015
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
The following Delivery Schedule item for CLIN 1007 has been changed from:
POP 01-JUL-2015 TO
30-JUN-2016
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
POP 01-JAN-2015 TO
31-DEC-2015
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
The following Delivery Schedule item for CLIN 1008 has been changed from:
POP 01-JUL-2015 TO
30-JUN-2016
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
POP 01-JAN-2015 TO
31-DEC-2015
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
The following Delivery Schedule item for CLIN 1009 has been changed from:
POP 01-JUL-2015 TO
30-JUN-2016
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
POP 01-JAN-2015 TO
31-DEC-2015
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
The following Delivery Schedule item for CLIN 1010 has been changed from:
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
POP 01-JAN-2015 TO
31-DEC-2015
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
The following Delivery Schedule item for CLIN 1011 has been changed from:
POP 01-JUL-2015 TO
30-JUN-2016
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
POP 01-JAN-2015 TO
31-DEC-2015
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
The following Delivery Schedule item for CLIN 1012 has been changed from:
POP 01-JUL-2015 TO
30-JUN-2016
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
POP 01-JAN-2015 TO
31-DEC-2015
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
The following Delivery Schedule item for CLIN 1013 has been changed from:
POP 01-JUL-2015 TO
30-JUN-2016
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
POP 01-JAN-2015 TO
31-DEC-2015
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
The following Delivery Schedule Item has been deleted from CLIN 1014:
POP 01-JUL-2015 TO
30-JUN-2016
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
The following Delivery Schedule item has been added to CLIN 1014:
POP 01-JAN-2015 TO
31-DEC-2015
N/A EAST BRANCH RESIDENT OFFICE
KIMBERLY M WARNER
US ARMY CORPS OF ENGINEER 631C
EAST BRANC
WILCOX PA 15870
270-343-6067
The following Delivery Schedule Item has been deleted from CLIN 1015:
POP 01-JUL-2015 TO
30-JUN-2016
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
The following Delivery Schedule Item has been deleted from CLIN 1016:
POP 01-JUL-2015 TO
30-JUN-2016
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
The following Delivery Schedule Item has been deleted from CLIN 1017:
POP 01-JUL-2015 TO
30-JUN-2016
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
The following Delivery Schedule Item has been deleted from CLIN 1018:
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
The following Delivery Schedule item for CLIN 2001 has been changed from:
POP 01-JUL-2016 TO
30-JUN-2017
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
POP 01-JAN-2016 TO
31-DEC-2016
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
The following Delivery Schedule item for CLIN 2002 has been changed from:
POP 01-JUL-2016 TO
30-JUN-2017
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
POP 01-JAN-2016 TO
31-DEC-2016
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
The following Delivery Schedule item for CLIN 2003 has been changed from:
POP 01-JUL-2016 TO
30-JUN-2017
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
POP 01-JAN-2016 TO
31-DEC-2016
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
The following Delivery Schedule item for CLIN 2004 has been changed from:
POP 01-JUL-2016 TO
30-JUN-2017
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
POP 01-JAN-2016 TO
31-DEC-2016
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
The following Delivery Schedule item for CLIN 2005 has been changed from:
POP 01-JUL-2016 TO
30-JUN-2017
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
POP 01-JAN-2016 TO
31-DEC-2016
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
The following Delivery Schedule item for CLIN 2006 has been changed from:
POP 01-JUL-2016 TO
30-JUN-2017
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
POP 01-JAN-2016 TO
31-DEC-2016
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
The following Delivery Schedule item for CLIN 2007 has been changed from:
POP 01-JUL-2016 TO
30-JUN-2017
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
POP 01-JAN-2016 TO
31-DEC-2016
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
The following Delivery Schedule item for CLIN 2008 has been changed from:
POP 01-JUL-2016 TO
30-JUN-2017
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
POP 01-JAN-2016 TO
31-DEC-2016
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
The following Delivery Schedule item for CLIN 2009 has been changed from:
POP 01-JUL-2016 TO
30-JUN-2017
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
POP 01-JAN-2016 TO
31-DEC-2016
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
The following Delivery Schedule item for CLIN 2010 has been changed from:
POP 01-JUL-2016 TO
30-JUN-2017
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
POP 01-JAN-2016 TO
31-DEC-2016
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
The following Delivery Schedule item for CLIN 2011 has been changed from:
POP 01-JUL-2016 TO
30-JUN-2017
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
POP 01-JAN-2016 TO
31-DEC-2016
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
The following Delivery Schedule item for CLIN 2012 has been changed from:
POP 01-JUL-2016 TO
30-JUN-2017
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
POP 01-JAN-2016 TO
31-DEC-2016
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
The following Delivery Schedule item for CLIN 2013 has been changed from:
POP 01-JUL-2016 TO
30-JUN-2017
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
POP 01-JAN-2016 TO
31-DEC-2016
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
The following Delivery Schedule Item has been deleted from CLIN 2014:
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
The following Delivery Schedule item has been added to CLIN 2014:
POP 01-JAN-2016 TO
31-DEC-2016
N/A EAST BRANCH RESIDENT OFFICE
KIMBERLY M WARNER
US ARMY CORPS OF ENGINEER 631C
EAST BRANC
WILCOX PA 15870
270-343-6067
The following Delivery Schedule Item has been deleted from CLIN 2015:
POP 01-JUL-2016 TO
30-JUN-2017
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
The following Delivery Schedule Item has been deleted from CLIN 2016:
POP 01-JUL-2016 TO
30-JUN-2017
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
The following Delivery Schedule Item has been deleted from CLIN 2017:
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
The following Delivery Schedule Item has been deleted from CLIN 2018:
POP 01-JUL-2016 TO
30-JUN-2017
N/A EAST BRANCH CLARION RIVER
RESOURCE MANAGER
US ARMY CORPS OF ENGINEER 631 EAST
BRANCH
WILCOX PA 15870
INSPECTION AND ACCEPTANCE
The following Acceptance/Inspection Schedule was added for CLIN 0014:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
N/A N/A N/A Government
The following Acceptance/Inspection Schedule was added for CLIN 1014:
The following Acceptance/Inspection Schedule was added for CLIN 2014:
The following have been added by reference:
52.212-4 Contract Terms and Conditions--Commercial Items MAY 2014
The following have been added by full text:
PERFORMANCE WORK STATEMENT
This Performance Work Statement is created from a template used for all grounds and maintenance service contracts within the Pittsburgh District. The paragraphs not applicable to this procurement are marked "Reserved". Only the relevant Exhibits and Attachments are included. The Exhibits contain information that is unique to this procurement and are incorporated by reference.
SECTION C-1
General
C-1.1 PROJECT INFORMATION.
The East Branch Clarion River Lake project is located in Jones Township, in northeastern Elk County, PA. The dam is located on the East Branch of the Clarion River, 7.3 miles upstream from its junction with the West Branch of the Clarion River at Johnsonburg, PA. Public-use facilities owned and operated by the Corps at East Branch include a boat launch, an overlook picnic area, a campground, a nature trail, the spillway, outflow fishing access and East Branch Lake.
C-1.2 SCOPE OF WORK. The Contractor shall furnish all necessary management, personnel, materials, supplies, tools, equipment, fuel, and vehicles, except as otherwise provided herein, required to perform mowing, cleaning, janitorial, and other maintenance services at the East Branch Clarion River Lake project recreation areas, as specified and in strict accordance with all Terms, Conditions, General, Specific and Technical Provisions, Drawings, Attachments, Exhibits, etc., contained herein or incorporated by reference.
It is emphasized that the work described in this contract is a critical part of the Corps mission. The work described will be performed in a public recreation area. The Corps is committed to "Customer Care" and providing quality professional service.
C-1.3 TASK ORDERS. All work under this contract will be ordered by issuance of individual Task Orders (DD Form 1449). No work shall be performed under this contract before an individual Task Order has been issued by the Contracting Officer. Only the Contracting Officer, by issuance of a modification, may make any change to a Task Order. The Task Order will list those items from the bid schedule that are to be performed or used to perform the work.
C-1.4 RESERVED
C-1.5 WORKING HOURS.
a. Normal Working Hours. Normal working hours, except as otherwise specified herein, shall be Monday through Friday, 7:30 a.m. to 4:00 p.m. or as specified on the Task Order. Work inside Government buildings or other secured areas shall be performed during the above referenced work hours. Work that interferes with other ongoing functions at the project shall be scheduled around normal working hours, as specified by the Contracting Officer Representative (COR). Refer to individual sections of this specification for specific schedules of work.
b. Holiday Work. The ten Federal holidays observed are:
New Year's Day (January 1st) Martin Luther King Day (3rd Monday in January) President's Day (3rd Monday in February) Memorial Day (Last Monday in May) Independence Day (July 4th) Labor Day (1st Monday in September) Columbus Day (2nd Monday in October) Veterans Day (November 11th) Thanksgiving Day (4th Thursday in November) Christmas Day (December 25th)
When one of the above designated holidays falls on a Sunday, the following Monday is observed as a legal holiday. When a legal holiday falls on a Saturday, the preceding Friday is observed as a holiday. Work shall be scheduled around the above listed Federal holidays except as specified herein or as approved by the
COR.
c. Inclement Weather Work. The Contractor shall maintain the schedule of services regardless of inclement weather. Exceptions may be approved by the COR when severe conditions make it impractical or dangerous to perform the work. The Contracting Officer will notify the Contractor, by modification to the Task Order, of any change that extends the performance period due to inclement weather.
d. Emergency and/or After Hours Work. Work may be required on holiday periods during heavy visitation, emergencies, or for other reasons as determined by the COR. Additional personnel may be required to handle the additional work load during holiday periods because of heavy visitation. The COR will notify the Contractor of actual work requirements.
C-1.6 CONTRACTOR SUBMITTALS. Unless otherwise specified, the Contractor shall submit the following information to the COR at the pre-work conference for this contract:
a. Quality Control Plan. A suggested outline of components for the Contractor's Quality Control Plan is in Attachment 1.
b. Contractor Quality Control Inspector. List of Quality Control Inspector(s) and contact information.
c. Contractor Representatives. List of names of Contractor’s authorized representative(s) and contact information.
d. Accident Prevention Plan (APP). A suggested outline for the Contractor’s Accident Prevention Plan is in Attachment 2. See Section C-1.9.b for APP requirements.
e. Emergency Contacts. A prioritized list, including phone numbers, of those persons (normally Contractor authorized representatives) to call in case of emergencies.
f. Certificate of Insurance
g. Security Requirements - See Section C-1.9.h for requirements.
h. Solid Waste Disposal -A letter of compliance and a signed release from the dump site property owner.
i. Raw Sewage and Sludge Removal -A letter from either the sewage plant accepting sewage or the state environmental agency approval of an alternate dump site.
C-1.7 PERMITS AND LICENSES. The Contractor shall, at his own expense, obtain any licenses or permits required to perform all aspects, requirements, and work under this contract. The Contractor shall comply with all current Federal, State, and local laws and regulations and shall comply with any subsequent changes.
C-1.8 IDENTIFICATION OF CONTRACT EMPLOYEES AND VEHICLES. The Contractor shall furnish his employees, other than office and clerical personnel, standardized uniforms (shirt-pants/shirt-skirt) with a company patch or embroidered identification on the breast pocket or on the sleeve at the top of the arm, within 30 days after notice of award of the contract. A hat with the Contractor’s company logo may also be worn. Any employee hired 30 calendar days after award of the Contract shall be in the required uniform within 14 calendar days of the date of hire. Contractor uniforms shall not resemble U.S. Army Corps of Engineers uniforms.
Contractor employees and subcontractors shall wear these uniforms at all times they are performing work under this contract. Exceptions may be granted by the COR for short term workers, or during disasters, emergencies, wildfire suppression, or special circumstances specified by the COR. Stained or faded uniforms shall not be worn. All vehicles used by the Contractor to perform work under this contract shall be identified with the company name prominently displayed on the outside of both front doors of each vehicle in a professional manner to provide an attractive and readily visible means of identification. These are to be professionally- made vinyl stick-on magnetic type signs. ‘Homemade’ signs made on a computer or with magic marker or stick-on letters and numbers on cardboard, etc, are not acceptable.
The Contractor may require his employees to report in their own vehicles to the project, but these personal vehicles must be parked at a site designated by the COR. All vehicles used in performance of work must be marked.
Vehicles used by the Contractor to perform administrative functions such as morning meetings or crew supervision must also be marked.
C-1.9 SAFETY AND SECURITY REQUIREMENTS.
a. General. If the Contractor fails or refuses to promptly comply with safety and security requirements as specified herein, the Contracting Officer may issue a stop work order for all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to any such work stoppage shall be made subject to any claims for extension of time or for excess costs or damages sustained by the Contractor. Also, the Contractor will not be paid for work not performed as a result of the stop order.
The Contractor shall comply with the Occupational Safety and Health Act (OSHA), the Corps of Engineers Manual, EM 385-1-1 (http://www.usace.army.mil/SafetyandOccupationalHealth/SafetyandHealthRequirementsManual.aspx) as otherwise stated herein. Special attention shall be given to the requirements for safety meetings. The Contractor shall inform the COR a minimum of 7 days prior to a Contractor monthly safety meeting, to permit a Government representative to attend.
b. Accident Prevention Plan (APP). The Contractor shall prepare an Accident Prevention Plan to assure that requirements of the safety program are provided as specified. This plan must be accepted by the Contracting Officer prior to commencement of any work. One copy of the Accident Prevention Plan shall be provided to the Contracting Officer and the COR one week prior to the pre-work conference. The Accident Prevention Plan must be in the outline and form prescribed in Appendix A of the Safety Manual
EM 385-1-1.
c. Activity Hazard Analysis.
1. The Contractor shall use Activity Hazard Analyses (AHA’s) as one of many tools to insure safe performance of work. It is the Contractor’s responsibility to prepare the AHA. An approved AHA must be prepared by the Contractor for each Task Order issued by the Government. Prior to performing jobs with inherent hazards, the Contractor shall review, at a “Tool Box” safety meeting, the approved AHA’s with those employees who shall perform that work each time the work is ordered. The Government may request advanced notification of the time and date of the above AHA Tool Box safety meeting for Contractor employees so that the Government may attend such reviews.
2. The Government will require the Contractor to prepare an AHA for any jobs for which an adequate
AHA does not already exist. A copy of this AHA shall be submitted to the COR and must be accepted before the Contractor starts the job. This copy of the AHA will become the property of the Government. Guidance is included in Attachment 3, which shall be used by the Contractor as a guide for the preparation of required AHA's.
3. A copy of an approved AHA is required for each Task Order issued by the Government. A copy of the approved AHA’s shall be available at all times to workers at each associated job site and a copy shall be provided to the Government.
d. Public Safety. The Contractor shall ensure that reasonable precautions are taken to protect the public at all times where work is being performed. The Contractor shall immediately report to the COR any potential hazards found by his employees on the project. The Accident Prevention Plan shall include procedures to be taken to provide for public safety. Additionally, the Contractor shall not allow any persons, except employees, into work areas that are not otherwise open to the public; nor shall the Contractor transport in Contractor work vehicles any persons, except employees, during times the Contractor is on the project performing work under a Task Order.
e. Personal Protective Apparel and Equipment. Protective apparel and equipment, as identified in the AHA, shall be provided to eliminate or minimize hazards to personnel. As a minimum, each employee shall wear shirt-pants/shirt-skirt (as detailed in C-1.8), and appropriate footwear during all contract work. Face shields, spectacles with side-shields, or goggles, and hearing protection shall be worn by employees when required by Safety Manual EM 385-1-1. Contractor personnel involved in handling or application of pesticides or herbicides shall use all protective apparel per manufacturer's recommendations. Fire extinguisher(s) and first aid kit(s) meeting the Safety Manual EM 385-1-1 standards shall also be provided and easily accessible to all employees.
f. Contractor Employees Certified in First Aid & CPR. The Contractor shall schedule employees so Two certified personnel trained are on duty to administer First Aid and CPR as required by the Safety Manual EM 385-1-1. Copies of their certification shall be provided to the COR. Individuals working alone shall be trained in First Aid.
g. Hazard Communication Program. The Contractor shall be responsible for implementing a hazard communication program for Contractor employees, as required by the Safety Manual EM 385-1-1. The Contractor shall provide Material Safety Data Sheets (MSDS)and/or Safety Data Sheets (SDS) to the COR for review prior to use of any hazardous substance on the project and provide a plan for the proper handling, transportation, storage and usage of hazardous substances on the project.
h. Security Requirements. In an effort to protect the public from criminal activity, e.g., theft, child abuse or molestation, drug trafficking, etc., the Contractor will have state background checks conducted for employees who will be working on site. Since background checks are limited to state information, the Registered Offenders List, a national registry, should also be searched. The results of the background checks and Registered Offenders List search will be submitted to the Contracting Officer within four weeks of contract award and every two years thereafter. The Corps' Pittsburgh District Security Officer will make the final determination on an employee's suitability for work on Government property. If a new employee is hired for work on site after submission of the initial or periodic information, a background check and the results of the Registered Offenders List search for that employee will be provided to the Contracting Officer within two weeks of the subject employee’s first day on the job.
1. Civilian background checks should be conducted for the state in which the site is located.
Instructions for acquiring background checks are as follows:
a. For New York: Go to http://www.criminaljustice.ny.gov/ojis/recordreview.htm
b. For Maryland: Go to http://www.dpscs.state.md.us/publicservs/bgchecks.shtml
c. For Ohio: Go to http://www.ocjs.ohio.gov/background_check.stm
d. For Pennsylvania: Go to https://epatch.state.pa.us/Home.jsp.
e. For West Virginia: Go to http://www.statepolice.wv.gov/Criminal%20Records/Pages/default.aspx
2. Instructions for acquiring sex offender information: Go to http://www.nsopw.gov/Core/Portal.aspx
3. The background checks and results of searching the Registered Offenders List shall be forwarded to the Contracting Officer by the Contractor. The Contracting Officer will forward the information to the Security Officer for final determination. The Contracting Officer will report the results of the determination to the Contractor, in writing, within 10 days of receipt.
4. Anti-Terrorism/Operational Security (AT/OPSEC)
a. AT/OPSEC 1. All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, controlled access areas, or require network acce3ss, shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable.
Upon request, the contractor shall submit certificate of completion for each affected contractor employee and subcontractor employee, to the COR or to the Contracting Officer (if a COR is not assigned), within 5 calendar days after completion of training by all employees and subcontractor personnel AT Level I awareness training is available at the following website: https://atlevel1.dtic.mil/at/; or it can be provided by the Contracting Officer Representative (COR) in presentation form which will be documented via memorandum.
b. AT/OPSEC 3. The contractor and all associated subcontractors' employees shall comply with applicable installation, facility, and area commander installation and facility access and local security policies and procedures (provided by the Government Representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the installation the USACE Security Office. The contractor workforce must comply with all personal identity verification requirements as directed by DoD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes. The contractor must submit the full name, Social Security Number, Date of Birth, and Place of Birth for all associated contractor or subcontractor employees to the USACE Security Specialist Paul M. Surace, 412-395-7162, paul.m.surace@usace.army.mil or Stephen Davidson, 412-395-7504, stephen.davidson@usace.army.mil. The District retains the right to deny any contractor and subcontractor employee from working on one of its contracts based on final background investigation results.
c. AT/OPSEC 4. The contractor and all associated sub-contractors shall receive a brief/training (iWatch provided by the COR) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity tot eh project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training.
d. AT/OPSEC 13. All contract employees, including subcontractor employees who are not in possession of the appropriate security clearance or access privileges, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas.
e. AT/OPSEC 15. The Contractor must pre-screen Candidates using the E-verify Program
(http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .