Revised Section 01 22 00.00 10

View the file

Other files

File Type Posted
BID RESULTS.pdf PDF
01 45 01.pdf PDF
Conformed Copy of Price Schedule.pdf PDF
W911WN-09-B-0019-0003.pdf PDF
W911WN-09-B-0019-0002.pdf PDF
OH080002.pdf PDF
W911WN-09-B-0019-0001.pdf PDF
W911WN-09-B-0019-0001MJK.zip ZIP file
BER.zip ZIP file
01 57 23.00 10.pdf PDF
01 57 20.00 10.pdf PDF
Berlin Kirwan Site Visit Attendees.doc DOC document
OH080002.doc DOC document
W911WN-09-B-0019.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Berlin Lake and M.J. Kirwan Lake, Pave Roads and Parking Areas

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 22 00.00 10

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1.1 LUMP SUM PAYMENT ITEMS

1.1.1 Project Sign

1.1.1.1 Payment

1.1.1.2 Unit of Measure

1.1.1.3 Payment Item

1.1.2 Remove and Reinstall Parking Bumpers

1.1.2.1 Payment

1.1.2.2 Unit of Measure

1.1.2.3 Payment Item

1.1.3 Paint Parking Lines and Graphics

1.1.3.1 Payment

1.1.3.2 Unit of Measure

1.1.3.3 Payment Item

1.2 UNIT PRICE PAYMENT ITEMS

1.2.1 Digital Progress Images

1.2.1.1 Payment

1.2.1.2 Measurement

1.2.1.3 Unit of Measure

1.2.1.4 Payment Item

1.2.2 Asphalt Concrete Overlay

1.2.2.1 Payment

1.2.2.2 Measurement

1.2.2.3 Unit of Measure

1.2.2.4 Payment Item

1.2.3 New Asphalt Concrete Pavement

1.2.3.1 Payment

1.2.3.2 Measurement

1.2.3.3 Unit of Measure

1.2.3.4 Payment Item

1.2.4 Drainage Pipes

1.2.4.1 Payment

1.2.4.2 Measurement

1.2.4.3 Unit of Measure

1.2.4.4 Payment Item

1.2.5 Slope Walls

1.2.5.1 Payment

1.2.5.2 Measurement

1.2.5.3 Unit of Measure

1.2.5.4 Payment Item

1.2.6 Furnish and Install Parking Bumpers

1.2.6.1 Payment

1.2.6.2 Measurement

1.2.6.3 Unit of Measure

1.2.6.4 Payment Item

SECTION 01 22 00.00 10 Page 1 W911WN-09-B-0019 Revised by Amendment 0003

1.2.7 Asphalt Scratch Coat

1.2.7.1 Payment

1.2.7.2 Measurement

1.2.7.3 Unit of Measure

1.2.7.4 Payment Item

1.2.8 Compacted Fill

1.2.8.1 Payment

1.2.8.2 Measurement

1.2.8.3 Unit of Measure:

1.2.8.4 Payment Items

PART 2 PRODUCTS (Not Applicable)

PART 3 EXECUTION (Not Applicable)

-- End of Section Table of Contents --

SECTION 01 22 00.00 10 Page 2

SECTION 01 22 00.00 10

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1.1 LUMP SUM PAYMENT ITEMS

Payment items for the work of this contract for which contract lump sum payments will be made are listed in the BIDDING SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular lump sum or unit price payment item, shall be included in the listed lump sum item most closely associated with the work involved. The lump sum price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required.

1.1.1 Project Sign

1.1.1.1 Payment

Payment will be made for costs associated with furnishing, installing, maintaining and removing project sign as specified in Section 01 50 10

PROJECT SIGNS.

1.1.1.2 Unit of Measure

Unit of measure: lump sum.

1.1.1.3 Payment Item

0001AB ARRA - PROJECT SIGN

0003AB ARRA - PROJECT SIGN

1.1.2 Remove and Reinstall Parking Bumpers

1.1.2.1 Payment

This work is specified in Sections 32 30 00 INCIDENTAL CONSTRUCTION. This price shall constitute full compensation for all costs in connection with completing the work as shown on the drawings and as specified.

1.1.2.2 Unit of Measure

Unit of Measure: Lump Sum.

1.1.2.3 Payment Item

0001AG ARRA - REMOVE AND REINSTALL PARKING BUMPERS

0003AF ARRA - REMOVE AND REINSTALL PARKING BUMPERS AND CONCRETE BLOCKS

SECTION 01 22 00.00 10 Page 3

1.1.3 Paint Parking Lines and Graphics

1.1.3.1 Payment

This work is specified in Sections 32 17 24.00 10 PAVEMENT MARKINGS. This price shall constitute full compensation for all costs in connection with completing the work as shown on the drawings and as specified.

1.1.3.2 Unit of Measure

Unit of Measure: Lump Sum.

1.1.3.3 Payment Item

0001AH ARRA - PAINT PARKING LINES AND GRAPHICS

0002AG PAINT PARKING LINES AND GRAPHICS

0003AG ARRA - PAINT PARKING LINES AND GRAPHICS

1.2 UNIT PRICE PAYMENT ITEMS

Payment items for the work of this contract on which the contract progress payments will be based are listed in the PRICE SCHEDULE and described below. The unit price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing all work required for each of the unit price items.

1.2.1 Digital Progress Images

1.2.1.1 Payment

This work is specified in Section 01 32 33 DIGITAL PROGRESS IMAGES.

Payment for this item shall constitute full compensation for all labor, equipment, material and supply costs for furnishing monthly digital progress images as specified.

1.2.1.2 Measurement

Measurement will be made of the number of sets of photographs taken and delivered to the Contracting Officer as approved or directed by the Contracting Officer or his authorized representative. Each set shall consist of all specified hardcopies and electronic copies for each photographic session as specified.

1.2.1.3 Unit of Measure

Unit of measure: Set.

1.2.1.4 Payment Item

0001AC ARRA - DIGITAL PROGRESS IMAGES

0003AC ARRA - DIGITAL PROGRESS IMAGES

1.2.2 Asphalt Concrete Overlay

1.2.2.1 Payment

This work is specified in Section 32 22 16 ASPHALT CONCRETE PAVEMENT CONSTRUCTION. Payments for constructing pavement overlay of existing

SECTION 01 22 00.00 10 Page 4 pavement shall constitute full compensation for furnishing all materials, equipment, plant, and tools; field and laboratory testing; and for labor and other incidentals necessary to complete the work required as specified, including joint treatment at the interfaces of new pavement with existing pavement.

1.2.2.2 Measurement

Measurement for overlay and parking lot construction will be the amount of square yards of surface constructed and accepted.

1.2.2.3 Unit of Measure

Unit of Measure: Square Yard.

1.2.2.4 Payment Item

0001AD ARRA - SCRATCH COAT, BOAT LAUNCH PARKING LOT AND ACCESS ROAD

0001AE ARRA - PAVE BOAT LAUNCH PARKING LOT AND ACCESS ROADS

0001AF ARRA - PAVE DAY USE PARKING LOT AND ACCESS ROADS

0003AE ARRA - PAVE ACCESS AND DAM ROADS

0004AB PAVE MAINTENANCE ROAD AND PARKING AREA

1.2.3 New Asphalt Concrete Pavement

1.2.3.1 Payment

This work is specified in Section 32 22 16 ASPHALT CONCRETE PAVEMENT CONSTRUCTION. Payments for reconstructing existing pavement at Michael J.

Kirwan Dam and constructing the new parking area at Berlin Lake shall constitute full compensation for furnishing all materials, equipment, plant, and tools; field and laboratory testing; and for labor and other incidentals necessary to complete the work required as specified, including excavation, furnishing and placing geotextile, construction of aggregate base course, construction of asphalt concrete pavement, and joint treatment at the interfaces of new pavement with existing pavement, as applicable.

1.2.3.2 Measurement

Measurement for overlay and parking lot construction will be the amount of square yards of surface constructed and accepted.

1.2.3.3 Unit of Measure

Unit of Measure: Square Yard.

1.2.3.4 Payment Item

0002AB CONSTRUCT NEW PARKING LOT, ASPHALT CONCRETE PAVEMENT AND

AGGREGATE BASE COURSE

0003AD ARRA - ENTRANCE RECONSTRUCTION

0004AC RECONSTRUCT MAINTENANCE YARD AREA

1.2.4 Drainage Pipes

1.2.4.1 Payment

This work is specified in Section 33 40 00 STORM DRAINAGE UTILITIES.

Payments for construction of culverts and underdrains shall constitute full

SECTION 01 22 00.00 10 Page 5 compensation for furnishing all materials, equipment, plant, and tools;

field and laboratory testing; and for labor and other incidentals necessary to complete the work required as specified. Payment for slopewalls will be made separately.

1.2.4.2 Measurement

Measurement for drainage pipes will be made along the centerline of the pipe.

1.2.4.3 Unit of Measure

Unit of Measure: Linear Feet.

1.2.4.4 Payment Item

0002AC CULVERT, 27-INCH HDPE

0002AD PIPE UNDERDRAIN

1.2.5 Slope Walls

1.2.5.1 Payment

This work is specified in Section 33 40 00 STORM DRAINAGE UTILITIES.

Payments for construction of culverts slopewalls shall constitute full compensation for furnishing all materials, equipment, plant, and tools;

field and laboratory testing; and for labor and other incidentals necessary to complete the work required as specified. Payment for slopewalls will be made separately.

1.2.5.2 Measurement

Measurement for slopewalls will be by the number of slopewalls constructed as shown on the drawings and as specified.

1.2.5.3 Unit of Measure

Unit of Measure: Each.

1.2.5.4 Payment Item

0002AE SLOPEWALLS

1.2.6 Furnish and Install Parking Bumpers

1.2.6.1 Payment

This work is specified in Section 32 30 00 INCIDENTAL CONSTRUCTION.

Payments for construction of culverts slopewalls shall constitute full compensation for furnishing all materials, equipment, plant, and tools;

field and laboratory testing; and for labor and other incidentals necessary to complete the work required as specified. Payment for slopewalls will be made separately.

1.2.6.2 Measurement

Measurement for slopewalls will be by the number of new parking bumpers furnished and installed as shown on the drawings and as specified.

SECTION 01 22 00.00 10 Page 6

1.2.6.3 Unit of Measure

Unit of Measure: Each.

1.2.6.4 Payment Item

0002AF FURNISH AND INSTALL PARKING BUMPERS

1.2.7 Asphalt Scratch Coat

1.2.7.1 Payment

This work is specified in Section 32 22 16 ASPHALT CONCRETE PAVEMENT CONSTRUCTION. Payments for scratch coat shall constitute full compensation for furnishing all materials, equipment, plant, and tools; field and laboratory testing; and for labor and other incidentals necessary to complete the work required as specified.

1.2.7.2 Measurement

Asphalt concrete for scratch coat will be tons of material used to level existing pavement as approved by the Contracting Officer. Asphalt concrete shall be weighed after mixing and weigh slips shall be presented to the Contracting Officer's representative at the time of delivery.

1.2.7.3 Unit of Measure

Unit of Measure: Tons

1.2.7.4 Payment Item

0001AD ARRA - SCRATCH COAT, BOAT LAUNCH PARKING LOT AND ACCESS ROAD

0004AD SCRATCH COAT, ROAD AND PARKING AREA

1.2.8 Compacted Fill

1.2.8.1 Payment

Payment will constitute full compensation for all labor, equipment, tools, supplies, and incidentals necessary to complete the work. Compacted fill will be paid for at the contract unit price per cubic yard for unclassified borrow fill obtained from off-site sources, which price shall include all costs of obtaining, placing, and compacting the fill material.

1.2.8.2 Measurement

The unit of measurement for excavation and compacted fill will be the cubic yard, computed by the average end area method from cross sections taken before and after the excavation and and fill or borrow operations, including the excavation for ditches and gutters, when the material is acceptably utilized or disposed of as herein specified. The measurements will include authorized excavation of unsatisfactory subgrade soil, and the volume of loose, scattered rocks and boulders collected within the limits of the work; allowance will be made on the same basis for selected backfill ordered as replacement. The measurement will not include the volume of subgrade material or other material that is scarified or plowed and reused in-place, and will not include the volume excavated without authorization or the volume of any material used for purposes other than directed. The volume of overburden stripped from borrow pits and the volume of excavation

SECTION 01 22 00.00 10 Page 7 for ditches to drain borrow pits, unless used as borrow material, will not be measured for payment. The measurement will not include the volume of any excavation performed prior to the taking of elevations and measurements of the undisturbed grade.

1.2.8.3 Unit of Measure:

Unit of Measure: Cubic Yard

1.2.8.4 Payment Items

0002AH CONSTRUCT NEW PARKING LOT, COMPACTED FILL

PART 2 PRODUCTS (Not Applicable)

PART 3 EXECUTION (Not Applicable)

-- End of Section --

SECTION 01 22 00.00 10 Page 8

01 22 00.00 10 - MEASUREMENT AND PAYMENT
01 22 00.00 10 - MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 LUMP SUM PAYMENT ITEMS
1.1.1 Project Sign
1.1.1.1 Payment
1.1.1.2 Unit of Measure
1.1.1.3 Payment Item
1.1.2 Remove and Reinstall Parking Bumpers
1.1.2.1 Payment
1.1.2.2 Unit of Measure
1.1.2.3 Payment Item
1.1.3 Paint Parking Lines and Graphics
1.1.3.1 Payment
1.1.3.2 Unit of Measure
1.1.3.3 Payment Item
1.2 UNIT PRICE PAYMENT ITEMS
1.2.1 Digital Progress Images
1.2.1.1 Payment
1.2.1.2 Measurement
1.2.1.3 Unit of Measure
1.2.1.4 Payment Item
1.2.2 Asphalt Concrete Overlay
1.2.2.1 Payment
1.2.2.2 Measurement
1.2.2.3 Unit of Measure
1.2.2.4 Payment Item
1.2.3 New Asphalt Concrete Pavement
1.2.3.1 Payment
1.2.3.2 Measurement
1.2.3.3 Unit of Measure
1.2.3.4 Payment Item
1.2.4 Drainage Pipes
1.2.4.1 Payment
1.2.4.2 Measurement
1.2.4.3 Unit of Measure
1.2.4.4 Payment Item
1.2.5 Slope Walls
1.2.5.1 Payment
1.2.5.2 Measurement
1.2.5.3 Unit of Measure
1.2.5.4 Payment Item
1.2.6 Furnish and Install Parking Bumpers
1.2.6.1 Payment
1.2.6.2 Measurement
1.2.6.3 Unit of Measure
1.2.6.4 Payment Item
1.2.7 Asphalt Scratch Coat
1.2.7.1 Payment
1.2.7.2 Measurement
1.2.7.3 Unit of Measure
1.2.7.4 Payment Item
1.2.8 Compacted Fill
1.2.8.1 Payment
1.2.8.2 Measurement
1.2.8.3 Unit of Measure:
1.2.8.4 Payment Items
PART 2 PRODUCTS Not Applicable