Text version
149566
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Re: Resident Engineer Off ice Building, Dam Safety Modif ication Project, East Branch Lake, Clarion River, Elk County, PA
This amendment is being issued to:1) Provide responses to questions received (Attachment 1), 2) Revise Technical Specif ications, and 3) Incorporate the current Wage Determination PA120002, dated 04/20/2012.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 19
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 24-Apr-2012
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911WN-12-R-0001
X 9B. DATED (SEE ITEM 11)
29-Mar-2012
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
24-Apr-2012
CODE
U.S. ARMY ENGINEER DISTRICT, PITTSBURGH
ATTN CECT-LRP
W S MOORHEAD FEDERAL BUILDING
1000 LIBERTY AVENUE ROOM 2203
PITTSBURGH PA 15222-4186
W911WN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911WN-12-R-0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
THE FOLLOWING SPECIFICATION SECTIONS ARE REPLACED/ADDED WITH THE ATTACHED
SECTIONS INCLUDED WITH THIS AMENDMENT, AS FOLLOWS:
SECTION 01 11 00 Performance Work Statement; (revisions to section are underlined) SECTION 01 22 00.00 10 Measurement and Payment; (revisions to section are underlined) SECTION 32 22 16 Bituminous Pavement Construction; (revisions to section are underlined)
RESPONSES TO QUESTIONS HAVE BEEN INCLUDED WITH THIS AMENDMENT AS
ATTACHMENT 1.
The following have been modified:
WAGE DETERMINATION
General Decision Number: PA120002 04/20/2012 PA2
Superseded General Decision Number: PA20100002
State: Pennsylvania
Construction Type: Building
Counties: Armstrong, Cameron, Clarion, Clearfield, Clinton, Crawford, Elk, Forest, Indiana, Jefferson, McKean, Potter, Venango and Warren Counties in Pennsylvania.
BUILDING ERECTION AND FOUNDATION EXCAVATION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories), EXCLUDING
SEWAGE AND WATER TREATMENT PLANT PROJECTS
Modification Number Publication Date 0 01/06/2012 1 02/10/2012 2 03/16/2012 3 04/06/2012 4 04/13/2012 5 04/20/2012
BOIL0013-002 01/01/2011
POTTER AND CLINTON COUNTIES
Rates Fringes
BOILERMAKER......................$ 37.35 30.02
BOIL0154-002 06/01/2011
ARMSTRONG, CAMERON, CLARION, CLEARFIELD, ELK, FOREST,
JEFFERSON, INDIANA, McKEAN, VENANGO, AND WARREN COUNTIES
Rates Fringes
BOILERMAKER......................$ 38.10 23.06
BOIL0744-002 07/01/2008
CRAWFORD COUNTY
Rates Fringes
BOILERMAKER......................$ 35.34 18.48
BRPA0005-048 05/01/2011
CLINTON COUNTY
Rates Fringes
Bricklayer.....................$ 30.05 13.15
TILE SETTER......................$ 27.37 12.66
BRPA0009-005 06/01/2011
CLARION (Except Brady, Madison, Perry,Tobe, Porter, Redbank Twps), CLEARFIELD, FOREST, JEFFERSON, AND VENANGO COUNTIES
BRICKLAYER.......................$ 27.65 14.52
CAULKER..........................$ 26.87 13.95
TILE SETTER......................$ 28.39 14.44
BRPA0009-007 06/01/2011
CLARION (except Brady, Madison, Perry, Tobe, Porter, Redbank Twps.), FOREST, AND VENANGO COUNTIES
Cement Mason/Plasterer...........$ 27.65 14.52
BRPA0009-016 06/01/2011
CAMERON, ELK, McKEAN, POTTER, AND WARREN COUNTIES
Bricklayer, Cement Mason, Plasterer........................$ 25.35 14.64
CAULKER..........................$ 26.87 13.95
TILE SETTER......................$ 28.39 14.44
BRPA0009-037 06/01/2011
CRAWFORD COUNTY
Rates Fringes
CAULKER..........................$ 26.87 13.95
TILE SETTER......................$ 28.39 14.44
BRPA0009-038 06/01/2011
ARMSTRONG, CLARION COUNTY (Brady, Madison, Perry, Tobe, Porter, and Redbank Townships), AND INDIANA COUNTIES
BRICKLAYER.......................$ 29.46 15.69
CAULKER..........................$ 26.87 13.95
TILE SETTER......................$ 28.39 14.44
BRPA0009-042 05/01/2011
CRAWFORD County
Rates Fringes
BRICKLAYER.......................$ 25.62 15.11
CARP0142-002 06/01/2011
ARMSTRONG COUNTY
Rates Fringes
CARPENTER........................$ 28.77 12.88
CARP0900-001 06/01/2011
CAMERON, CLARION, CLEARFIELD, CLINTON, CRAWFORD, ELK, FOREST,
INDIANA, JEFFERSON, AND POTTER COUNTIES
Carpenter & Soft Floor Layer.....$ 25.85 10.11
CARP1014-002 06/01/2011
MCKEAN, VENANGO, AND WARREN COUNTIES
Carpenter & Soft Floor Layer.....$ 24.85 9.95
CARP1759-005 06/01/2011
ARMSTRONG COUNTY
Rates Fringes
FLOOR LAYER: Carpet.............$ 28.77 12.90
ELEC0005-003 12/23/2011
ARMSTRONG, CAMERON, CLARION, CLEARFIELD, ELK, INDIANA,
JEFFERSON, AND MCKEAN COUNTIES
ELECTRICIAN......................$ 35.76 20.75
ELEC0005-008 12/23/2011
VENANGO COUNTY
Rates Fringes
ELECTRICIAN......................$ 35.76 20.75
ELEC0056-001 06/01/2011
FOREST AND WARREN COUNTIES
Rates Fringes
ELECTRICIAN......................$ 27.00 19.37
ELEC0712-001 12/27/2010
CRAWFORD COUNTY
Rates Fringes
ELECTRICIAN......................$ 27.50 3%+18.68
ELEC0812-001 06/01/2011
CLINTON COUNTY
Rates Fringes
ELECTRICIAN......................$ 27.54 16.67
ELEC0812-005 06/01/2011
POTTER COUNTY
Rates Fringes
ELECTRICIAN......................$ 28.55 16.70
* ENGI0066-004 07/01/2011
CAMERON, CLARION, CLEARFIELD, CLINTON, CRAWFORD, ELK, FOREST,
JEFFERSON, McKEAN, POTTER, VERANGO, WARREN
Power equipment operators:
Breakman, Deckhand..........$ 22.65 13.91
CLASS 1.....................$ 26.875 13.91
CLASS 2.....................$ 24.20 13.91
Helicopter, Oiler, Mechanic Helper/Fireman, Oiler on Tr.Cr. 50-ton up to but not including 100-ton.........................$ 22.90 13.91 Oiler on Tr.Cr. 100-ton and over....................$ 23.65 13.91
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
CLASS I
Asphalt Paver, Asphalt Roller, Asphalt Plant Operator, Athey Loader, Auger (Truck or Tractor Mounted), Auto Grader (C.M.I. and similar), Backhoe (180' and 360' swing), Back-Filling Machine, Batch Plant, Bulldozer, Cable Layer, Cableway, Caisson Drill, Central Mix Plant, Compactor with Blade, Concrete Pump (all types), Over-Head Crane, Crane (Crawler or Truck Mounted)*, Tower Crane (Stationary or Climbing Type), Rough Terrain Crane**, Wagon Crane, Crushing and/or Screening Plant, Derrick Traveler, Derrick (all types)(when assistance is needed it will be an oiler or apprentice), Derrick Boats, Dragline, Drill (Davey or similar), Dredge, Drill (Well and Core)(Truck or Skid Mounted), Elevator, Excavating Equipment (all other), Fork Lift (Lull or similar), Franki Pile Machine (or similar), Guard Post Driver, Gradall (all types), Grader, Elevating Grader, Equipment Greaser, Helicopter, Helicopter Hoist Operators, Front End Loader, Hoist, Hydraulic Boom Truck, Jumbo Operator, Kocal, Koehring Scooper, Locomotive, Metro Chip Harvester (or similar), Mix Mobile, Mixer - Paver, Mucking Machine, Multiple Bowl Machines, Pile Driver (Sonic or similar), Scrapers, Shovels (powered), Slip Form Paver (C.M.I. and similar), Spreader (Concrete, Asphalt, or Stone), Tire Repairman (when assigned to a jobsite), Tower Mobile, Tractors (all types), Trencher, Tug Boat, Vermeer
Saw, Welder (repairman), Whirley
* Cranes with Boom or Mast length (including jib) 100 ft or over shall be paid an additional $.50 per hour for each 50-foot increment of additional boom and/or jib length)
** Rough Terrain Cranes with Boom or Mast length (including jib) 101 ft or over shall be paid an Additional $.50 per hour for each 50-foot increment of additional boom and/or jib length)
Note: An additional $1.25 per hour (not counting boom pay) shall be paid for any crane (excluding overhead cranes) rated 100 ton or over.
CLASS II
Ballast Regulator, Boat (material or personnel)(powered), Boiler, Boring Machine, Compressor (combined with Air Tugger, Air Pump, Gunite Machine, or Sand Blaster), Concrete Belt Placer, Concrete Saw, Conveyor, Carry Crane, Crushing/Screening Plants, Curb Builder (self-propelled), Forklifts (ridden or self-propelled), Form Line Machine, Generator (over 5KW), Grout Pump, Heaters, Hoist (monorail, roof, one drum-regardless of power used), Huck Machine (or similar), Hydraulic Jack (single or multiple)(power driven), Ladavator, Mortar Mixer, Mulching Machine, Pavement Breaker (self-propelled or ridden), Pin Puller (powered), Pipe Cleaning Machine, Pipe Dream, Power Broom (except push type), Pulverizer, Pumps (regardless of power used), Roller/Compactor (Dirt), Refrigeration Plant, Ross Carrier (or similar), Seeding Machine, Skid Steer Loader (or similar), Slab Lifting Machine (hydraulic), Soil Stabilizer (pump type), Spray Cure Machine (power driven), Side Delivery Shoulder Spreader (attachment), Steam Jenny (or similar), Stone Crusher, Stone Spreader (self-propelled), Siphon (steam or air), Tie Tamper (multiple heads), Tractor (when used for landscaping, snaking, or hauling), Truck (Winch)(when hoisting and placing), Tube Finisher (C.M.I. and similar), Tugger, Water Blaster, Welding Machine, Well Point System
General Note: Hazardous Material Sites Level C & D receive $1.00 per hour premium for all classifications and Levels A & B receive $2.50 premium for all classifications
* ENGI0066-008 06/01/2011
ARMSTRONG AND INDIANA COUNTIES
Rates Fringes
Power equipment operators:
CLASS 1.....................$ 31.05 15.75
CLASS 2.....................$ 27.36 15.75
CLASS 3.....................$ 25.64 15.75
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
CLASS I
Asphalt Paver, Asphalt Roller, Asphalt Plant Operator, Athey Loader, Auger (Truck or Tractor Mounted), Auto Grader (C.M.I. and similar), Backhoe (180' and 360' swing), Back-Filling Machine, Batch Plant, Bulldozer, Cable Layer, Cableway, Caisson Drill, Central Mix Plant, Compactor with Blade, Concrete Pump (all types), Over-Head Crane, Crane (Crawler or Truck Mounted)*, Tower Crane (Stationary or Climbing Type), Rough Terrain Crane**, Wagon Crane, Crushing and/or Screening Plant, Derrick Traveler, Derrick (all types)(when assistance is needed it will be an oiler or apprentice), Derrick Boats, Dragline, Drill (Davey or similar), Dredge, Drill (Well and Core)(Truck or Skid Mounted), Elevator, Excavating Equipment (all other), Fork Lift (Lull or similar), Franki Pile Machine (or similar), Guard Post Driver, Gradall (all types), Grader, Elevating Grader, Equipment Greaser, Helicopter, Helicopter Hoist Operators, Front End Loader, Hoist, Hydraulic Boom Truck, Jumbo Operator, Kocal, Koehring Scooper, Locomotive, Metro Chip Harvester (or similar), Mix Mobile, Mixer - Paver, Mucking Machine, Multiple Bowl Machines, Pile Driver (Sonic or similar), Scrapers, Shovels (powered), Slip Form Paver (C.M.I. and similar), Spreader (Concrete, Asphalt, or Stone), Tire Repairman (when assigned to a jobsite), Tower Mobile, Tractors (all types), Trencher, Tug Boat, Vermeer Saw, Welder (repairman), Whirley
* Cranes with Boom or Mast length (including jib) 100 ft or over shall be paid an additional $.50 per hour for each 50-foot increment of additional boom and/or jib length)
** Rough Terrain Cranes with Boom or Mast length (including jib) 101 ft or over shall be paid an Additional $.50 per hour for each 50-foot increment of additional boom and/or jib length)
Note: An additional $1.25 per hour (not counting boom pay) shall be paid for any crane (excluding overhead cranes) rated 100 ton or over.
CLASS II
Ballast Regulator, Boat (material or personnel)(powered), Boiler, Boring Machine, Compressor (combined with Air Tugger, Air Pump, Gunite Machine, or Sand Blaster), Concrete Belt Placer, Concrete Saw, Conveyor, Carry Crane, Crushing/Screening Plants, Curb Builder (self-propelled), Forklifts (ridden or self-propelled), Form Line Machine, Generator (over 5KW), Grout Pump, Heaters, Hoist (monorail, roof, one drum-regardless of power used), Huck Machine (or similar), Hydraulic Jack (single or multiple)(power driven), Ladavator, Mortar Mixer, Mulching Machine, Pavement Breaker (self-propelled or ridden), Pin Puller
(powered), Pipe Cleaning Machine, Pipe Dream, Power Broom (except push type), Pulverizer, Pumps (regardless of power used), Roller/Compactor (Dirt), Refrigeration Plant, Ross Carrier (or similar), Seeding Machine, Skid Steer Loader (or similar), Slab Lifting Machine (hydraulic), Soil Stabilizer (pump type), Spray Cure Machine (power driven), Side Delivery Shoulder Spreader (attachment), Steam Jenny (or similar), Stone Crusher, Stone Spreader (self-propelled), Siphon (steam or air), Tie Tamper (multiple heads), Tractor (when used for landscaping, snaking, or hauling), Truck (Winch)(when hoisting and placing), Tube Finisher (C.M.I. and similar), Tugger, Water Blaster, Welding Machine, Well Point System
CLASS III
Brakeman, Deck Hand, Helicopter Signalman, Oiler*, Elevator (Alterations & Remodeling Commercial Buildings),
* Oilers on Truck Cranes: less than 50 ton shall receive $.10 over the Class III base rate; 50 ton up to 100 ton rated capacity shall be paid an additional $.25 per hour over the Class III base rate; 100 ton and over shall be paid an additional $1.00 per hour over the Class III base rate.
General Note: Hazardous Material Sites Level C & D receive $1.00 per hour premium for all classifications and Levels A & B receive $2.50 premium for all classifications
ENGI0066-019 07/01/2011
Rates Fringes
Power equipment operators:
(ARMSTRONG AND INDIANA AND
LAWRENCE COUNTIES)
SCRAPER.....................$ 31.045 15.75
Power equipment operators:
(CAMERON, CLARION,
CLEARFIELD, CLINTON,
CRAWFORD, ELK, JEFFERSON,
MCKEAN, POTTER, VANANGO AND
WARREN COUNTIES)
SCRAPER.....................$ 24.565 12.07
IRON0003-003 06/01/2011
ARMSTRONG, CLARION, INDIANA, CRAWFORD, FOREST AND WARREN
COUNTIES
Ironworkers:.....................$ 30.38 24.20 Pre-Engineered Metal Building....................$ 29.43 7.42
Structural, Reinforcing & Ornamental
IRON0003-009 06/01/2011
BLAIR, CAMERON, CENTRE, CLEARFIELD, CLINTON, ELK, JEFFERSON,
MCKEAN AND POTTER COUNTIES
Ironworkers:.....................$ 30.38 24.20
IRON0207-003 06/01/2011
VENANGO COUNTY
Rates Fringes
IRONWORKER, STRUCTURAL,
REINFORCING AND ORNAMENTAL.......$ 27.06 18.96
LABO0323-001 01/01/2011
VENANGO COUNTY
Rates Fringes
Laborers:
GROUP 1.....................$ 21.17 10.45
GROUP 2.....................$ 21.32 10.45
GROUP 3.....................$ 21.45 10.45
GROUP 4.....................$ 21.92 10.45
LABORERS CLASSIFICATIONS
GROUP 1 - COMMMON LABORER: Building laborer, west brick buggy or similar (non self-propelled), stripper and mover of forms as follows: Cement finisher, footers, forms not to be re-used, forms that are a matter of record; window cleaner, toolroom man, water proofing (any mode or method).
GROUP 2 - SKILLED LABORER: Powered wheelbarrows, buggies, mason tender, pipe layer, bottom man (10 below grade), mortar mixer, mason plasterer, concrete, other, hod carrier
- mason,plasterer (any method), scaffold builder, concrete buster, jackhammer (air tool, electric, other), other mechanical or power tools, concrete saw, carryable pumps and operating, all operators of compacting equipment, grout machine feeder and pump operator, all material conveyors (regardless of power used, including starting and stopping), bell and bottom man on furnaces and stacks, burner (demolition), groundman, jackhammer man, drill man, high (climber) blaster, wagon drill operator. .
GROUP 3 - Asbestos removal or abatement laborer
GROUP 4 - Toxic or hazardous waste handling laborer
LABO0419-002 07/01/2011
CLEARFIELD AND CLINTON COUNTIES
Rates Fringes
Laborers:
GROUP 1.....................$ 18.27 10.15
GROUP 2.....................$ 18.42 10.15
GROUP 3.....................$ 18.52 10.15
GROUP 4.....................$ 17.61 10.15
LABORERS CLASSIFICATIONS
GROUP 1 - Unskilled laborer
GROUP 2 - Plasterer tender & Mason Tender
GROUP 3 - Asbestos removal and toxic waste removal laborer
GROUP 4 - Flagman
* LABO0952-002 06/01/2011
ARMSTRONG, CLARION, INDIANA, AND JEFFERSON COUNTIES
Rates Fringes
Laborers:
GROUP 1.....................$ 21.17 10.45
GROUP 2.....................$ 21.32 10.45
GROUP 3.....................$ 21.45 10.45
GROUP 4.....................$ 21.92 10.45
GROUP 5.....................$ 20.85 9.16
LABORERS CLASSIFICATIONS
GROUP 1 - COMMON LABORER Building laborer; Brick removal for alterations; Carryable pumps; West brick buggy or similar;
Walk behind forklift or similar (non self-propelled);
Stripper and mover of forms;Tool room man; all material conveyors(regardless of power used, including starting and stopping);Pouring of mortar or aggregate into blocks of voids
GROUP 2 - SKILLED LABORER Air track; West brick buggy or similar (self propelled); Power wheelbarrows and buggies;
walk behind forklift or similar (self-propelled); Drill runner; (including Drill Mounted on Truck, Track or similar); Blasterer's All operators of compacting equipment; pipe layer; Burner; Jackhammerman - concrete buster; vibator operator; clay spade and/orsimilar; gunnute nozzleman; blaster; copncrete saw operator; hod carrier;
scaffold builder; air track operator; bell and bottom man on furnace and stacks; grout machine feeder and pump operator; gunnite machine opoerator or similar; gunnite machine potman or similar; mortar mixer; mortar mixer machine (regardless of power used including starting and stopping); wagon drill operator; laser cleaner; lancer
GROUP 3 - Asbestos removal or abatement laborer
GROUP 4 - Toxic or Hazardous waste handling laborer
GROUP 5 - Flag Person
LABO0952-003 06/01/2010
CAMERON, ELK, FOREST, McKEAN, POTTER AND WARREN COUNTIES
Rates Fringes
Laborers:
GROUP 1.....................$ 18.30 10.04
GROUP 2.....................$ 18.55 10.04
GROUP 3.....................$ 19.10 10.04
LABORERS CLASSIFICATIONS
GROUP 1 - Common laborer, carpenter tender, flagman, spotter equipment, scaffold builder for masons, window cleaner, form stripper and mover, scaffold and runways, building materials handlers (loading and unloading) concrete pitman, puddler, mason tender
GROUP 2 - Mechanical tampers (power) powered wheelbarrows and buggies and worklifts, sweepers and similar, mortar mixer, bell bottom man on furnances and stacks, jackhammer man, concrete buster, sheeters and shorers, vibrator operators, power tamper operators y-gun, burnercutting torch and carrable pumps, chain saw operator, pipe layers, all material conveyors and elevators, signal man, west brick buggies or similar, scaffold builder for plasterers' regardless of height, hod carriers, plasterer tender, form cleaning machine operator, plasterer applicating and/or pump machine operator, paving creaker, asphalt raker, lancer, berfix cutting tool, gunnite potman blacksmith, tool dresser (cable tools)
GROUP 3 - Blasters, wagon drill operator(air trac) drill runner, nozzle man, grout machine operator, walk behind power roller and temper, welder, driller (cable tools) multiplate pipe aligning and securing
LABO0964-001 06/01/2010
CRAWFORD COUNTY
Laborers:
Group 1.....................$ 19.46 10.77 Group 2.....................$ 19.61 10.77 Group 3.....................$ 19.74 10.77 Group 4.....................$ 20.21 10.77
GROUP 1 - Common Laborers
GROUP 2 - Material buggy handlers, all power tool operators, pipe layers, drill runner, asbestos and toxic waste removal laborer
GROUP 3 - Mason tender, mortar mixer, hod carrier, scaffold builder, mechanical tamper, powered wheelbarrows
GROUP 4 - Toxic and hazardous waste handling and removal
PAIN0021-007 05/01/2010
CLINTON COUNTY
Rates Fringes
Painters:
Brush and Roller............$ 23.30 13.00 Brush & Roller
PAIN0057-006 06/01/2011
ARMSTRONG, CLARION, CLEARFIELD, ELK, INDIANA, JEFFERSON AND
VENANGO COUNTIES
Painters:
Brush & Roller..............$ 25.72 14.09
PAIN0057-007 06/01/2010
CAMERON, CRAWFORD, FOREST, POTTER AND WARREN (excluding Freehold and Columbus townships) COUNTIES
Painters:
Brush and Roller............$ 21.85 12.70 Brush & Roller
PAIN0057-018 06/01/2011
DRYWALL FINISHER/TAPER
(ARMSTRONG AND INDIANA
COUNTIES)........................$ 25.00 14.75
DRYWALL FINISHER/TAPER
(CAMERON, CLARION,
CLEARFIELD, ELK, FOREST,
JEFFERSON, AND VENANGO
COUNTIES)........................$ 24.50 13.92
DRYWALL FINISHER/TAPER
(CRAWFORD, McKEAN, POTTER, AND WARREN COUNTIES).............$ 22.00 12.27
PAIN0057-025 05/01/2011
McKean and Warren Counties (Including Columbus and Freehold Townships)
PAINTER
Brush and Roller............$ 20.28 13.25
PLAS0024-001 06/01/1998
ELK, MCKEAN, POTTER AND WARREN COUNTIES:
Rates Fringes
PLASTERER........................$ 18.85 5.83
PLAS0031-002 06/01/2010
CRAWFORD COUNTY
Rates Fringes
PLASTERER........................$ 26.13 12.15
PLAS0031-007 06/01/2010
ARMSTRONG, CLEARFIELD,AND JEFFERSON COUNTIES
Rates Fringes
PLASTERER........................$ 26.13 12.15
PLAS0031-008 06/01/2010
CLINTON AND INDIANA COUNTIES
PLASTERER........................$ 20.97 9.94
PLAS0526-003 06/07/2011
ARMSTRONG, INDIANA, CLEARFIELD, AND JEFFERSON COUNTIES
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 27.14 12.82
PLAS0526-005 07/01/2011
CLINTON COUNTY
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 24.60 11.69
PLUM0027-003 06/01/2011
ARMSTRONG COUNTY
Rates Fringes
PLUMBER..........................$ 35.85 17.57
PLUM0047-006 05/01/2011
CLARION, CRAWFORD, FOREST, McKEAN, VENANGO, AND WARREN COUNTIES
Rates Fringes
Plumbers and Pipefitters.........$ 34.16 17.37
PLUM0354-002 06/01/2011
CAMERON, CLEARFIELD, ELK, INDIANA, AND JEFFERSON COUNTIES
Rates Fringes
Plumbers and Pipefitters.........$ 31.81 19.18
PLUM0449-002 06/01/2011
ARMSTRONG COUNTY
Rates Fringes
PIPEFITTER.......................$ 36.68 18.14
PLUM0520-010 05/01/2011
CLINTON AND POTTER COUNTIES
Plumbers and Pipefitters.........$ 31.92 20.39
ROOF0030-006 06/01/2011
CLINTON COUNTY
Rates Fringes
ROOFER...........................$ 24.25 15.21
ROOF0037-002 06/01/2011
ARMSTRONG, CAMERON, CLARION, CLEARFIELD, ELK, FOREST, INDIANA,
AND JEFFERSON COUNTIES
ROOFER...........................$ 27.65 12.32
ROOF0210-002 06/01/2010
CRAWFORD, McKEAN, POTTER, VENANGO, AND WARREN COUNTIES
Rates Fringes
ROOFER...........................$ 23.65 11.99
SUPA2000-001 06/22/2000
Rates Fringes
Power equipment operators:
Bulldozers..................$ 19.23 8.46 Excavators..................$ 12.00 Forklift....................$ 17.72 8.46 Loader......................$ 18.91 8.46 Mechanics...................$ 14.08 5.62 Pavers......................$ 19.06 8.39 Rollers.....................$ 14.88 8.46
Sheet metal worker...............$ 20.10 6.10
TRUCK DRIVER.....................$ 9.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.
Union Identifiers
An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.
Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rate.
Non-Union Identifiers
Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.
Survey wage rates will remain in effect and will not change until a new survey is conducted.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
(End of Summary of Changes)