Resident Engineer Office Building Dam Safety Modification Project, East Branch Lake
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 11 00
PERFORMANCE WORK STATEMENT
PART 1 GENERAL REQUIREMENTS
1.1 REFERENCES
1.2 SUBMITTALS
1.2.1 Design Submittal Packages
1.2.1.1 Preliminary Design Drawings
1.2.1.2 Final Building Design Detail Drawings
1.3 DESCRIPTION OF WORK
1.4 MATERIALS AND STANDARD PRODUCTS
1.5 CONTRACT DRAWINGS
1.6 SUPERVISION
1.7 TIME OF PERFORMANCE
1.8 ENGINEERING SERVICES
1.9 PROTECTION OF TRAFFIC
1.10 UTILITIES
1.11 OPERATIONAL PLAN
PART 2 GENERAL SPECIFICATIONS
2.1 NEW PERMANENT BUILDING
2.1.1 DESIGN CODES
2.1.2 STRUCTURE
2.1.2.1 Design Requirements
2.1.2.2 Foundation
2.1.2.3 Building Location and Layout
2.1.3 MISCELLANEOUS CAST-IN-PLACE CONCRETE
2.1.4 ELECTRICAL
2.1.4.1 Standard Products
2.1.4.2 Electrical Requirements for Parking Area
2.1.4.3 Electrical Requirements for Building
2.1.4.3.1 Security & Fire System
2.1.4.4 Parking & Exterior Lighting
2.1.4.5 Communications System
2.1.5 MECHANICAL
2.1.5.1 Water Service Line
2.1.5.2 Building Piping
2.1.5.3 Precast Manholes
2.1.5.3.1 General Requirements
2.1.5.3.2 Steel Ladder Anchorage
2.1.5.3.3 Jointing, Plastering and Sealing
2.1.5.3.4 Setting of Frames and Covers
2.1.5.3.5 External Preformed Rubber Joint Seals
2.1.5.4 Gravity Sewer Main
2.1.5.5 Gravity Sewer Line Test
2.1.5.6 Building Sewer Piping
2.1.5.7 Gas Line
2.1.5.8 HVAC
2.1.5.9 Plumbing Fixtures
SECTION 01 11 00 Page 1
W911WN-12-R-0001 REVISED BY AMENDMENT 0002
2.1.6 ARCHITECTURAL AND FINISHES
2.1.6.1 Roofing
2.1.6.2 Exterior Walls
2.1.6.3 Interior Walls
2.1.6.3.1 GYPSUM BOARD
2.1.6.3.2 METAL SUPPORT SYSTEM
2.1.6.4 Interior Ceiling
2.1.6.4.1 ACOUSTICAL TILE UNITS
2.1.6.4.2 ACOUSTICAL CEILING SUSPENSION SYSTEM
2.1.6.4.3 HANGERS
2.1.6.4.4 FINISHES
2.1.6.5 Interior Resilient Flooring
2.1.6.5.1 VINYL COMPOSITION TILE
2.1.6.5.2 CARPET TILE
2.1.6.5.3 WALL BASE
2.1.6.5.4 MOLDING
2.1.6.6 Paint
2.1.6.7 Exterior Windows
2.1.6.7.1 Additional Requirements
2.1.6.8 Exterior Doors
2.1.6.8.1 Additional Requirements
2.1.6.9 Interior Doors
2.1.6.9.1 Additional Requirements
2.1.6.10 Interior Signage
2.1.6.10.1 Additional Requirements
2.1.6.11 Bathrooms and Toilet Accessories
2.1.6.12 Kitchen
2.1.7 FURNISHINGS
2.1.8 SITE WORK
2.1.8.1 Seeding
2.1.8.2 Walkway and Paths
2.1.8.3 Parking Pavement and Markings
2.1.8.4 Fence
2.1.8.5 Mail Box
2.2 Warranty For Building Systems
2.2.1 Contractor's Five (5) Year No Penal Sum Warranty
-- End of Section Table of Contents --
SECTION 01 11 00 Page 2
SECTION 01 11 00
PERFORMANCE WORK STATEMENT
January 2012
PART 1 GENERAL REQUIREMENTS
1.1 REFERENCES
The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICANS WITH DISABILITIES ACT (ADA)
ADA Specifications
ASTM INTERNATIONAL (ASTM)
ASTM A 489 (2004e1) Standard Specification for Carbon Steel Lifting Eyes
ASTM A 53/A 53M (2007) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless
ASTM A 641/A 641M (2009a) Standard Specification for Zinc-Coated (Galvanized) Carbon Steel Wire
ASTM B 88 (2009) Standard Specification for Seamless Copper Water Tube
ASTM C 1002 (2007) Standard Specification for Steel Self-Piercing Tapping Screws for the Application of Gypsum Panel Products or Metal Plaster Bases to Wood Studs or Steel Studs
ASTM C 1047 (2009) Standard Specification for Accessories for Gypsum Wallboard and Gypsum Veneer Base
ASTM C 1136 (2009) Standard Specification for Flexible, Low Permeance Vapor Retarders for Thermal Insulation
ASTM C 36/C 36M (2003e1) Gypsum Wallboard
ASTM C 475/C 475M (2002; R 2007) Joint Compound and Joint Tape for Finishing Gypsum Board
ASTM C 635/C 635M (2007) Manufacture, Performance, and Testing of Metal Suspension Systems for Acoustical Tile and Lay-In Panel Ceilings
SECTION 01 11 00 Page 3
ASTM C 645 (2009a) Nonstructural Steel Framing Members
ASTM C 954 (2007) Steel Drill Screws for the Application of Gypsum Panel Products or Metal Plaster Bases to Steel Studs from
0.033 in. (0.84 mm) to 0.112 in. (2.84 mm) in Thickness
ASTM D 2122 (1998; R 2004) Determining Dimensions of Thermoplastic Pipe and Fittings
ASTM D 2241 (2009) Standard Specification for Poly(Vinyl Chloride) (PVC) Pressure-Rated Pipe (SDR Series)
ASTM D 2513 (2009) Thermoplastic Gas Pressure Pipe, Tubing, and Fittings
ASTM D 2665 (2009) Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Drain, Waste, and Vent Pipe and Fittings
ASTM D 3034 (2008) Standard Specification for Type PSM Poly(Vinyl Chloride) (PVC) Sewer Pipe and Fittings
ASTM D 3139 (1998; R 2005) Joints for Plastic Pressure Pipes Using Flexible Elastomeric Seals
ASTM D 3212 (2007) Standard Specification for Joints for Drain and Sewer Plastic Pipes Using Flexible Elastomeric Seals
ASTM D 3676 (2007) Rubber Cellular Cushion Used for Carpet or Rug Underlay
ASTM E 795 (2005) Mounting Test Specimens During Sound Absorption Tests
ASTM F 1066 (2004) Standard Specification for Vinyl Composition Floor Tile
ASTM F 1861 (2008) Resilient Wall Base
ASTM F 477 (2008) Standard Specification for Elastomeric Seals (Gaskets) for Joining Plastic Pipe
AMERICAN WATER WORKS ASSOCIATION (AWWA)
AWWA C600 (2005) Installation of Ductile-Iron Water Mains and Their Appurtenances
AWWA C651 (2005; Errata 2005) Standard for Disinfecting Water Mains
INTERNATIONAL CODE COUNCIL (ICC)
ICC IBC (2012; Errata First Printing)
SECTION 01 11 00 Page 4
International Building Code
INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO)
ISO 2551 (1981) Machine-made Textile Floor Coverings - Determination of Dimensional Changes Due to the Effects of Varied Water and Heat Conditions
MASTER PAINTERS INSTITUTE (MPI)
MPI 77 (Oct 2009) Epoxy Gloss
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2008; AMD 1 2008) National Electrical Code
NFPA 72 (2010; Am 10-2; Am 10-3; Proposed Am 971) National Fire Alarm and Signaling Code
UNIFIED FACILITIES CRITERIA (UFC)
UFC 3-110-03 (2006) ROOFING
UFC 3-320-03A (2010) STRUCTURAL CONSIDERATIONS FOR METAL
ROOFING
UNIFIED FACILITIES GUIDE SPECIFICATIONS (UFGS)
UFGS 07 61 13.00 (2006) STRUCTURAL STANDING SEAM METAL ROOF
SYSTEM
UFGS 07 61 14.00 20 (2011) STEEL STANDING SEAM ROOFING
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation, or submittals with an "F" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following submittals are described in more detail within the referenced sections of the Base Contract. See the Base Contract submittal register for location of submittal descriptions. Additional submittals may be required by additional sections included with this contract.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES.
SD-02 Shop Drawings
ARCHITECTURAL
Preliminary Design Drawings; G, ED
Preliminary Design Drawings shall be submitted for information only within 30 days of Notice to Proceed.
Final Building Design Detail Drawings; G, ED
SECTION 01 11 00 Page 5
Final Building Design Detail Drawings shall be submitted for approval within 75 days of Notice to Proceed.
STRUCTURAL
Foundation Detail Drawings; F, ED
Foundation design drawings and calculations shall be submitted with the Preliminary Design Drawings for information only within 30 days of Notice to Proceed. This shall include any mechanical or electrical rough-ins within the foundation.
Structural Building Drawings; G, ED
PLUMBING
Mechanical Schematic; F, ED
Provide detailed drawings of pipe sizes and layout for:
Water Distribution Piping; G, ED Natural Gas Piping; G, ED Sewer Piping; G, ED
HVAC
HVAC Instrumentation and Control; G, ED
Provide detailed drawings indicating location and size of equipment for:
Central Heating System; G, ED Central Cooling System; G, ED
Ducts; G, ED
Provide detailed drawings of ductwork sizes and layout.
ELECTRICAL
Electrical Schematic; F, ED
Detail Drawings for Electrical System; G, ED Detail Drawings for Panelboards; G, ED Utility Pole; G, ED Interior Lighting; G, ED Exterior Lighting; G, ED Emergency Lighting System; G, ED
COMMUNICATIONS
Communications Detail Drawings; G, ED
SD-03 Product Data; G, ED
THERMAL AND MOISTURE PROTECTION
Thermal Insulation for Roof; G, ED
SECTION 01 11 00 Page 6
Thermal Insulation for Walls; G, ED Standing Seam Metal Roof & Accessories; G, ED Gutters and Downspouts; G, ED Snow Guards; G, ED
DOORS AND WINDOWS
Hollow Metal Frames; G, ED Hollow Metal Doors; G, ED Stainless Steel Doors; G, ED Wood Doors; G, ED Aluminum Windows; G, ED Door Hardware; G, ED
FINISHES
Exterior Architectural Stone; G, ED Siding; G, ED Gypsum Board; G, ED Resilient Flooring; G, ED Slip-Resistant Flooring Treatment; G, ED Carpet Tile; G, ED Acoustical Tile Units; G, ED Wall Base; G, ED Molding; G, ED Acoustical Ceiling Suspension System; G, ED Acoustical Insulation; G, ED Paint; G, ED
SPECIALTIES, EQUIPMENT, AND FURNISHINGS
Markerboards; G, ED Interior Signage; G, ED Corner Guards; G, ED Toilet Accessories; G, ED Fire Extinguisher and Cabinet; G, ED Mail Box; G, ED Refrigerator; G, ED Microwave Oven; G, ED Sink Disposal; G, ED Projector Screen; G, ED Horizontal Louver Blinds; G, ED Kitchen Cabinets and Counertops; G, ED Entrance Floor Mats; G, ED
PLUMBING
Gages; G, ED Valves; G, ED Plumbing Hangers and Supports; G, ED Pipe ID; G, ED Manhole Frames and Covers; G, ED Cleanouts; G, ED Water Distribution Piping; G, ED Natural Gas Piping; G, ED Sewer Piping; G, ED Pipe Insulation; G, ED Drains; G, ED Water Heater; G, ED
SECTION 01 11 00 Page 7
Toilets; G, ED Lavatories and Sinks; G, ED Faucets; G, ED
HVAC
HVAC Hangers and Supports; G, ED Testing, Adjusting and Balancing of HVAC System; G, ED Central Heating System; G, ED Central Cooling System; G, ED HVAC Insulation; G, ED HVAC Instrumentation and Control; G, ED Ducts; G, ED Duct Accessories; G, ED Fuel-Fired Furnace; G, ED Central Air Conditioning Equipment; G, ED
ELECTRICAL
Electrical Hangers and Supports; G, ED Conduits, Raceway and Fittings; G, ED Wire and Cable; G, ED Underground Wiring; G, ED Electrical Handhole; G, ED Splices and Connections; G, ED Switches; G, ED Receptacles; G, ED Outlets, Outlet Boxes, and Pull Boxes; G, ED Circuit Breaker; G, ED Panelboard; G, ED Interior Light Fixtures; G, ED Exterior Lighting Fixtures; G, ED Light Poles; G, ED Utility Pole; G, ED Electrical Grounding and Bonding; G, ED Identification for Electrical Systems; G, ED Exit Signs; G, ED Emergency Lighting; G, ED
COMMUNICATIONS
Communications Grounding and Bonding; G, ED Pathways; G, ED Communications Hangers and Supports; G, ED Conduits and Backboxes; G, ED Cable Tray; G, ED Underground Ducts; G, ED Identification for Communication Systems; G, ED Data Communication Cables; G, ED Telephone Communication Cables; G, ED
ELECTRONIC SAFETY AND SECURITY
Security & Fire Cables; G, ED Security & Fire Grounding and Bonding; G, ED Identification for Electronic Safety and Security Systems; G, ED Intrusion Detection; G, ED Alarm Control; G, ED Smoke Detection Sensors; G, ED
SECTION 01 11 00 Page 8
Fire Alarm; G, ED
SD-04 Samples
Color charts; G, ED
SD-05 Design Data
Building Design Analysis; G, ED Foundation Design Analysis; G, ED
PLUMBING
Water Distribution Piping; G, ED Sewer Piping; G, ED Natural Gas Piping; G, ED
HVAC
Central Heating System; G, ED Central Cooling System; G, ED Ducts; G, ED
ELECTRICAL
Low-Voltage Distribution Schedule; G, ED Lighting Panelboard Schedule; G, ED Lighting Fixture Schedule; G, ED
SD-06 Test Reports
Water Distribution Piping; G, ED Sewer Piping; G, ED Natural Gas Piping; G, ED Testing, Adjusting and Balancing of HVAC System; G, ED Wiring and Cables; G, ED Communications System; G, ED Interior Lighting Operating Test; G, ED Exterior Lighting Operating Test; G, ED Emergency Lighting Operating Test; G, ED
SD-07 Certificates
Concrete Pipeline Testing
SD-11 Closeout Submittals
Warranty; G, ED
1.2.1 Design Submittal Packages
Throughout building design, the following packages are required to be submitted for approval. Submittals that are listed above which are also listed in the design submittal packages do not need to be submitted twice.
The contractor may submit any parts of these packages separately prior to the required submission dates.
SECTION 01 11 00 Page 9
1.2.1.1 Preliminary Design Drawings
A preliminary drawing package shall be submitted for information only within 30 days after Notice to Proceed. This package may be submitted prior to 30 days, and no government approval is necessary to commence work.
This shall include (i) one drawing showing the approximate floor plan of the building, (ii) elevation drawing(s) showing the exterior design of the front, sides and rear of building, (iii) interior and exterior wall sections and details, the (iv) foundation detail drawings (par 2.1.2.2),
(v) mechanical schematic, and (Vi) electrical schematic.
(i) The floor plan drawing shall include room layouts with each room labeled, dimensions for each room, and locations of doorways and windows, and wall thicknesses shall be shown on the drawings and considered in the dimensions.
(ii) The elevation drawing(s) shall include elevation views for the front, sides and rear of the building. The drawings shall include dimensions of the building and roof height, width and length, doorway and window locations, and dimensions for the stone panel and vinyl siding.
(iii) The interior wall, exterior wall, ceiling and roof sections and details shall show typical sections with dimensions and labels for the interior and exterior walls, ceiling and roof. Interior wall details shall show interfaces between the wall features, finished floor, and ceiling system. Exterior wall details shall show interfaces between the wall features, flooring/foundation, ceiling system and roof system. Ceiling details shall show typical ceiling section. Roof details shall show typical roof section.
(iv) The Foundation design drawings and calculations shall include a plan view showing any mechanical or electrical rough-ins within the foundation, as well as a typical section showing the slab, footers, foundation wall, subbase, and foundation drains.
(v) The mechanical schematic shall show planned locations for all mechanical site utilities. This should include a plan view showing water distribution, natural gas piping, and sewer piping, and how these utilities are expected to tie into the building. An elevation view of the sewer piping shall be included as well.
(vi) The electrical schematic shall show planned locations for all electrical and communications site utilities and how these utilities are expected to tie into the building.
1.2.1.2 Final Building Design Detail Drawings
Final Building Design Detail Drawings shall be submitted for approval within 75 days after Notice to Proceed. These drawings shall be submitted in printed hard copy AND ELECTRONIC MICROSTATION FILES (versions V8 XM or V8i).
This shall include, at a minimum, (i) one drawing showing the floor plan of the building, (ii) elevation drawing(s) showing the exterior design of the front, sides and rear of building, (iii) interior and exterior wall sections and details, (iv) detail drawings for the Mechanical Systems (Water distribution, natural gas piping, sewer piping, HVAC system), (v) detail drawings for the Electrical/Communications/Fire/Security Systems, SECTION 01 11 00 Page 10 and (vi) catalog cuts for procurement sensitive features.
(i) Same as 1.2.1.1(i).
(ii) Same as 1.2.1.1(ii)
(iii) Same as 1.2.1.1(iii).
(iv) The detail drawings for the Mechanical system shall show all water distribution, natural gas piping, sewer piping, central heating, central cooling, ducts, and all mechanical equipment within a five foot perimeter of the building.
(v) The detail drawings for the Electrical/Communication/Fire/Security systems shall show all electrical wiring and conduit, communications wiring and conduit/cable tray, fire system wiring and conduit, security system wiring and conduit, electrical equipment, interior lighting, exterior lighting, fire system hardware, and security system hardware within a five foot perimeter of the building. Each system shall be on a separate drawing.
(vi) The catalog cuts shall include any procurement sensitive features, such as windows and doors, that are "long-lead" items.
1.3 DESCRIPTION OF WORK
The work shall take place at East Branch Dam, near Wilcox, Elk County, Pennsylvania.
The general description of the work is to furnish all equipment, labor, materials, supplies, layout of work, and supervision to design and construct a new permanent (non-relocatable), one-story, office building of approximately 2,100 Square Feet, for use by USACE. The building will consist of approximately five offices, a conference room, a communications room, a plotter room, two bathrooms, a kitchen, a mechanical room, storage room, and a reception area. The project also includes paving the existing aggregate parking lot and entrance, installing security fencing and gate, construction of concrete sidewalks, and provide seeding around building.
The building construction may be pre-engineered or conventional. If pre-engineered, metal or modular style buildings are both acceptable.
However, modular trailer-style offices are not acceptable. This building is to be used as a permanent, non-relocatable park office for a minimum of 25 years.
Unless specified, all materials and equipment provided in the performance of this contract shall be new. All equipment and materials shall be tested for proper operation prior to the completion of work. Materials and equipment removed under this contract shall become the property of the Contractor and shall be disposed of in accordance with all Federal, State, and local laws. All property damaged during work under this contract shall be restored to its original condition.
The building shall be designed and constructed to meet all local, state, and federal codes, laws, and regulations.
The Contractor shall obtain and pay for all required permits and inspections of the building construction as required by State and local authorities having jurisdiction. Licenses, impact fees, utility fees, state and local taxes, and any and all permit cost that may be imposed are
SECTION 01 11 00 Page 11 to be included in the proposal.
1.4 MATERIALS AND STANDARD PRODUCTS
All materials shall be furnished by the Contractor.
Materials and equipment shall be standard products of a manufacturer regularly engaged in the manufacture of such products and shall essentially duplicate items that have been in satisfactory use for at least 2 years prior to bid opening. Equipment shall be supported by a service organization that is, in the opinion of the Contracting Officer, reasonably convenient to the site.
1.5 CONTRACT DRAWINGS
The contract drawings listed on Drawing No. G-0021 show the work under this contract.
1.6 SUPERVISION
The Contractor shall provide adequate supervision, safety, and quality control to assure the accuracy, quality, completeness, and safe progress of the work under this contract.
1.7 TIME OF PERFORMANCE
The Contractor shall confine all operations at the work site between the hours of 7:30 am and 6:30 pm, Monday through Friday, unless otherwise approved. Work will not be permitted on weekends or Federal holidays unless otherwise approved.
1.8 ENGINEERING SERVICES
The Contractor is responsible for designing the new building and foundation. The Contractor is also responsible for providing utility connections, site work, and providing all necessary surveying and layout services during construction. Surveys during construction shall be at the discretion of the Contractor.
1.9 PROTECTION OF TRAFFIC
The Contractor shall maintain and protect traffic on all roads impacted by the Contractor's operations. Measures for the protection and diversion of traffic, including the provision for watchmen and flagmen, erection of barricades, placing of lights around and in front of equipment and the work, and the erection and maintenance of adequate warning, danger, and direction signs, shall be as required by State and local authorities having jurisdiction.
1.10 UTILITIES
No utility services will be provided by the Government.
1.11 OPERATIONAL PLAN
The Contractor shall develop and provide a written operational plan and warranties at move in. The operational plan shall include information on all emergency and regular operation of equipment supplied. Contact numbers and names, and locations of installation contractors, sub-contractors and
SECTION 01 11 00 Page 12 warranty providers shall be included in the operational plan. Contractor and/or vendor shall guarantee all labor, materials, and equipment for a period of one year after final acceptance of work.
PART 2 GENERAL SPECIFICATIONS
2.1 NEW PERMANENT BUILDING
All available manufacturer warranties shall be transferred to the Army Corps of Engineers. If manufacturer warranties are not available, a standard one-year warranty shall be provided by the Contractor on all furnishings and appliances listed in this section. Warranties shall start at final acceptance of the contract.
The building system shall be warranted by the Contractor on a no penal sum basis for a period of five years against materials and workmanship deficiencies; system deterioration caused by exposure to the elements and/or inadequate resistance to specified service design loads, water leaks, and wind uplift damage. The building system covered under this warranty shall include but is not limited to the following: framing and structural members, roofing and siding panels and seams, interior or exterior gutters and downspouts, accessories, fasteners, trim, flashings and miscellaneous building closure items such as doors (when furnished by the manufacturer), connectors, components, and fasteners, and other system components and assemblies installed to provide a weathertight system; and items specified in other sections of these specifications that become part of the building system. All material and workmanship deficiencies, system deterioration caused by exposure to the elements and/or inadequate resistance to specified service design loads, water leaks and wind uplift damage shall be repaired as approved by the Contracting Officer. See the attached Contractor's written warranty for issue resolution of warrantable defects. This warranty shall warrant and cover the entire cost of repair or replacement, including all material, labor, and related markups. The Contractor shall supplement this warranty with written warranties from the installer and/or system manufacturer, which shall be submitted along with Contractor's warranty. However, the Contractor is ultimately responsible for this warranty. The Contractor's written warranty shall be as outlined in attached WARRANTY FOR BUILDING SYSTEMS (paragraph 2.2) and start upon final acceptance of the facility. The Contractor shall provide a separate bond in an amount equal to the installed total building system cost in favor of the owner (Government) covering the Contractor's warranty responsibilities effective throughout the five year Contractor's warranty period for the entire metal building system as outlined above.
2.1.1 DESIGN CODES
The building and site shall be designed and constructed by the Contractor to meet all local, State, and Federal codes, inluding but not limited to:
International Building Code Unified Facilities Criteria Unified Facilities Guide Specifications Americans with Disabilities Act
AASHTO
PennDOT American Water Works Association National Fire Protection Act National Electric Code
SECTION 01 11 00 Page 13
International Plumbing Code
All building and site components/systems shall be designed and constructed in accordance with the documents listed above. The latest edition of these codes and standards in effect and amended as of the date of the Contractor's proposal will govern the design and selection of the building and site components/systems. The criteria from these sources may be supplemented but not supplanted by the applicable criteria contained in national recognized codes and standards. In case of conflict between these requirements, the most stringent will apply. References pertain to standard specifications of any technical society, organization or association, or to codes, manuals, regulations, specification, or tentative specification adopted and published at least 90 days prior to submittal of proposal, unless specifically stated otherwise. All submittals which are based on the Contractor's designs shall include design calculations, assumptions and design references used in preparing the designs.
If any requirements within this scope of work do not agree with required codes, it is the Contractor's responsibility to notify the Government. In the event of an inconsistency between specifications and codes, satisfying codes shall take precedence over specification requirements unless the specification exceeds code requirements.
2.1.2 STRUCTURE
2.1.2.1 Design Requirements
The building shall be designed by the manufacturer or a registered Professional Engineer(s) (Designer of Record) as a complete system. The Designer of Record shall be registered to practice in the particular professional field involved in a State or possession of the United States, in Puerto Rico, or the District of Columbia. If the building is a pre-engineered structure, a Professional Engineer is still required. All structural members and connections shall be the responsibility of the Designer of Record. All components of the system shall be specified by the Designer of Record. This includes, but is not limited to, components such as foundations, primary framing, secondary framing, and lateral bracing.
All drawings must be stamped by a Professional Engineer.
a. Design Code - Design load application shall be in accordance with:
International Building Code; ICC IBC
b. Dead Loads
c. Live Loads
d. Snow Loads
e. Wind Load
f. Collateral load shall include the weight of additional permanent materials other than the building system, such as doors, mechanical systems, and electrical systems. Equipment loads shall be shown on the shop (detail) drawings and the structure (frame, purlins, girts) shall be strengthened as required. The Contractor is responsible for providing the building manufacturer the magnitude and approximate location of all concentrated loads before design of the building commences.
SECTION 01 11 00 Page 14
g. Rainfall Intensity - Gutters and downspouts shall be 6-inches in diameter. Supports for gutters and downspouts shall be designed for the anticipated loads.
h. Seismic Performance - Design and engineer building system capable of withstanding the effects of earthquake motions determined according to ASCE/SEI 7-05, and the applicable portions of the building code in the geographic area where the construction will take place.
i. Site Conditions - There are no other structures in the immediate vicinity of the new buildings.
The Structural Building Drawings and Building Design Analysisshall be submitted for approval.
If any requirements within this scope of work do not agree with required codes, it is the Contractor's responsibility to notify the Government. In the event of an inconsistency between specifications and codes, satisfying codes shall take precedence over specification requirements unless the specification exceeds code requirements.
2.1.2.2 Foundation
The foundation shall consist of a concrete slab with all-concrete footers and foundation wall. The footing for the foundation shall be set at a depth below the frost line to prevent frost heave damage to the building, as shown on the drawings. The foundation shall be designed and installed by the Contractor and signed and stamped by a Professional Engineer certified in a State or possession of the United States, in Puerto Rico, or the District of Columbia. Soil data for foundation design is included as an attachment to this specification document. This data includes test pits from the existing soil conditions, as well as the design specifications for the fill that will be placed under an existing site development contract.
The Contractor shall estimate allowable bearing capacity for foundation design purposes based on the data provided with this solicitation, as well as the types of soil present in the area. The Contractor shall retain the services of a qualified Professional Engineer to verify that the soil or rock exposed at the foundation level during construction will have the bearing capacity assumed in the design.
The finished floor elevation for the building and the grade elevations around the building are shown on drawing C-3082. The finished floor elevation is approximate and can change, but must be above grade. The top of the slab-on-grade shall also be above grade.
If the flooring system includes floor joists, pressure-treated lumber must be used. Vents for moisture control in the voids between joists must be included, along with varmint controls. The subfloor must be double-layer tongue-and-groove with staggered joints. Utilities must be brought up through the slab-on-grade, and insulated/heated to prevent freezing. Once inside the building, utilities shall not be run below floor between joists.
Regardless of foundation system, a concrete slab-on-grade must be used.
Concrete steps and wheel chair ramp shall be provided for access.
SECTION 01 11 00 Page 15
The foundation shall include an aggregate subbase.
Foundation drains shall be furnished and installed. Drains shall drain to existing trapezoidal ditch. At drain termination at ditch, the Contractor shall furnish and install 2'x2'x3' thick concrete slopewall with varmint protection.
All foundation excavation, subgrade preparation/compaction, subbase aggregate, foundation drains and concrete foundation shall be designed, furnished and installed by the contractor. Excess material from excavation shall be disposed of in accordance with SECTION 02 42 00 DISPOSAL OF
MATERIALS.
The Foundation Detail Drawings and Foundation Design Analysis must be submitted for approvalinformation only within 4530 days of the NTP.
2.1.2.3 Building Location and Layout
The location and layout of the new building should be similar to that shown in the drawings. The dimensions of the building and interior rooms shall be designed and submitted by the offeror, but comply with the following requirements:
1. The building shall have a minimum approximate area of 2,100 square feet, and have approximate dimensions of 70 feet by 30 feet (plus or minus 5-feet for either dimension).
2. There shall be five (5) offices in the building with approximate locations as shown in the drawings. One corner office shall have a minimum area of 130 square feet. The four remaining offices shall have a minimum of 85 square feet.
3. There shall be one (1) conference room with a minimum area of 400 square feet.
4. There shall be one (1) communications room with a minimum area of 72 square feet.
5. There shall be one (1) plotter room with a minimum area of 50 square feet.
6. There shall be two (2) ADA compliant bathrooms, one (1) for men and one (1) for women, each with a minimum area of 45 square feet.
7. There shall be one (1) kitchen with a minimum area of 115 square feet.
8. There shall be one (1) storage room with a minimum area of 100 square feet.
9. The main entrance and reception area shall have a minimum area of 215 square feet.
10. There shall be a mechanical room with a minimum area of 144 square feet.
11. The interior ceiling height shall be a minimum of 8 feet.
SECTION 01 11 00 Page 16
2.1.3 MISCELLANEOUS CAST-IN-PLACE CONCRETE
See Specification Section 03 30 53.
2.1.4 ELECTRICAL
All electrical components shall be designed by the manufacturer or a registered Professional Engineer as a complete system. The Electrical designer shall be registered to practice in the particular professional field involved in the State or possesion of the United States, in Puerto Rico, or the District of Columbia. All electrical design drawings must be stamped by the electrical Professional Engineer. All components of the system shall be specified by the designer including, but not limited to electrical utilities, communications utilities, interior lighting, building electrical system, building communications system, fire alarm system, and security system.
The contractor shall submit Detail Drawings for Electrical System, Identification for Electrical Systems, Detail Drawings for Panelboards, Low-Voltage Distribution Schedule, Lighting Panelboard Schedule, and Lighting Fixture Schedule for approval. This shall be included in the 100% Design Drawings Package.
2.1.4.1 Standard Products
Unless otherwise approved in writing by the Contracting Officer, the equipment and materials to be furnished under this specification shall be standard products or manufacturers regularly engaged in the production of such equipment or materials and shall be the manufacturer's latest design.
2.1.4.2 Electrical Requirements for Parking Area
The Contractor shall furnish and install overhead power lines from nearby power panel/pole to feed new building.
The contractor shall furnish and install all underground wiring shown on the drawings.
The Contractor shall furnish and install a 30-FT high treated wood Utility Pole, class 7; and five (5) 3" GRS conduit with weatherhead for power cables to handhole and communication cables to telephone box inside building; as shown on drawings.
The Contractor shall furnish and install an electrical handhole as shown on drawings. Actual location of electrical handhole shall be field determined.
Furnish and install circuit wiring for parking area lighting from circuit greater 20A, 2P, 240V in new building .
Furnish and install conduit ductbank with 1"C for control and communication box.
Furnish and install fence and gate grounding at locations shown on drawings.
2.1.4.3 Electrical Requirements for Building
The contractor shall submit the Interior Lighting System, and Emergency Lighting System for approval.
SECTION 01 11 00 Page 17
Furnish and install the following conforming to NFPA 70:
Lighting Panelboard: minimum 200A, 120-240 VAC, 1-Phase, 3-Wire, main breaker panel with 42 single circuit spaces, NEMA 1 enclosure, surface mounted at Mechanical Room. Also, furnish and install 120/240 surge suppresor; similar or equal to Sycom 120/240-T2, Panamaz SEP-200 or APC SurgeArrest Panelmount; for lighting panel LP.
Circuit Breaker Box: 200A, 2P, 240 VAC. Allow at least 20 percent of circuit breakers for spare. Provide one (1) dedicated circuit for emergency exit sign fixtures and two (2) dedicated circuits for communications room.
Wire: Minimum #12AWG copper wire. Minimum size of conduit to be 3/4-inch.
Light Switches: Single Pole and 3-Way. Minimum amount and approximate locations as shown on drawings.
Three-Way Switches: 120 volt, 15 amp light switches.
Duplex Receptacles: 20A, 125 VAC, wall mounted and floor/ceiling mounted. Minimum amount and approximate locations as shown on drawings.
Telephone and Information Network Outlets: Wall mounted and floor mounted. Minimum amount and approximate locations as shown on drawings.
Type "A" Interior Light Fixtures: Ceiling recessed fluorescent light fixtures, 2x4 FT, with four (4) lamps, T8, normal ballasts, 120 VAC, 60 HZ. Minimum amount and approximate locations as shown on drawings.
Type "B" Interior Light Fixtures: Ceiling recessed fluorescent light fixtures, 2x4 FT, with four (4) lamps, T8, normal and emergency ballasts, 120 VAC, 60 HZ. Minimum amount and approximate locations as shown on drawings.
Type "C" Interior Light Fixtures: Ceiling surface mounted fluorescent light fixtures, 1x4 FT, wrap-around, with two (2) lamps, T8, normal ballasts. Minimum amount and approximate locations as shown on drawings.
Type "D" Interior Light Fixtures: Ceiling surface mounted fluorescent light fixtures, 1x4 FT, wrap-around, with two (2) lamps, T8, normal and emergency ballasts. Minimum amount and approximate locations as shown on drawings.
Type "B" and "D" shall be Emergency Lighting, as shown on the drawings.
Exhaust Fans: furnish and install at kitchen and bathrooms for ventilation. Fans shall operate on a separate switch from the lights and exhaust through the roof. Fans shall be sized by contractor to meet required exchange rates.
An exhaust fan shall be furnished and installed in the mechanical room. The fan shall operate in sequence with the furnace. The mechanical room shall be a conditioned space supplied by the furnace and exhausted by the exhaust fan through the roof.
Exit Signs: Combined LED exit sign with 2-head lights and battery
SECTION 01 11 00 Page 18 backup. Minimum amount and approximate locations as shown on drawings.
Type "L" Exterior Light Fixtures: furnish and install LED lighting similar or equal to LED Compact Wall-Pack Luminaire for Security Lighting, part No. WWL12-8X2W-XPW-001. Minimum amount and approximate locations as shown on drawings.
Light switch and receptacle cover colors shall be submitted by the contractor for approval.
All electrical hangers and supports, Splices and Connections, Outlets, Outlet Boxes, and Pull Boxes, Electrical Grounding and Bonding, conduits, raceway and fittings, and wire and cable shall be furnished and installed by the contractor.
The contractor shall submit an Interior Lighting Operating Test, Exterior Lighting Operating Test, and an Emergency Lighting Operating Test. All electrical and communications wiring and cables shall be tested within the building
2.1.4.3.1 Security & Fire System
The Contractor shall furnish and install 1"C EMT conduit connected to every wall recessed communication outlet box and up to above drop ceiling to protect network information cable inside the wall.
The Contractor shall furnish and install a complete electronic security fire alarm system in the new building. The security fire alarm system shall consist of a fire alarm control panel and signal input devices such as ionization smoke detection sensors, manual pull station, bi-magnet switch on entrance doors, magnetic contact intrusion detection on windows, and audible/visible warning alarm bell and strobe with associated wiring as required per NFPA 72 and NFPA 70. The security alarm shall be connected to the telephone dialer to send alarm signal to authorized security office for response. A coded key pad shall be furnished and installed near all entrance doors and accessible by personnel within 30 seconds after door opening.
The Contractor shall furnish and install cable tray type Flextray above ceiling for supporting communication cables. The location of the tray shall run close to top of walls for cables dropping from tray to communication outlet via conduit embedded inside wall. Cable tray shall be secured on the building structure utilizing threaded rods brackets, channels, and hardware per cable tray manufacturer's recommendations. The cable tray shall be used for supporting network and security fire alarm signal cables only. The cable tray shall be grounded as required per code.
The Contractor shall provide a Identification for Electronic Safety and Security Systems with layout of the circuit wiring diagrams of all lighting, power circuits, circuit breakers, fire alarm system, security system, and network/communications in the building to the Government for review prior to installation.
All required Security & Fire Cables and Security & Fire Grounding and Bonding shall be furnished and installed by the contractor.
2.1.4.4 Parking & Exterior Lighting
Furnish and install conduit ductbank with 1-1/2"C for parking area lighting.
SECTION 01 11 00 Page 19
Furnish and install circuit wiring for parking area lighting using an available circuit breaker 20A, 2P, 240V in existing power panel.
Furnish and install five (5) light poles and exterior lighting fixtures with grounding, as shown on the drawings.
2.1.4.5 Communications System
The Contractor shall furnish and install all required communications inside the building as described below. The Contractor shall furnish and install the underground communications conduit shown on the drawings with pull strings. No exterior communications cabling or connections are included in this contract.
The Contractor shall furnish and install all network outlets, network cabling and telephone cabling. Each outlet shall have a minimum of three
(3) functioning ports and be installed in the approximate locations shown on the drawings. Two (2) ports are to be wired for network/data/ VoIP transmission and one (1) for telephone. Cables shall be bundled and supported above ceiling, and ran through cable tray where possible. All network data communication cables and telephone communication cables shall home run to the Communications Room, where it shall be neatly bundled. Each cable and port shall be identified/labeled and tested by the Contractor.
The Contractor shall furnish and install a telephone box in the Communications Room in the approximate locations shown on the drawings. No serial port switches, routers, modems, or servers are included in this contract.
The contractor shall submit the Communications Detail Drawings, Identification for Communication Systems,Communications Grounding and Bonding, Pathways, Communications Hangers and Supports, Conduits and Backboxes, and Underground Ducts for approval.
2.1.5 MECHANICAL
All mechanical components shall be designed by the manufacturer or a registered Professional Engineer as a complete system. The Mechanical designer shall be registered to practice in the particular professional field involved in the State or possesion of the United States, in Puerto Rico, or the District of Columbia. All HVAC and plumbing design drawings must be stamped by a mechanical Professional Engineer. This may be the same person, provided they are qualified to design both systems. All components of the system shall be specified by the designer including, but not limited to mechanical utilities, mechanical/plumbing, building plumbing, and building HVAC system.
The mechanical following features shall be submitted for approval:
PLUMBING
Water Distribution Piping Natural Gas Piping Sewer Piping
Gages Valves Plumbing Hangers and Supports Pipe ID
SECTION 01 11 00 Page 20
HVAC
Provide detailed drawings indicating location and size of equipment for:
Central Heating System Central Cooling System
Provide detailed drawings of ductwork sizes and layout.
2.1.5.1 Water Service Line
A new service line shall be provided from the existing 1 1/2" diameter SDR21 PVC water line to the new building as shown on drawing M-8020. The waterline shall be installed with a minimum 48 inches of cover. The new service water piping shall be 1 1/2" dia. SDR 21 PVC pipe meeting the requirements of ASTM D 2241 and having an NSF No. 14 rating for potable water. Pipe joints shall be in accordance with ASTM D 3139. Elastomeric seals shall be in accordance with ASTM F 477. The service line from 12 inches above the building floor in the chase area to 10 feet beyond the building wall shall be 2" diameter Type "K" soft copper tubing meeting the requirements of ASTM B 88. Joints in the copper tubing under the building floor are not permitted. Bedding and initial backfill for the waterline shall be sand. Final backfill shall be select material in grass areas and AASHTO #57 under roads and parking areas. A 6-inch wide detectable ID marking tape shall be provided 12" below the ground surface above all new water lines. Concrete thrust blocks shall be provided on all Tee's, bends and plugs.
All piping penetrating the building concrete floor or foundation walls shall be provided with SCH 40 PVC pressure pipe sleeves. Voids between carier pipe and sleeves shall be filled with flexible waterproof sealant.
Sleeves through fire rated walls shall be sealed in accordance with NFPA.
If the foundation system includes a unconditioned space between the slab-on-grade and the finished floor, Utilities must be brought up through the slab-on-grade, and insulated/heated to prevent freezing. Once inside the building, utilities shall not be run below floor between joists.
Pressure and leakage testing shall be in accordance with AWWA C600. All potable water supply piping including building piping shall be disinfected in accordance with AWWA C651.
2.1.5.2 Building Piping
Potable water supply piping shall be type "L", hard drawn copper meeting the requirements of ASTM B 88. Supply piping shall be sloped to allow complete drainage. Drain valves shall be provided at all low points. Shut off valves shall be provided for all fixtures to enable isolation of fixtures for repair, allowing the remainder of the building fixtures to be operable. A gate or ball valve shall be provided where the water service Main enters the building. All supply piping shall be sized to provide adequate water pressure for operation of the fixtures with a minimum service line pressure of 25 PSI. Pipe Insulation shall be furnished and installed to satisfy codes, including ADA requirements under lavatories. A backflow preventer shall be provided on the service line in the mechanical room area prior to any branch circuits. A hose bib shall be provided in the Mechanical room. All piping shall be concealed within the service area.
Two (2) frost free hose bibs shall be provided to the exterior of the
SECTION 01 11 00 Page 21 building. One (1) hose bib shall be located on the front and rear of the office building. All fixtures shall be provided with an air gap, vacuum breaker or backflow preventer as required by the International Plumbing Code. All piping shall be installed in accordance with the National Plumbing Code.
2.1.5.3 Precast Manholes
2.1.5.3.1 General Requirements
Manholes shall be constructed precast concrete manhole sections. The invert channels shall be smooth and semicircular in shape conforming to the inside of the adjacent sewer section. Changes in direction of flow shall be made with a smooth curve of as large a radius as the size of the manhole will permit. Changes in size and grade of the channels shall be made gradually and evenly. The invert channels shall be formed directly in the concrete of the manhole base, or shall be built up with lean concrete.
Pipe connections shall be made to manhole using water stops, standard O-ring joints, special manhole coupling, or shall be made in accordance with the manufacturer's recommendation. The Contractor's proposed method of connection, list of materials selected, and specials required, shall be approved prior to installation. The floor of the manhole outside the channels shall be smooth and shall slope toward the channels not less than 1 inch per foot nor more than 2 inches per foot. Free drop inside the manholes shall not exceed 18 inches, measured from the invert of the inlet pipe to the top of the floor of the manhole outside the channels; drop manholes shall be constructed whenever the free drop would otherwise be greater than 1 foot 6 inches. Interior and exterior of manholes shall be coated with bituminous paint.
Precast concrete grade rings shall be used to adjust manhole frames to grade.
Manhole frames and covers shall be cast iron or ductile iron. Frames and covers shall be of type suitable for the application, circular, without vent holes. The frames and covers shall have a combined weight of not less than 400 pounds. The word "Sewer" shall be stamped or cast into covers so that it is plainly visible.
2.1.5.3.2 Steel Ladder Anchorage
Ladder shall be adequately anchored to the wall by means of steel inserts spaced not more than 6 feet apart vertically, and shall be installed to provide at least 7 inches of space between the wall and the rungs. The wall along the line of the ladder shall be vertical for its entire length.
2.1.5.3.3 Jointing, Plastering and Sealing
Mortar joints shall be completely filled and shall be smooth and free from surplus mortar on the inside of the manhole. Mortar and mastic joints between precast rings shall be full-bedded in jointing compound and shall be smoothed to a uniform surface on both the interior and exterior of the manhole. Installation of rubber gasket joints between precast rings shall be in accordance with the recommendations of the manufacturer. Precast rings may also be sealed by the use of extruded rolls of rubber with mastic adhesive on one side. Lifting holes shall also be filled with non-shrink grout.
SECTION 01 11 00 Page 22
2.1.5.3.4 Setting of Frames and Covers
Unless otherwise indicated, tops of frames and covers shall be set flush with finished grade in paved areas or 2 inches higher than finished grade in unpaved areas. Frame and cover assemblies shall be sealed to manhole sections using external preformed rubber joint seals that meet the requirements of ASTM D 412 and ASTM D 624, or other methods specified in paragraph Jointing, Plastering and Sealing, unless otherwise specified.
Grade surrounding ground to drain surface water away from covers.
2.1.5.3.5 External Preformed Rubber Joint Seals
External preformed rubber joint seals and extruded rolls of rubber with mastic adhesive shall meet the requirements of ASTM D 412 and ASTM C 972 to ensure conformance with paragraph Leakage Tests. The seal shall be multi-section with neoprene rubber top section and all lower sections made of Ethylene Propylene Di Monomer (EPDM) rubber with a minimum thickness of 60 mils. Each unit shall consist of a top and a bottom section and shall have mastic on the bottom of the bottom section and mastic on the top and bottom of the top section. The mastic shall be non-hardening butyl rubber sealant and shall seal to the cone/top slab of the manhole and over the lip of the casting. One unit shall seal a casting and up to six, 2 inch adjusting rings. The bottom section shall be 12 inches in height. A 6 inch high top section will cover up to two, 2 inch adjusting rings. A 12 inch high bottom section will cover up to six, 2 inch adjusting rings.
Extension sections shall cover up to two more adjusting rings. Each extension shall overlap the bottom section by 2 inches and shall be overlapped by the top section by 2 inches.
2…