Conformed Price Schedule_Amd 0001.pdf
PDF 168 KB Posted
- Solicitation number
- W911WN10B0006
About this file
Conformed Bid Schedule per Amendment 0001. Bidders are requested to use this conformed bid schedule in preparing and submitting bids.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 Lump Sum
ARRA FUNDED ITEMS
FFP
LEFT ABUTMENT STABILIZATION AND SCOUR PROTECTION IN GATE
BAYS 12 THROUGH 14
FOB: Destination
MILSTRIP: W81ET493446422
PURCHASE REQUEST NUMBER: W81ET493446422
NET AMT
0001AA 1 Lump Sum
ARRA - REIMBURSEMENT FOR ACTUAL
FFP
PERFORMANCE AND PAYMENT BOND PREMIUMS
FOB: Destination
0001AB 1 Lump Sum
ARRA - MOBILIZATION AND DEMOBILIZATION
FFP
0001AC 20 Set
ARRA - DIGITAL PROGRESS IMAGES
0001AD 1 Lump Sum
ARRA - PROJECT SIGNS
0001AE 1 Lump Sum
ARRA - SCOUR PROTECTION
FFP
DEMONSTRATION PROJECT
0001AF 5,265 Cubic
Yard
ARRA - SCOUR PPROTECTION, REMOVAL,
STAGING, AND REUSE OF EXISTING DERRICK STONE
0001AG 2,015 Cubic
ARRA - SCOUR PROTECTION, REMOVAL,
STAGING, AND REUSE OF EXISTING 3'-0" GRADED STONE LAYER
0001AH 28,535 Cubic
ARRA - SCOUR PROTECTION, DREDGING FOR
3H:1V SLOPE AND DISPOSAL
0001AJ 3,750 Square
ARRA - SCOUR PROTECTION, GEOGRID
REINFORCEMENT
0001AK 1,825 Cubic
ARRA - SCOUR PROTECTION
BEDDING MATERIAL
0001AL 5,195 Cubic
ARRA - SCOUR PROTECTION, FURNISH
AND INSTALL GROUT BAGS WITH ACCESSORIES AND GROUT INFILL
0001AM 250 Cubic
ARRA - SCOUR PROTECTION, CAST-IN-PLACE
APRON TIE-IN ELEMENT
0001AN 3 Each
ARRA - SCOUR PROTECTION, GROUT BAG
FFP
FLANK PROTECTION
0001AP 75 Linear
Foot
ARRA - EXISTING DAM APRON, DRILLING
OF GROUT HOLES
0001AQ 15 Linear
ARRA - EXISTING DAM APRON, DRILLING
OF VENT HOLES
0001AR 75 Cubic
ARRA - EXISTING DAM APRON
GROUT PLACEMENT
0001AS 1 Lump Sum
ARRA - INSTRUMENTATION -
FFP
INSTALLATION, MONITORING, DATA REDUCTION AND
INTERPRETATION, AND REPORTING
0001AT 1 Lump Sum
ARRA - LAYDOWN AND STAGING AREA
0001AU 70 Linear
ARRA - DEMOLITION OF POSTS AND CABLES
0001AV 214 Cubic
ARRA - EARTHWORK - WORK
PLATFORM BEHIND ABUTMENT WALL
0001AW 320 Square
ARRA - WORK PLATFORM, AGGREGATE
BASE COURSE
0001AX 320 Square
ARRA - WORK PLATFORM RESTORATION,
GROUTED R-3 RIPRAP OVER FS-1 FILTER STONE ON PLATFORM
0001AY 130 Linear
ARRA - WORK PLATFORM RESTORATION
0001AZ 110 Cubic
ARRA - NON-CONTAMINATED MATERIAL,
TEMPORARY STORAGE
0001BA 107 Cubic
ARRA - CONTAMINATED MATERIAL,
TEMPORARY STORAGE AND OFFSITE DISPOSAL
0001BB 1 Lump Sum
ARRA - CHEMICAL DATA QUALITY CONTROL
0001BC 468 Linear
ARRA - DRILLING HOLES IN CONCRETE FOR
7-INCH DIAMETER MICROPILES
0001BD 544 Linear
DRILLING HOLES IN SOIL
FOR 7-INCH DIAMETER MICROPILES
0001BE 428 Linear
ARRA - DRILLING HOLES IN ROCK FOR
7-INCH DIAMETER MICROPILES
0001BF 257 Sack
ARRA - PREGROUTING HOLES (ROCK SECTION)
FFP
FOR MICROPILES
0001BG 428 Linear
ARRA - REDRILLING GROUTED HOLES
FOR WATERTIGHTNESS TESTING FOR 7-INCH DIAMETER MICROPILES
0001BH 20 Each
ARRA - WATERTIGHTNESS TESTING FOR 7-INCH
FFP
DIAMATER MICROPILES
0001BJ 7 Each
ARRA - 7-INCH DIAMETER MICROPILES AT
FFP
LANDSIDE
0001BK 13 Each
ARRA - 7-INCH DIAMETER
FFP
MICROPILES AT RIVERSIDE
0001BL 2 Each
ARRA - ABANDONMENT OF HOLES FOR
FFP
MICROPILES AT LANDSIDE
0001BM 2 Each
ARRA - ABANDONMENT OF HOLES FOR
FFP
MICROPILES
0001BN 4 Each
ARRA - CLEAN OUT EXISTING WEEP HOLES
FFP
THROUGH ABUTMENT WALL
0001BP 4 Each
ARRA - DRILL NEW 4-INCH DIAMETER
FFP
WEEP HOLES THROUGH ABUTMENT WALL
0001BQ 342 Linear
ARRA - ABUTMENT COMBINATION WALL,
48-INCH DIAMETER BY 1/2-INCH THICK PIPE PILE/CASING, TOP EL.
695.0 (K1 TO K9)
0001BR 645 Linear
48-INCH DIAMETER BY 1/2-INCH THICK PIPE PILE/CASING, TOP EL.
700.0 (K10 TO K24)
0001BS 798 Linear
PZC 18 METAL SHEET PILING, TOP EL. 695.0 (K1 TO K9)
0001BT 1,204 Linear
PZC 18 METAL SHEET PILING, TOP EL. 700.0 (K10 TO K24)
0001BU 38 Linear
HP12X53 END PILE
0001BV 12 Each
ARRA - ABUTMENT COMBINATION WALL,
FFP
W33X263 KING PILE, TIP EL. 635.0 (PILES K1 TO K6 AND K19 TO K24)
0001BW 8 Each
ARRA - ABUTMENT COMBINATION WALL,
FFP
STIFFENED W33X263 KING PILE, TIP EL. 635.0 (PILES K7 TO K9 AND K14
TO K18)
0001BX 4 Each
ARRA - ABUTMENT COMBINATION WALL,
FFP
STIFFENED W33X263 KING PILE, TIP EL. 631.0 (PILES K10 TO K13)
0001BY 544 Linear
42-INCH DIAMETER ROCK SOCKET
0001BZ 637 Cubic
CONCRETE FOR SOCKETED PIPE PILES
0001CA 98 Cubic
REINFORCED CONCRETE CAP/SLAB
0001CB 94 Linear
ARRA - DRILLING CASED HOLES IN CONCRETE
FOR ROCK ANCHORS
0001CC 116 Linear
ARRA - DRILLING CASED HOLES IN SOIL
0001CD 522 Linear
ARRA - DRILLING HOLES IN ROCK
FOR ROCK ANCHORS (PARTLY CASED)
0001CE 313 Bag
ARRA - PREGROUTING HOLES (BOND ZONE)
FFP
0001CF 522 Linear
ARRA - REDRILLING GROUTED HOLES
FOR WATERTIGHTNESS TESTING OF ROCK ANCHORS
0001CG 6 Each
ARRA - WATERTIGHTNESS TESTING FOR
FFP
ROCK ANCHORS
0001CH 6 Each
ARRA - FURNISH AND INSTALL ROCK
FFP
ANCHORS (INCLUDING ALL COMPONENTS)
0001CJ 1 Each
ARRA - PERFORMANCE TESTS FOR ROCK
FFP
ANCHORS (INCLUDING ALL TEST COMPONENTS, RECORDS, DATA
REDUCTION, REPORTING, RETESTING, AND LIFTOFF AND LOCKOFF)
0001CK 5 Each
ARRA - PROOF TESTS FOR ROCK
FFP
ANCHORS (INCLUDING ALL TEST COMPONENTS, RECORDS, DATA
REDUCTION, REPORTING, RETESTING, AND LIFTOFF AND LOCKOFF)
0001CL 1 Lump Sum
ARRA - ABUTMENT COMBINATION WALL,
FFP
REPLACE SALVAGES GRADED RIPRAP AND DERRICK STONE AGAINST
ABUTMENT SECTION AND BEHIND SLOPE SECTION OF COMBINATION
WALL
0001CM 1 Lump Sum
ARRA - RESTORATION OF WORK PLATFORM AND
FFP
DISTURBED AREAS
0001CN 139 Cubic
ARRA - ABUTMENT WALL REPAIR AND
ROCK ANCHOR RECESSES, CONCRETE REMOVAL AND OTHER
DEMOLITION
0001CP 159 Cubic
ARRA - ABUTMENT WALL REPAIR,
DOWELED AND REINFORCED CONCRETE REPAIRS, ROCK ANCHOR
ENCASEMENT, AND MISCELLANEOUS CONCRETE REPAIR WORK
0001CQ 122 Linear
ARRA - ABUTMENT WALL REPAIR, INSTALL
NEW HANDRAIL
0001CR 1,645 Cubic
ARRA - DISPOSAL OF EXCESS
NON-CONTAMINATED MATERIAL AT COMMERCIALLY AVAILABLE,
PERMITTED FACILITY
0001CS 27,000 Cubic
ARRA - ALTERNATE 1
DISPOSAL OF NON-CONTAMINATED MATERIAL AT COMMERCIALLY
AVAILABLE, PERMITTED FACILITY
0001CT 27,000 Cubic
ARRA - ALTERNATE 2
DISPOSAL OF NON-CONTAMINATED MATERIAL AT PHILLIS ISLAND
MAIN CHANNEL AND GEORGETOWN ISLAND MAIN CHANNEL
DISPOSAL SITES
OPTION AWARDABLE OPTION - NON-ARRA FUNDED ITEMS
FFP
SCOUR PROTECTION IN GATE BAYS 9 THROUGH 11
0002AA 1 Lump Sum
REIMBURSEMENT FOR ACTUAL
FFP
PERFORMANCE AND PAYMENT BOND PREMIUMS, NON-ARRA
FUNDED ITEMS
0002AB 4,815 Cubic
SCOUR PROTECTION, REMOVAL,
STAGING, AND REUSE OF EXISTING DERRICK STONE
0002AC 1,530 Cubic
SCOUR PROTECTION, REMOVAL,
STAGING, AND REUSE OF EXISTING 3'-0" GRADED STONE LAYER
0002AD 21,695 Cubic
SCOUR PROTECTION, DREDGING
FOR 3H:1V SLOPE AND DISPOSAL
0002AE 3,485 Square
SCOUR PROTECTION,
GEOGRID REINFORCEMENT
0002AF 1,695 Cubic
SCOUR PROTECTION
BEDDING MATERIAL
0002AG 5,015 Cubic
FURNISH AND INSTALL GROUT BAGS WITH ACCESSORIES AND
GROUT INFILL
0002AH 260 Cubic
CAST-IN-PLACE APRON TIE-IN ELEMENT
0002AJ 3 Each
SCOUR PROTECTION,
FFP
GROUT BAG FLANK PROTECTION
0002AK 75 Linear
EXISTING DAM APRON, DRILLING
OF GROUT HOLES
0002AL 15 Linear
EXISTING DAM APRON, DRILLING
OF VENT HOLES
0002AM 75 Cubic
EXISTING DAM APRON,
GROUT PLACEMENT
0002AN 3,695 Cubic
DISPOSAL OF EXCESS
NON-CONTAMINATED MATERIAL AT COMMERCIALLY AVAILABLE,
PERMITTED FACILITY
0002AP 18,000 Cubic
ALTERNATE 1,
DISPOSAL OF NON-CONTAMINATED MATERIAL AT COMMERCIALLY
AVAILABLE, PERMITED FACILITY
0002AQ 18,000 Cubic
ALTERNATE 2,
DISPOSAL OF NON-CONTAMINATED MATERIAL AT PHILLIS ISLAND
BACK CHANNEL AND GEORGETOWN ISLAND BACK CHANNEL
DISPOSAL SITES
TOTALS
TOTAL, Base Contract, Items 0001AA thru 0001CT $______________________
TOTAL, Awardable Option, Items 0002AA thru 0002AQ $______________________
TOTAL, Base Contract plus Awadable Option, Items 0001AA thru 0002AQ
See Note Below
NOTE: INSTRUCTIONS FOR BIDDING ALTERNATE LINE ITEMS (0001CS and 0001CT, 0002AP and 0002AQ)
For Contract Line Items 0001CS and 0001CT, bidders are instructed to provide bid pricing for only ONE of these Line Items, either 0001CS OR 0001CT. DO NOT SUBMIT PRICING
FOR BOTH OF THESE ITEMS.
The same guidance is applicable to Line Items 0002AP and 0002AQ. Bidders are instructed to provide bid pricing for either 0002AP OR 0002AQ. DO NOT SUBMIT PRICING
FOR BOTH OF THESE ITEMS.
For example, if Alternate 1 (Item 0001CS) is elected by a bidder, a unit price and total price will be entered for Item 0001CS and the bidder will enter N/A for 0001CT. If Alternate 2 (Item 0001CT) is elected by the bidder, a unit price and total price will be entered for Item 0001CT and the bidder will enter N/A for 0001CS.
ALL QUANTITIES ARE ESTIMATED EXCEPT WHERE THE UNIT IS GIVEN AS LUMP SUM.
NOTE: ALL EXTENSIONS OF THE UNIT PRICES SHOWN WILL BE SUBJECT TO
VERIFICATION BY THE GOVERNMENT.
PLEASE DO NOT ROUND OFF TOTALS. IN CASE OF VARIATION BETWEEN THE UNIT PRICE
AND THE EXTENSION, THE UNIT PRICE WILL BE CONSIDERED TO BE THE BID. IF A
MODIFICATION TO A BID BASED ON UNIT PRICES IS SUBMITTED, WHICH PROVIDES FOR A
LUMP SUM ADJUSTMENT TO THE TOTAL ESTIMATED COST, THE APPLICATION OF THE
LUMP SUM ADJUSTMENT TO EACH UNIT PRICE IN THE BID SCHEDULE MUST BE STATED.
IF IT IS NOT STATED, THE BIDDER AGREES THAT THE LUMP SUM ADJUSTMENT SHALL BE
APPLIED ON A PRORATA BASIS TO EVERY UNIT PRICE IN THE BID SCHEDULE.
The following is a list of abbreviations and their meanings as used in the price schedule under U/M (units of measure):
CD Cubic Yards LF Linear Feet LS Lump Sum SY Square Yards ST Short Ton EA Each
File details come from the government source that posted it. Updated .