Revised Section 33 40 15
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| BID RESULTS.doc | DOC document | |
| 01 22 00.00 10.pdf | ||
| 41 24 40.pdf | ||
| W911WN-09-B-0023-0001.pdf | ||
| Conformed Price Schedule.pdf | ||
| W911WN-09-B-0023-0001.zip | ZIP file | |
| Braddock Tow Haul Site Visit Attendence Register.doc | DOC document | |
| W911WN-09-B-0023.pdf | ||
| PA080004.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Braddock Locks and Dam - Tow Haulage Unit Installation
SECTION TABLE OF CONTENTS
DIVISION 33 - UTILITIES
SECTION 33 40 15
STORM-DRAINAGE SYSTEM
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 DELIVERY, STORAGE, AND HANDLING
1.3.1 Delivery and Storage
1.3.2 Handling
PART 2 PRODUCTS
2.1 PIPE FOR STORM DRAINS
2.1.1 PVC Pipe
2.1.1.1 Type PSM PVC Pipe
2.2 DRAINAGE STRUCTURES
2.2.1 Trench Drain System
2.3 MISCELLANEOUS MATERIALS
2.3.1 Joints
2.3.1.1 PVC Plastic Pipes
PART 3 EXECUTION
3.1 EXCAVATION FOR PIPE AND DRAINAGE STRUCTURES
3.1.1 Trenching
3.1.2 Removal of Unstable Material
3.2 BEDDING
3.2.1 Plastic Pipe
3.3 PLACING PIPE
3.3.1 PVC Pipe
3.4 BACKFILLING
3.4.1 Backfilling Pipe in Trenches
3.4.2 Movement of Construction Machinery
3.4.3 Compaction
3.4.3.1 General Requirements
3.4.3.2 Minimum Density
3.4.4 Determination of Density
-- End of Section Table of Contents --
SECTION 33 40 15 Page 1 W911WN-09-B-0023 Revised by Amendment 0001
SECTION 33 40 15
STORM-DRAINAGE SYSTEM
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM D 1557 (2007) Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3) (2700 kN-m/m3)
ASTM D 1784 (2008) Standard Specification for Rigid Poly(Vinyl Chloride) (PVC) Compounds and Chlorinated Poly(Vinyl Chloride) (CPVC) Compounds
ASTM D 2167 (2008) Density and Unit Weight of Soil in Place by the Rubber Balloon Method
ASTM D 2321 (2005) Standard Practice for Underground Installation of Thermoplastic Pipe for Sewers and Other Gravity-Flow Applications
ASTM D 2922 (2005) Density of Soil and Soil-Aggregate in Place by Nuclear Methods (Shallow Depth)
ASTM D 3017 (2005) Water Content of Soil and Rock in Place by Nuclear Methods (Shallow Depth)
ASTM D 3034 (2008) Standard Specification for Type PSM Poly(Vinyl Chloride) (PVC) Sewer Pipe and Fittings
PENNSYLVANIA DEPARTMENT OF TRANSPORTATION (PDT)
PDT 408 (2007) Specifications
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES
SD-03 Product Data
SECTION 33 40 15 Page 2
Placing Pipe
Printed copies of the manufacturer's recommendations for installation procedures of the material being placed, prior to installation.
SD-07 Certificates
Pipe, Joints and Fittings; G, RE Precast Trench Drain Sections and Inlets; G, RE
Certificates from the manufacturers of all pipe and pipe joint materials, before pipe is installed, stating that materials are manufactured, tested and supplied in accordance with the requirements of these specifications. Certification that the frames, covers and grates, manhole sections and inlets meet the requirements of PDT 408, as specified herein.
1.3 DELIVERY, STORAGE, AND HANDLING
1.3.1 Delivery and Storage
Materials delivered to site shall be inspected for damage, unloaded, and stored with a minimum of handling. Materials shall not be stored directly on the ground. The inside of pipes and fittings shall be kept free of dirt and debris. Before, during, and after installation, plastic pipe and fittings shall be protected from any environment that would result in damage or deterioration to the material. The Contractor shall have a copy of the manufacturer's instructions available at the construction site at all times and shall follow these instructions unless directed otherwise by the Contracting Officer. Solvents, solvent compounds, lubricants, elastomeric gaskets, and any similar materials required to install plastic pipe shall be stored in accordance with the manufacturer's recommendations and shall be discarded if the storage period exceeds the recommended shelf life. Solvents in use shall be discarded when the recommended pot life is exceeded.
1.3.2 Handling
Materials shall be handled in a manner that ensures delivery to the trench in sound, undamaged condition. Pipe shall be carried to the trench, not dragged.
PART 2 PRODUCTS
2.1 PIPE FOR STORM DRAINS
Pipe for storm drains shall be of the sizes indicated and shall conform to the requirements specified.
2.1.1 PVC Pipe
The pipe manufacturer's resin certification, indicating the cell classification of PVC used to manufacture the pipe, shall be submitted prior to installation of the pipe.
SECTION 33 40 15 Page 3
2.1.1.1 Type PSM PVC Pipe
ASTM D 3034, Type PSM, maximum SDR 35, produced from PVC certified by the compounder as meeting the requirements of ASTM D 1784, minimum cell class 12454-B.
2.2 DRAINAGE STRUCTURES
2.2.1 Trench Drain System
Trench drain shall be a precast polymer concrete trench system, as shown on the drawings, and shall be similar or equal to PolyDrain System, as manufactured by ABT Inc., 359-T Murdock Rd. P.O. Box 837, Troutman, NC 28166 (800) 438-6057, and available from AR Chambers and Son, 111 - 35th St., Pittsburgh, PA 15201, (412) 681-8955. The system shall consist of interlocking trench drain channels with built-in invert slope, heavy duty slotted grate, and precast polymer concrete catch basin, size as shown.
Installation supports, grating locking devices and end plates shall also be furnished.
2.3 MISCELLANEOUS MATERIALS
2.3.1 Joints
2.3.1.1 PVC Plastic Pipes
Joints shall be solvent cement or elastomeric gasket type in accordance with the specification for the pipe and as recommended by the pipe manufacturer.
PART 3 EXECUTION
3.1 EXCAVATION FOR PIPE AND DRAINAGE STRUCTURES
Excavation of trenches and backfilling for storm drains and appurtenant structures shall closely conform to the limits shown on the drawings, and shall be performed in accordance with the applicable portions of Section 31 00 00 EARTHWORK and the requirements specified below.
3.1.1 Trenching
The width of trenches at any point below the top of the pipe shall be not greater than the outside diameter of the pipe plus pipe outside diameter (O.D.) for pipes of less than 24 inches inside diameter and shall not exceed 36 inches plus pipe outside diameter for sizes larger than 24 inches inside diameter to permit satisfactory jointing and thorough tamping of the bedding material under and around the pipe. Sheeting and bracing, where required, shall be placed within the trench width as specified. Contractor shall not overexcavate. Where trench widths are exceeded, redesign with a resultant increase in cost of stronger pipe or special installation procedures will be necessary. Cost of this redesign and increased cost of pipe or installation shall be borne by the Contractor without additional cost to the Government.
3.1.2 Removal of Unstable Material
Where wet or otherwise unstable soil incapable of properly supporting the pipe, as determined by the Contracting Officer, is unexpectedly encountered in the bottom of a trench, such material shall be removed to the depth
SECTION 33 40 15 Page 4 required and replaced to the proper grade with select granular material, compacted as provided in paragraph BACKFILLING. When removal of unstable material is due to the fault or neglect of the Contractor in his performance of shoring and sheeting, water removal, or other specified requirements, such removal and replacement shall be performed at no additional cost to the government.
3.2 BEDDING
The bedding surface for the pipe shall provide a firm foundation of uniform density throughout the entire length of the pipe.
3.2.1 Plastic Pipe
Bedding for PVC and PE pipe shall meet the requirements of ASTM D 2321.
Bedding, haunching, and initial backfill shall be either Class IB or II material.
3.3 PLACING PIPE
Each pipe shall be thoroughly examined before being laid; defective or damaged pipe shall not be used. Plastic pipe shall be protected from exposure to direct sunlight prior to laying, if necessary to maintain adequate pipe stiffness and meet installation deflection requirements.
Pipelines shall be laid to the grades and alignment indicated. Proper facilities shall be provided for lowering sections of pipe into trenches.
Pipe shall not be laid in water, and pipe shall not be laid when trench conditions or weather are unsuitable for such work. Diversion of drainage or dewatering of trenches during construction shall be provided as necessary.
3.3.1 PVC Pipe
Laying shall proceed upgrade with spigot ends of bell-and-spigot pipe pointing in the direction of the flow.
3.4 BACKFILLING
3.4.1 Backfilling Pipe in Trenches
After the pipe has been properly bedded, selected material from excavation or borrow, at a moisture content that will facilitate compaction, shall be placed along both sides of pipe in layers not exceeding 6 inches in compacted depth. The backfill shall be brought up evenly on both sides of pipe for the full length of pipe. The fill shall be thoroughly compacted under the haunches of the pipe. Each layer shall be thoroughly compacted with mechanical tampers or rammers. This method of filling and compacting shall continue until the fill has reached an elevation of at least 12 inches above the top of the pipe. The remainder of the trench shall be backfilled and compacted by spreading and rolling or compacted by mechanical rammers or tampers in layers not exceeding 6[_____] inches.
Tests for density shall be made as necessary to ensure conformance to the compaction requirements specified below. Where it is necessary, in the opinion of the Contracting Officer, that sheeting or portions of bracing used be left in place, the contract will be adjusted accordingly.
Untreated sheeting shall not be left in place beneath structures or pavements.
SECTION 33 40 15 Page 5
3.4.2 Movement of Construction Machinery
When compacting by rolling or operating heavy equipment parallel with the pipe, displacement of or injury to the pipe shall be avoided. Movement of construction machinery over a culvert or storm drain at any stage of construction shall be at the Contractor's risk. Any damaged pipe shall be repaired or replaced.
3.4.3 Compaction
3.4.3.1 General Requirements
Cohesionless materials include gravels, gravel-sand mixtures, sands, and gravelly sands. Cohesive materials include clayey and silty gravels, gravel-silt mixtures, clayey and silty sands, sand-clay mixtures, clays, silts, and very fine sands. When results of compaction tests for moisture-density relations are recorded on graphs, cohesionless soils will show straight lines or reverse-shaped moisture-density curves, and cohesive soils will show normal moisture-density curves.
3.4.3.2 Minimum Density
Backfill over and around the pipe and backfill around and adjacent to drainage structures shall be compacted at the approved moisture content to not less than 90 percent of maximum density for cohesive material and 95 percent of maximum density for cohesionless material, up to the elevation where requirements for pavement subgrade materials and compaction shall control.
3.4.4 Determination of Density
Testing shall be the responsibility of the Contractor and performed at no additional cost to the Government. Testing shall be performed by an approved commercial testing laboratory or by the Contractor subject to approval. Tests shall be performed in sufficient number to ensure that specified density is being obtained. Laboratory tests for moisture-density relations shall be made in accordance with ASTM D 1557 except that mechanical tampers may be used provided the results are correlated with those obtained with the specified hand tamper. Field density tests shall be determined in accordance with ASTM D 2167 or ASTM D 2922. When ASTM D 2922 is used, the calibration curves shall be checked and adjusted, if necessary, using the sand cone method as described in paragraph Calibration of the referenced publications. ASTM D 2922 results in a wet unit weight of soil and when using this method ASTM D 3017 shall be used to determine the moisture content of the soil. The calibration curves furnished with the moisture gauges shall be checked along with density calibration checks as described in ASTM D 3017 or ASTM D 2922. Test results shall be furnished the Contracting Officer. The calibration checks of both the density and moisture gauges shall be made at the beginning of a job on each different type of material encountered and at intervals as directed.
3.8 PIPELINE TESTING
Lines shall be tested for leakage by low pressure air or water testing or exfiltration tests, as appropriate. Low pressure air testing for vitrified clay pipes shall conform to ASTM C 828. Low pressure air testing for concrete pipes shall conform to ASTM C 924. Low pressure air testing for plastic pipe shall conform to ASTM F 1417. Low pressure air testing
SECTION 33 40 15 Page 6 procedures for other pipe materials shall use the pressures and testing times prescribed in ASTM C 828 or ASTM C 924, after consultation with the pipe manufacturer. Testing of individual joints for leakage by low pressure air or water shall conform to ASTM C 1103. Prior to exfiltration tests, the trench shall be backfilled up to at least the lower half of the pipe. If required, sufficient additional backfill shall be placed to prevent pipe movement during testing, leaving the joints uncovered to permit inspection. Visible leaks encountered shall be corrected regardless of leakage test results. When the water table is 2 feet or more above the top of the pipe at the upper end of the pipeline section to be tested, infiltration shall be measured using a suitable weir or other device acceptable to the Contracting Officer. An exfiltration test shall be made by filling the line to be tested with water so that a head of at least 2 feet is provided above both the water table and the top of the pipe at the upper end of the pipeline to be tested. The filled line shall be allowed to stand until the pipe has reached its maximum absorption, but not less than 4 hours. After absorption, the head shall be reestablished. The amount of water required to maintain this water level during a 2-hour test period shall be measured. Leakage as measured by the exfiltration test shall not exceed [250 gallons per inch in diameter per mile of pipeline per day] [0.2 gallons per inch in diameter per 100 feet of pipeline per hour].
When leakage exceeds the maximum amount specified, satisfactory correction shall be made and retesting accomplished. Testing, correcting, and retesting shall be made at no additional cost to the Government.
-- End of Section --
SECTION 33 40 15 Page 7
| 33 40 15 - STORM-DRAINAGE SYSTEM |
| 33 40 15 - STORM-DRAINAGE SYSTEM |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 DELIVERY, STORAGE, AND HANDLING |
| 1.3.1 Delivery and Storage |
| 1.3.2 Handling |
| PART 2 PRODUCTS |
| 2.1 PIPE FOR STORM DRAINS |
| 2.1.1 PVC Pipe |
| 2.1.1.1 Type PSM PVC Pipe |
| 2.2 DRAINAGE STRUCTURES |
| 2.2.1 Trench Drain System |
| 2.3 MISCELLANEOUS MATERIALS |
| 2.3.1 Joints |
| 2.3.1.1 PVC Plastic Pipes |
| PART 3 EXECUTION |
| 3.1 EXCAVATION FOR PIPE AND DRAINAGE STRUCTURES |
| 3.1.1 Trenching |
| 3.1.2 Removal of Unstable Material |
| 3.2 BEDDING |
| 3.2.1 Plastic Pipe |
| 3.3 PLACING PIPE |
| 3.3.1 PVC Pipe |
| 3.4 BACKFILLING |
| 3.4.1 Backfilling Pipe in Trenches |
| 3.4.2 Movement of Construction Machinery |
| 3.4.3 Compaction |
| 3.4.3.1 General Requirements |
| 3.4.3.2 Minimum Density |
3.4.4 Determination of Density
3.8 PIPELINE TESTING