Conformed Price Schedule. Bidders are requested to use this conformed copy in preparation and submittal of bids.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| BID RESULTS.doc | DOC document | |
| 41 24 40.pdf | ||
| W911WN-09-B-0023-0001.pdf | ||
| W911WN-09-B-0023-0001.zip | ZIP file | |
| 33 40 15.pdf | ||
| 01 22 00.00 10.pdf | ||
| Braddock Tow Haul Site Visit Attendence Register.doc | DOC document | |
| W911WN-09-B-0023.pdf | ||
| PA080004.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section 00010 - Solicitation Contract Form
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
FFP
FOB: Destination
PURCHASE REQUEST NUMBER: W81ET491776306
NET AMT
0001AA 1 Lump Sum Reimbursement for Actual Performance and
FFP
Payment Bonds Premium (See Section 00800 Paragraph 52.228-4000)
0001AB 10 Set Digital Progress Images
0001AC 1 Lump Sum Removal of Miscellaneous Items and
FFP
Appurtenances
0001AD 1 Lump Sum Removal of Miscellaneous Electrical
FFP
Fixtures, Equipment and Machinery
0001AE 1 Lump Sum Removal of Existing Tow Haulage System
0001AF 835 Square
Yard
Removal of Concrete Esplanade
0001AG 180 Cubic
Unclassified Excavation
Esplanade
0001AH 25,750 Pound Steel Bars, Concrete Reinforcement
0001AJ 1,175 Pound Steel Welded Wire Fabric
FFP
Concrete Reinforcement
0001AK 2,495 Pound Dowels
0001AL 925 Linear
Foot
Drill Holes and Grout Dowels
0001AM 355 Cubic
Concrete, Land Wall Overlay
0001AN 33 Cubic
Concrete, Esplanade
0001AP 105 Cubic
Concrete, Miscellaneous
0001AQ 155 Cubic
Aggregate Base Course
0001AR 1 Lump Sum Trench Drain System
0001AS 16 Each Install Government-Furnished Check Posts
0001AT 680 Linear
Guard Fence
0001AU 1 Each Single Swing Gate
0001AV 2,175 Linear
Aluminum Rabbet Angles
0001AW 1,090 Square
Aluminum Planking
0001AX 1 Lump Sum Install Government Furnished Jib Crane
0001AY 1 Lump Sum Install Government-Furnished
FFP
Tow Haulage System
0001AZ 1 Lump Sum Tow Haulage Equipment
FFP
Manufacturer's Representative
0001BA 1 Lump Sum Electrical Work
0001BB 1 Lump Sum New Equipment Building
OPTION Awardable Option
0002AA 1 Lump Sum OPTION Reimbursement for Actual Performance and
FFP
Payment Bonds Premium (See Section 00800 Paragraph 52.228-4000)
0002AB 2 Each OPTION Equipment Shelters
TOTALS
Total, Replace Tow Hauling System at Braddock Locks and Dam, ITEMS 0001AA – 0002AB, INCLUSIVE $____________________________
Do not round off totals, in case of a variation between the unit price and the extension, the unit price will be considered to be the bid. If a modification to a bid based on unit prices is submitted, which provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment to each unit price in the bid schedule must be stated. If it is not stated, the bidder agrees that the lump sum adjustment shall be applied on a prorata basis to every unit price in the bid schedule.