About this file

Updated Specification Project Table of Contents

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Emsworth L/D - Back Channel Left Abutment Stabilization and Scour Protection

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 GENERAL REQUIREMENTS

01 14 19.10 CSX TRANSPORTATION RAILROAD REQUIREMENTS

01 18 00 UTILITY COORDINATIONS

01 22 00.00 10 MEASUREMENT AND PAYMENT

01 32 01.00 10 PROJECT SCHEDULE

01 32 23 SURVEY AND ALIGNMENT CONTROL

01 32 33 DIGITAL PROGRESS IMAGES

01 33 00 SUBMITTAL PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 35 45.00 10 CHEMICAL DATA QUALITY CONTROL

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 01.10 USACE QUALITY CONTROL SYSTEM (QCS)

01 45 01 USACE QUALITY CONTROL

01 50 10 PROJECT AND SAFETY SIGNS

01 57 20.00 10 ENVIRONMENTAL PROTECTION

01 57 23 STORM WATER POLLUTION PREVENTION MEASURES

01 78 02.00 15 CLOSEOUT SUBMITTALS

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

02 42 00 DISPOSAL OF MATERIALS

02 61 13 EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL

DIVISION 03 - CONCRETE

03 11 14.00 10 FORMWORK FOR CONCRETE

03 15 14.00 10 MONOLITH, CONTROL, AND CONSTRUCTION JOINTS

03 20 02 STEEL BARS, WELDED WIRE FABRIC, AND ACCESSORIES FOR

CONCRETE REINFORCEMENT

03 31 01.00 10 CONCRETE AND OTHER CONCRETE SECTIONS

03 37 26 CONCRETE FOR SOCKETED PIPE PILES

DIVISION 05 - METALS

05 50 14 STRUCTURAL METAL FABRICATIONS

05 50 15 CIVIL WORKS FABRICATIONS

DIVISION 13 - SPECIAL CONSTRUCTION

13 50 00 INSTRUMENTATION

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

31 05 19.19 GEOGRID REINFORCEMENT

31 05 22 GEOTEXTILES USED AS FILTERS

31 62 16.13 METAL SHEET PILING AND WALL TERMINATION COLUMNS

31 62 23.13 SOCKETED PIPE PILES

31 63 33 MICROPILES

31 68 13 PERMANENT INCLINED ROCK ANCHORS

31 73 00 UNDER APRON GROUTING

DIVISION 32 - EXTERIOR IMPROVEMENTS

PROJECT TABLE OF CONTENTS Page 1 W911WN-10-B-0006 Added by Amendment 0001

Emsworth L/D - Back Channel Left Abutment Stabilization and Scour Protection

32 11 23 AGGREGATE BASE COURSE

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

35 20 23 DREDGING

35 31 19.15 GEORGETOWN AND PHILLIS ISLAND BANK PROTECTION AND DREDGE

MATERIALS DISPOSAL

35 31 19 STONE SLOPE AND SCOUR PROTECTION

35 43 29.15 GROUT BAG DEMONSTRATION PROJECT

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 2 W911WN-10-B-0006 Added by Amendment 0001

PROJECT TABLE OF CONTENTS

File details come from the government source that posted it. Updated .