ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 Lump Sum

ARRA FUNDED ITEMS

FFP

LEFT ABUTMENT STABILIZATION AND SCOUR PROTECTION IN GATE

BAYS 12 THROUGH 14

FOB: Destination

MILSTRIP: W81ET493446422

PURCHASE REQUEST NUMBER: W81ET493446422

NET AMT

0001AA 1 Lump Sum

ARRA - REIMBURSEMENT FOR ACTUAL

FFP

PERFORMANCE AND PAYMENT BOND PREMIUMS

FOB: Destination

0001AB 1 Lump Sum

ARRA - MOBILIZATION AND DEMOBILIZATION

FFP

0001AC 20 Set

ARRA - DIGITAL PROGRESS IMAGES

0001AD 1 Lump Sum

ARRA - PROJECT SIGNS

0001AE 1 Lump Sum

ARRA - SCOUR PROTECTION

FFP

DEMONSTRATION PROJECT

0001AF 5,265 Cubic

Yard

ARRA - SCOUR PPROTECTION, REMOVAL,

STAGING, AND REUSE OF EXISTING DERRICK STONE

0001AG 2,015 Cubic

ARRA - SCOUR PROTECTION, REMOVAL,

STAGING, AND REUSE OF EXISTING 3'-0" GRADED STONE LAYER

0001AH 28,535 Cubic

ARRA - SCOUR PROTECTION, DREDGING FOR

3H:1V SLOPE AND DISPOSAL

0001AJ 3,750 Square

ARRA - SCOUR PROTECTION, GEOGRID

REINFORCEMENT

0001AK 1,825 Cubic

ARRA - SCOUR PROTECTION

BEDDING MATERIAL

0001AL 5,195 Cubic

ARRA - SCOUR PROTECTION, FURNISH

AND INSTALL GROUT BAGS WITH ACCESSORIES AND GROUT INFILL

0001AM 250 Cubic

ARRA - SCOUR PROTECTION, CAST-IN-PLACE

APRON TIE-IN ELEMENT

0001AN 3 Each

ARRA - SCOUR PROTECTION, GROUT BAG

FFP

FLANK PROTECTION

0001AP 75 Linear

Foot

ARRA - EXISTING DAM APRON, DRILLING

OF GROUT HOLES

0001AQ 15 Linear

ARRA - EXISTING DAM APRON, DRILLING

OF VENT HOLES

0001AR 75 Cubic

ARRA - EXISTING DAM APRON

GROUT PLACEMENT

0001AS 1 Lump Sum

ARRA - INSTRUMENTATION -

FFP

INSTALLATION, MONITORING, DATA REDUCTION AND

INTERPRETATION, AND REPORTING

0001AT 1 Lump Sum

ARRA - LAYDOWN AND STAGING AREA

0001AU 70 Linear

ARRA - DEMOLITION OF POSTS AND CABLES

0001AV 214 Cubic

ARRA - EARTHWORK - WORK

PLATFORM BEHIND ABUTMENT WALL

0001AW 320 Square

ARRA - WORK PLATFORM, AGGREGATE

BASE COURSE

0001AX 320 Square

ARRA - WORK PLATFORM RESTORATION,

GROUTED R-3 RIPRAP OVER FS-1 FILTER STONE ON PLATFORM

0001AY 130 Linear

ARRA - WORK PLATFORM RESTORATION

0001AZ 110 Cubic

ARRA - NON-CONTAMINATED MATERIAL,

TEMPORARY STORAGE

0001BA 107 Cubic

ARRA - CONTAMINATED MATERIAL,

TEMPORARY STORAGE AND OFFSITE DISPOSAL

0001BB 1 Lump Sum

ARRA - CHEMICAL DATA QUALITY CONTROL

0001BC 468 Linear

ARRA - DRILLING HOLES IN CONCRETE FOR

7-INCH DIAMETER MICROPILES

0001BD 544 Linear

DRILLING HOLES IN SOIL

FOR 7-INCH DIAMETER MICROPILES

0001BE 428 Linear

ARRA - DRILLING HOLES IN ROCK FOR

7-INCH DIAMETER MICROPILES

0001BF 257 Sack

ARRA - PREGROUTING HOLES (ROCK SECTION)

FFP

FOR MICROPILES

0001BG 428 Linear

ARRA - REDRILLING GROUTED HOLES

FOR WATERTIGHTNESS TESTING FOR 7-INCH DIAMETER MICROPILES

0001BH 20 Each

ARRA - WATERTIGHTNESS TESTING FOR 7-INCH

FFP

DIAMATER MICROPILES

0001BJ 7 Each

ARRA - 7-INCH DIAMETER MICROPILES AT

FFP

LANDSIDE

0001BK 13 Each

ARRA - 7-INCH DIAMETER

FFP

MICROPILES AT RIVERSIDE

0001BL 2 Each

ARRA - ABANDONMENT OF HOLES FOR

FFP

MICROPILES AT LANDSIDE

0001BM 2 Each

ARRA - ABANDONMENT OF HOLES FOR

FFP

MICROPILES

0001BN 4 Each

ARRA - CLEAN OUT EXISTING WEEP HOLES

FFP

THROUGH ABUTMENT WALL

0001BP 4 Each

ARRA - DRILL NEW 4-INCH DIAMETER

FFP

WEEP HOLES THROUGH ABUTMENT WALL

0001BQ 342 Linear

ARRA - ABUTMENT COMBINATION WALL,

48-INCH DIAMETER BY 1/2-INCH THICK PIPE PILE/CASING, TOP EL.

695.0 (K1 TO K9)

0001BR 645 Linear

48-INCH DIAMETER BY 1/2-INCH THICK PIPE PILE/CASING, TOP EL.

700.0 (K10 TO K24)

0001BS 798 Linear

PZC 18 METAL SHEET PILING, TOP EL. 695.0 (K1 TO K9)

0001BT 1,204 Linear

PZC 18 METAL SHEET PILING, TOP EL. 700.0 (K10 TO K24)

0001BU 38 Linear

HP12X53 END PILE

0001BV 12 Each

ARRA - ABUTMENT COMBINATION WALL,

FFP

W33X263 KING PILE, TIP EL. 635.0 (PILES K1 TO K6 AND K19 TO K24)

0001BW 8 Each

ARRA - ABUTMENT COMBINATION WALL,

FFP

STIFFENED W33X263 KING PILE, TIP EL. 635.0 (PILES K7 TO K9 AND K14

TO K18)

0001BX 4 Each

ARRA - ABUTMENT COMBINATION WALL,

FFP

STIFFENED W33X263 KING PILE, TIP EL. 631.0 (PILES K10 TO K13)

0001BY 544 Linear

42-INCH DIAMETER ROCK SOCKET

0001BZ 637 Cubic

CONCRETE FOR SOCKETED PIPE PILES

0001CA 98 Cubic

REINFORCED CONCRETE CAP/SLAB

0001CB 94 Linear

ARRA - DRILLING CASED HOLES IN CONCRETE

FOR ROCK ANCHORS

0001CC 116 Linear

ARRA - DRILLING CASED HOLES IN SOIL

0001CD 522 Linear

ARRA - DRILLING HOLES IN ROCK

FOR ROCK ANCHORS (PARTLY CASED)

0001CE 313 Bag

ARRA - PREGROUTING HOLES (BOND ZONE)

FFP

0001CF 522 Linear

ARRA - REDRILLING GROUTED HOLES

FOR WATERTIGHTNESS TESTING OF ROCK ANCHORS

0001CG 6 Each

ARRA - WATERTIGHTNESS TESTING FOR

FFP

ROCK ANCHORS

0001CH 6 Each

ARRA - FURNISH AND INSTALL ROCK

FFP

ANCHORS (INCLUDING ALL COMPONENTS)

0001CJ 1 Each

ARRA - PERFORMANCE TESTS FOR ROCK

FFP

ANCHORS (INCLUDING ALL TEST COMPONENTS, RECORDS, DATA

REDUCTION, REPORTING, RETESTING, AND LIFTOFF AND LOCKOFF)

0001CK 5 Each

ARRA - PROOF TESTS FOR ROCK

FFP

ANCHORS (INCLUDING ALL TEST COMPONENTS, RECORDS, DATA

REDUCTION, REPORTING, RETESTING, AND LIFTOFF AND LOCKOFF)

0001CL 1 Lump Sum

ARRA - ABUTMENT COMBINATION WALL,

FFP

REPLACE SALVAGES GRADED RIPRAP AND DERRICK STONE AGAINST

ABUTMENT SECTION AND BEHIND SLOPE SECTION OF COMBINATION

WALL

0001CM 1 Lump Sum

ARRA - RESTORATION OF WORK PLATFORM AND

FFP

DISTURBED AREAS

0001CN 139 Cubic

ARRA - ABUTMENT WALL REPAIR AND

ROCK ANCHOR RECESSES, CONCRETE REMOVAL AND OTHER

DEMOLITION

0001CP 159 Cubic

ARRA - ABUTMENT WALL REPAIR,

DOWELED AND REINFORCED CONCRETE REPAIRS, ROCK ANCHOR

ENCASEMENT, AND MISCELLANEOUS CONCRETE REPAIR WORK

0001CQ 122 Linear

ARRA - ABUTMENT WALL REPAIR, INSTALL

NEW HANDRAIL

0001CR 1,645 Cubic

ARRA - DISPOSAL OF EXCESS

NON-CONTAMINATED MATERIAL AT COMMERCIALLY AVAILABLE,

PERMITTED FACILITY

0001CS 27,000 Cubic

ARRA - ALTERNATE 1

DISPOSAL OF NON-CONTAMINATED MATERIAL AT COMMERCIALLY

AVAILABLE, PERMITTED FACILITY

0001CT 27,000 Cubic

ARRA - ALTERNATE 2

DISPOSAL OF NON-CONTAMINATED MATERIAL AT PHILLIS ISLAND

MAIN CHANNEL AND GEORGETOWN ISLAND MAIN CHANNEL

DISPOSAL SITES

OPTION AWARDABLE OPTION - NON-ARRA FUNDED ITEMS

FFP

SCOUR PROTECTION IN GATE BAYS 9 THROUGH 11

0002AA 1 Lump Sum

REIMBURSEMENT FOR ACTUAL

FFP

PERFORMANCE AND PAYMENT BOND PREMIUMS, NON-ARRA

FUNDED ITEMS

0002AB 4,815 Cubic

SCOUR PROTECTION, REMOVAL,

STAGING, AND REUSE OF EXISTING DERRICK STONE

0002AC 1,530 Cubic

SCOUR PROTECTION, REMOVAL,

STAGING, AND REUSE OF EXISTING 3'-0" GRADED STONE LAYER

0002AD 21,695 Cubic

SCOUR PROTECTION, DREDGING

FOR 3H:1V SLOPE AND DISPOSAL

0002AE 3,485 Square

SCOUR PROTECTION,

GEOGRID REINFORCEMENT

0002AF 1,695 Cubic

SCOUR PROTECTION

BEDDING MATERIAL

0002AG 5,015 Cubic

FURNISH AND INSTALL GROUT BAGS WITH ACCESSORIES AND

GROUT INFILL

0002AH 260 Cubic

CAST-IN-PLACE APRON TIE-IN ELEMENT

0002AJ 3 Each

SCOUR PROTECTION,

FFP

GROUT BAG FLANK PROTECTION

0002AK 75 Linear

EXISTING DAM APRON, DRILLING

OF GROUT HOLES

0002AL 15 Linear

EXISTING DAM APRON, DRILLING

OF VENT HOLES

0002AM 75 Cubic

EXISTING DAM APRON,

GROUT PLACEMENT

0002AN 3,695 Cubic

DISPOSAL OF EXCESS

NON-CONTAMINATED MATERIAL AT COMMERCIALLY AVAILABLE,

PERMITTED FACILITY

0002AP 18,000 Cubic

ALTERNATE 1,

DISPOSAL OF NON-CONTAMINATED MATERIAL AT COMMERCIALLY

AVAILABLE, PERMITED FACILITY

0002AQ 18,000 Cubic

ALTERNATE 2,

DISPOSAL OF NON-CONTAMINATED MATERIAL AT PHILLIS ISLAND

BACK CHANNEL AND GEORGETOWN ISLAND BACK CHANNEL

DISPOSAL SITES

TOTALS

TOTAL, Base Contract, Items 0001AA thru 0001CT $______________________

TOTAL, Awardable Option, Items 0002AA thru 0002AQ $______________________

TOTAL, Base Contract plus Awadable Option, Items 0001AA thru 0002AQ

See Note Below

NOTE: INSTRUCTIONS FOR BIDDING ALTERNATE LINE ITEMS (0001CS and 0001CT, 0002AP and 0002AQ)

For Contract Line Items 0001CS and 0001CT, bidders are instructed to provide bid pricing for only ONE of these Line Items, either 0001CS OR 0001CT. DO NOT SUBMIT PRICING

FOR BOTH OF THESE ITEMS.

The same guidance is applicable to Line Items 0002AP and 0002AQ. Bidders are instructed to provide bid pricing for either 0002AP OR 0002AQ. DO NOT SUBMIT PRICING

FOR BOTH OF THESE ITEMS.

For example, if Alternate 1 (Item 0001CS) is elected by a bidder, a unit price and total price will be entered for Item 0001CS and the bidder will enter N/A for 0001CT. If Alternate 2 (Item 0001CT) is elected by the bidder, a unit price and total price will be entered for Item 0001CT and the bidder will enter N/A for 0001CS.

ALL QUANTITIES ARE ESTIMATED EXCEPT WHERE THE UNIT IS GIVEN AS LUMP SUM.

NOTE: ALL EXTENSIONS OF THE UNIT PRICES SHOWN WILL BE SUBJECT TO

VERIFICATION BY THE GOVERNMENT.

PLEASE DO NOT ROUND OFF TOTALS. IN CASE OF VARIATION BETWEEN THE UNIT PRICE

AND THE EXTENSION, THE UNIT PRICE WILL BE CONSIDERED TO BE THE BID. IF A

MODIFICATION TO A BID BASED ON UNIT PRICES IS SUBMITTED, WHICH PROVIDES FOR A

LUMP SUM ADJUSTMENT TO THE TOTAL ESTIMATED COST, THE APPLICATION OF THE

LUMP SUM ADJUSTMENT TO EACH UNIT PRICE IN THE BID SCHEDULE MUST BE STATED.

IF IT IS NOT STATED, THE BIDDER AGREES THAT THE LUMP SUM ADJUSTMENT SHALL BE

APPLIED ON A PRORATA BASIS TO EVERY UNIT PRICE IN THE BID SCHEDULE.

The following is a list of abbreviations and their meanings as used in the price schedule under U/M (units of measure):

CD Cubic Yards LF Linear Feet LS Lump Sum SY Square Yards ST Short Ton EA Each

File details come from the government source that posted it. Updated .