PA080004.pdf
PDF 53 KB Posted
- Attached to
- Braddock Tow Hauling System Federal contract opportunity
- Solicitation number
- W911WN09B0023
About this file
General Decision Number PA08004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| BID RESULTS.doc | DOC document | |
| 41 24 40.pdf | ||
| 33 40 15.pdf | ||
| 01 22 00.00 10.pdf | ||
| W911WN-09-B-0023-0001.pdf | ||
| Conformed Price Schedule.pdf | ||
| W911WN-09-B-0023-0001.zip | ZIP file | |
| Braddock Tow Haul Site Visit Attendence Register.doc | DOC document | |
| W911WN-09-B-0023.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Decision Number: PA080004 07/24/2009 PA4
Superseded General Decision Number: PA20070004
State: Pennsylvania
Construction Types: Heavy and Highway
Counties: Allegheny, Armstrong, Beaver, Bedford, Blair, Butler, Cambria, Cameron, Centre, Clarion, Clearfield, Clinton, Crawford, Elk, Erie, Fayette, Forest, Franklin, Fulton, Greene, Huntingdon, Indiana, Jefferson, Lawrence, McKean, Mercer, Mifflin, Potter, Somerset, Venango, Warren, Washington and Westmoreland Counties in Pennsylvania.
HEAVY AND HIGHWAY CONSTRUCTION PROJECTS (excluding sewer grouting projects and excluding sewage and water treatment plant projects)
Modification Number Publication Date 0 02/08/2008 1 02/22/2008 2 03/07/2008 3 03/21/2008 4 04/11/2008 5 05/30/2008 6 06/20/2008 7 06/27/2008 8 07/04/2008 9 07/18/2008 10 09/19/2008 11 10/03/2008 12 10/24/2008 13 11/07/2008 14 11/28/2008 15 12/05/2008 16 12/12/2008 17 12/19/2008 18 12/26/2008 19 01/02/2009 20 02/27/2009 21 03/06/2009 22 04/03/2009 23 04/17/2009 24 04/24/2009 25 05/01/2009 26 06/05/2009 27 06/12/2009 28 06/26/2009 29 07/03/2009 30 07/10/2009 31 07/24/2009
BOIL0013-005 09/30/2008
CENTRE, FRANKLIN, POTTER, CLINTON, FULTON, HUNTINDON AND
MIFFLIN COUNTIES
Rates Fringes
BOILERMAKER......................$ 38.81 25.26
BOIL0154-004 06/01/2008
ALLEGHENY, ARMSTRONG, BEAVER, BEDFORD, BLAIR, BUTLER, CAMBRIA,
CAMERON, CLARION, CLEARFIELD, CRAWFORD, ELK, FAYETTE, FOREST,
GREENE, INDIANA, JEFFERSON, LAWRENCE, MCKEAN, MERCER, SOMERSET,
VENANGO, WARREN, WASHINGTON AND WESTMORELAND COUNTIES
BOILERMAKER......................$ 33.90 22.07
BOIL0744-003 07/01/2008
ERIE COUNTY
Rates Fringes
BOILERMAKER......................$ 35.34 18.48
BRPA0009-023 12/01/2008
BEAVER COUNTY
Rates Fringes
BRICKLAYER.......................$ 25.95 13.60
BRPA0009-024 12/01/2008
WASHINGTON (Cross Creek, Hanover, Jefferson, Mt Pleasant, Nottingham, Peters, Robinson, Smith, Union Twps) COUNTY
BRICKLAYER.......................$ 27.98 13.22
BRPA0009-025 12/01/2008
BUTLER, LAWRENCE, AND MERCER COUNTIES
Rates Fringes
BRICKLAYER.......................$ 25.95 13.48
BRPA0009-032 12/01/2008
FAYETTE (Jefferson & Washington Twps), GREENE (Except Cumberland, Dunkirk, Greene, Monongahelia Twps), INDIANA, AND WESTMORELAND (Rostraver Twp) COUNTIES
BRICKLAYER.......................$ 26.90 13.64
BRPA0009-033 12/01/2008
ARMSTRONG, CLARION (Brady, Madison, Perry, Tobe, Porter, Redbank Twps), FAYETTE (Except Jefferson & Washington Twps), GREENE (Cumberland, Dunkirk, Greene, Monongahelia Twps), INDIANA, AND WESTMORELAND (Except Rostrave Twp) COUNTIES
BRICKLAYER.......................$ 27.02 13.52
BRPA0009-034 05/01/2009
ERIE COUNTY
Rates Fringes
BRICKLAYER.......................$ 24.87 13.99
CARP2235-005 01/01/2009
PILEDRIVERMAN
Piledriverman (welder)......$ 29.15 12.10 Piledriverman...............$ 28.85 12.10
CARP2235-006 01/01/2007
Rates Fringes
Diver............................$ 40.40 10.77 Tender...........................$ 26.93 10.77
CARP2274-001 01/01/2009
Rates Fringes
CARPENTER (ALLEGHENY,
ARMSTRONG, BEAVER, BUTLER,
ERIE, FAYETTE, GREENE,
LAWRENCE, MERCER, WASHINGTON,
AND WESTMORELAND COUNTIES)
Carpenter (Welders).........$ 28.23 12.16 Carpenters..................$ 27.53 12.16
CARPENTER (BEDFORD, BLAIR,
CAMBRIA, CAMERON, CENTRE,
CLARION, CLINTON, CLEARFIELD,
CRAWFORD, ELK, FOREST,
FRANKLIN, FULTON, HUNTINGDON,
INDIANA, JEFFERSON, MCKEAN,
MIFFLIN, POTTER, SOMERSET,
VENANGO, AND WARREN COUNTIES)
Carpenters (Welders).......$ 27.99 12.16 Carpenters..................$ 27.28 12.16
ELEC0005-006 12/26/2008
ALLEGHENY, ARMSTRONG, BEDFORD, BLAIR, BUTLER CAMBRIA, CAMERON,
CENTRE (Remainder), CLARION, CLEARFIELD, ELK, FAYETTE, FULTON, GREENE, HUNTINGDON, INDIANA, JEFFERSON, MCKEAN, SOMERSET, VENANGO, WASHINGTON, AND WESTMORELAND COUNTIES
ELECTRICIAN......................$ 33.11 3%+$15.65
ELEC0056-004 06/01/2009
ERIE, FOREST AND WARREN COUNTIES
Rates Fringes
ELECTRICIAN......................$ 25.90 3%+16.32
ELEC0126-005 06/01/2008
ALLEGHENY, ARMSTRONG, BEAVER, BEDFORD, BLAIR, CAMBRIA, CENTRE,
CLARION, CLEARFIELD, FAYETTE, FULTON, GREENE, HUNTINGDON,
INDIANA, JEFFERSON, SOMERSET, WASHINGTON AND WESTMORELAND
Line Construction:
Groundman...................$ 21.22 26%+5.55 Lineman.....................$ 37.45 26%+5.55 Truck Driver................$ 23.09 26%+5.55 Winch Truck Operator........$ 24.96 26%+5.55
ELEC0126-007 06/01/2008
FRANKLIN AND MIFFLIN COUNTIES
Rates Fringes
Line Construction:
Groundman...................$ 19.63 26%+5.55 Lineman.....................$ 34.65 26%+5.55 Truck Driver................$ 21.36 26%+5.55 Winch Truck Operator........$ 23.10 26%+5.55
ELEC0143-007 06/01/2009
FRANKLIN and MIFFLIN COUNTIES
Rates Fringes
ELECTRICIAN......................$ 27.20 14.69
ELEC0712-003 03/02/2009
CRAWFORD, BEAVER, LAWRENCE AND MERCER COUNTIES
Rates Fringes
ELECTRICIAN......................$ 29.20 17.48
ELEC0812-008 06/01/2007
CLINTON COUNTY
Rates Fringes
ELECTRICIAN......................$ 24.34 14.58
ELEC0812-009 06/01/2007
POTTER COUNTY
Rates Fringes
ELECTRICIAN......................$ 25.35 14.61
ELEC0812-011 06/01/2007
CENTRE COUNTY (Burnside, Curtin, Liberty, Howard, Marion, Walker, Miles, Haines Townships)
ELECTRICIAN......................$ 25.35 14.61
ELEC1319-004 08/31/2008
BUTLER, CAMERON, CLINTON, CRAWFORD, ELK, ERIE, FOREST,
LAWRENCE, MCKEAN, MERCER, VENANGO, WARREN AND POTTER COUNTIES
Line Construction:
Groundman...................$ 24.53 17.13 Heavy Equipment Operator....$ 39.17 17.13 Lineman.....................$ 39.57 17.13 Truck Drivers...............$ 25.72 17.13
ENGI0066-016 01/01/2009
Power equipment operators:
(ALLEGHENY, ARMSTRONG,
BEAVER, BLAIR, BUTLER,
CAMBRIA, CENTRE, CLARION,
CLEARFIELD, CRAWFORD, ERIE,
ELK, FAYETTE, GREENE,
INDIANA, JEFFERSON, LAWRENCE,
MCKEAN, MERCER, SOMERSET,
VENANGO, WARREN, WASHINGTON,
AND WESTMORELAND COUNTIES)
GROUP 1.....................$ 26.38 14.44
GROUP 2.....................$ 26.12 14.44
GROUP 3.....................$ 22.47 14.44
GROUP 4.....................$ 22.01 14.44
GROUP 5.....................$ 21.76 14.44
Power equipment operators:
(BEDFORD, CAMERON, CLINTON,
FOREST, FRANKLIN, FULTON,
HUNTINGDON, MIFFLIN, AND
POTTER COUNTIES)
GROUP 1.....................$ 26.09 14.44
GROUP 2.....................$ 25.81 14.44
GROUP 3.....................$ 22.17 14.44
GROUP 4.....................$ 21.68 14.44
GROUP 5.....................$ 21.47 14.44
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1 - Asphalt Paving Machine (Spreader), Autograde (C.M.I. and similar); Backfiller, Compactor with Blade, Backhoe - 360 and 180 degree Swing; Cableway; Caisson Drill (similar to Hugh Williams), Central Mix Plant; Cooling Plant; Concrete Paving Mixer, Concrete Pump (self-propelled); Cranes; Cranes (boom or mast over 101ft.$.50 per each additional 50 feet inclusive of jib), Cranes (Tower Stationary- Climbing Tower Crane); Derrick; Derrick Boat; Dozer(greater than 25,000 lbs.); Dragline; Dredge;
Dredge Hydraulic; Elevating Grader; Franki Pile Machine;
Gradall (remote control or otherwise),Grader (power-fine grade); Hllift (4 cy. and over); Hoist 2 Drums or more (in one unit); Hydraulic Boom Truck with pivotal cab (single motor-Pitman or similar), (Boom and Mast over 101 feet will be paid an additional 50 feet inclusive of jib if used;)
Kocal; Mechanic, Locomotive (std. Gauge); Metro-chip Harvester or similar; Milling Machine (Roto Mill or similar); Mix Mobile; Mix Mobile (with Self Loading Attachment), Mucking Machine (tunnel); Pile Driver Machine;
Pipe Extrusion Machine; Prespliter Drill (self contained);
Refrigeration Plant (soil Stablization) Rough Terrain Crane (25 ton over) (Boom and Mast over 101 feet will be paid an additional 50 feet inclusive of jib if used); Rough Terrain Crane (under 25 ton), Scrapers; Shovel-Power; Slip form Paver (C.M.I. and similar); Trenching Machine (30,000 lbs.
and over), Trenching Machine (under 30,000 lb.), Tunnell Machine (Mark XXI Jarva or similar), Vermeer Saw, Whirley, Mechanic, Pipe bursting machine, Slip Lining machine
GROUP 2: Asphalt plant operator; auger (tractor mtd.); auger (truck mtd.); belt loader (euclid or similar); boring machine; cable placer or layer; compactor with blade, concrete batch plant (electronically synchronized);
concrete belt placer (C.M.I. and similar); concrete finishing machine and spreader, concrete mixer (over 1 cy.)
concrete pump (stationary); core drill (truck or skid mtd.
- similar to penn drill), dozer (25,000 lbs or less); Ditch Witch Saw, force feedloader; fork lift (lull or similar);
grader - power; grease unit opertor (head); guard rail post driver (truck mounted) guard rail post driver (skid type);
hilift (under 4 cy.); skid steer loader; hydraulic boom truck (non-pivotal cab); job work boat (powered), jumbo operator; locomotive (narrow guage); minor equipment operator (accumulative four units); mucking machine;
multi-head saw (groover); overhead crane; roller -power-asphalt; ross carrier; side boom or tractor mounted boom;
shuttle buggy (asphalt), stone crusher (screening-washing plants); stone spreader (self propelled) truck mounted drill (davey or similar); welder and repairman; well point pump operator.
GROUP 3: Broom Finisher (C.M.I. or similar);
Compactors/Rollers (static or vibratory (Self-propelled) on dirt or stone; Curb Builder; Minor Equipment Opertor (two or three units); Multi-head Tie Tamper; Pavement Breaker (self-propelled or ridden); Soil Stablizer Machine; Tire Repairman; Tractor (snaking and hauling); Well Driller and Horizontal: Winch or "A" Frame Truck (when hoisting and lowering).
GROUP 4: Ballast Regulator; Compressor; Concrete Mixer (1
cy. & under with skip); Concrete Saw (Ridden or selp-propelled); Conveyor; Elevator (Material hauling only); Fork-lift (Ridden or self-propelled); Form Line Machine; Generator; Groute Pump; Heater (Machinical); Hoist (single Drum); Ladavator, Light Plant; Mulching Machine;
Personnel Boat (Powered), Pulverizer, Pumps, Seeding Machine, spray Cure Machine (powered Driven); Subgrader;
Tie Puller; Tugger; Welding Machine (Gas or Diesel).
GROUP 5: Deck Hand; Farm Tractor; Fireman on Boiler; Oiler;
Power Broom; Side Delivery Shoulder Spreader (attachment).
IRON0003-001 06/01/2009
ALLEGHENY, FAYETTE, WESTMORELAND, CAMBRIA, INDIANA, ARMSTRONG,
BUTLER, BEAVER, CLARION, AND WASHINGTON COUNTIES
IRONWORKER.......................$ 29.43 21.25
IRON0207-002 06/01/2009
LAWRENCE, MERCER, AND VENANGO COUNTIES
Rates Fringes
IRONWORKER.......................$ 26.66 16.83
IRON0348-002 06/01/2009
CRAWFORD, ERIE, FOREST, AND WARREN COUNTIES
Rates Fringes
IRONWORKER.......................$ 25.33 20.17
IRON0404-008 07/01/2009
FRANKLIN (Remainder), HUNTINGDON (Remainder), AND MIFFLIN
COUNTIES
IRONWORKER, STRUCTURAL...........$ 27.07 21.85
IRON0549-002 12/01/2008
GREENE COUNTY
IRONWORKER.......................$ 28.75 10%+15.69
IRON0568-004 05/01/2009
BEDFORD, FRANKLIN (Southwest 1/3), FULTON, HUNTINGDON (Western
2/3), AND SOMERSET COUNTIES
Ironworkers:
Sheeter, Bucker-Up..........$ 26.33 12.88 Structural, Ornamental, Reinforcing, Machinery Mover, Rigger & Machinery Erector, Welder, Fence Erector.....................$ 26.08 12.88
IRON0772-001 06/01/2009
BLAIR, CAMERON, CENTRE, CLEARFIELD, CLINTON, ELK, JEFFERSON,
MCKEAN AND POTTER COUNTIES
IRONWORKER.......................$ 24.73 19.94+A
A. HOLIDAYS
The following holidays shall be observed: New Years Day, Goodfriday, Memorial Day, Fourth of July, Labor Day, Veterans Day (Observed the day after Thanksgiving), Thanksgiving Day, Christmas Day.
Any holiday which occurs on Sunday shall be observed the following Monday.
LABO1058-001 01/01/2009
Rates Fringes
LABORER (BEDFORD, CAMERON,
CENTRE, CLINTON, CRAWFORD,
FOREST, FRANKLIN, FULTON,
HUNTINGDON, JEFFERSON,
MIFFLIN, AND POTTER COUNTIES)
GROUP 1.....................$ 23.20 12.65
GROUP 2.....................$ 23.36 12.65
GROUP 3.....................$ 23.85 12.65
GROUP 4.....................$ 24.30 12.65
GROUP 5.....................$ 24.71 12.65
GROUP 6.....................$ 21.55 12.65
GROUP 7.....................$ 24.20 12.65
GROUP 8.....................$ 25.70 12.65
Laborers: (ALLEGHENY, ARMSTRONG, BEAVER, BLAIR, BUTLER, CAMBRIA, CLARION, CLEARFIELD, ELK, ERIE, FAYETTE, GREENE, INDIANA, LAWRENCE, MCKEAN, MERCER, SOMERSET, VENANGO, WARREN, WASHINGTON, AND WESTMORELAND
COUNTIES)
GROUP 1.....................$ 23.30 12.65
GROUP 2.....................$ 23.46 12.65
GROUP 3.....................$ 23.85 12.65
GROUP 4.....................$ 24.30 12.65
GROUP 5.....................$ 24.71 12.65
GROUP 6.....................$ 21.55 12.65
GROUP 7.....................$ 24.30 12.65
GROUP 8.....................$ 25.80 12.65
LABORERS CLASSIFICATIONS
GROUP 1: Asphalt curb sealer; Asphalt tamper; Batcherman (weigh) Blaster,Boatman, Brakeman, Change house attendant, Coffer dam, Concrete curing pitman, Puddler, Drill Runner's helper (Includes Drill Mounted on Truck, Track, or similar and Davey Drill Spots, Clean up, helps to maintain), Electric Brush and or Grinder, Fence Construction (Including Fence Machine Operator) Form stripper and Mover, Gabion (Erectors and Placers) Hydro jet blaster nozzleman;
Landscape laborer, Manually moved emulusion sprayer, Radio actuated traffic control operator Rip rap work, scaffolds and Runways, Sheeters and Shorers (includes lagging) structural concrete Top Surfacer, Walk Behind Street Sweeper, and Wood Chipper
GROUP 2: Air tool operator (all types); Asphalt, batch & concrete plant operator (manually operated) Burner, Caisson; men (open air); Carryable pumps; Chain saw operator including attachments, Cribbing, (concrete or steel); Curb machine operator (asphalt or concrete walk behind); Diamond head Core Drller, Drill runner's helper (tunnel) Fork Lift, (walk behind), Form Setter (Road Forms Line man) Highway Slab reinforcement placers (including joint and Basket Setters) Hydraulic pipe pusher; Liner plates (Tile or Vitrified Clay) Mechanical compacting equipment operators, Mechanical joint sealer, Dope pot and Tar Kettle, Mortar mixer (hand or machine) Muckers, Brakemen & all other Labor, (Includes installation of utility lines) Pipe Layers /Fusion /Heating Iron (Regardless of materials) Portable Single Unit Conveyor, Post Hole Auger, (2 or 4 cycle hand operated) Power wheelbarrows and buggies, Rail porter or similar; Sand blaster;Signal Man,Vibrator operator, Crown Screed Adjuster, All RAILROAD TRACK WORK TO INCLUDE THE FOLLOWING:
adzing machine, ballast Router, Bolting Machine, Power Jacks, Rail Drills, Railroad Brakeman,Rail Saws, Spike Drivers (Manually or hand held tool) Spike Pullers Tamping Machine, Thermitweld
GROUP 3: Asphalt Luteman/Raker,Blacksmith, Blaster, Brick, stone and block pavers and block cutters (wood, belgian and asphalt); Cement mortar lining car pusher; Cement mortar mixer (pipe relining); Cement mortar pipe reliners;
concrete saw operator (walk behind); Curb cutters and setters; Elevated roadway drainage construction; erector of overhead signs, Form setter (road forms-lead man); Grout machine operator; Gunite or dry pack gun (nozzle and machine man); Manhole or catch basin builder (Brick block concrete or any prefabrication) Miners and drillers (including lining, supporting and form workmen, setting of shields, miscellaneous equipment and jumbos); Multi-plate pipe (aligning and securing); Placing wire mesh on gunite projects; Wagon drill operators (air track or similar);
Walk behind ditching machine (trencher or similar)
GROUP 4: Reinforcing Steel Placer (Bending, aligning, and securing, Cadweld)
GROUP 5:High Burner, (Any burning not done from deck), Welder (Pipeline)
GROUP 6: Uniformed Flagperson, Watchman
GROUP 7: Toxic/Hazardous Waste Removal Laborer Levels C & D
GROUP 8: Toxic/Hazardous Waste Removal Laborer Levels A & B
PAIN0021-019 05/01/2009
CLINTON COUNTY
Rates Fringes
Painters:
Bridge......................$ 25.60 12.05 Brush & Roller..............$ 24.65 12.05 Spray.......................$ 25.65 12.05
PAIN0021-024 05/01/2009
FRANKLIN COUNTY
Rates Fringes
PAINTER
Brush.......................$ 22.17 8.90
PAIN0057-014 06/01/2009
ALLEGHENY, FAYETTE, GREEN, WASHINGTON COUNTIES
Rates Fringes
Painters:
Bridge......................$ 30.10 12.34 Brush & Roller..............$ 27.53 12.34 Spray.......................$ 28.06 12.34
PAIN0057-015 06/01/2009
ARMSTRONG, BEAVER, BEDFORD, BLAIR, BUTLER,CAMBRIA, CENTRE,
CLARION, CLEARFIELD, ELK, FULTON, HUNTINGTON, INDIANA,
JEFFERSON, LAWRENCE, MERCER, MIFFLIN, SOMERSET, VENANGO AND
WESTMORELAND COUNTIES
Painters:
Bridge......................$ 30.10 12.34 Brush and Roller............$ 27.53 12.34 Spray.......................$ 28.06 12.34
PAIN0057-022 05/01/2009
Rates Fringes
Painters: (ERIE, McKEAN, AND WARREN (Including Columbus and Freehold twps) COUNTIES) Bridges,Stacks,Towers.......$ 22.52 11.60 Brush and Roller............$ 20.52 11.60 Spray and Sandblasting......$ 21.27 11.60
PAIN0057-027 06/01/2009
CAMERON, CRAWFORD, POTTER, WARREN, (Excluding Columbus and Freehold twps)
PAINTER
Brush and Roller............$ 22.49 11.84
PLAS0526-002 01/01/2009
CEMENT MASON/CONCRETE FINISHER
Beaver, Cameron, Clarion, Crawford, Elk, Forest, Lawrence, McKean, Potter, Venango and Warren Counties....................$ 26.72 12.97 Bedford, Blair, Cambria, Centre, Clinton, Huntingdon, Mifflin and Somerset Counties...........$ 26.72 12.97 All Other Counties..........$ 26.72 12.97
PLUM0027-001 06/01/2009
ALLEGHENY, ARMSTRONG, GREENE (Except extreme Eastern portion), WASHINGTON (Except extreme Eastern portion) and WESTMORELAND (City of Arnold and City of New Kensington Only) COUNTIES
Plumbers and Pipefitters (Bridge Drain Pipe)..............$ 33.75 16.37
PLUM0047-005 05/01/2009
BEAVER, BUTLER, MCKEAN, MERCER, VENANGO, CLARION, LAWRENCE,
FOREST, WARREN, CRAWFORD, AND ERIE COUNTIES
(Bridge Drain Pipe)..............$ 34.18 16.90
PLUM0354-005 06/01/2009
BEDFORD, BLAIR, CAMBRIA, CAMERON, CLEARFIELD, ELK, FAYETTE,
GREENE (Extreme Eastern portion), HUNTINGDON, INDIANA, JEFFERSON, SOMERSE, WASHINGTON (Extreme Eastern portion), AND
WESTMORELAND COUNTIES
(Bridge Drain Pipe)..............$ 28.54 18.48
TEAM0040-001 01/01/2009
Rates Fringes
TRUCK DRIVER (ALLEGHENY,
ARMSTRONG, BEAVER, BLAIR,
BUTLER, CAMBRIA, CENTRE,
CLARFIELD, CRAWFORD, ERIE,
FAYETTE, GREENE, INDIANA,
JEFFERSON, LAWRENCE, MCKEAN,
MERCER, SOMERSET, VENANGO,
WARREN, WASHINGTON, AND
WESTMORELAND)
GROUP 1.....................$ 24.23 $11.44 A+B
GROUP 2.....................$ 24.38 $11.51 A+B
GROUP 3.....................$ 24.91 $11.75 A+B
Truck drivers: (BEDFORD, CAMERON, CLAIRON, CLINTON, ELK, FOREST, FRANKLIN, FULTON, HUNTINGDON, MIFFLIN, AND POTTER COUNTIES)
GROUP 1.....................$ 24.05 $11.35 A+B
GROUP 2.....................$ 24.23 $11.44 A+B
GROUP 3.....................$ 24.74 $11.69 A+B
FOOTNOTES: A. Hazardous/toxic waste material/work level A & B receive additional $2.50 per hour above classification rate
B. Hazardous/toxic waste materials/Work level C & D receive $1.00 per hour above classification
TRUCK DRIVERS CLASSIFICATIONS
GROUP 1 - Single Axle (2 axles including steering axle);
Includes partsman and warehoueman
GROUP 2 - Tandem - Tri-Axle - Semi-Tractor Trailer (combination) (3 axles or more including steering axle)
GROUP 3 - Specialty Vehicles; Heavy equipment whose capacity exceeds that for which state licenses are issued specifically refers to units in excess of eight (8) feet width (such as Euclids, Atley Wagon, Payloder, Tournawagons, and similar equipment when not self loaded);
Tar and Asphalt Distributors Trucks, Heavy Duty Trailer, such as Low Boy, High Boy
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
File details come from the government source that posted it. Updated .