Exhibit_K.pdf
PDF 24 KB Posted
- Solicitation number
- W911WN14T0021
About this file
Revised Exhibit K
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W911WN-14-T-0021-Conformed.pdf | ||
| Amend_0002_Exhibits.pdf | ||
| Amend_0002_Price_Schedule.xls | XLS spreadsheet | |
| W911WN-14-T-0021-0002.pdf | ||
| Amend_0002_Attachments_1_-_7.pdf | ||
| Attachments_1_-_7.pdf | ||
| W911WN-14-T-0021-0001.pdf | ||
| W911WN-14-T-0021.pdf | ||
| Revised_Price_Schedule.xls | XLS spreadsheet | |
| Sign_in_Sheet.pdf | ||
| Price_Schedule.xls | XLS spreadsheet | |
| Exhibits.pdf | ||
| MasterEXHpbsc_2014.docx | DOCX document | |
| OSHA_300.pdf | ||
| ATCH_6_QUALITY_ASSURANCE_SURVEILLANC_PLAN.pdf | ||
| ATCH_4_ENG_Form3394.pdf | ||
| CELRH_FORM_2800_Contractor_Equipment_and_Supply_Inspection_MAY_2010.pdf | ||
| ATCH_3_Hazards_Analysis_Form.xls | XLS spreadsheet | |
| ATCH_1_Qual_Ctrl_Plan.pdf | ||
| ATCH_7_Pesticide_applic_method.pdf | ||
| ATCH_2_Accident_Prevention_Plan.docx | DOCX document | |
| ATCH_5_DD2772.pdf |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT K – PESTICIDE APPLICATION
3. Pesticide Application (C-12)
Pesticides will be applied in accordance with C-12.1.
Overlook Picnic Area – Site 2
a. The contractor shall apply pesticide to the area beyond the overlook observation fence, which is identified in the exhibit sketch.
b. The total area (180 ft by 20 ft) for pesticide application is approximately 0.1 acres.
Campground Area – Site 3
a. The contractor shall apply Pesticide application for Vegetation Control on the 32 campsites.
The 9 tent campsites will not be treated with any herbicide. The East Branch Campground sites are to be sprayed with an approved herbicide for the purpose of vegetation control on 32 campsite sites. Each campsite varies in size so the total area to be sprayed is approximately 1.6 acres.
b. The contractor shall apply herbicide to the area located at well 2. The area to be treated is the interior of fenced area and 3’ around perimeter of chain link fence. Approximately .1 acre.
c. The total area for pesticide application is approximately 1.7 acres.
Boat Launch Ramp – Site 4
a. The contractor shall apply herbicide to the rip rap surfaces on both sides of the boat launch ramp from the entry point to the water. Approximately 0.1 acre.
Dam and Communication Tower Area – Site 6
b. The contractor shall apply herbicide to the rock surfaces of the upstream, breast side of the dam, spillway channel, spillway weir abutments, spillway dispersal bucket rock abutment, and toe area of downstream embankment of the dam and communication tower site, which includes area inside of fence of communication tower and 3’ around perimeter of chain link fence for the purpose of vegetation control. The contractor shall also apply herbicide to the control tower service bridge entrance from the guide rail to the shoreline, on both sides to a width of 20’ to the shoreline, stilling basin area on the right side from concrete down river to end of rip rap.
b. The total area for pesticide application is approximately 9.9 acres.
Schedule of Work
a. Services will be ordered each year