W911WN-09-B-0019-0003.pdf

PDF 46 KB Posted

Attached to
RECOVERY--Y--KIRWAN AND BERLIN PAVING
Solicitation number
W911WN09B0019
Issued by

About this file

Amendment 0003 to W911WN-09-B-0019

View the file

Other files

File Type Posted
BID RESULTS.pdf PDF
01 45 01.pdf PDF
01 22 00.00 10.pdf PDF
Conformed Copy of Price Schedule.pdf PDF
W911WN-09-B-0019-0002.pdf PDF
OH080002.pdf PDF
W911WN-09-B-0019-0001.pdf PDF
W911WN-09-B-0019-0001MJK.zip ZIP file
BER.zip ZIP file
01 57 23.00 10.pdf PDF
01 57 20.00 10.pdf PDF
Berlin Kirwan Site Visit Attendees.doc DOC document
OH080002.doc DOC document
W911WN-09-B-0019.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. ARMY ENGINEER DISTRICT, PITTSBURGH

ATTN CECT-LRP

W S MOORHEAD FEDERAL BUILDING

1000 LIBERTY AVENUE ROOM 2116

PITTSBURGH PA 15222-4186

W81ET491766288

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

This amendment is being issued to 1) Provide responses to additional questions received, 2) Revise the specifications as indicated on the Summary of Changes of this amendment, and 3) Revise the bid schedule, Section 00010.

The date and time specified fro receipt of offers remains unchanged at 1:00 pm on August 28, 2009.

1. CONTRACT ID CODE PAGE OF PAGES

J

FAR (48 CFR) 53.243

1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 26-Aug-2009

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911WN-09-B-0019

X 9B. DATED (SEE ITEM 11)

23-Jul-2009

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

26-Aug-2009

CODE

U.S. ARMY ENGINEER DISTRICT, PITTSBURGH

ATTN CECT-LRP

W S MOORHEAD FEDERAL BUILDING

1000 LIBERTY AVENUE ROOM 2116

PITTSBURGH PA 15222-4186

W911WN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE W911WN

FACILITY CODECODE

EMAIL:TEL:

W911WN-09-B-0019

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0003

The following specifications have been revised and are attached to this amendment.

SECTION 01 22 00.00 10 MEASUREMENT AND PAYMENT

SECTION 01 45 01 USACE QUALITY CONTROL

ADDITIONAL QUESTIONS & ANSWERS

For MJ Kirwan

Q1. Amendment #1 answered the contractor’s question (Q13) by stating that the original bid quantity of 1,710 Sy is correct. However, the contractor is not clear as to how this number is correct. DWG G-116 Plan view clearly shows the area of work for reconstructing entrance and the begin pavement overlay boundary.

In addition, a detail for the reconstruction of the entrance is also provided on the same sheet. The dimensions in the detail clearly do not equal 1,710 SY.

A1. There was a unit error. The quantity is corrected to 210 SY.

Q2. For the above Entrance Reconstruction the detail does not depict the reconstruction of the existing Wedge Curb. The existing curb is in very poor condition and partially buried and covered by soil and gravel.

Since the detail does not show this feature, is it being eliminated?

A2. The detail is correct. There will be no curb.

Q3. How is the contractor intended to place 1 ½” pavement overlay in areas where severe deep tire track ruts exist in the pavement? This condition was particularly apparent just past the existing gate entrance to the maintenance building at Kirwan Dam. However there are other small and/or less deep areas across this project where this was observed. How are wide deep cracks (2” to 3”) in the existing pavement to be addressed? There are many locations where this exists.

A3. The predesign site survey did not indicate rutting. Line Item 0004AD, Scratch Coat, Road and Parking Area, has been added to the Additional Pavement items with a quantity of 10 Tons.

Q4. Kirwan Dam field measurements do not match bidding quantities.

A4. The quantity for Item 0003AD has been corrected from 1,710 SY to 210 SY.

Q5. On the overlay only areas, there are a number of 2”- 3” cracks (grass/weeds growing in them)as well as regular cracks. This is not addressed as to how this should be corrected and paid for.

A5. Line Item 0004AD, Scratch Coat, Road and Parking Area, has been added to the Additional Pavement items with a quantity of 10 Tons.

For Berlin

Q6. How will the damaged pavement areas be addressed at the Berlin Boat Launch area since only an overlay is being bid?

A6. Edge repair may be required and addressed during construction.

Q7. The construction of the new parking lot bid item is to include all work for this item. Per the three cross section details a large amount of fill (approx. 11,500 cubic yards) will be required and the new lot will be approx. 2-3 ft higher (across the center line) than the existing adjacent roadway. This seems to be adding a significant cost to the project which seems unnecessary. Can the Gov’t confirm this raised or elevated parking lot is the intent?

A7. The parking lot was raised to eliminate the need for subsurface drainage systems. Due to high water table and the proximity of the lake. The payment item has been revised to provide payment for the aggregate base and asphalt pavement by square yard and a separate payment for compacted fill by cubic yard.

Q8. Sheet C-308-A shows the finish proposed grade for the new boat launch overflow parking lot with a fill ranging from 2’ to 5’, but sheet G-107-A does not show enough grades to accurately calculate a fill takeoff.

Do you have a fill quantity or a grading plan for us to do an accurate cut and fill takeoff?

A8. Line Item 0002AH has been added for Compacted Fill in cubic yards.

Q9. Plans do not show new grades or existing grades for new parking lot at Berlin. Without such it is impossible to calculate the excavation.

A9. Line Item 0002AH has been added for Compacted Fill in cubic yards.

Q10. Field measurements are not matching scaled drawings, therefore sq yds to bid are not correct.

A10. Bid should be prepared based on the quantities shown. Payment will be made based on the actual work performed.

Q11. Level course is variable and cannot be measured in sq yds because depth is variable, should be in cu yds or tons.

A11. The unit of measure for Item 0001AD has been changed from Square Yards to Tons.

Q12. Striping plans are vague and show very little detail as to what owner wants.

A12. The striping in the new parking lot is shown on Dwg. G-107. Striping in other areas is intended to replace the existing. Most of the striping is for standard size parking spaces. Item 0003AG for line painting and graphics at MJ Kirwan has been removed.

Q13. Spec section 01 45 01 Paragraph 3.4.3.1 states that the Project safety and health manager shall possess specialized experience in marine construction. It also later goes on to state that the qualifications should cite any previous experience with Corps of Engineer projects and specifically any projects involving diving operations. This job has no marine construction or diving so hopefully that was just left in there by mistake and we dont have to add extra expenses to cover those requirements.

A13. Specification Section 01 45 01 has been revised.

SECTION 00010 - SOLICITATION CONTRACT FORM

SUBCLIN 0001AD

The pricing detail quantity has decreased by 174.00 from 195.00 to 21.00.

The unit of issue has changed from Square Yard to Short Ton.

CLIN 0002

The CLIN extended description has changed from This Line Item is for information only and should not be priced. Pricing information should be inserted in SubCLINs (0002AA - 0002AG) only. to This Line Item is for information only and should not be priced. Pricing information should be inserted in SubCLINs (0002AA - 0002AH) only..

CLIN 0003

The CLIN extended description has changed from Michael J. Kirwan Dam. This Line Item is for information only and should not be priced. Pricing information should be inserted in SubCLINs (0003AA - 0003AG) only. to Michael J. Kirwan Dam. This Line Item is for information only and should not be priced. Pricing information should be inserted in SubCLINs (0003AA - 0003AF) only..

SUBCLIN 0003AD

The pricing detail quantity has decreased by 1,500.00 from 1,710.00 to 210.00.

SUBCLIN 0003AG

The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.

The unit of issue Lump Sum has been deleted.

CLIN 0004

The CLIN extended description has changed from Michael J. Kirwan Dam. This Line Item is for information only and should not be priced. Pricing information should be inserted in SubCLINs (0004AA - 0004AC) only. to Michael J. Kirwan Dam. This Line Item is for information only and should not be priced. Pricing information should be inserted in SubCLINs (0004AA - 0004AD) only..

SUBCLIN 0002AH is added as follows:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002AH 11,000 Cubic

Yard

Construct New Parking Lot

FFP

Compacted Fill FOB: Destination

NET AMT

SUBCLIN 0004AD is added as follows:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0004AD 10 Short Ton Scratch Coat, Road and Parking Area

FFP

FOB: Destination

NET AMT

The following have been modified:

TOTALS

Total, ARRA Funded Items - Berlin Lake, Items 0001AA-0001AH $__________________________

Total , Non-ARRA Funded Items - Berlin Lake, Items 0002AA-0002AH $________________________

Total, ARRA, Paving Roads and Parking Areas, Items 0003AA-0003AF $________________________

Total, Additional Pavement, Items 0004AA – 0004AD $_______________________

Total, Berlin Lake & M.J. Kirwan Pave Roads and Parking Area, ITEMS 0001AA – 0004AD, INCLUSIVE $____________________________

Do not round off totals, in case of a variation between the unit price and the extension, the unit price will be considered to be the bid. If a modification to a bid based on unit prices is submitted, which provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment to each unit price in the bid schedule must be stated. If it is not stated, the bidder agrees that the lump sum adjustment shall be applied on a prorata basis to every unit price in the bid schedule.

(End of Summary of Changes)