Conformed Price Schedule.pdf

PDF 115 KB Posted

Attached to
Braddock Tow Hauling System Federal contract opportunity
Solicitation number
W911WN09B0023
Issued by
Department of the Army Corps of Engineers Engineering District Pittsburgh

About this file

Conformed Price Schedule. Bidders are requested to use this conformed copy in preparation and submittal of bids.

View the file

Other files for this federal contract opportunity

Other files attached to Braddock Tow Hauling System, newest first.
File Type Posted
BID RESULTS.doc DOC document
41 24 40.pdf PDF
W911WN-09-B-0023-0001.pdf PDF
W911WN-09-B-0023-0001.zip ZIP file
33 40 15.pdf PDF
01 22 00.00 10.pdf PDF
Braddock Tow Haul Site Visit Attendence Register.doc DOC document
W911WN-09-B-0023.pdf PDF
PA080004.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section 00010 - Solicitation Contract Form

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

FFP

FOB: Destination

PURCHASE REQUEST NUMBER: W81ET491776306

NET AMT

0001AA 1 Lump Sum Reimbursement for Actual Performance and

FFP

Payment Bonds Premium (See Section 00800 Paragraph 52.228-4000)

0001AB 10 Set Digital Progress Images

0001AC 1 Lump Sum Removal of Miscellaneous Items and

FFP

Appurtenances

0001AD 1 Lump Sum Removal of Miscellaneous Electrical

FFP

Fixtures, Equipment and Machinery

0001AE 1 Lump Sum Removal of Existing Tow Haulage System

0001AF 835 Square

Yard

Removal of Concrete Esplanade

0001AG 180 Cubic

Unclassified Excavation

Esplanade

0001AH 25,750 Pound Steel Bars, Concrete Reinforcement

0001AJ 1,175 Pound Steel Welded Wire Fabric

FFP

Concrete Reinforcement

0001AK 2,495 Pound Dowels

0001AL 925 Linear

Foot

Drill Holes and Grout Dowels

0001AM 355 Cubic

Concrete, Land Wall Overlay

0001AN 33 Cubic

Concrete, Esplanade

0001AP 105 Cubic

Concrete, Miscellaneous

0001AQ 155 Cubic

Aggregate Base Course

0001AR 1 Lump Sum Trench Drain System

0001AS 16 Each Install Government-Furnished Check Posts

0001AT 680 Linear

Guard Fence

0001AU 1 Each Single Swing Gate

0001AV 2,175 Linear

Aluminum Rabbet Angles

0001AW 1,090 Square

Aluminum Planking

0001AX 1 Lump Sum Install Government Furnished Jib Crane

0001AY 1 Lump Sum Install Government-Furnished

FFP

Tow Haulage System

0001AZ 1 Lump Sum Tow Haulage Equipment

FFP

Manufacturer's Representative

0001BA 1 Lump Sum Electrical Work

0001BB 1 Lump Sum New Equipment Building

OPTION Awardable Option

0002AA 1 Lump Sum OPTION Reimbursement for Actual Performance and

FFP

Payment Bonds Premium (See Section 00800 Paragraph 52.228-4000)

0002AB 2 Each OPTION Equipment Shelters

TOTALS

Total, Replace Tow Hauling System at Braddock Locks and Dam, ITEMS 0001AA – 0002AB, INCLUSIVE $____________________________

Do not round off totals, in case of a variation between the unit price and the extension, the unit price will be considered to be the bid. If a modification to a bid based on unit prices is submitted, which provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment to each unit price in the bid schedule must be stated. If it is not stated, the bidder agrees that the lump sum adjustment shall be applied on a prorata basis to every unit price in the bid schedule.