U.S. ARMY ENGINEER DISTRICT, PITTSBURGH
ATTN CECT-LRP
W S MOORHEAD FEDERAL BUILDING
1000 LIBERTY AVENUE ROOM 2203
PITTSBURGH PA 15222-4186
W81ET493446422
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
Re: ARRA - Emsw orth Locks and Dam Back Channel Scour Protection and Left Abutment Stabilization
SEE SUMMARY OF CHANGES FOR AMENDMENT DETAILS
THE DATE AND TIME SPECIFIED FOR RECEIPT OF OFFERS REMAINS UNCHANGED AT 11:00 AM ON FEBRUARY 19, 2010.
1. CONTRACT ID CODE PAGE OF PAGES
J
FAR (48 CFR) 53.243
1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 08-Feb-2010
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911WN-10-B-0006
X 9B. DATED (SEE ITEM 11)
19-Jan-2010
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
08-Feb-2010
CODE
U.S. ARMY ENGINEER DISTRICT, PITTSBURGH
ATTN CECT-LRP
W S MOORHEAD FEDERAL BUILDING
1000 LIBERTY AVENUE ROOM 2203
PITTSBURGH PA 15222-4186
W911WN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE W911WN
FACILITY CODECODE
EMAIL:TEL:
W911WN-10-B-0006
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
This amendment is being issued to:
1. Change the address for the organization offers are to be sent to:
FROM:
U.S. ARMY ENGINEER DISTRICT, PITTSBURGH
ATTN CECT-LRP
W S MOORHEAD FEDERAL BUILDING
1000 LIBERTY AVENUE ROOM 2204
PITTSBURGH PA 15222-4186
TO:
U.S. ARMY ENGINEER DISTRICT, PITTSBURGH
ATTN CECT-LRP
W S MOORHEAD FEDERAL BUILDING
1000 LIBERTY AVENUE ROOM 2203
PITTSBURGH PA 15222-4186
2. Correct the Quantities/Unit for the following Line Items:
LINE ITEM FROM TO
0001AH 27,210 Cubic Yards 28,535 Cubic Yards
0001AU 70 Each 70 Linear Feet
0001BY 4 Each 544 Linear Feet
0001CR 320 Cubic Yards 1,645 Cubic Yards
0002AD 20,665 Cubic Yards 21,695 Cubic Yards
0002AN 2,665 Cubic Yards 3,695 Cubic Yards
3. Correct the extended description for Line Item 0001BY to read: ARRA – ABUTMENT
COMBINATION WALL, 42-INCH DIAMETER ROCK SOCKET
4. Correct the extended description for Line Item 0001CQ to read: ARRA – ABUTMENT WALL
REPAIR, INSTALL NEW HANDRAIL
5. Revise Instruction for Bidding Alternate Line Items to also inculde instructions for bidding Alternate Line Items 0002AP and 0002AQ.
6. Provide a conformed copy of the Bid Schedule that reflects all of the Line Item corrections and revisions incorporated by this Amendment 0001. Offerors are requested to use this conformed copy in bid preparation and submission.
7. Revise Clause 52.211-10, “Commencement, Prosecution, and Completion of Work”, as follows:
FROM: Completion within 540 calendar days after receiving the Notice to Proceed (NTP) TO: Completion within 630 calendar days after receiving the Notice to Proceed (NTP).
8. Revise Clause 52.214-4006, “Awardable Options (May 2005)”, as follows:
a. The date specified for making the determination to award the option items is changed:
FROM: June 30, 2010 TO: April 30, 2011
b. The calendar days specified for the extension of contract completion time for award of the option items is changed:
FROM: 540 calendar days TO: 450 calendar days
9. Provide responses to questions received.
10. Specification SECTION 31 05 19.19, GEOGRID REINFORCEMENT, is revised and is attached to this amendment.
11. Specification SECTION 31 73 00, UNDER APRON GROUTING, erroneously omitted from the specification package, is incorporated and attached to this amendment.
12. The Project Table of Contents has been updated to include Specification Section 31 73 00 and is attached to this amendment.
The following have been modified:
TOTALS
TOTAL, Base Contract, Items 0001AA thru 0001CT $______________________
TOTAL, Awardable Option, Items 0002AA thru 0002AQ $______________________
TOTAL, Base Contract plus Awadable Option, Items 0001AA thru 0002AQ
See Note Below
NOTE: INSTRUCTIONS FOR BIDDING ALTERNATE LINE ITEMS (0001CS and 0001CT, 0002AP and
0002AQ)
For Contract Line Items 0001CS and 0001CT, bidders are instructed to provide bid pricing for only ONE of these Line Items, either 0001CS OR 0001CT. DO NOT SUBMIT PRICING FOR BOTH OF THESE
ITEMS.
The same guidance is applicable to Line Items 0002AP and 0002AQ. Bidders are instructed to provide bid pricing for either 0002AP OR 0002AQ. DO NOT SUBMIT PRICING FOR BOTH OF THESE ITEMS.
For example, if Alternate 1 (Item 0001CS) is elected by a bidder, a unit price and total price will be entered for Item 0001CS and the bidder will enter N/A for 0001CT. If Alternate 2 (Item 0001CT) is elected by the bidder, a unit price and total price will be entered for Item 0001CT and the bidder will enter N/A for 0001CS.
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been modified:
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within ten (10) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 630 calendar days. The time stated for completion shall include final cleanup of the premises.
(End of clause)
52.214-4006 AWARDABLE OPTIONS (May 2005)
Only the basic contract items, Items Nos. 0001AA through 0001CT, will be awarded initially.
Awardable Option Items 0002AA thru 0002AQ will be made based upon availability and receipt of funds.
Awardable Option will be awarded as a group. The Not-to-Exceed amount for Item 0002AA should reflect bond costs for all awardable option items. The determination to award these awardable option items will be made no later than April 30, 2011.
The contract completion time will be extended 450 calendar days for award of these optional items.
QUESTIONS AND ANSWERS
Q1. I downloaded the plans and seems like there should be more information on the micropiles – details and plans. If there are any more plans, please provide them.
Additionally, if there are any available current Soils/Geotechnical Reports related to this project, please provide them.
A1. The plan sheets with information on the micropiles are as follows: S-1141, S-2142, S-3143, S-3144, and S-3147. Information on the micropiles is also in the specifications in Section 31 63 33.
The only current soils/geotechnical report is the HTRW Phase II report. The HTRW Phase II report is provided with this Amendment 0001.
Q2. I can not find any drawings for the Geotechnical Instrumentation. We are unable to determine location or quantity of instruments. Do these drawing exist for this project?
A2. By “Geotechnical” Instrumentation it is assumed that the section being referenced is 13 50
00. Sheet S-1141 shows the location and elevation of two tiltmeters.
Q3. On the Solicitation Sheets there are two items which have the same description and quantity. I believe they are doubled-up. They are Item Nos. 0001BX and 0001BY. Could you confirm this and make a change to the solicitation sheets if necessary.
A3. Line Item 0001BY has been corrected to read, “ARRA – ABUTMENT COMBINATION
WALL, 42-INCH DIAMETER ROCK SOCKET”
Q4. Division 31 Section 31 05 19.19, Referencing geogrid reinforcement: Requires 100 % UV resistance - Is this 100 % of the required design strength?
A4. The geogrid to be used in construction will need to have an allowable strength higher than the required design strength, as stated in Section 31 05 19.19 Para 2.1.1.1. The allowable strength is given in Table 1 in Section 31 05 19.19. Therefore, the answer to the question is: No, the 100% should be of the allowable strength. The 100% shown in Table 1 of Section 31 05
19.19 is incorrect. Section 31 05 19.19 has been revised.
Q5. On the Solicitation Sheets page 27 of 103, there is Item 0001CQ ARRA - Abutment Wall Repair, Install NE. Could you provide a better description? I'm not sure what the abbreviation NE is referring to.
A5. The description for Line Item 0001CQ has been corrected to read, “ARRA- ABUTMENT
WALL REPAIR, INSTALL NEW HANDRAIL”
Q6. Item 0001AU “Demolition of Posts and Cables” – Quantity/Units listed as “70 each”, should this be 70 Linear Feet?
A6. The Quantity for Item 0001AU should be 70 Linear Feet, not 70 Each. Line Item 0001AU has been corrected.
Q7. I do not find any specification for the drilling of the grout and vent holes on the existing dam apron (bid items 0001AP, 0002AK, 0001AQ, and 0002AL). Likewise, the specification Section 31 73 00 Under Apron Grouting, referenced in Subparagraph 1.2.12.1 Payment, on Page 15 of Section 01 22 00, has not been issued.
A7. Section 31 73 00 Under Apron Grouting was erroneously left out of the specification package posted with the solicitation. Section 31 73 00 is provided with this Amendment 0001.
(End of Summary of Changes)